Temporary shortcut for construction of lake-crossing levee bridge
By designing temporary walkways during the construction of the bridge through the lake and using cofferdams and wooden pile structures, the problems of traffic passage and water quality protection during the bridge construction are solved, and the safe, convenient construction and rapid demolition of the walkways are achieved to ensure environmental protection and Traffic safety.
Patent Information
- Application Number
- CN202420391549.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-01
AI Technical Summary
During the construction of the bridge through the lake, it is difficult for the existing technology to provide a temporary walkway while ensuring traffic passage, and the construction and demolition of the walkways do not affect water quality and traffic safety.
A temporary walkway structure was designed, including stacking cofferdams on both sides of the lake embankment, surrounding the bridge, and building a walkway between one of the cofferdams and the lake embankment. Wooden piles arranged in matrix form are used as the foundation and top laying The clearing slag layer, gravel layer and cement concrete slabs are combined with steel-plastic geogrids and bamboo fences to form a flat working surface, and simple guardrails are installed on both sides of the walkway. The wooden piles adopt a hoop structure to enhance the overall support.
It has achieved the realization of traffic during the bridge construction process, ensured safety of driving through the lake, and facilitated construction, and the walkways were convenient and quickly removed in the later stage without affecting the water quality. The use of wooden piles and gravel materials reduced the risk of pollution.
Smart Images

Figure CN222100532U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of civil engineering, in particular to a temporary access road for constructing a bridge across a lake embankment. Background Art
[0002] A lake-crossing embankment usually connects the two sides of a lake, or connects the island in the middle of the lake and the shore, which makes transportation more convenient and can effectively save travel time. At the same time, the lake-crossing embankment also takes into account the needs of flood control and drainage.
[0003] In actual use, after the lake-crossing dike is opened to traffic, as other traffic and road needs arise in the water area, it will be necessary to cut off a section of the lake-crossing dike and then add a bridge to cross the lake-crossing dike in the water area.
[0004] In the prior art, it is necessary to find a temporary road structure, which can replace the traffic function of the lake-crossing embankment during the bridge construction process without affecting the connectivity between the two banks, and can be abandoned after the lake-crossing embankment is open to traffic again. Utility Model Content
[0005] In order to solve the above problems, the present application provides a temporary access road with a reasonable structure during the construction of a lake-crossing embankment bridge, so that traffic can be maintained during the bridge construction process, effectively ensuring the safety of driving through the lake. The access road is easy to construct and can be easily and quickly dismantled in the later stage without affecting the water quality.
[0006] The technical solution adopted by the utility model is as follows:
[0007] A temporary access road for the construction of a bridge across a lake embankment, comprising a lake embankment, a bridge to be built on the lake embankment in the water, cofferdams respectively piled on both sides of the lake embankment, both ends of the cofferdams respectively connected to the lake embankment, and the cofferdams on both sides enclose the bridge inside; a access road is built between one of the cofferdams and the lake embankment, and the lake embankment located outside the two ends of the bridge is connected to both ends of the access road; the structure of the access road is: it includes wooden piles driven into the bottom of the lake and arranged at intervals in a matrix form, and the tops of the wooden piles are laid upward in sequence to form a road cleaning slag layer and a crushed stone layer, and a cement concrete slab is laid on the top of the crushed stone layer.
[0008] As a further improvement of the above technical solution:
[0009] The cofferdams on both sides are cofferdam one and cofferdam two respectively, and the access road and cofferdam one are located on the same side of the lake embankment; the access road is contained inside cofferdam one, and the distance between the two ends of cofferdam one is greater than the distance between the two ends of cofferdam two.
[0010] The two ends of the cofferdam extend obliquely toward the lake embankment, and an acute angle is formed between the two ends of the cofferdam and the lake embankment section where the bridge is located.
[0011] The two ends of the access road extend obliquely toward the lake embankment, and an acute angle is formed between the two ends of the access road and the lake embankment section where the bridge is located.
[0012] A bidirectional steel-plastic geogrid is laid between the top of the wooden pile and the road slag layer; ballast is laid between the tops of adjacent wooden piles to form a ballast embedding layer, and the ballast fills the gaps in the geogrid.
[0013] A bamboo fence tied with steel bars is laid on the top of the wooden piles to form a flat working surface; and a geogrid is laid above the working surface.
[0014] Soil is laid on the gravel layer on the outside of both sides of the cement concrete slab to form a shoulder, and simple guardrails are installed on the shoulder along the length direction.
[0015] The cross-section of the footpath above the lake bottom is an isosceles trapezoidal structure, and the side of the footpath forms a slope structure with an inclination of 1:1.5.
[0016] The cross section of the wooden pile is circular, and the wooden pile is driven downward into the bearing layer of the lake bottom soil.
[0017] A hoop is installed between two or three adjacent wood piles, so that all the wood piles form a whole; a single hoop includes a column-holding part that embraces the single wood pile, and a connecting part located between the two column-holding parts.
[0018] Compared with the prior art, the present invention has the following beneficial effects:
[0019] The utility model has a compact and reasonable structure. Through the setting of the access road, traffic can be kept open during the construction of the bridge, effectively ensuring the safety of driving through the lake. The access road is easy to construct, and the later access road can be conveniently and quickly removed. It also does not affect the water quality in terms of environmental protection.
[0020] The utility model also has the following advantages:
[0021] The footpath uses densely driven wood piles as its foundation, which is convenient for construction, meets the requirements of footpath foundation, and is easy to remove and reuse in the later stage;
[0022] The main body of the footpath is mostly made of ballast and gravel, which not only ensures effective passage but is also easy to remove later, without pollution and without affecting water quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 The utility model is a schematic diagram of the layout of the temporary road relative to the lake embankment.
[0024] Figure 2 It is a cross-sectional schematic diagram of the utility model access road.
[0025] Figure 3 for Figure 2 A partial enlarged view of point A in the middle.
[0026] Figure 4 for Figure 2 A partial enlarged view of point B in the middle.
[0027] Figure 5 It is a schematic diagram of the arrangement of wooden piles of the utility model.
[0028] Figure 6 The utility model is a schematic diagram of the arrangement of the clamps between the wooden piles.
[0029] Figure 7 It is a structural schematic diagram of the clamp of the utility model.
[0030] Among them: 10, access road; 20, cofferdam 1; 30, lake embankment; 40, cofferdam 2; 50, bridge;
[0031] 1. Wooden piles; 2. Geogrid; 3. Cleaning slag layer; 4. Gravel layer; 5. Soil; 6. Cement concrete slab; 7. Simple guardrail; 8. Hoop; 31. Ballast embedding layer; 81. Column holding part; 82. Connecting part. DETAILED DESCRIPTION
[0032] The specific implementation of the present utility model is described below in conjunction with the accompanying drawings.
[0033] like Figure 1 As shown, a temporary access road for constructing a bridge across a lake embankment in this embodiment includes a lake embankment 30, a bridge 50 to be built on the lake embankment 30 in the water, cofferdams are respectively piled on both sides of the lake embankment 30, and both ends of the cofferdams are respectively connected to the lake embankment 30, and the cofferdams on both sides enclose the bridge 50 inside; a access road 10 is built between one of the cofferdams and the lake embankment 30, and the lake embankments 30 located outside the two ends of the bridge 50 are connected to the two ends of the access road 10; Figure 2 As shown, the structure of the access road 10 is: it includes wooden piles 1 driven into the lake bottom and arranged in a matrix form, and the tops of the wooden piles 1 are laid upward in sequence to form a road cleaning slag layer 3 and a crushed stone layer 4, and a cement concrete slab 6 is laid on the top of the crushed stone layer 4.
[0034] In this embodiment, by setting up the temporary road 10, traffic can be maintained during the construction of the bridge 50, effectively ensuring the safety of driving through the lake; by setting up the cofferdams on both sides of the lake embankment 30, it is convenient to drain the lake water inside the cofferdam, which is convenient for the construction of the bridge 50 and the temporary road 10, and at the same time, the temporary road 10 can be effectively isolated from the water area, ensuring the structural stability and safety of the temporary road 10.
[0035] The cofferdams on both sides are cofferdam 1 20 and cofferdam 2 40 respectively, and the access road 10 and cofferdam 1 20 are located on the same side of the lake embankment 30; the access road 10 is contained inside the cofferdam 1 20, and the distance between the two ends of the cofferdam 1 20 is greater than the distance between the two ends of the cofferdam 2 40. The overall layout is compact, reasonable and ingenious, effectively utilizing the space inside the cofferdam while taking into account the cost.
[0036] Both ends of the cofferdam extend obliquely toward the lake embankment 30 , and an acute angle is formed between the two ends of the cofferdam and the section of the lake embankment 30 where the bridge 50 is located, which ensures the performance of the cofferdam while saving the cofferdam construction and materials.
[0037] Both ends of the sidewalk 10 extend obliquely toward the lake embankment 30 , and an acute angle is formed between the two ends of the sidewalk 10 and the section of the lake embankment 30 where the bridge 50 is located, effectively ensuring the convenience and smoothness of driving between the two ends of the sidewalk 10 and the lake embankment 30 .
[0038] like Figure 3 As shown, soil 5 is laid on the gravel layer 4 located outside the two sides of the cement concrete slab 6 to form a shoulder, and a simple guardrail 7 is installed on the shoulder along the length direction.
[0039] In actual operation, the shoulder width can be set to 50 cm, which effectively helps to ensure the driving safety on the sidewalk 10; the simple guardrail 7 is also used to ensure the driving safety when crossing the lake, and it is low in cost and easy to dismantle.
[0040] In this embodiment, the cement concrete slab 6 can be selected according to the actual vehicle load, flow rate and other requirements, for example, a cement concrete slab 6 with a strength of 4.0 MPa and C30 can be selected.
[0041] like Figure 4 As shown, a bidirectional steel-plastic geogrid 2 is laid between the top of the wooden pile 1 and the slag layer 3, and the geogrid 2 forms a tensile support on the top surface of the wooden pile 1; ballast is laid between the tops of adjacent wooden piles 1 to form a ballast embedding layer 31, and the ballast fills the gaps in the geogrid 2, effectively improving and ensuring the overall structural support strength of the wooden pile 1.
[0042] A bamboo fence tied with steel bars is laid on the top of the wooden piles 1 to form a flat working surface; a geogrid 2 is laid above the working surface to effectively ensure the flatness of the laying and improve the structure of the access road 10.
[0043] The cross section of the access road 10 located above the lake bottom is an isosceles trapezoidal structure, and the side surface of the access road 10 forms a slope structure with an inclination of 1:1.5.
[0044] like Figure 5 As shown, the cross section of the wooden pile 1 is circular, and the wooden pile 1 is driven downward into the bearing layer of the lake bottom soil, effectively ensuring the stability of the foundation of the access road 10.
[0045] In this embodiment, the access road 10 uses densely driven wooden piles 1 as a foundation, which is convenient to construct, meets the needs of the access road 10 foundation, and is easy to remove and reuse in the later stage.
[0046] like Figure 6 As shown, a clamp 8 is installed between two or three adjacent wood piles 1, so that all wood piles 1 form a whole; Figure 7 As shown, a single hoop 8 includes a column-embracing portion 81 that embraces a single wooden pile 1 , and a connecting portion 82 located between the two column-embracing portions 81 .
[0047] In this embodiment, by providing clamps 8 between the wooden piles 1, the integrity of the wooden piles 1 is effectively improved, and the structural stability and reliability of the supporting foundation of the access road 10 are ensured.
[0048] In actual use, the clamp 8 can be an existing standard product, or a steel clamp can be used, which can connect the wooden piles 1 to form a whole.
[0049] In this embodiment, the thickness of the cement concrete slab 6 can be set to 20 cm, the thickness of the crushed stone layer 4 is set to 20 cm, and the thickness of the slag layer 3 can be set according to actual traffic needs, such as a thickness of about 1.5 meters, which effectively ensures the structural strength and supporting performance of the access road 10. Of course, the slag layer 3 needs to be rolled to a certain density and flatness requirements, such as rolling to an average wheel track difference of less than 5 mm.
[0050] In this embodiment, the main body of the temporary road 10 is mostly made of ballast and crushed stone, which can ensure effective passage while being easy to dig out later, without pollution and affecting water quality.
[0051] In actual use, the top surface width of the sidewalk 10 can be set to about 5m according to actual needs, and the sidewalk 10 can be divided into a motor vehicle lane and a non-motor vehicle lane according to the width to achieve smooth and smooth passage of the sidewalk 10.
[0052] The utility model ensures traffic during the bridge construction process, effectively ensures the safety of driving through the lake, and the construction of the access road is convenient, while taking into account the convenience and rapid removal of the access road in the later stage, and also does not affect the water quality in terms of environmental protection.
[0053] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0054] The above description is an explanation of the utility model, not a limitation of the utility model. The scope of the utility model is defined by the claims. Any form of modification can be made within the protection scope of the utility model.
Claims
1. A temporary access road for constructing a bridge across a lake embankment, comprising a lake embankment (30), a bridge (50) to be constructed on the lake embankment (30) in water, characterized in that: Cofferdams are respectively piled on both sides of the lake embankment (30), and both ends of the cofferdams are connected to the lake embankment (30), and the cofferdams on both sides enclose the bridge (50) inside; a temporary road (10) is built between one of the cofferdams and the lake embankment (30), and the lake embankment (30) located outside the two ends of the bridge (50) is connected to both ends of the temporary road (10); the structure of the temporary road (10) is: it includes wooden piles (1) driven into the lake bottom and arranged in a matrix form, and the top of the wooden piles (1) is laid upward in sequence to form a road cleaning slag layer (3) and a crushed stone layer (4), and a cement concrete slab (6) is laid on the top of the crushed stone layer (4).
2. A temporary access road for constructing a bridge across a lake as claimed in claim 1, characterized in that: The cofferdams on both sides are cofferdam one (20) and cofferdam two (40), and the access road (10) and cofferdam one (20) are located on the same side of the lake embankment (30); the access road (10) is contained inside the cofferdam one (20), and the distance between the two ends of the cofferdam one (20) is greater than the distance between the two ends of the cofferdam two (40).
3. A temporary access road for constructing a bridge across a lake as claimed in claim 1, characterized in that: The two ends of the cofferdam extend obliquely toward the lake embankment (30), and an acute angle is formed between the two ends of the cofferdam and the lake embankment (30) section where the bridge (50) is located.
4. A temporary access road for constructing a bridge across a lake as claimed in claim 1, characterized in that: The two ends of the access road (10) extend obliquely toward the lake embankment (30), and an acute angle is formed between the two ends of the access road (10) and the lake embankment (30) section where the bridge (50) is located.
5. The temporary access road for constructing a bridge across a lake as claimed in claim 1, characterized in that: A bidirectional steel-plastic geogrid (2) is laid between the top of the wooden pile (1) and the road slag layer (3); ballast is laid between the tops of adjacent wooden piles (1) to form a ballast embedding layer (31), and the ballast fills the gaps in the geogrid (2).
6. A temporary access road for constructing a bridge across a lake as claimed in claim 5, characterized in that: A bamboo fence tied with steel bars is laid on the top of the wooden piles (1) to form a flat working surface; and a geogrid (2) is laid above the working surface.
7. The temporary access road for constructing a bridge across a lake as claimed in claim 1, characterized in that: Soil (5) is laid on the gravel layer (4) outside the two sides of the cement concrete slab (6) to form a shoulder, and a simple guardrail (7) is installed on the shoulder along the length direction.
8. The temporary access road for constructing a bridge across a lake as claimed in claim 1, characterized in that: The cross section of the access road (10) located above the lake bottom is an isosceles trapezoidal structure, and the side surface of the access road (10) forms a slope structure with an inclination of 1:1.
5.
9. The temporary access road for constructing a bridge across a lake as claimed in claim 1, characterized in that: The cross section of the wooden pile (1) is circular, and the wooden pile (1) is driven downward into the bearing layer of the lake bottom soil.
10. A temporary access road for constructing a bridge across a lake as claimed in claim 1, characterized in that: A hoop (8) is installed between two or three adjacent wood piles (1) so that all the wood piles (1) form a whole; a single hoop (8) comprises a column-embracing portion (81) that embraces the single wood pile (1), and a connecting portion (82) located between two column-embracing portions (81).