Construction device for tunnel portal

By burying three-axis mixing piles and three-axis rotary spray piles near the tunnel door and setting up an inflatable annular airbags in the ring frame, the problem of geological instability caused by the steel pipes being pushed into is solved, and a better reinforcement effect is achieved and construction stability.

CN222084507UActive Publication Date: 2024-11-29NO 1 ENG LIMITED OF CR20G +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420006428.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-02
Publication Date
2024-11-29
Estimated Expiration
2034-01-02

AI Technical Summary

Technical Problem

When the existing tunnel door construction device is pushed into the geological body, it is easy to cause the surrounding strata to become instable. The existing reinforcement effect is poor, and there is a risk of geological body instability.

Method used

A reinforcement component including a three-axis mixing pile pile row and a three-axis rotary spray pile row is designed. Combined with an annular frame and an annular airbag, the three-axis stirring pile row and three-axis rotary spray pile are embedded at the tunnel door. The pile row is reinforced, and an annular airbag is installed in the ring frame to inflate and expand to close the sliding gap between the steel pipe and the ring frame to prevent water from seeping in.

Benefits of technology

It effectively prevents disturbances to the surrounding geological bodies when the steel pipe is pushed in, improves the reinforcement effect of the geological bodies around the tunnel door, reduces the risk of geological bodies instability, and enhances the construction stability of the tunnel door.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222084507U_ABST
    Figure CN222084507U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction device of a tunnel portal, which relates to the field of tunnel engineering and comprises a reinforcing component, a steel pipe group, an annular frame group and an annular air bag. Wherein the reinforcing assembly is arranged at a tunnel way of the tunnel and is close to a tunnel portal; the steel pipe set comprises a plurality of steel pipes, and the steel pipes penetrate through the three-axis stirring pile rows and the three-axis jet grouting pile rows in the extending direction of the tunnel and are supported by the three-axis stirring pile rows and the three-axis jet grouting pile rows. The ring frame group comprises a plurality of ring frames which are independently arranged, the plurality of ring frames are pre-buried in a geologic body corresponding to the tunnel portal in the circumferential direction of the tunnel portal, the ring frames are arranged outside the corresponding steel pipes in a sleeving manner, and ring-shaped mounting grooves distributed in the circumferential direction of the ring frames are formed in the inner walls of the ring frames; and the annular air bag is arranged in the annular mounting groove. The technical problems that in the prior art, a tunnel portal construction device is poor in reinforcing effect, and when a steel pipe is jacked into a stratum, the steel pipe still disturbs a surrounding geologic body, so that the surrounding stratum is unstable are solved, and the reinforcing effect on the surrounding geologic body is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel engineering construction, in particular to a construction device for a tunnel portal. Background Art

[0002] As my country gradually develops, tunnels are widely used in my country's transportation field, and the construction standards of tunnels are gradually improved. Therefore, the pipe curtain method is adopted for construction.

[0003] The pipe curtain method is to push multiple steel pipes into the geological body to be constructed. Multiple steel pipes are enclosed to form a pipe curtain as a supporting skeleton for tunnel construction, which reinforces the geological body to be constructed, maintains the overall structural stability of the face, controls and reduces the deformation of the strata, and prevents the strata around the tunnel from being disturbed by tunnel construction, resulting in the overall instability of the tunnel structure, causing casualties, economic losses and other accidents. However, the existing pipe curtain method often causes disturbances to the surrounding geological bodies when the steel pipes are pushed into the geological body, causing the surrounding strata to become unstable. Therefore, it is necessary to reinforce the geological body to be constructed by the pipe curtain, but the reinforcement effect of the existing tunnel portal construction device is not good, and the geological body to be constructed is still at risk of instability.

[0004] Therefore, how to provide a tunnel portal construction device that solves the above-mentioned technical problems is a technical problem that technical personnel in this field urgently need to solve. Utility Model Content

[0005] The main purpose of the utility model is to provide a construction device for a tunnel portal, which aims to solve the technical problem that when a steel pipe is pushed into a geological body, the steel pipe will disturb the surrounding geological body, causing the surrounding strata to become unstable. Therefore, it is necessary to reinforce the geological body to be constructed with the pipe curtain, but the existing construction device for the tunnel portal is not effective, and the geological body to be constructed still has the risk of instability.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0007] The utility model provides a construction device for a tunnel portal, the construction device for the tunnel portal comprising:

[0008] A reinforcement component, which is arranged in the tunnel of the tunnel and close to the tunnel entrance, and includes a vertically arranged three-axis mixing pile row and a three-axis rotary jet pile row;

[0009] A steel pipe group, the steel pipe group comprising a plurality of steel pipes, each of the steel pipes being passed through and supported on the three-axis mixing pile row and the three-axis rotary jet pile row along the extension direction of the tunnel;

[0010] A ring frame group, the ring frame group includes a plurality of independently arranged ring frames, the plurality of ring frames are pre-buried in the geological body corresponding to the tunnel door along the circumference of the tunnel door, the number of the ring frames is consistent with the number of the steel pipes and corresponds one to one, and the ring frames are sleeved outside the corresponding steel pipes, and the inner wall of the ring frame is formed with an annular installation groove distributed along the circumference thereof;

[0011] An annular airbag is arranged in the annular mounting groove, and the annular airbag is connected to an external air source through an air inlet pipe.

[0012] Optionally, the width of the three-axis jet-jet pile row along the arch waist direction of the tunnel is A, and the width of the portal along the arch waist direction of the tunnel is B; wherein A>B.

[0013] Optionally, the width of the tri-axis mixing pile row along the arch waist direction of the tunnel is C, wherein A>C>B.

[0014] Optionally, the three-axis rotary jet pile row is arranged between the three-axis mixing pile row and the tunnel portal; the three-axis mixing pile row includes a plurality of three-axis mixing piles arranged in sequence along the arch waist direction of the tunnel; the three-axis rotary jet pile row includes a plurality of three-axis rotary jet piles arranged in sequence along the arch waist direction of the tunnel.

[0015] Optionally, the three-axis mixing piles and the three-axis rotary jet grouting piles are both reinforced concrete piles.

[0016] Optionally, the number of rows of three-axis jet jet piles is multiple rows.

[0017] Optionally, an elastic cover plate is installed at the notch of the mounting groove, and the elastic cover plate and the mounting groove enclose a mounting cavity, and the annular airbag is accommodated in the mounting cavity.

[0018] Optionally, the elastic cover plate completely covers the notch of the mounting groove, and the two sides of the elastic cover plate are respectively a fixed side and a free side, the fixed side is fixed to the side of the inner wall of the ring frame away from the extension direction of the tunnel, and the free side extends in a direction away from the fixed side and overlaps the inner wall of the ring frame.

[0019] Optionally, the cover plate is a spring steel plate.

[0020] Optionally, the air inlet pipe is pre-buried in the annular frame, one end of the air inlet pipe extends to the outside of the cave door and is connected to the external air source, and the other end extends into the installation groove and is connected to the annular airbag.

[0021] Optionally, the ring frame is a concrete ring frame.

[0022] The utility model proposes a construction device for a tunnel portal, which fixes the geological body around the tunnel portal by pre-burying a three-axis mixing pile row and a three-axis rotary jet pile row in the tunnel tunnel near the tunnel portal to prevent the geological body from becoming unstable. Then, a ring frame is installed at the tunnel portal, and a ring-shaped water stop groove is formed on the inner wall of the ring frame. A ring-shaped air bag is arranged in the water stop groove. In the process of the steel pipe being pushed into the geological body, the steel pipe needs to pass through the ring frame, and the ring-shaped air bag is inflated and tightly wrapped around the outer side of the steel pipe, closing the sliding gap between the steel pipe and the interlocking steel pipe, and preventing the external water from penetrating into the geological body near the portal, causing the geological body near the portal to become unstable. The construction device for the tunnel portal avoids the disturbance of the surrounding geological body when the steel pipe is pushed into the stratum, which causes the surrounding geological body to become unstable, and improves the reinforcement effect of the construction device for the tunnel portal on the geological body around the portal. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0024] Figure 1 This is a structural schematic diagram of the construction structure of a tunnel door according to an embodiment of the utility model;

[0025] Figure 2 It is a front view schematic diagram of a ring frame group and a steel pipe group in the construction structure of a tunnel door in one embodiment of the utility model;

[0026] Figure 3 It is a front view schematic diagram of the construction structure ring frame and steel pipe of the tunnel door in one embodiment of the utility model;

[0027] Figure 4 It is a cross-sectional schematic diagram of a construction structure ring frame of a tunnel door according to an embodiment of the utility model.

[0028] Description of Figure Numbers:

[0029]

[0030] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0032] It should be noted that all directional indications (such as up, down, left, right, front, back, etc.) in the embodiments of the present utility model are only used to explain the position of the user in a certain posture (such as the attached Figure 1 The relative position relationship, movement status, etc. between the various components under the specific posture are shown. If the specific posture changes, the directional indication will also change accordingly.

[0033] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0034] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the utility model, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the utility model.

[0035] The utility model proposes a construction device for a tunnel portal, which comprises a reinforcement assembly 10, a steel pipe group 20, a ring frame group 30 and an annular airbag 40; wherein the reinforcement assembly 10 is arranged at the tunnel of the tunnel and close to the tunnel portal, and the reinforcement assembly 10 comprises a vertically arranged three-axis mixing pile row 11 and a three-axis rotary jet pile row 12; the steel pipe group 20 comprises a plurality of steel pipes 21, each of which is penetrated and supported by the three-axis mixing pile row 11 and the three-axis rotary jet pile row 12 along the extension direction of the tunnel; the ring frame group 30 comprises a plurality of mutually independently arranged ring frames 31, and the plurality of ring frames 31 are pre-buried in the geological body corresponding to the tunnel portal along the circumference of the tunnel portal, the number of the ring frames 31 is consistent with the number of the steel pipes 21 and corresponds one to one, and the ring frames 31 are sleeved outside the corresponding steel pipes 21, and the inner wall of the ring frames 31 is formed with an annular mounting groove 70 distributed along the circumference thereof;

[0036] The annular airbag 40 is disposed in the annular mounting groove 70 , and the annular airbag 40 is connected to an external air source through an air inlet pipe 60 .

[0037] Specifically, Figures 1 to 4 As shown, the reinforcement component 10 is vertically passed through the tunnel near the tunnel portal and is arranged in the tunnel. The reinforcement component 10 reinforces the geological body near the tunnel portal. The reinforcement component 10 includes a three-axis mixing pile row 11 and a three-axis rotary jet pile row 12. Through the double reinforcement of the three-axis mixing pile row 11 and the three-axis rotary jet pile row 12, the reinforcement effect of the geological body near the tunnel portal is improved, and the risk of instability of the geological body near the tunnel portal is reduced. At the same time, a ring frame group 30 is installed at the tunnel portal. The ring frame group 30 includes a plurality of ring frames 31. Each ring frame 31 is sequentially arranged around the tunnel portal in the geological body on the plane where the tunnel portal is located. An annular mounting groove 70 is formed on the inner wall of the ring frame 31. An annular airbag 40 is installed in the annular mounting groove 70. During the jacking construction of the steel pipe 21, the steel pipe 21 passes through the ring frame 31. A sliding gap is formed between the steel pipe 21 and the ring frame 31. The annular airbag 40 in the mounting groove 70 is inflated, and the annular airbag 40 is in close contact with the steel pipe 21, closing the sliding gap between the steel pipe 21 and the ring frame 31, which can effectively prevent the infiltration of external water and cause the geological body around the tunnel portal to become unstable, thereby improving the reinforcement effect of the construction device of the tunnel portal on the geological body around the tunnel portal.

[0038] Furthermore, the geological body near the tunnel portal is reinforced by the reinforcement component 10, and the sliding gap between the steel pipe 21 and the ring frame 31 is sealed and closed by the annular airbag 40 to prevent external water from seeping in through the sliding gap and causing the geological body near the tunnel portal to become unstable, thereby improving the stability of the geological body near the tunnel portal and further improving the reinforcement effect of the tunnel portal construction device on the geological body around the portal.

[0039] In one embodiment, the width of the three-axis jet grouting pile row 12 along the tunnel waist direction is A, and the width of the portal along the tunnel waist direction is B; wherein A>B.

[0040] Furthermore, if Figure 1 As shown, the width A of the three-axis rotary jet pile row 12 is greater than the width B of the tunnel entrance. The three-axis rotary jet pile 121 row is arranged in the tunnel and extends to the outside of the tunnel. Therefore, the three-axis rotary jet pile row 12 has a larger reinforcement range for the geological body around the tunnel entrance and a better reinforcement effect, thereby improving the reinforcement effect of the three-axis rotary jet pile row 12 on the geological body around the tunnel entrance.

[0041] In one embodiment, the width of the triaxial mixing pile row 11 along the haunch direction of the tunnel is C, wherein A>C>B.

[0042] The width of the three-axis mixing pile row 11 is greater than the width of the tunnel portal, and the reinforcement range of the three-axis rotary jet pile row 12 on the geological body around the tunnel portal is widened, thereby improving the reinforcement effect of the three-axis rotary jet pile row 12 on the geological body around the tunnel portal. At the same time, based on the existing three-axis rotary jet pile row 12, the width of the three-axis mixing pile row 11 is less than the width of the three-axis rotary jet pile row 12, which is more economical and practical.

[0043] In one embodiment, a three-axis rotary jet pile row 12 is arranged between a three-axis mixing pile row 11 and a tunnel entrance; the three-axis mixing pile row 11 includes a plurality of three-axis mixing piles 111 arranged in sequence along the arch waist direction of the tunnel; the three-axis rotary jet pile row 12 includes a plurality of three-axis rotary jet piles 121 arranged in sequence along the arch waist direction of the tunnel.

[0044] Specifically, a plurality of three-axis mixing piles 111 and a plurality of three-axis rotary jet piles 121 are arranged in sequence along the arch waist direction of the tunnel to form corresponding three-axis mixing pile rows 11 and three-axis rotary jet pile rows 12. The three-axis mixing pile row 11 is arranged in the tunnel near the tunnel entrance, and the three-axis rotary jet pile row 12 is arranged between the tunnel entrance and the three-axis mixing pile row 11.

[0045] In one embodiment, the number of the three-axis jet grouting pile rows 12 is multiple. Figure 1 As shown, multiple rows of three-axis jet jet piles 12 have better reinforcement effect.

[0046] In one embodiment, the three-axis mixing pile 111 and the three-axis rotary jet pile 121 are both reinforced concrete piles. By adopting reinforced concrete piles, the pile bodies of the three-axis mixing pile 111 and the three-axis rotary jet pile 121 have better toughness, so that the three-axis mixing pile 111 and the three-axis rotary jet pile 121 will not be sheared off by the shear force generated when the geological body around the tunnel portal becomes unstable, thereby preventing the three-axis mixing pile 111 and the three-axis rotary jet pile 121 from losing their original anchoring capacity, and strengthening the reinforcement effect of the three-axis mixing pile row 11 and the three-axis rotary jet pile row 12 on the strata around the tunnel, and having better stability.

[0047] In one embodiment, if Figure 4 As shown, an elastic cover plate 50 is installed at the notch of the installation groove 70 , and the elastic cover plate 50 and the installation groove 70 enclose a mounting cavity 70 a , and the annular airbag 40 is accommodated in the mounting cavity 70 a .

[0048] Specifically, an elastic cover plate 50 is installed at the notch of the mounting groove 70 on the inner wall of the annular frame 31, and the elastic cover plate 50 and the mounting groove 70 enclose a mounting cavity 70a. The annular airbag 40 is accommodated in the mounting cavity 70a. During the construction of the tunnel portal, the steel pipe 21 passes through the annular frame 31 and is pushed into the geological body. There is a sliding gap between the steel pipe 21 and the annular frame 31. The annular airbag 40 is inflated to lift up the elastic cover plate 50. The elastic cover plate 50 is in close contact with the steel pipe 21 to seal the sliding gap between the steel pipe 21 and the annular frame 31, thereby preventing external water from seeping into the geological body around the tunnel portal along the sliding gap and causing the geological body to become unstable, thereby improving the reinforcement effect of the construction device of the tunnel portal and reducing the risk of instability of the geological body during construction.

[0049] In one embodiment, if Figure 4 As shown, the elastic cover plate 50 completely covers the notch of the mounting groove 70 , and the two sides of the elastic cover plate 50 are respectively a fixed side and a free side. The fixed side is fixed to the side of the inner wall of the ring frame 31 away from the extension direction of the tunnel, and the free side extends in the direction away from the fixed side and overlaps the inner wall of the ring frame 31.

[0050] Furthermore, the fixed side of the elastic cover plate 50 is fixed to the inner wall of the ring frame 31 away from the tunnel extension direction, and the free side extends in the direction away from the fixed side and overlaps the inner wall of the ring frame 31, completely covering the notch of the installation groove 70. The annular airbag 40 and the steel pipe 21 are completely separated by the elastic cover plate 50, which has a better protection effect on the annular airbag 40 and improves the durability of the annular airbag 40.

[0051] In one embodiment, the elastic cover plate 50 is a spring steel plate 50a. The spring steel plate 50a is easy to obtain and more durable. In another embodiment, the elastic cover plate 50 can also be a rubber cover plate. The material of the elastic cover plate 50 of the utility model can be flexibly selected according to actual needs, and the utility model does not limit the type of the elastic cover plate 50.

[0052] In one embodiment, if Figure 4 As shown, an air inlet pipe 60 is pre-buried in the ring frame 31 , one end of the air inlet pipe 60 extends to the outside of the cave door and is connected to the external air source, and the other end extends into the mounting groove 70 and is connected to the annular airbag 40 .

[0053] Specifically, the ring frame 31 is a concrete ring frame 31. When the ring frame 31 is manufactured, an air inlet pipe 60 is pre-buried. The end of the air inlet pipe 60 extends to the outside of the opening end of the ring frame 31, and the other end extends to the mounting groove 70. Concrete is poured, and the ring frame 31 is formed. The ring frame 31 is pre-buried in the geological body at the cave entrance. One end of the air inlet pipe 60 in the mounting groove 70 is connected to the annular airbag 40, and the other end of the air inlet pipe 60 is extended to the outside of the cave entrance and connected to the external air source. In the process of the steel pipe 21 being pushed into the geological body, the annular airbag 40 is inflated through the air inlet pipe 60 to expand the annular airbag 40. By pre-buried in the ring frame 31, the air inlet pipe 60 inflates the annular airbag 40. The structure is reasonable and the operation is simpler.

[0054] In one embodiment, the ring frame 31 is a concrete ring frame 31. The concrete ring frame 31 is convenient to obtain, simple to manufacture and more durable.

[0055] The construction device of the tunnel portal fixes the geological body around the tunnel portal of the tunnel by pre-burying the three-axis mixing pile row 11 and the three-axis rotary jet pile row 12 in the tunnel tunnel near the tunnel portal to prevent the geological body from becoming unstable. Then, a ring frame 31 is installed at the tunnel portal, and the inner wall of the ring frame 31 is formed with an annular water stop groove, and an annular air bag 40 is arranged in the water stop groove. In the process of the steel pipe 21 pushing into the geological body, the steel pipe 21 needs to pass through the ring frame 31, and the annular air bag 40 is inflated and tightly wrapped around the outer side of the steel pipe 21, closing the sliding gap between the steel pipe 21 and the interlocking steel pipe 21, blocking the external water from penetrating into the geological body near the tunnel portal, causing the geological body near the tunnel portal to become unstable. Therefore, the construction device of the tunnel portal avoids the disturbance of the surrounding geological body when the steel pipe 21 pushes into the stratum, which causes the surrounding geological body to become unstable, and improves the reinforcement effect of the construction device of the tunnel portal on the geological body around the tunnel portal.

[0056] The above description is only an optional embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. A construction device for a tunnel portal, characterized in that: The construction device of the tunnel portal comprises: A reinforcement component, which is arranged in the tunnel of the tunnel and close to the tunnel entrance, and includes a vertically arranged three-axis mixing pile row and a three-axis rotary jet pile row; A steel pipe group, the steel pipe group comprising a plurality of steel pipes, each of the steel pipes being passed through and supported on the three-axis mixing pile row and the three-axis rotary jet pile row along the extension direction of the tunnel; A ring frame group, the ring frame group includes a plurality of independently arranged ring frames, the plurality of ring frames are pre-buried in the geological body corresponding to the tunnel door along the circumference of the tunnel door, the number of the ring frames is consistent with the number of the steel pipes and corresponds one to one, and the ring frames are sleeved outside the corresponding steel pipes, and the inner wall of the ring frame is formed with an annular installation groove distributed along the circumference thereof; An annular airbag is arranged in the annular mounting groove, and the annular airbag is connected to an external air source through an air inlet pipe.

2. The construction device for a tunnel portal according to claim 1, characterized in that: The width of the three-axis jet-jet pile row along the arch waist direction of the tunnel is A, and the width of the portal along the arch waist direction of the tunnel is B; wherein A>B.

3. The construction device for a tunnel portal as claimed in claim 2, characterized in that: The width of the triaxial mixing pile row along the arch waist direction of the tunnel is C, wherein A>C>B.

4. The construction device for a tunnel portal according to claim 1, characterized in that: The three-axis rotary jet pile row is arranged between the three-axis mixing pile row and the tunnel gate; the three-axis mixing pile row includes a plurality of three-axis mixing piles arranged in sequence along the arch waist direction of the tunnel; the three-axis rotary jet pile row includes a plurality of three-axis rotary jet piles arranged in sequence along the arch waist direction of the tunnel.

5. The construction device for a tunnel portal as claimed in claim 4, characterized in that: The three-axis mixing piles and the three-axis jet-jet piles are both reinforced concrete piles.

6. The tunnel portal construction device according to any one of claims 1 to 5, characterized in that: The number of the rows of three-axis jet jet piles is multiple rows.

7. The tunnel portal construction device according to any one of claims 1 to 5, characterized in that: An elastic cover plate is installed at the notch of the installation groove, and the elastic cover plate and the installation groove enclose a installation cavity, and the annular airbag is accommodated in the installation cavity.

8. The construction device for a tunnel portal according to claim 7, characterized in that: The elastic cover plate completely covers the notch of the mounting groove, and the two sides of the elastic cover plate are respectively a fixed side and a free side, the fixed side is fixed to the side of the inner wall of the ring frame away from the extension direction of the tunnel, and the free side extends in a direction away from the fixed side and overlaps the inner wall of the ring frame.

9. The construction device for a tunnel portal according to claim 7, characterized in that: The cover plate is a spring steel plate.

10. The tunnel portal construction device according to any one of claims 1 to 5, characterized in that: The air intake pipe is buried in the annular frame, one end of the air intake pipe extends to the outside of the cave door and is connected to the external air source, and the other end extends into the installation groove and is connected to the annular airbag.

11. The tunnel portal construction device according to any one of claims 1 to 5, characterized in that: The ring frame is a concrete ring frame.