Folding trolley equipment for excavation of small-section tunnel

By designing small-section tunnel excavation folding trolley equipment, using pins and oblique brace structures to achieve the folding and unfolding of the equipment, the problems of low efficiency and high cost of traditional trolley equipment in small-section tunnel construction are solved, and construction efficiency is improved Security.

CN222102040UInactive Publication Date: 2024-12-03GEZHOUBA XINJIANG ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420926289.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-29
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional trolley equipment is difficult to meet the construction needs of small section tunnels, resulting in low construction efficiency, long time and high cost, and the temporary working platform cannot be folded and portable and moved easily.

Method used

A small-section tunnel excavation folding trolley equipment is designed, including the equipment skeleton, which is folded and unfolded through the structure of pins and oblique braces, and is equipped with mobile tires and ladders to facilitate construction and transportation in the tunnel.

Benefits of technology

It achieves low construction cost, high efficiency and easy operation, reduces construction risks, improves work efficiency, and reuses construction materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222102040U_ABST
    Figure CN222102040U_ABST
Patent Text Reader

Abstract

The utility model discloses small-section tunnel excavation folding trolley equipment which comprises an equipment framework, the equipment framework comprises two parallel bottom frameworks arranged in the tunnel direction, each bottom framework is provided with a plurality of side frameworks perpendicular to the ground, a first top framework is arranged between the two side frameworks in parallel, and a second top framework is arranged between the first top framework and the second top framework. A first bolt is arranged at the joint of the side framework and the first top framework, two second bolts are arranged in the middle of the first top framework at equal intervals, a first inclined strut is further hinged to each second bolt, and the other end of each first inclined strut is rotationally connected with the side framework through a first retaining part. Construction cost is low, machining is easy and convenient, operation is easy, efficiency is high, construction materials can be reused after being dismantled, construction risks are effectively reduced, working efficiency is improved, and application and popularization can be achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of tunnel construction equipment and relates to a folding trolley device for excavating a small-section tunnel. Background Art

[0002] In water conservancy project construction, tunnel excavation usually uses a trolley as an excavation face working platform to ensure the progress and safety of tunnel construction. However, traditional trolley equipment is often large in size and difficult to meet the construction needs of small-section tunnels. In addition, the excavation of small-section tunnels is difficult, resulting in low excavation efficiency and long time consumption, which increases manpower and economic costs. If a temporary working platform for small sections is built during construction, although it can meet the construction needs, there are still problems of time-consuming and labor-intensive assembly and disassembly of the temporary working platform, as well as low efficiency. In addition, the temporary working platform cannot be retracted, which makes it difficult for workers to carry and move it conveniently. Utility Model Content

[0003] The utility model aims to provide a folding trolley device for excavating a small-section tunnel, which solves the problems of low excavation construction efficiency, long time consumption, high cost and inability to be folded, carried and moved in the prior art.

[0004] The technical solution adopted by the utility model is a folding trolley device for excavating a small-section tunnel, comprising an equipment frame, the equipment frame comprising two parallel bottom frames arranged along the tunnel direction, a plurality of side frames perpendicular to the ground arranged on each bottom frame, a first top frame arranged in parallel between the side frames on both sides, a first latch arranged at the interface between the side frame and the first top frame, two second latches arranged at equal intervals in the middle of the first top frame, a first diagonal brace hinged on the second latch, and the other end of the first diagonal brace is rotatably connected to the side frame via a first support.

[0005] The utility model is also characterized in that:

[0006] One end of a plurality of side frames away from the ground is fixedly connected to a second top frame which is parallel to the bottom frame.

[0007] The second latch is the folding point.

[0008] The side frame is rotatably connected to the first top frame via a first latch.

[0009] Side wings are respectively arranged at the middle positions on both sides of the side frame, the side wings are rotatably connected to the side frame through the third latch, the other side of the side wing is rotatably connected to the second diagonal brace, a fourth latch is arranged at the interface between the side wing and the second diagonal brace, and the other end of the second diagonal brace is rotatably connected to the side frame through the second support.

[0010] The side wing is rotatably connected to the second diagonal support interface via a fourth latch.

[0011] The two bottom frames are symmetrically connected to the two tires on the side close to the ground, and the bottom of each tire is fitted with a stop block.

[0012] The ends of the bottom frame and the second top frame are cross-fixed with the diagonal frame, and the intersection of the diagonal frame is fixed with the side frame.

[0013] A ladder is arranged on one side of the side frame.

[0014] The beneficial effects of the utility model are:

[0015] The utility model discloses a folding trolley device for excavating a small-section tunnel, which has the advantages of low construction cost, simple processing, easy operation, high efficiency, and reusable construction materials after removal, effectively reducing construction risks, improving work efficiency, and can be widely used. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a side view of the folding trolley device for excavating a small-section tunnel of the utility model;

[0017] Figure 2 It is a front view of a folding trolley device for excavating a small-section tunnel according to the utility model.

[0018] In the figure: 101. top frame; 102. side frame; 103. cable-stayed frame; 104. bottom frame; 201. first diagonal brace; 202. second diagonal brace; 301. first latch; 302. second latch; 30. third latch; 304. fourth latch; 401. first support; 402. second support; 5. side wing; 6. ladder; 7. tire; 8. anti-entry pad. DETAILED DESCRIPTION

[0019] The utility model is described in detail below with reference to the accompanying drawings and specific implementation modes.

[0020] like Figure 1 As shown, the small-section tunnel excavation folding trolley device includes a device frame 1, which includes two parallel bottom frames 104 arranged along the tunnel direction, each bottom frame 104 is provided with a plurality of side frames 102 perpendicular to the ground, and a first top frame 101 is arranged parallel between the side frames 102 on both sides. Figure 2 As shown, a first pin 301 is provided at the interface between the side frame 102 and the first top frame 101, and the side frame 102 and the first top frame 101 are rotatably connected through the first pin 301. Two second pins 302 are equidistantly provided in the middle of the first top frame 101, and the second pins 302 are folding points. A first diagonal brace 201 is also hinged on the second pin 302, and the other end of the first diagonal brace 201 is rotatably connected to the side frame 102 through a first support 401. A plurality of side frames 102 are fixedly connected at one end away from the ground to a second top frame 105 parallel to the bottom frame 104.

[0021] like Figure 1 As shown, side wings 5 ​​are respectively provided at the middle positions on both sides of the side frame 102, and the side wings 5 ​​are rotatably connected to the side frame 102 through the third pin 303, and the other side of the side wing 5 is rotatably connected to the second diagonal brace 202, and a fourth pin 304 is provided at the interface between the side wing 5 and the second diagonal brace 202, and the other end of the second diagonal brace 202 is rotatably connected to the side frame 102 through the second support 402, and the side wing 5 is rotatably connected to the interface of the second diagonal brace 202 through the fourth pin 304.

[0022] The two bottom frames 104 are symmetrically connected to the two tires 7 on the side close to the ground, and an anti-entry pad 8 is attached to the bottom of each tire 7. The ends of the bottom frame 104 and the second top frame 105 are cross-fixed with the diagonal frame 103, and the intersection of the diagonal frame 103 is fixed with the side frame 102, and a ladder 6 is arranged on one side of the side frame 102.

[0023] The utility model provides a small-section tunnel excavation folding trolley device, and its working principle is as follows: a simple trolley device frame (1) is manufactured to assemble into a tunnel excavation support trolley, four moving tires (7) are installed at the bottom of the trolley device frame (1) to move the trolley device frame (1) and to balance the trolley device frame (1). A pedestrian passage can be arranged according to the on-site working environment, and then the trolley side wing (5) is connected to the trolley through a latch (3) and a diagonal brace (2), and the diagonal brace (2) plays a supporting role through a support (4). A steel ladder (6) is welded on the side of the trolley device frame (1) to be used for For upward and downward passage, all folding points are connected by latches (3). When the trolley equipment is required to operate, the trolley is fixed by placing pads, and all folding points are opened. The diagonal braces (2) support the trolley equipment frame (1) and the side wings (5); when a mechanical passage is required, the trolley equipment needs to be folded, and the fixed pads are first removed, and then the diagonal braces (2) are moved out of the support (4), and the trolley is manually pushed sideways to fold the trolley to the side of the tunnel to provide a mechanical transportation passage. The overall manufacturing is simple, the materials are universal, the cost is low, and the manpower input can be reduced, and the construction period can be saved. On the other hand, it can effectively reduce the construction risk and improve the work efficiency.

[0024] Example 1

[0025] like Figure 1 As shown, the small-section tunnel excavation folding trolley device includes a device frame 1, which includes two parallel bottom frames 104 arranged along the tunnel direction, each bottom frame 104 is provided with a plurality of side frames 102 perpendicular to the ground, and a first top frame 101 is arranged parallel between the side frames 102 on both sides. Figure 2As shown, a first pin 301 is provided at the interface between the side frame 102 and the first top frame 101, and the side frame 102 and the first top frame 101 are rotatably connected through the first pin 301. Two second pins 302 are equidistantly provided in the middle of the first top frame 101, and the second pins 302 are folding points. A first diagonal brace 201 is also hinged on the second pin 302, and the other end of the first diagonal brace 201 is rotatably connected to the side frame 102 through a first support 401. A plurality of side frames 102 are fixedly connected at one end away from the ground to a second top frame 105 parallel to the bottom frame 104.

[0026] Example 2

[0027] like Figure 1 As shown, the small-section tunnel excavation folding trolley device includes a device frame 1, which includes two parallel bottom frames 104 arranged along the tunnel direction, each bottom frame 104 is provided with a plurality of side frames 102 perpendicular to the ground, and a first top frame 101 is arranged parallel between the side frames 102 on both sides. Figure 2 As shown, a first pin 301 is provided at the interface between the side frame 102 and the first top frame 101, and the side frame 102 and the first top frame 101 are rotatably connected through the first pin 301. Two second pins 302 are equidistantly provided in the middle of the first top frame 101, and the second pins 302 are folding points. A first diagonal brace 201 is also hinged on the second pin 302, and the other end of the first diagonal brace 201 is rotatably connected to the side frame 102 through a first support 401. A plurality of side frames 102 are fixedly connected at one end away from the ground to a second top frame 105 parallel to the bottom frame 104.

[0028] like Figure 1 As shown, side wings 5 ​​are respectively provided at the middle positions on both sides of the side frame 102, and the side wings 5 ​​are rotatably connected to the side frame 102 through the third pin 303, and the other side of the side wing 5 is rotatably connected to the second diagonal brace 202, and a fourth pin 304 is provided at the interface between the side wing 5 and the second diagonal brace 202, and the other end of the second diagonal brace 202 is rotatably connected to the side frame 102 through the second support 402, and the side wing 5 is rotatably connected to the interface of the second diagonal brace 202 through the fourth pin 304.

[0029] Example 3

[0030] like Figure 1 As shown, the small-section tunnel excavation folding trolley device includes a device frame 1, which includes two parallel bottom frames 104 arranged along the tunnel direction, each bottom frame 104 is provided with a plurality of side frames 102 perpendicular to the ground, and a first top frame 101 is arranged parallel between the side frames 102 on both sides. Figure 2As shown, a first pin 301 is provided at the interface between the side frame 102 and the first top frame 101, and the side frame 102 and the first top frame 101 are rotatably connected through the first pin 301. Two second pins 302 are equidistantly provided in the middle of the first top frame 101, and the second pins 302 are folding points. A first diagonal brace 201 is also hinged on the second pin 302, and the other end of the first diagonal brace 201 is rotatably connected to the side frame 102 through a first support 401. A plurality of side frames 102 are fixedly connected at one end away from the ground to a second top frame 105 parallel to the bottom frame 104.

[0031] like Figure 1 As shown, side wings 5 ​​are respectively provided at the middle positions on both sides of the side frame 102, and the side wings 5 ​​are rotatably connected to the side frame 102 through the third pin 303, and the other side of the side wing 5 is rotatably connected to the second diagonal brace 202, and a fourth pin 304 is provided at the interface between the side wing 5 and the second diagonal brace 202, and the other end of the second diagonal brace 202 is rotatably connected to the side frame 102 through the second support 402, and the side wing 5 is rotatably connected to the interface of the second diagonal brace 202 through the fourth pin 304.

[0032] The two bottom frames 104 are symmetrically connected to the two tires 7 on the side close to the ground, and an anti-entry pad 8 is attached to the bottom of each tire 7. The ends of the bottom frame 104 and the second top frame 105 are cross-fixed with the diagonal frame 103, and the intersection of the diagonal frame 103 is fixed with the side frame 102, and a ladder 6 is arranged on one side of the side frame 102.

Claims

1. Small-section tunnel excavation folding trolley equipment, characterized in that: The invention comprises an equipment frame (1), wherein the equipment frame (1) comprises two parallel bottom frames (104) arranged along the tunnel direction, a plurality of side frames (102) perpendicular to the ground are arranged on each of the bottom frames (104), a first top frame (101) is arranged in parallel between the side frames (102) on both sides, a first latch (301) is arranged at the interface between the side frames (102) and the first top frame (101), two second latches (302) are arranged at equal intervals in the middle of the first top frame (101), a first diagonal brace (201) is hinged on the second latch (302), and the other end of the first diagonal brace (201) is rotatably connected to the side frame (102) via a first support (401).

2. The small-section tunnel excavation folding trolley device according to claim 1 is characterized in that: The ends of the side frames (102) away from the ground are fixedly connected to a second top frame (105) parallel to the bottom frame (104).

3. The small-section tunnel excavation folding trolley device according to claim 1 is characterized in that: The second latch (302) is a folding point.

4. The small-section tunnel excavation folding trolley device according to claim 1 is characterized in that: The side frame (102) is rotatably connected to the first top frame (101) via a first latch (301).

5. The small-section tunnel excavation folding trolley device according to claim 1, characterized in that: Side wings (5) are respectively arranged at the middle positions on both sides of the side frame (102); the side wings (5) are rotatably connected to the side frame (102) via a third latch (303); the other side of the side wing (5) is rotatably connected to a second diagonal brace (202); a fourth latch (304) is arranged at the interface between the side wing (5) and the second diagonal brace (202); the other end of the second diagonal brace (202) is rotatably connected to the side frame (102) via a second support (402).

6. The small-section tunnel excavation folding trolley device according to claim 5, characterized in that: The side wing (5) is rotatably connected to the interface of the second diagonal support (202) via a fourth latch (304).

7. The small-section tunnel excavation folding trolley device according to claim 6, characterized in that: The two bottom frames (104) are symmetrically connected to two tires (7) on one side close to the ground, and an anti-advance pad (8) is attached to the bottom of each tire (7).

8. The small-section tunnel excavation folding trolley device according to claim 7, characterized in that: The ends of the bottom frame (104) and the second top frame (105) are cross-fixed with the diagonal frame (103), and the diagonal frame (103) is fixed to the side frame (102) at the intersection.

9. The folding trolley device for excavating a small-section tunnel according to claim 8, characterized in that: A ladder (6) is provided on one side of the side frame (102).