Heat treatment system in heating furnace
By setting up multi-curve heating temperature control and transmission drive in the heating furnace, the problem that workpieces cannot control the advance speed and process conversion separately in the prior art is solved, and the process conversion is fast and efficient, and the production efficiency and production capacity are improved.
Patent Information
- Application Number
- CN202420636810.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-03-29
AI Technical Summary
In the existing heat treatment industry, the stick-gradual and step-by-step heat treatment main heating furnace cannot control the forward speed and process of the workpiece separately, resulting in the need to clear all workstations when changing the processing workpiece or process to perform the next process, resulting in energy and time. waste.
Design a heat treatment system in the heating furnace. By setting a temperature control area and dividing it into eight temperature control areas, multi-curve heating temperature control and transmission driving methods are adopted to realize multi-curve transmission and independent temperature control of the workpiece, allowing the workpiece to move in the process of gradual transition process parameters.
It achieves rapid and efficient process conversion, reduces energy and time waste, expands the range of heating workpieces, and improves production efficiency and production capacity.
Smart Images

Figure CN222123918U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of heat treatment, and in particular relates to a heat treatment system in a heating furnace. Background Art
[0002] In the existing heat treatment industry, in the main heating furnace of progressive and step-type heat treatment of sticks, multiple temperature control zones correspond to different workstations, and the transmission drive uses a single main drive to drive all workstations, driving the workpieces on all workstations to move. Since the forward speed of all workpieces is the same and cannot be controlled individually, the workpiece can only execute a single process after entering the main heating furnace, and the process conversion cannot be performed. Therefore, when changing the workpiece or processing technology, the process conversion is required, and the heat treatment temperature and heating time at different stages are changed, all workstations in the heating furnace must be cleared before the next process can be executed, resulting in energy waste and time waste. Summary of the invention
[0003] In view of the defects of the above-mentioned prior art, the purpose of the utility model is to provide a heat treatment system in a heating furnace and a heat treatment process conversion method thereof, to improve the temperature control method and transmission drive of the main heating furnace, and to realize multi-curve heating temperature control.
[0004] To achieve the above-mentioned purpose, the technical solution adopted by the utility model is: a heat treatment system in a heating furnace, wherein a temperature control area is arranged in the heating furnace, wherein the temperature control area covers and controls ten heat treatment processing stations, wherein the temperature control area is divided into eight temperature control zones, which are temperature control zone 1 to temperature control zone 8 in the forward direction of the workpiece; among the ten heat treatment processing stations, station No. 1 is in the coverage control range of temperature control zone 1, a part of station No. 2 is in the coverage control range of temperature control zone 1, and the other part is in the coverage control range of temperature control zone 2, station No. 3 is in the coverage control range of temperature control zone 2, station No. 4 is in the coverage control range of temperature control zone 3, and station No. 5 is in the coverage control range of temperature control zone 6. The coverage control range of temperature control zone 4, workstation 6 is in the coverage control range of temperature control zone 5, workstations 7 and 8 are in the coverage control range of temperature control zone 6, workstation 9 is in the coverage control range of temperature control zone 7, and workstation 10 is in the coverage control range of temperature control zone 8; the workpieces on the ten heat treatment processing stations are moved in sequence through the transmission control of the stations, among which workstations 1 and 2 are controlled by the first main transmission drive M1 to transmit, workstations 3, 4, and 5 are controlled by the second main transmission drive M2 to transmit, workstations 6, 7, 8, and 9 are controlled by the third main transmission drive M3 to transmit, and workstation 10 is controlled by the quick-out waiting transmission drive M4 to transmit.
[0005] Furthermore, a fast-forward transmission drive M0 is provided at the transmission entrance in front of the No. 1 station, and the workpiece is transmitted from the heating furnace entrance into the No. 1 station by the fast-forward transmission drive M0.
[0006] Furthermore, a front air lock chamber is arranged in front of the entrance of the temperature control area, and the front air lock chamber is connected between the entrance of the heating furnace and the entrance of the temperature control area. The fast-forward transmission drive M0 is arranged at the end of the conveying device corresponding to the front air lock chamber to control the conveyance of the workpiece between the entrance of the heating furnace and the front air lock chamber; an in-place monitoring grating is arranged at the entrance of the heating furnace; and in-place monitoring gratings are respectively arranged at both ends of the conveying device driven by the fast-forward transmission drive M0.
[0007] Furthermore, a quick-out transmission drive M5 is provided at the conveying exit behind the No. 10 station, and the workpiece is conveyed from the No. 10 station to the heating furnace exit through the quick-out transmission drive M5.
[0008] Furthermore, a rear air lock chamber is arranged behind the outlet of the temperature control area, and the rear air lock chamber is connected between the outlet of the temperature control area and the outlet of the heating furnace. The quick-out transmission drive M5 is arranged at the end of the conveying device corresponding to the outlet of the heating furnace to control the conveyance of the workpiece between the rear air lock chamber and the outlet of the heating furnace; and both ends of the conveying device driven by the quick-out transmission drive M5 are respectively provided with in-place monitoring gratings.
[0009] Furthermore, the first main transmission drive M1, the second main transmission drive M2, the third main transmission drive M3 and the quick-out waiting transmission drive M4 are all rear drive structures, and the first main transmission drive M1, the second main transmission drive M2, the third main transmission drive M3 and the quick-out waiting transmission drive M4 are respectively arranged on the rear workstations corresponding to the control transmission.
[0010] Furthermore, both ends of the conveying devices driven by the first main transmission drive M1, the second main transmission drive M2, the third main transmission drive M3 and the fast-out waiting transmission drive M4 are provided with in-position monitoring gratings.
[0011] Furthermore, a conveying device for conveying workpieces is provided below the temperature control area in the heating furnace. The conveying device is divided into ten fixed workstations corresponding to the eight temperature control zones. The conveying device is controlled by a plurality of transmission drives. The conveying device is a chain conveyor belt, and the plurality of transmission drives are servo motors.
[0012] Furthermore, eight temperature control zones are respectively provided with independent heater groups, thermocouples and temperature control instruments. Each heater group is independently controlled by an independent temperature control instrument, and each temperature control zone has an independent thermocouple that feeds back to the temperature control instrument for control; separate temperature control zones are provided with independent insulation devices for isolation and distinction.
[0013] Furthermore, a stirring fan is arranged inside the heating furnace to ensure the uniformity of the temperature inside the furnace.
[0014] A heat treatment process conversion method for a heat treatment system in a heating furnace, when performing process conversion, delays loading of materials, and waits until at least two workstation positions are vacant before loading and processing, and moves along workstations 1-10 with the vacant workstation positions. Along the moving direction, the temperature control zone and transmission drive corresponding to the workstation behind the vacant workstation position adopt the new process parameter settings, and the temperature control zone and transmission drive corresponding to the workstation in front of the vacant workstation position adopt the old process parameter settings, and gradually transition to the new process parameters as the vacant workstation position moves forward.
[0015] The beneficial effects of the utility model are as follows: the utility model improves the temperature control mode transmission drive of the original progressive and step-by-step heat treatment main heating furnace for sticks, realizes multi-curve heating temperature control, effectively improves production efficiency, expands the range of heated workpieces, fills the industry gap that the process cannot be adjusted after the workpiece enters the heating furnace, and effectively improves the process method for production capacity. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the heat treatment system in the heating furnace before improvement;
[0017] Figure 2 This is a schematic diagram of the heat treatment system in the improved heating furnace of the utility model;
[0018] In the figure: 1. front air lock chamber, 2. rear air lock chamber, 3. fast-forward transmission drive M0, 4. first main transmission drive M1, 5. second main transmission drive M2, 6. third main transmission drive M3, 7. fast-out waiting transmission drive M4, 8. fast-out transmission drive M5, 9. in-place monitoring grating (11 in total), 10. stirring fan. DETAILED DESCRIPTION
[0019] In order to make the structure and function of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0020] See attached Figure 2, a heat treatment system in a heating furnace, wherein a temperature control area is arranged in the heating furnace, wherein the temperature control area covers and controls ten heat treatment processing stations, wherein the temperature control area is divided into eight temperature control zones, which are temperature control zone 1 to temperature control zone 8 in the forward direction of the workpiece; among the ten heat treatment processing stations, station No. 1 is in the coverage control range of temperature control zone 1, a part of station No. 2 is in the coverage control range of temperature control zone 1, and the other part is in the coverage control range of temperature control zone 2, station No. 3 is in the coverage control range of temperature control zone 2, station No. 4 is in the coverage control range of temperature control zone 3, and station No. 5 is in the coverage control range of temperature control zone 4, Workstation No. 6 is within the coverage control range of temperature control zone 5, workstations No. 7 and 8 are within the coverage control range of temperature control zone 6, workstation No. 9 is within the coverage control range of temperature control zone 7, and workstation No. 10 is within the coverage control range of temperature control zone 8; the workpieces on the ten heat treatment processing workstations are moved in sequence through the transmission control of the workstations, among which workstations No. 1 and No. 2 are controlled for transmission by the first main transmission drive M1, workstations No. 3, 4, and 5 are controlled for transmission by the second main transmission drive M2, workstations No. 6, 7, 8, and 9 are controlled for transmission by the third main transmission drive M3, and workstation No. 10 is controlled for transmission by the quick-out waiting transmission drive M4.
[0021] Based on the above technical solution, station 2 is between temperature control zones 1 and 2, because stations 1 and 2 are driven by a transmission, and station 2 is in the temperature climbing stage. Zone 2 alone cannot reach the process set temperature. Station 1 has high power and strong heating capacity, which indirectly complements station 2 and lays a good foundation for the stability of the next temperature control zone, so that good products can be processed and the organization can be stable.
[0022] There are eight temperature control zones in the heating furnace. Each temperature control zone refers to a heating area. Each zone is composed of several heaters, corresponding to eight groups of heaters, for independent heating and independent control, which is convenient for process conversion. Different areas have corresponding temperature control instruments to control the corresponding heaters independently. Separate areas have independent insulation devices for isolation and distinction. Each temperature control zone has an independent thermocouple to feedback to the temperature control instrument for control. The PID mode is used to form a temperature closed-loop control to ensure that the internal structure of the product meets the process requirements. This is the core technical essence of heat treatment research. The thermocouple test point is 200mm below the insulation layer. The actual temperature in the furnace is measured. Because there is a circulating fan in the furnace, the temperature in the furnace is uniform, which reflects the actual temperature of the workpiece. Ten heat treatment processing stations refer to ten fixed positions for placing workpieces. When the heating furnace is put into use, a maximum of ten workpieces can be processed in the temperature control area.
[0023] Furthermore, a fast-forward transmission drive M0 is provided at the transmission entrance in front of the No. 1 station, and the workpiece is transmitted from the heating furnace entrance to the No. 1 station through the fast-forward transmission drive M0. A front air lock chamber is provided in front of the entrance of the temperature control area, and the front air lock chamber is connected between the heating furnace entrance and the temperature control area entrance. The fast-forward transmission drive M0 is provided at the end of the transmission device corresponding to the front air lock chamber to control the transmission of the workpiece at the heating furnace entrance and the front air lock chamber.
[0024] Furthermore, a quick-out transmission drive M5 is provided at the conveying exit behind the No. 10 station, and the workpiece is conveyed from the No. 10 station to the heating furnace exit through the quick-out transmission drive M5. A rear air lock chamber is provided behind the exit of the temperature control area, and the rear air lock chamber is connected between the exit of the temperature control area and the exit of the heating furnace. The quick-out transmission drive M5 is provided at the end of the conveying device corresponding to the exit of the heating furnace, and controls the conveyance of the workpiece between the rear air lock chamber and the exit of the heating furnace.
[0025] Furthermore, the fast-forward transmission drive M0, the first main transmission drive M1, the second main transmission drive M2, the third main transmission drive M3, the fast-exit waiting transmission drive M4 and the fast-exit transmission drive M5 are all rear drive structures, and the fast-forward transmission drive M0, the first main transmission drive M1, the second main transmission drive M2, the third main transmission drive M3, the fast-exit waiting transmission drive M4 and the fast-exit transmission drive M5 are respectively arranged on the rear workstations corresponding to the control transmission.
[0026] Based on the above technical solution, the workpiece transmission from the entrance to the exit of the heating furnace is realized by a conveyor belt, and the multiple sections of conveyor belts controlled by the transmission drive M0-M5 form a continuous workpiece transmission channel.
[0027] Furthermore, both ends (transmission entrance and transmission exit) of the workstations driven by the fast-forward transmission drive M0, the first main transmission drive M1, the second main transmission drive M2, the third main transmission drive M3, the fast-out waiting transmission drive M4 and the fast-out transmission drive M5 are provided with in-place monitoring gratings for positioning control; the in-place monitoring gratings are provided at the entrance of the heating furnace for positioning control. There are 11 in-place monitoring gratings in total. Figure 2 Not all are shown.
[0028] Furthermore, a conveying device for conveying workpieces is provided below the temperature control area in the heating furnace. The conveying device is divided into ten fixed workstations corresponding to the eight temperature control zones. The conveying device is controlled by a plurality of transmission drives. The conveying device is a chain conveyor belt, and the plurality of transmission drives are servo motors.
[0029] Based on the above technical solution, the transmission drive refers to the use of a servo motor in conjunction with a grating in place to achieve accurate positioning. The process sets the temperature and insulation time of the product in each area, which requires the servo motor and the grating in place to achieve accurate positioning. The workstation transmission mechanism is a chain, which has the advantages of high temperature resistance and accurate transmission.
[0030] A heat treatment process conversion method for a heat treatment system in a heating furnace, when performing process conversion, delays loading of materials, and waits until at least two workstation positions are vacant before loading and processing, and moves along workstations 1-10 with the vacant workstation positions. Along the moving direction, the temperature control zone and transmission drive corresponding to the workstation behind the vacant workstation position adopt the new process parameter settings, and the temperature control zone and transmission drive corresponding to the workstation in front of the vacant workstation position adopt the old process parameter settings, and gradually transition to the new process parameters as the vacant workstation position moves forward.
[0031] Figure 1 The shortcomings of the previous technology are as follows: if the processing method needs to be changed, all workstations in the heating furnace must be cleared before the next process can be executed, resulting in waste of energy and time.
[0032] Therefore, this application is based on Figure 2 The temperature control zones and transmission drive arrangement within the system are replanned in a certain way. Specifically, the utility model designs eight temperature control zones ①-⑧ and 3 main transmission drives.
[0033] The fast-forward transmission drive is (M0), stations 1 and 2 have one main transmission drive (M1), stations 3 to 5 have one main transmission drive (M2), stations 6 to 9 have one main transmission drive (M3), station 10 has a separate transmission drive (M4) (fast-exit waiting transmission), and the fast-exit transmission drive is (M5); both ends of each transmission drive have in-place monitoring functions.
[0034] The temperature control zones of the utility model are zone ① for stations 1 and 2, zone ② for stations 2 and 3, zone ③ for station 4, zone ④ for station 5, zone ⑤ for station 6, zone ⑥ for stations 7 and 8, zone ⑦ for station 9, and zone ⑧ for station 10.
[0035] Take the example of leaving two workstations empty during process changeover under extreme conditions:
[0036] Workstations 1 and 2 are vacated, zone ① transitions from the old process temperature to the new process temperature, zones ②-⑧ use the old process temperature, M1 quickly completes the process conversion (transmission speed conversion is completed within a few seconds) and reaches the new process speed, and M2-M4 use the old process speed;
[0037] Workstations 2 and 3 are vacant, zone ① adopts the new process temperature, zone ② transitions from the old process temperature to the new process temperature, zones ③-⑧ adopt the old process temperature, M1 adopts the new process speed, and M2-M4 adopts the old process speed;
[0038] Workstations 3 and 4 are vacant, zones ①-② adopt the new process temperature, zone ③ transitions from the old process temperature to the new process temperature, zones ④-⑧ adopt the old process temperature, M1 adopts the new process speed, and M2-M4 adopt the old process speed;
[0039] Workstations 4 and 5 are vacant, zones ①-② adopt the new process temperature, zones ③-④ transition from the old process temperature to the new process temperature, zones ⑤-⑧ adopt the old process temperature, M1 and M2 adopt the new process speed, and M3 and M4 adopt the old process speed;
[0040] Workstations 5 and 6 are vacant, zones ①-③ adopt new process temperature, zones ④-⑤ transition from old process temperature to new process temperature, zones ⑥-⑧ adopt old process temperature, M1 and M2 adopt new process speed, and M3 and M4 adopt old process speed;
[0041] Workstations 6 and 7 are vacant, zones ①-④ adopt the new process temperature, zone ⑤ transitions from the old process temperature to the new process temperature, zones ⑥-⑧ adopt the old process temperature, M1 and M2 adopt the new process speed, and M3 and M4 adopt the old process speed;
[0042] Workstations 7 and 8 are vacant, zones ①-⑤ adopt the new process temperature, zone ⑥ transitions from the old process temperature to the new process temperature, zones ⑦-⑧ adopt the old process temperature, M1 and M2 adopt the new process speed, and M3-M4 adopt the old process speed;
[0043] It should be noted that when stations 7 and 8 are vacant, station 6 is a new workpiece, and station 9 is an old workpiece. Before the workpiece on station 9 reaches station 10, M3 runs at the original set speed. After station 9 reaches station 10, M3 adjusts the speed according to the total time of the new process. Since stations 7 and 8 are vacant, the total time can be adjusted through the vacant stations. In case ①, the process (new process) time of the workpiece processed at station 6 is longer than the old process, and the total time is not affected. In case ②, the process (new process) time of the workpiece processed at station 6 is shorter than the old process. After the workpiece at station 9 reaches station 10, the M3 speed is automatically converted to achieve the total time of the workpiece from station 6 to station 9 unchanged. That is, the overall processing time of the workpiece can be controlled by adjusting M3, and the temperature is adjusted through the transition micro-adjustment of the temperature control zone. During this process, due to the presence of an in-place monitoring grating for detection, even if M3 uses the old process speed and the transmission is slower, and M2 uses the new process speed and the transmission is faster, the workpiece at position 5 will not collide with the workpiece at position 6;
[0044] Workstations 8 and 9 are vacant, zones ①-⑥ adopt the new process temperature, zone ⑦ transitions from the old process temperature to the new process temperature, zone ⑧ adopts the old process temperature, M1-M2 adopt the new process speed, M3 adjusts the transition to the new process speed according to the change of processing time, and M4 adopts the old process speed;
[0045] Workstations 9 and 10 are vacant, zones ①-⑥ adopt the new process temperature, zones ⑦-⑧ transition from the old process temperature to the new process temperature, M1-M3 adopt the new process speed, and M1 quickly completes the process conversion (transmission speed conversion is completed within a few seconds) to reach the new process speed.
[0046] Under the existing 10 workstation conditions, the utility model designs eight temperature control zones ①-⑧ and 3 main transmission drives. It can realize batch transmission control of 10 workstations while ensuring the minimum number of main transmission drives, filling the industry gap that the process cannot be adjusted after the workpiece enters the heating furnace.
[0047] The advantages of this utility model compared with the existing technology:
[0048] 1. There is no need to clear all workstations, just vacate two workstations to achieve process conversion.
[0049] 2. With the uniquely designed temperature control zone, the process can be fully controlled.
[0050] It should be noted that the parts not described in detail in the present invention are prior art.
[0051] The above examples are only the best embodiments of the present invention. Obviously, the present invention is not limited to the above examples, and there are many variations. All variations that can be directly derived or associated with the contents disclosed by a person skilled in the art should be considered as the protection scope of the present invention.
Claims
1. A heat treatment system in a heating furnace, characterized in that: A temperature control area is provided in the heating furnace, and the temperature control area covers and controls ten heat treatment processing stations. The temperature control area is divided into eight temperature control zones, which are temperature control zone 1 to temperature control zone 8 in the forward direction of the workpiece; among the ten heat treatment processing stations, station No. 1 is in the coverage control range of temperature control zone 1, a part of station No. 2 is in the coverage control range of temperature control zone 1, and the other part is in the coverage control range of temperature control zone 2, station No. 3 is in the coverage control range of temperature control zone 2, station No. 4 is in the coverage control range of temperature control zone 3, station No. 5 is in the coverage control range of temperature control zone 4, and station No. 6 is in the coverage control range of temperature control zone 7. The coverage control range of temperature control zone 5, workstations 7 and 8 are in the coverage control range of temperature control zone 6, workstation 9 is in the coverage control range of temperature control zone 7, and workstation 10 is in the coverage control range of temperature control zone 8; the workpieces on the ten heat treatment processing workstations are moved in sequence through the transmission control of the workstations, among which workstations 1 and 2 are controlled by the first main transmission drive M1 to transmit, workstations 3, 4, and 5 are controlled by the second main transmission drive M2 to transmit, workstations 6, 7, 8, and 9 are controlled by the third main transmission drive M3 to transmit, and workstation 10 is controlled by the quick-out waiting transmission drive M4 to transmit.
2. A heat treatment system in a heating furnace according to claim 1, characterized in that: A fast-forward transmission drive M0 is arranged at the transmission entrance in front of the No. 1 station, and the workpiece is transmitted from the heating furnace entrance to the No. 1 station by the fast-forward transmission drive M0.
3. A heat treatment system in a heating furnace according to claim 2, characterized in that: A front air lock chamber is arranged in front of the entrance of the temperature control area, and the front air lock chamber is connected between the entrance of the heating furnace and the entrance of the temperature control area. The fast-forward transmission drive M0 is arranged at the end of the conveying device corresponding to the front air lock chamber to control the conveyance of the workpiece between the entrance of the heating furnace and the front air lock chamber; an in-place monitoring grating is arranged at the entrance of the heating furnace; and in-place monitoring gratings are respectively arranged at both ends of the conveying device driven by the fast-forward transmission drive M0.
4. A heat treatment system in a heating furnace according to claim 1, characterized in that: A quick-out transmission drive M5 is provided at the conveying exit behind the No. 10 station, and the workpiece is conveyed from the No. 10 station to the heating furnace exit through the quick-out transmission drive M5.
5. A heat treatment system in a heating furnace according to claim 4, characterized in that: A rear air lock chamber is arranged behind the exit of the temperature control area, and the rear air lock chamber is connected between the exit of the temperature control area and the exit of the heating furnace. The quick-out transmission drive M5 is arranged at the end of the conveying device corresponding to the exit of the heating furnace to control the conveyance of the workpiece between the rear air lock chamber and the exit of the heating furnace; and both ends of the conveying device driven by the quick-out transmission drive M5 are respectively provided with in-place monitoring gratings.
6. A heat treatment system in a heating furnace according to claim 1, characterized in that: The first main transmission drive M1, the second main transmission drive M2, the third main transmission drive M3 and the quick-out waiting transmission drive M4 are all rear drive structures, and the first main transmission drive M1, the second main transmission drive M2, the third main transmission drive M3 and the quick-out waiting transmission drive M4 are respectively arranged on the rear stations of the corresponding controlled conveying devices.
7. The heat treatment system in a heating furnace according to claim 1, characterized in that: Both ends of the conveying devices driven by the first main transmission drive M1, the second main transmission drive M2, the third main transmission drive M3 and the fast-out waiting transmission drive M4 are provided with in-position monitoring gratings.
8. The heat treatment system in a heating furnace according to claim 1, characterized in that: A conveying device for conveying workpieces is arranged below the temperature control area in the heating furnace. The conveying device is divided into ten fixed workstations corresponding to the eight temperature control zones. The conveying device is controlled by a plurality of transmission drives. The conveying device is a chain conveyor belt, and the plurality of transmission drives are servo motors.
9. The heat treatment system in a heating furnace according to claim 1, characterized in that: The eight temperature control zones are respectively provided with independent heater groups, thermocouples and temperature control instruments. Each heater group is independently controlled by an independent temperature control instrument, and each temperature control zone has an independent thermocouple that feeds back to the temperature control instrument for control.
