Detachable tumbling barrel assembly for concrete pouring

By designing a detachable string cylinder assembly, the fixed connection and limit steel bars of the tapered closure and the connecting base are solved, and the problems of unstable swing and thread disassembly caused by chain connection are achieved, and safety is achieved during concrete pouring and efficiency improvement.

CN222084042UActive Publication Date: 2024-11-29CCCC FIRST HIGHWAY XIAMEN ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421069831.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-16
Publication Date
2024-11-29
Estimated Expiration
2034-05-16

AI Technical Summary

Technical Problem

In existing concrete pouring, the chain-connected barrels are prone to unstable movement at high places, which affects efficiency and is unsafe. The threaded connection of the upper and lower barrels is time-consuming and labor-intensive, resulting in frequent concrete separation.

Method used

A detachable string cylinder assembly is designed to achieve head-to-end fixed connection through a tapered closure and a connecting base, and a screw and nut lock are used to ensure stable and flexible adjustment of the structure with limiting steel bars.

Benefits of technology

It improves the stability of the cartridge, ensures the safety of staff, simplifies the construction process, saves time and costs, and reduces the occurrence of concrete separation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222084042U_ABST
    Figure CN222084042U_ABST
Patent Text Reader

Abstract

The detachable tumbling barrel assembly comprises a plurality of tumbling barrels which are fixedly connected end to end, the bottom end of each tumbling barrel is provided with a conical closing opening capable of being inserted into the top end of the next tumbling barrel, the upper end and the lower end of each tumbling barrel are each provided with a connecting base in the circumferential direction, and each connecting base is provided with an installation through hole. The two ends of the connecting screw respectively penetrate through the mounting through holes of the corresponding upper and lower adjacent connecting bases and then are locked through nuts, the conical closing opening of the previous section of tumbling barrel is inserted into the top end of the next section of adjacent tumbling barrel, preliminary positioning and preliminary fixing are achieved, and then reinforced connection is conducted through the connecting bolts. The tumbling barrel connecting device has the advantages that the safety of workers is improved, the work task load is effectively saved, time and labor are saved, the process flow is effectively saved, the construction period is shortened, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of concrete pouring, and in particular relates to a detachable string barrel assembly for concrete pouring. Background Art

[0002] Since segregation will occur when the free fall height of concrete exceeds 2 meters, concrete for pile foundations or piers over 2 meters must be transported using conduits, string barrels, or chutes. The existing string barrel connection method for pouring concrete for piers and pile foundations usually uses a chain to connect the upper and lower adjacent string barrels. However, since the pier or pile foundation concrete is poured relatively deep, multiple string barrels are required for connection. Therefore, during the pouring process, the flexible connection method of multiple string barrels is easily affected by the impact force of the concrete being driven in, causing violent swinging, which not only affects the pouring efficiency, but also prevents workers from staying at the bottom to perform auxiliary operations for safety reasons. At the same time, the driven concrete is likely to escape from the gaps between the sections, causing some concrete to still segregate. Summary of the Invention

[0003] The utility model aims to provide a detachable string barrel assembly for concrete pouring, which has strong stability, safe personnel-assisted construction, convenient disassembly, and saves time and effort. It solves the problems of severe swinging and poor stability of the barrel body caused by connecting the upper and lower adjacent string barrels with chains, and the time-consuming and labor-intensive disassembly of the sleeve caused by the threaded connection of the upper and lower string barrels.

[0004] To this end, the technical solution adopted by the present invention is: a detachable string tube assembly for concrete pouring, comprising several sections of string tubes fixedly connected at the head and tail, the bottom end of the string tube is provided with a conical closing end that can be inserted into the top end of the next section of the string tube, the upper and lower ends of the string tube are both circumferentially provided with connecting bases, the connecting bases are provided with mounting through holes, and are equipped with vertical connecting screws, the two ends of the connecting screws respectively pass through the mounting through holes corresponding to the upper and lower adjacent connecting bases and are locked by nuts, thereby fixing the upper and lower adjacent string tubes.

[0005] As a preferred embodiment of the above scheme, the string tube is circumferentially provided with no less than two connecting bases, which are fixed to the upper and lower ends of the string tube by welding, and are firmly connected. The use of two or more connecting bases can ensure the stability of the installation and the overall structural stability of several sections of the string tube.

[0006] It is further preferred that the connection bases located at the upper and lower ends of the string tube are respectively 100mm to 200mm away from the top surface of the string tube and the tapered end at the corresponding end, which is a reasonable size to ensure the stability of the installation of the connecting screw.

[0007] More preferably, the length of each section of the string tube is 1m to 3m. According to the required casting depth, a string tube of appropriate length is selected, which has a wide range of applications.

[0008] It is further preferred that the inward inclination angle of the outer wall at the tapered end is 10° to 30°, which is reasonable and ensures that the initial positioning of the upper and lower adjacent string tubes is stable when they are connected.

[0009] More preferably, the connecting base as a whole adopts a plate-like structure with a thickness of 5 mm to 30 mm, which is a reasonable size to ensure stable installation of the connecting screw.

[0010] The top of the string tube at the top and the bottom are further preferably equipped with two parallel limiting steel bars that pass through the two sides of the corresponding string tube and are connected to the bottom of the base. The two ends of the limiting steel bars equipped with the string tube at the top extend outward and rest on the edge of the pile foundation or pier column mouth to achieve the top limit of the detachable string tube assembly. The staff can adjust the pouring mouth position of the top of the string tube by directly adjusting the position of the limiting steel bars. The operation is flexible. The two ends of the limiting steel bars equipped with the string tube at the bottom extend into the pile foundation or pier column steel bar cage to achieve the bottom limit of the detachable string tube assembly, thereby limiting the upper and lower positions of the detachable string tube assembly. Since the detachable string tube assembly is too long, the bottom also needs to be limited. The design is reasonable, which can not only prevent the overall barrel of the detachable string tube assembly from tilting when lowered, affecting the subsequent concrete pouring effect, but also avoid the shaking of the bottom due to the excessively long detachable string tube assembly during the pouring process, and has strong operational flexibility.

[0011] Beneficial effects of the utility model:

[0012] (1) Compared with the method of connecting the upper and lower adjacent string barrels by chains, which causes the barrel body to swing severely and has poor stability, this scheme uses the conical end of the upper string barrel to insert into the top of the next adjacent string barrel to achieve preliminary positioning and preliminary fixation, and then reinforce the connection through connecting bolts, so as to achieve a fixed connection between the head and tail of several string barrels. The string barrel connection is stable and will not swing due to concrete pouring. Therefore, the staff below can always perform auxiliary work at the bottom as the pouring surface rises. There is no need to go down and disassemble the bottom string barrel after each pouring, which ensures the construction safety of the staff, effectively saves the workload, and saves time and effort.

[0013] (2) Compared with the threaded connection of the upper and lower string barrels, which makes the sleeve disassembly time-consuming and labor-intensive, this solution uses connecting bolts that pass through the installation holes of the corresponding upper and lower adjacent connection bases and are then locked by nuts. This ensures a stable connection while also facilitating subsequent disassembly and assembly. The staff only needs to remove the lowest section of the string barrel at the bottom, and then use a lifting rope to tie the top of the string barrel and lift it out. The installation holes are used as lifting ears to ensure safety during lifting, effectively avoiding the need to use lifting equipment to lift the entire string barrel out, effectively saving process flow, shortening the construction period, and reducing construction costs.

[0014] To sum up, it has the advantages of improving the safety of workers, effectively reducing the workload, saving time and effort, effectively saving process flow, shortening the construction period, and reducing construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the structure of two sections of fixedly connected string tubes at the ends. DETAILED DESCRIPTION

[0016] The present invention will be further described below with reference to the following embodiments and accompanying drawings:

[0017] like Figure 1 As shown, a detachable string tube assembly for concrete pouring is composed of several sections of string tubes 1 fixedly connected at the end.

[0018] The length of each string tube 1 is preferably 1m to 3m.

[0019] The bottom end of the string tube 1 is provided with a tapered closing opening 11 into which the top end of the next string tube 1 can be inserted.

[0020] The inward inclination angle of the outer wall at the tapered opening 11 is preferably 10° to 30°.

[0021] A connection base 12 is provided in a circular manner at the upper and lower ends of the string tube 1.

[0022] The connection base 12 has a plate-like structure as a whole, and the thickness is preferably 5 mm to 30 mm.

[0023] The string tube 1 is provided with no less than two connection bases 12 in a circumferential direction, and the connection bases 12 are fixed to the upper and lower ends of the string tube 1 by welding.

[0024] The connection base 12 is provided with a mounting through hole and is equipped with a vertical connection screw 13 .

[0025] The distances between the connection base 12 located at the upper and lower ends of the string tube 1 and the top surface of the string tube 1 at the corresponding end and the tapered closing end 11 are preferably 100mm to 200mm.

[0026] The two ends of the connecting screw 13 pass through the corresponding mounting holes of the upper and lower adjacent connecting bases 12 and are then locked by nuts, thereby fixing the upper and lower adjacent string tubes 1.

[0027] The top of the string tube 1 located at the top and the bottom are equipped with two parallel limiting steel bars that pass through the corresponding string tubes 1 on both sides and are connected directly below the base 12. The two ends of the limiting steel bars equipped with the top string tube 1 extend outward and rest on the edge of the pile foundation or pier column to achieve the top limitation of the detachable string tube assembly. The two ends of the limiting steel bars equipped with the bottom string tube 1 extend into the pile foundation or pier column steel bar cage to achieve the bottom limitation of the detachable string tube assembly.

[0028] First, select a string tube of appropriate length according to the grouting depth of the pile foundation for docking installation. Insert the tapered end of the previous string tube into the top of the next adjacent string tube to achieve preliminary positioning and preliminary fixation. Then, reinforce the connection with connecting bolts to achieve a fixed connection between the ends of several string tubes.

[0029] Then the staff first lowered the assembled detachable string tube assembly into the pier pile foundation, and used tools such as ladders to move to the connection between the two lowest string tube sections.

[0030] When it is necessary to remove the bottom section of the string tube, the entire string tube needs to be moved to the side to make room for operation, then the connecting screws are removed, manually tied to the installation through-hole with a lifting rope, and then lifted with the help of a lifting device. There is no need to move all the grouting equipment above to make room for the entire set of string tubes to be lifted.

Claims

1. A detachable string tube assembly for concrete pouring, characterized in that: The invention comprises a plurality of string tubes (1) which are fixedly connected end to end. The bottom end of the string tube (1) is provided with a conical closing opening (11) which can be inserted into the top end of the next string tube (1). The upper and lower ends of the string tube (1) are both circumferentially provided with connecting bases (12). The connecting bases (12) are provided with mounting through holes and are equipped with vertical connecting screws (13). The two ends of the connecting screws (13) respectively pass through the mounting through holes of the corresponding upper and lower adjacent connecting bases (12) and are then locked by nuts, thereby fixing the upper and lower adjacent string tubes (1).

2. A detachable string tube assembly for concrete pouring according to claim 1, characterized in that: The string tube (1) is provided with no less than two connection bases (12) in a circumferential direction, and the connection bases (12) are fixed to the upper and lower ends of the string tube (1) by welding.

3. A detachable string tube assembly for concrete pouring according to claim 1, characterized in that: The distances between the connection bases (12) located at the upper and lower ends of the string tube (1) and the top surface of the string tube (1) and the conical closing opening (11) at the corresponding ends are both 100 mm to 200 mm.

4. A detachable string tube assembly for concrete pouring according to claim 1, characterized in that: The length of each section of the string tube (1) is 1m to 3m.

5. The detachable string tube assembly for concrete pouring according to claim 1, characterized in that: The inward inclination angle of the outer wall at the tapered closing end (11) is 10° to 30°.

6. A detachable string tube assembly for concrete pouring according to claim 1, characterized in that: The connection base (12) has an overall plate-like structure and a thickness of 5 mm to 30 mm.

7. A detachable string tube assembly for concrete pouring according to claim 1, characterized in that: The top of the string tube (1) located at the top and the bottom are each equipped with two parallel limiting steel bars that pass through the corresponding string tube (1) on both sides and are connected to the bottom of the base (12). The two ends of the limiting steel bars equipped with the string tube (1) located at the top extend outward and rest on the edge of the pile foundation or the pier column to achieve the top limit of the detachable string tube assembly. The two ends of the limiting steel bars equipped with the string tube (1) located at the bottom extend into the pile foundation or the pier column steel bar cage to achieve the bottom limit of the detachable string tube assembly.