Composite track for GIS movable dustproof shed
By installing horizontal rails in the cable trench and using fixed components and placement racks, the problem of large space occupied by the installation of GIS mobile dustproof shed tracks is solved, and convenient disassembly and assembly of the tracks and the composite use of the cable trench is achieved, which meets the 500kV GIS Compact demand for smart installation.
Patent Information
- Application Number
- CN202420797501.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-12-10
- Estimated Expiration
- 2034-04-17
AI Technical Summary
The track installation method of the existing GIS mobile dustproof shed takes up a lot of space and is difficult to meet the compact needs of 500kV GIS smart installation.
The horizontal rail is installed in the cable trench and fixed in the steel cement layer and ash soil layer of the cable trench by bolts. The fixed components and placement frames are used to achieve the fixing and disassembly of the tracks, which is convenient for the composite use of the cable trench.
It effectively reduces the footprint, realizes the convenient disassembly and assembly of horizontal rails and the composite use of cable trenches, and solves the problem of large space occupation.
Smart Images

Figure CN222139666U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of installation of a GIS mobile dustproof shed, in particular to a composite track of a GIS mobile dustproof shed. Background Art
[0002] GIS is the abbreviation of Gas Insulated Switchgear, which is a high-voltage switchgear commonly used in power transmission and distribution systems. It consists of circuit breakers, disconnectors, grounding switches, transformers, lightning arresters, busbars, connectors and outgoing terminals. These devices or components are all enclosed in a metal grounded casing, which is filled with SF6 insulating gas at a certain pressure, so it is also called SF6 fully enclosed switchgear.
[0003] With the requirements of 500kV GIS intelligent installation, mobile dustproof sheds are increasingly used. Figure 1 The conventional practice for the track of the mobile dustproof shed is to dig a trench 100 on the ground to lay the horizontal track, which is arranged in parallel with the matching cable trench 200. The cable trench is set close to the foundation of the horizontal track, which occupies a large space. Utility Model Content
[0004] In order to solve the above technical problems, the utility model provides a composite track for a GIS mobile dustproof shed, which can install the horizontal track in a cable trench to reduce the occupied area.
[0005] The utility model is implemented by the following technical scheme: a composite track of a GIS mobile dustproof shed, wherein GIS electrical equipment is arranged in the mobile dustproof shed, and track wheels are arranged on the bottoms of both sides of the mobile dustproof shed, and the track wheels are arranged on the horizontal rails; the horizontal rails are fixed in the cable trench through the fixing components, and the cable trench is fixed underground.
[0006] Preferably, the fixing assembly includes fixing blocks placed on the left and right sides of the lower end of the horizontal rail, and bolts are installed on the fixing blocks. The bolts penetrate the fixing blocks and the cable trench and extend to the underground below the cable trench, and nuts are threaded on the bolts.
[0007] Preferably, the inner bottom surface of the cable trench has a first reinforced cement layer.
[0008] Preferably, a steel plate is fixed in the first reinforced concrete layer, and the bolts pass through the steel plate.
[0009] Preferably, a drainage ditch is provided on the top of the first reinforced concrete layer.
[0010] Preferably, there is a second reinforced concrete layer underground below the cable trench, and there is a ash soil layer below the second reinforced concrete layer.
[0011] Preferably, a placement rack for placing cables is fixed on both sides of the cable trench, and the placement rack has a plurality of placement plates.
[0012] Preferably, the cable is fixed by a binding rope.
[0013] Preferably, a cover plate is provided on the top of the cable trench.
[0014] Preferably, the bolt is an anchor bolt.
[0015] Beneficial effects of the utility model:
[0016] The utility model can install the lying rail in the cable trench to reduce the occupied area; the lying rail and the bottom of the cable trench are fixed with bolts, so that the cable can be directly laid after the lying rail is removed, that is, the cable trench and the foundation of the mobile dustproof shed are used in combination, which effectively solves the problem of large occupied area. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural diagram of the background technology.
[0018] Figure 2 It is a structural schematic diagram of the utility model.
[0019] Figure 3 It is a structural diagram of the cable trench.
[0020] Figure 4 This is a schematic diagram of the cable trench structure (after removing the horizontal rails).
[0021] Figure 5 It is a schematic diagram of the structure of the drainage trough. DETAILED DESCRIPTION
[0022] The utility model is further described below in conjunction with the accompanying drawings.
[0023] like Figures 2 to 5 The utility model provides an embodiment: a GIS mobile dustproof shed composite track, wherein a GIS electrical equipment 2 is arranged in the mobile dustproof shed 1, and track wheels 3 are provided at the bottom of both sides of the mobile dustproof shed 1, and the track wheels 3 are arranged on the horizontal rails 4, and the movement of the mobile dustproof shed 1 can be facilitated by the track wheels 3 and the horizontal rails 4; the horizontal rails 4 are fixed in the cable trench 6 through the fixing components, and the horizontal rails 4 on one side can be fixed in the ground, and the horizontal rails 4 on the other side can be fixed in the cable trench 6, or both sides of the horizontal rails can be fixed in the cable trench 6, and the horizontal rails 4 can be fixed in the cable trench 6 through the fixing components, so as to reduce the floor space and facilitate the disassembly and assembly of the horizontal rails 4, and the cable trench 6 is fixed in the ground.
[0024] The fixing assembly includes fixing blocks 51 placed on the left and right sides of the lower end of the horizontal rail 4, and bolts 52 are installed on the fixing blocks 51. The bolts 52 penetrate the fixing blocks 51 and the cable trench 6 and extend to the underground below the cable trench 6. Nuts 53 are screwed on the bolts 52. The nuts 53 are screwed on the bolts 52, so that the fixing blocks 51 can be fixed on the horizontal rail 4, thereby fixing the horizontal rail 4; when the horizontal rail 4 needs to be removed, the nuts 53 are unscrewed from the bolts 52, and then the fixing blocks 51 are picked up, and finally the horizontal rail 4 is taken out.
[0025] A placement rack 7 for placing cables 14 is fixed on both sides of the cable trench 6. The placement rack 7 has a plurality of placement plates 8 for placing the cables 14 at different heights.
[0026] In one embodiment of the utility model, the inner bottom surface of the cable trench 6 has a first reinforced concrete layer 9, which can improve the tensile strength of the bolts 52 and better fix the horizontal rail 4.
[0027] In an embodiment of the utility model, a steel plate 10 is fixed in the first reinforced concrete layer 9 , and the bolts 52 pass through the steel plate 10 , which can improve the tensile strength of the bolts 52 and better fix the horizontal rail 4 .
[0028] In an embodiment of the utility model, a drainage groove 11 is provided on the top of the first reinforced concrete layer 9 to avoid water accumulation.
[0029] In one embodiment of the utility model, there is a second reinforced concrete layer 12 underground below the cable trench 6, which can be used as a load-bearing device for the mobile dustproof shed 1 and its track wheels 3, horizontal rails 4, etc. The lower end of the bolt 52 is located in the second reinforced concrete layer 12, which can increase the tensile strength of the bolt 52 and better fix the horizontal rail 4.
[0030] There is a lime soil layer 13 below the second reinforced cement layer 12 for supporting the second reinforced cement layer 12 .
[0031] In an embodiment of the present invention, the cable 14 is fixed by a binding rope (not shown), so that the cable 14 can be fixed.
[0032] In one embodiment of the utility model, a cover plate is provided on the top of the cable trench 6, and the cable trench 6 is closed by the cover plate after the cables 14 are laid.
[0033] In an embodiment of the present invention, both ends of the cover plate are fixed to the top of the cable trench 6 via first rivets.
[0034] In an embodiment of the utility model, one end of the cover plate is hinged on the cable trench 6, and the other end is fixed to the top of the cable trench 6 via a second rivet.
[0035] In an embodiment of the present invention, the bolt 52 may be an anchor bolt 52 , but is not limited thereto. The anchor bolt 52 can improve the tensile strength and better fix the horizontal rail 4 .
[0036] The above description is only a preferred embodiment of the present utility model and cannot be understood as a limitation of the present application. All equivalent changes and modifications made within the scope of the patent application of the present utility model shall fall within the scope of the present utility model.
Claims
1. A composite track for a GIS mobile dustproof shed, wherein GIS electrical equipment is arranged in the mobile dustproof shed, characterized in that: The bottom of both sides of the mobile dustproof shed are provided with track wheels, and the track wheels are arranged on the horizontal rails; the horizontal rails are fixed in the cable trench through the fixing components, and the cable trench is fixed underground; The fixing assembly includes fixing blocks placed on the left and right sides of the lower end of the horizontal rail, and bolts are installed on the fixing blocks. The bolts penetrate the fixing blocks and the cable trench and extend to the underground below the cable trench. Nuts are screwed on the bolts.
2. A GIS mobile dustproof shed composite track according to claim 1, characterized in that: The inner bottom surface of the cable trench has a first reinforced concrete layer.
3. A GIS mobile dustproof shed composite track according to claim 2, characterized in that: A steel plate is fixed in the first reinforced concrete layer, and the bolts pass through the steel plate.
4. The GIS mobile dustproof shed composite track according to claim 2 is characterized in that: A drainage ditch is provided on the top of the first reinforced concrete layer.
5. A GIS mobile dustproof shed composite track according to any one of claims 1 to 4, characterized in that: There is a second reinforced concrete layer underground below the cable trench, and there is a ash soil layer below the second reinforced concrete layer.
6. The GIS mobile dustproof shed composite track according to claim 1, characterized in that: Placement racks for placing cables are fixed on both sides of the cable trench, and the placement racks are provided with a plurality of placement plates.
7. The GIS mobile dustproof shed composite track according to claim 6, characterized in that: The cable is fixed by a binding rope.
8. The GIS mobile dustproof shed composite track according to claim 1, characterized in that: A cover plate is arranged on the top of the cable trench.
9. A GIS mobile dustproof shed composite track according to any one of claims 1 to 4, characterized in that: The bolts are anchor bolts.