Combined anti-seepage suspended formwork tool for floor reserved hole
By designing a combined anti-seepage lifting tool and using adjustable screws and cone connecting sleeve structures, the cumbersome and leakage problems of traditional lifting process are solved, and the construction needs of floor slabs of different thicknesses are realized and the recycling of tools is achieved. Significantly reduces leakage risks and construction costs.
Patent Information
- Application Number
- CN202323368011.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-11
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2033-12-11
AI Technical Summary
In construction, the traditional floor slab reserved hole hanging mold process is cumbersome, not firmly fixed, and has hidden dangers of leakage, especially it cannot effectively adapt to the needs of floor slabs of different thicknesses, and tools are difficult to recycle.
A combined anti-seepage lifting tool is designed, using an adjustable screw and cone connecting sleeve structure, combining a tripod fixture and water stop ring to achieve flexible adjustment of the tool and leakage protection, and connecting the sleeve through a cone The combination with screws forms a "three-stage" screw structure to fix the bottom support, adapting to the construction needs of floor slabs of different thicknesses, and other components can be reused after removal.
The tool simplifies operation, reduces leakage risks, adapts to the construction needs of floor slabs of different thicknesses, realizes the recycling of tools, saves labor and materials, and improves construction efficiency and safety.
Smart Images

Figure CN222101452U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a combined anti-seepage hanging formwork tool for reserved holes in floor slabs. Background Art
[0002] In the field of construction, during the construction process, the floor of a building usually needs to be set with relevant reserved holes such as wire holes, pump pipe holes, and material transfer ports. These floor holes need to be suspended and sealed with concrete in the later stage. The traditional suspension formwork process generally uses the lower layer to return to the top, or even uses the wire drawing process in violation of regulations. The above traditional processes have the disadvantages of cumbersome operation, loose fixation, and leakage risks.
[0003] Therefore, it is urgent to invent a hanging mold tool which is easy to install and remove, reduces the leakage of the hanging hole and can be recycled. Utility Model Content
[0004] In order to overcome the shortcomings of the prior art, the technical problem to be solved by the utility model is to provide a combined anti-seepage hanging formwork tool for reserved holes in floor slabs, which has a simple structure, is easy to install and disassemble, can reduce leakage of the hanging holes, can be recycled and meet the use needs of floors of different thicknesses.
[0005] To achieve the above-mentioned purpose, the utility model provides a combined anti-seepage hanging formwork tool for floor slab reserved holes, comprising a middle adjustable screw located inside the floor slab reserved hole, a first cone connecting sleeve and a second cone connecting sleeve which are respectively threadedly connected to the two ends of the middle adjustable screw and symmetrically arranged; the first cone connecting sleeve is located at the inner top end of the floor slab reserved hole and is fixedly connected to the upper screw, and the upper screw is fixed above the floor slab reserved hole through a tripod fixing frame; the second cone connecting sleeve is located at the inner bottom end of the floor slab reserved hole and is fixedly connected to the lower screw, and the lower screw is provided with a bottom bracket for blocking the bottom of the floor slab reserved hole, and the bottom bracket is screwed and fixed to the lower screw by a nut located on its bottom surface; the lower surface of the second cone connecting sleeve abuts against the top surface of the bottom bracket, and the upper surface of the first cone connecting sleeve is arranged flush with the top surface of the floor slab reserved hole.
[0006] Preferably, the middle adjustable screw consists of an inner rod and an outer rod that are threadedly connected, and the length of the middle adjustable screw can be adjusted by relative rotation of the inner rod and the outer rod; the ends of the inner rod and the outer rod away from the center of the reserved hole in the floor slab have threaded portions that are threadedly connected to the first cone connecting sleeve and the second cone connecting sleeve.
[0007] Furthermore, the small-diameter ends of the first cone connecting sleeve and the second cone connecting sleeve are both arranged toward the center of the reserved hole in the floor slab, and the large-diameter ends thereof are respectively welded and fixed to the upper screw rod and the lower screw rod.
[0008] Preferably, a water stop ring is fixed to the circumferential surface of the outer rod.
[0009] Furthermore, the legs of the tripod fixing frame are supported on the concrete floor around the reserved holes of the floor.
[0010] Furthermore, the top of the upper screw is fixed to the top of the tripod fixing frame through a mountain-shaped fastener.
[0011] From the above, compared with the prior art, the combined anti-seepage hanging formwork tool for floor reserved holes of the utility model has at least the following beneficial effects:
[0012] 1. The upper screw, the middle adjustable screw and the lower screw of the hanging formwork tool of the utility model are all connected to form a "three-section" screw by a conical connecting sleeve, and the bottom bracket of the hanging formwork tool is fixed to the bottom of the reserved hole of the floor slab by the above-mentioned "three-section" screw and a tripod fixing frame to cast concrete in the reserved hole. The middle adjustable screw can adjust the corresponding length according to the thickness of the floor slab, and a water stop ring is provided on the middle adjustable screw to prevent leakage at the middle adjustable screw.
[0013] 2. The hanging formwork tool of the utility model has a wide range of applications. Compared with the traditional lower-layer top-returning process, it is easy to operate. At the same time, it also optimizes the hidden danger of floor leakage caused by the illegal process of wire hanging formwork. At the same time, the hanging formwork tool of the utility model can adapt to the construction of hanging formwork with reserved holes in floors of different thicknesses. It is easy to disassemble and assemble, and only consumes the middle adjustable screw, and other parts can be reused.
[0014] 3. The anti-seepage hanging formwork tool provided by the utility model has a simple structure, is easy to install and disassemble, can be recycled and can meet the use needs of floors of different thicknesses, and greatly reduces the leakage risk of the hanging hole while saving labor and materials. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solution of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 This is a structural schematic diagram of a combined anti-seepage hanging formwork tool for reserved holes in floor slabs of the utility model;
[0017] Figure 2 It is a structural schematic diagram of the combined anti-seepage hanging formwork tool for reserved holes in floor slabs of the utility model during use;
[0018] Figure 3 for Figure 2 main view.
[0019] Description of the numbers in the figure:
[0020] 1. Base; 2. Tripod fixing frame; 3. Mountain-shaped fastener; 4. Lower screw; 5. Middle adjustable screw; 6. Upper screw; 7. First cone connecting sleeve; 8. Water stop ring; 9. Concrete floor; 10. Reserved hole in the floor. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] See below Figure 1 to Figure 3 The utility model provides a combined anti-seepage hanging formwork tool for reserved holes in floor slabs.
[0023] The utility model discloses a combined anti-seepage hanging formwork tool for reserved holes in floor slabs, which is mainly composed of a bottom support 1, a tripod fixing frame 2, a mountain-shaped fastener 3, a lower screw rod 4, a middle adjustable screw rod 5, an upper screw rod 6, a first cone connecting sleeve 7 and a second cone connecting sleeve.
[0024] Among them, the middle adjustable screw 5 is located inside the floor reserved hole 10, and the first cone connecting sleeve 7 and the second cone connecting sleeve are symmetrically arranged and respectively threadedly connected to the two ends of the middle adjustable screw 5. The first cone connecting sleeve 7 is located at the top of the floor reserved hole 10 and is fixedly connected to the upper screw 6, and the upper screw 6 is fixed above the floor reserved hole 10 through a tripod fixing frame 2. The second cone connecting sleeve is located at the bottom of the floor reserved hole 10 and is fixedly connected to the lower screw 4. The lower screw 4 is provided with a bottom bracket 1 for blocking the bottom of the floor reserved hole 10, and the bottom bracket 1 is screwed and fixed to the lower screw 4 by a nut located on its bottom surface.
[0025] In addition, the lower surface of the second cone connecting sleeve abuts against the top surface of the base 1 , and the upper surface of the first cone connecting sleeve 7 is flush with the top surface of the reserved hole 10 of the floor slab.
[0026] Among them, the lower screw 4, the middle adjustable screw 5, and the upper screw 6 are connected to each other by a conical connecting sleeve to form a "three-section screw". After the preparation work of hanging holes such as roughening the concrete around the reserved hole 10 in the floor slab is completed, the "three-section screw" is passed through the reserved hole 10 in the floor slab, and the base 1 is fixed to the bottom of the reserved hole 10 in the floor slab by using a tripod fixing frame 2 and a mountain-shaped fastener 3.
[0027] The legs of the tripod fixing frame 2 are supported on the concrete floor 9 around the floor reserved hole 10. The top of the upper screw rod 6 is fixed to the top of the tripod fixing frame 2 by the mountain-shaped fastener 3.
[0028] In the utility model, the middle adjustable screw 5 is composed of an inner rod and an outer rod connected by threads, and the length of the middle adjustable screw 5 can be adjusted by relative rotation of the inner rod and the outer rod. The ends of the inner rod and the outer rod away from the center of the reserved hole 10 of the floor slab have threaded parts that are threadedly connected to the first cone connecting sleeve 7 and the second cone connecting sleeve. The middle adjustable screw 5 can adjust the length of the middle adjustable screw 5 by using the inner rod and the outer rod connected by threads, so as to achieve the fixation of the bottom support 1 under different floor slab thicknesses. At the same time, a water stop ring 8 is fixed to the circumferential surface of the outer rod of the middle adjustable screw 5, which can effectively prevent leakage at the middle adjustable screw 5 after the hanging formwork concrete is poured.
[0029] The lower screw rod 4, the middle adjustable screw rod 5, and the upper screw rod 6 are connected to each other by a cone connecting sleeve, which is convenient for installation and removal. After the hanging formwork concrete is poured and the formwork removal conditions are met, the lower screw rod 4, the upper screw rod 6, and the corresponding cone connecting sleeve can be conveniently removed, so that except for the middle adjustable screw rod 5, other parts can be reused.
[0030] In addition, the first cone connecting sleeve 7 and the second cone connecting sleeve are cone-shaped sleeves, and the small diameter ends of the first cone connecting sleeve 7 and the second cone connecting sleeve are both arranged toward the center of the reserved hole 10 of the floor slab. The large diameter ends of the first cone connecting sleeve 7 and the second cone connecting sleeve are respectively welded and fixed to the upper screw 6 and the lower screw 4, and the inside of the cone sleeve has a thread matching the threaded part of the inner rod and the outer rod of the middle adjustable screw 5. The connection between the middle adjustable screw 5 and the lower screw 4 and the upper screw 6 is located inside the cone connecting sleeve. After the concrete is poured, the lower screw 4 and the upper screw 6 are rotated and removed by twisting the lower screw 4 and the upper screw 6, and the first cone connecting sleeve 7 and the second cone connecting sleeve attached to the lower screw 4 and the upper screw 6 are also removed together.
[0031] The small diameter ends of the first cone connecting sleeve 7 and the second cone connecting sleeve of the utility model face inwards, and the large diameter ends face outwards, forming a large and small head structure, which effectively prevents leakage. In addition, a notch with a thin inside and a thick outside is formed in the poured concrete, which can reduce the resistance when taking out the first cone connecting sleeve 7 and the second cone connecting sleeve after the concrete pouring is completed, and the notch formed by the first cone connecting sleeve 7 and the second cone connecting sleeve in the poured concrete is then smoothed with mortar.
[0032] The combined anti-seepage hanging formwork tool of the utility model has a simple structure and is easy to install and disassemble, can be recycled and can meet the use needs of floors of different thicknesses, and can greatly reduce the leakage risk of the hanging hole while saving labor and materials.
[0033] The above is only a specific implementation of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be understood by anyone familiar with the technology within the technical scope disclosed by the present invention should be included in the scope of the present invention.
Claims
1. A combined anti-seepage hanging formwork tool for reserved holes in floor slabs, characterized in that: It comprises a middle adjustable screw rod (5) located inside a reserved hole (10) in a floor slab, a first cone connecting sleeve (7) and a second cone connecting sleeve which are respectively threadedly connected to both ends of the middle adjustable screw rod (5) and are symmetrically arranged; The first cone connecting sleeve (7) is located at the top of the inner part of the reserved hole (10) of the floor slab and is fixedly connected to the upper screw rod (6), and the upper screw rod (6) is fixed above the reserved hole (10) of the floor slab via a tripod fixing frame (2); The second cone connecting sleeve is located at the inner bottom end of the reserved hole (10) in the floor slab and is fixedly connected to the lower screw rod (4); a bottom bracket (1) for blocking the bottom of the reserved hole (10) in the floor slab is passed through the lower screw rod (4); the bottom bracket (1) is fixedly screwed to the lower screw rod (4) by a nut located on its bottom surface; The lower surface of the second cone connecting sleeve abuts against the top surface of the base (1), and the upper surface of the first cone connecting sleeve (7) is arranged flush with the top surface of the reserved hole (10) in the floor slab.
2. The combined anti-seepage hanging formwork tool for reserved holes in floor slabs according to claim 1, characterized in that: The middle adjustable screw rod (5) is composed of an inner rod and an outer rod connected by threads, and the length of the middle adjustable screw rod (5) can be adjusted by relative rotation of the inner rod and the outer rod; The ends of the inner rod and the outer rod away from the center of the reserved hole (10) in the floor slab have threaded portions which are threadedly connected to the first cone connecting sleeve (7) and the second cone connecting sleeve.
3. The combined anti-seepage hanging formwork tool for reserved holes in floor slabs according to claim 1, characterized in that: The small diameter ends of the first cone connecting sleeve (7) and the second cone connecting sleeve are both arranged toward the center of the reserved hole (10) in the floor slab, and the large diameter ends thereof are respectively welded and fixed to the upper screw rod (6) and the lower screw rod (4).
4. The combined anti-seepage hanging formwork tool for reserved holes in floor slabs according to claim 2, characterized in that: A water stop ring (8) is fixed on the circumferential surface of the outer rod.
5. The combined anti-seepage hanging formwork tool for reserved holes in floor slabs according to claim 1, characterized in that: The legs of the tripod fixing frame (2) are supported on the concrete floor slab (9) around the reserved hole (10) in the floor slab.
6. The combined anti-seepage hanging formwork tool for reserved holes in floor slabs according to claim 1 or 5, characterized in that: The top of the upper screw rod (6) is fixed to the top of the tripod fixing frame (2) via a mountain-shaped fastener (3).
