Novel plugging structure for concrete pull rod hole

Through the combination of precast concrete sealing blocks and resin glue, the process of sealing the tie rod hole is simplified, the problems of complexity and pollution in traditional methods are solved, and the efficiency and quality sealing effect is achieved, which is suitable for large-scale applications.

CN222160903UActive Publication Date: 2024-12-13THE 2ND ENG CO LTD MBEC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420121799.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-12-13
Estimated Expiration
2034-01-17

AI Technical Summary

Technical Problem

When traditional methods are used to seal the pull rod holes of the large bridge pier and the main tower, the construction process is complex, the repair effect is difficult to control, and it is easy to pollute the finished concrete surface. Moreover, the personnel, equipment and materials are invested heavily, so the appearance quality cannot be guaranteed.

Method used

The prefabricated round table-shaped concrete sealing block is connected to the tie rod hole through resin glue, including the prefabricated sealing concrete blocks of the main tower and the pier body, which are respectively inserted into the conical nut tie rod holes of the main tower and the pier body, and are glued with resin glue. Connecting structures simplifies the sealing process.

Benefits of technology

It realizes rapid construction of tie rod hole sealing, which is easy to operate, high efficiency, excellent appearance quality and good durability, reduces personnel and equipment investment, is suitable for mass production, and ensures the appearance requirements of clean water concrete.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222160903U_ABST
    Figure CN222160903U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of bridge pull rod hole plugging structures, in particular to a novel concrete pull rod hole plugging structure which comprises a plugging concrete block which comprises a main tower prefabricated plugging concrete block and a pier body prefabricated plugging concrete block. The main tower prefabricated plugging concrete block is inserted into the main tower conical nut pull rod hole, the pier body prefabricated plugging concrete block is inserted into the pier body nut pull rod hole, rapid construction of pull rod hole plugging can be achieved, operation is easy and convenient, efficiency is high, control can be achieved, after pull rod hole plugging is completed, the appearance quality is good, large color difference does not exist on the whole, and the construction period is shortened. And the plugging block is bonded through resin glue, durability is good, falling is avoided, safety is high in the later operation period, the concrete block and the resin glue are adopted for plugging the pull rod hole, the finished product is low, batch production and use can be achieved, and high application and popularization value is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge tie rod hole blocking structures, in particular to a new type of concrete tie rod hole blocking structure. Background Art

[0002] The bridge pier and main tower formwork has many tie rod holes, and the pier and main tower are made of fair-faced concrete, which has high requirements for appearance quality. The traditional method uses mortar of equal strength for plugging, which has complex construction technology, is difficult to control the repair effect, and is easy to cause secondary pollution to the finished concrete surface. In addition, for piers and towers with many tie rod holes, large holes, and quasi-fair-faced concrete, the investment in personnel, equipment, and materials is large, and the appearance quality cannot be guaranteed.

[0003] Therefore, a new type of sealing structure for concrete tie rod holes is needed to improve the above problems. Utility Model Content

[0004] The utility model aims to provide a new type of plugging structure for concrete tie rod holes to solve the problems raised in the above-mentioned background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A new type of concrete tie rod hole sealing structure includes sealing concrete blocks, which include prefabricated sealing concrete blocks for a main tower and prefabricated sealing concrete blocks for a pier body. The prefabricated sealing concrete blocks for the main tower are inserted into the interior of the conical nut tie rod holes of the main tower, and the prefabricated sealing concrete blocks for the pier body are inserted into the interior of the nut tie rod holes of the pier body.

[0007] As a preferred solution of the utility model, the outer shape structure of the prefabricated blocking concrete block of the main tower is a truncated cone structure design.

[0008] As a preferred solution of the utility model, the outer shape structure of the prefabricated blocking concrete block of the pier body is a truncated cone structure design.

[0009] As a preferred solution of the utility model, the prefabricated plugging concrete block of the main tower is connected to the tapered nut tie rod hole of the main tower by resin glue in an adhesive structure.

[0010] As a preferred solution of the utility model, the prefabricated blocking concrete block of the pier body is connected to the nut tie rod hole of the pier body by resin glue in an adhesive structure.

[0011] As a preferred solution of the utility model, the outer structure of the prefabricated plugging concrete block of the main tower is compatible with the outer structure of the tapered nut tie rod hole of the main tower.

[0012] As a preferred solution of the utility model, the outer shape structure of the prefabricated plugging concrete block of the pier body is compatible with the outer shape structure of the nut tie rod hole of the pier body.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] 1. In the utility model, the process structure can be used to realize rapid construction of tie rod hole plugging, which is easy to operate, efficient and controllable. After the tie rod hole plugging is completed, the appearance quality is good, there is no large overall color difference, and the plugging blocks are bonded with resin glue, which has good durability and will not fall off. It has high safety during the later operation period. The tie rod hole plugging adopts concrete block + resin glue, and the finished product is low and can be mass-produced and used, which has a high value of promotion and use.

[0015] 2. In the utility model, the new plugging method is easy to operate, highly efficient, and controllable. After the new plugging method is used, the appearance quality is good and can meet the requirements of fair-faced concrete. Moreover, the new plugging method has a simple process and can be operated by one person, with less investment in personnel and equipment, and concrete blocks can be mass-produced. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the structure of the plugging concrete block of the utility model;

[0017] Figure 2 This is a schematic diagram of the structure of the prefabricated plugging concrete blocks of the main tower of the utility model;

[0018] Figure 3 This is a schematic diagram of the structure of the prefabricated sealing concrete blocks for the pier body of the utility model.

[0019] In the figure: 101, blocking concrete block; 1, prefabricated blocking concrete block of main tower; 2, prefabricated blocking concrete block of pier body. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0021] For examples, see Figure 1-3 , the utility model provides a technical solution:

[0022] A new type of concrete tie rod hole sealing structure includes a sealing concrete block 101. The sealing concrete block 101 includes a main tower prefabricated sealing concrete block 1 and a pier body prefabricated sealing concrete block 2. The main tower prefabricated sealing concrete block 1 is inserted into the main tower conical nut tie rod hole, and the pier body prefabricated sealing concrete block 2 is inserted into the pier body nut tie rod hole.

[0023] In this embodiment, the outer structure of the prefabricated blocking concrete block 1 of the main tower is a truncated cone structure design, and the outer structure of the prefabricated blocking concrete block 2 of the pier body is a truncated cone structure design. The prefabricated blocking concrete block 1 of the main tower is connected to the tapered nut tie rod hole of the main tower by resin glue in a bonding structure, and the prefabricated blocking concrete block 2 of the pier body is connected to the nut tie rod hole of the pier body by resin glue in a bonding structure. The outer structure of the prefabricated blocking concrete block 1 of the main tower is adapted to the outer structure of the tapered nut tie rod hole of the main tower, and the outer structure of the prefabricated blocking concrete block 2 of the pier body is adapted to the outer structure of the nut tie rod hole of the pier body. This process structure can realize the rapid construction of tie rod hole blocking, which is easy to operate, efficient and controllable. After the tie rod hole is blocked, the appearance quality is good, and there is no large color difference as a whole. The blocking blocks are bonded with resin glue, which has good durability and will not fall off. The safety is high during the later operation period. The tie rod hole blocking adopts concrete block + resin glue, and the finished product can be mass-produced and used, which has a high value of promotion and use.

[0024] The working process of the utility model is as follows: first, when the tie rod hole is blocked, a contoured concrete block is prefabricated in advance according to the size of the tie rod hole. The size of the concrete block is 0.5 mm smaller than the size of the tie rod hole. After removing the template, a chisel and a hammer are used to chisel 3 cm around the tie rod head into the concrete by 2 to 3 cm to form a conical groove;

[0025] When plugging the taper nut tie rod hole of the main tower, use a special vise to slowly rotate and take out the taper nut, remove the residue in the taper hole, then apply resin glue to the surface of the taper nut profiling concrete block, and then insert the main tower prefabricated plugging concrete block 1 into the taper nut tie rod hole of the main tower. Finally, mix the concrete mortar in advance, smooth and modify the surface of the filled tie rod hole, and the plugging of the taper nut tie rod hole of the main tower can be completed.

[0026] When plugging the nut tie rod hole of the pier body, first use an electric drill and a wire twister to reach into the tie rod hole to cut off 5 cm of the end PVC and remove the residue in the hole. Then, apply resin glue on the surface of the concrete block shaped like the tie rod hole of the PVC pipe. Finally, insert the prefabricated plugging concrete block 2 of the pier body into the nut tie rod hole of the pier body and install it. Finally, mix the concrete mortar in advance, smooth and modify the surface of the filled tie rod hole, and the plugging of the nut tie rod hole of the pier body can be completed. The new plugging method is easy to operate, efficient, and controllable. After the new plugging method is used, the appearance quality is good and can meet the requirements of fair-faced concrete. In addition, the new plugging method has a simple process and can be operated by one person. It requires less personnel and equipment, and the concrete blocks can be mass-produced.

[0027] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A novel plugging structure for a concrete tie rod hole, comprising a plugging concrete block (101), Features: The blocking concrete block (101) comprises a main tower prefabricated blocking concrete block (1) and a pier body prefabricated blocking concrete block (2); the main tower prefabricated blocking concrete block (1) is inserted into the interior of the main tower conical nut tie rod hole, and the pier body prefabricated blocking concrete block (2) is inserted into the interior of the pier body nut tie rod hole.

2. A new type of plugging structure for concrete tie rod holes according to claim 1, Features: The outer shape structure of the main tower prefabricated plugging concrete block (1) is a truncated cone structure.

3. A new type of plugging structure for concrete tie rod holes according to claim 1, Features: The outer shape structure of the prefabricated pier body blocking concrete block (2) is a truncated cone-shaped structure.

4. A new type of plugging structure for concrete tie rod holes according to claim 1, Features: The main tower prefabricated plugging concrete block (1) is connected to the main tower conical nut tie rod hole by resin glue in an adhesive structure.

5. A new type of plugging structure for concrete tie rod holes according to claim 1, Features: The pier body prefabricated plugging concrete block (2) is connected to the pier body nut tie rod hole by resin glue in an adhesive structure.

6. A new type of plugging structure for concrete tie rod holes according to claim 1, Features: The outer shape structure of the main tower prefabricated plugging concrete block (1) is compatible with the outer shape structure of the main tower conical nut tie rod hole.

7. A new type of plugging structure for concrete tie rod holes according to claim 1, Features: The outer shape structure of the prefabricated pier body blocking concrete block (2) is compatible with the outer shape structure of the pier body nut tie rod hole.