Super-long prefabricated pipe pile forming structure
By designing the tensile mechanism of the pipe bracket and locking device in the prefabricated pipe piles, fixing the steel strand and fixing it through the connection key limit, the problem of insufficient support force after the pipe pile is connected in the prior art is solved, and the pipe piles are improved Strength and service life.
Patent Information
- Application Number
- CN202420779570.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2034-04-16
AI Technical Summary
The internal support force of existing prefabricated pipe piles is insufficient after connection, resulting in weak load-bearing capacity at the connection, which is prone to breaking, making it difficult to meet the strength requirements of ultra-long pipe piles.
An ultra-long prefabricated pipe pile forming structure is designed, using a locking device of a pipe bracket and a steel strand. The two ends of the steel strand are fixed to the locking assembly of the pipe bracket through a tensile mechanism, and fixed by connecting keys and bolts. The structure enhances the connection strength to ensure that the steel strand can withstand more internal stresses.
By passing through the tensile structure and fixing it to the locking assembly, the strength at the connection is enhanced, internal stress failure is reduced, and the overall service life of the pipe pile is improved.
Smart Images

Figure CN222270726U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of mechanical production, in particular to an ultra-long prefabricated pipe pile forming structure. Background Art
[0002] Prefabricated pipe piles are a type of tubular support structure made of cement. The manufacturing process of the pipe piles requires the use of steel strands and cement materials, which are then welded and mixed to form the final pipe piles.
[0003] Chinese patent: CN217974333U (prefabricated pipe pile) discloses a steel cage including a pile body and a hollow portion in the pile body, wherein the pile body includes a plurality of first main bars, the steel cage includes a plurality of second main bars, and a connector connecting the first main bars and the second main bars is provided between the first main bars and the second main bars. The utility model has good pull-out resistance and can speed up construction progress.
[0004] However, the existing structure still has the following problems: when the existing pipe piles are manufactured, they are first welded together by iron wire and steel strands, and then the steel wire mesh after the steel strands are welded is placed in a mold, and then poured with cement to cover it, and finally rotated to form a cement column through centrifugal force. In order to lengthen the pipe piles, the existing technology uses steel strands to connect the formed pipe piles, and then pours cement again to connect the pipe piles to extend them. However, after this operation, the supporting force inside the pipe piles is not enough to support the load-bearing capacity after the multiple pipe piles are connected, especially the force-bearing capacity at the connection is weaker than that of other parts of the pipe piles, resulting in the long pipe piles after the connection are not strong enough and easy to break.
[0005] Based on this, the utility model designs an ultra-long prefabricated pipe pile forming structure to solve the above problems. Utility Model Content
[0006] In view of the above-mentioned shortcomings of the prior art, the utility model provides an ultra-long prefabricated pipe pile forming structure.
[0007] In order to achieve the above objectives, the present invention is implemented through the following technical solutions:
[0008] An ultra-long prefabricated pipe pile forming structure, comprising a pipe support and a steel strand, wherein both left and right end surfaces of the pipe support are provided with locking devices for fixing the pipe supports;
[0009] The locking device comprises a locking component, a plug-in component and a fixing structure, wherein the locking component is fixedly connected to the left and right ends of the pipe support, the plug-in component is movably connected to the outer wall of the locking component, and the fixing structure fixes the plug-in component to the locking component;
[0010] The outer side of the plug-in assembly is movably connected with a stretching mechanism for stretching the steel strand at the connection of the pipe support;
[0011] The stretching mechanism comprises a first stretching structure movably connected to one end of the pipe support and a second stretching structure movably connected to the other end of the pipe support;
[0012] The first tensile structure is fixedly connected to the second tensile structure by a connecting structure;
[0013] The surfaces of the first tensile structure and the second tensile structure penetrate and slide with the steel strands, and the two ends of the steel strands are respectively fixedly connected to the locking components of the pipe supports on both sides;
[0014] Furthermore, the locking assembly includes a locking plate and a locking groove, wherein the locking plate is fixed to the end surface of the pipe support, and the locking groove is formed on the outer wall of the locking plate.
[0015] Furthermore, the plug-in assembly includes a plug-in block and a plug-in rod, the plug-in rod is fixed at the center of the outer wall of the plug-in block, and the plug-in block is rotatably engaged inside the locking groove.
[0016] Furthermore, the fixing structure includes bolt blocks, the bolt blocks are fixed at two ends of the plug-in block, and the bolt blocks are fixed to the locking plate by bolts.
[0017] Furthermore, the first stretching structure includes a stretching seat and a connecting pipe, the stretching seat is fixed to the outer end of the plug-in rod, and the connecting pipe is fixed to the outer wall of the stretching seat.
[0018] Furthermore, the second stretching structure has the same structure as the first stretching structure and the second stretching structure further includes a threaded rod that rotates with the outer wall of the connecting tube.
[0019] Furthermore, the connecting pipe of the first tensile structure is threadedly connected to the threaded rod of the second tensile structure.
[0020] Furthermore, the connection structure includes a connecting key, and the surfaces of the connecting pipes on both sides of the pipe bracket pass through the sliding connecting key and are fixed at the ends of the connecting key by bolts. The two ends of the steel strand pass through the surfaces of the tensile seats on both sides and are respectively fixed to the outer walls of the locking plates of the pipe brackets on both sides.
[0021] The utility model has the following technical effects:
[0022] 1. The utility model slides the steel strand through the surfaces of the first tensile structure and the second tensile structure and fixes the two ends of the steel strand to the end faces of the locking components of the left and right pipe supports respectively, and then stretches the steel strand through the structural connection between the first tensile structure and the second tensile structure, so that after pouring cement, the connection strength can be enhanced and the internal stress damage can be reduced.
[0023] 2. The utility model limits and fixes the connecting pipe and the threaded rod by bolts of the connecting key, thereby ensuring that the connection strength between the pipe supports is sufficient and the steel strands can withstand more internal stress, thereby increasing the service life. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0025] Figure 1 The utility model is a three-dimensional super-long prefabricated pipe pile forming structure Figure 1 ;
[0026] Figure 2 This is a front view of an ultra-long prefabricated pipe pile forming structure of the utility model;
[0027] Figure 3 The utility model is a three-dimensional super-long prefabricated pipe pile forming structure Figure 2 ;
[0028] Figure 4 This is a disassembly diagram of a locking device of an ultra-long prefabricated pipe pile forming structure of the utility model;
[0029] Figure 5 This is a disassembly diagram of a stretching mechanism of an ultra-long prefabricated pipe pile forming structure of the utility model.
[0030] The numbers in the figure represent:
[0031] 1. Pipe support; 2. Steel strand; 3. Locking device; 31. Locking assembly; 311. Locking plate; 312. Locking groove; 32. Plug-in assembly; 321. Plug-in block; 322. Plug-in rod; 33. Fixing structure; 331. Bolt block; 4. Stretching mechanism; 41. First stretching structure; 411. Stretching seat; 412. Connecting pipe; 42. Second stretching structure; 421. Threaded rod; 5. Connecting structure; 51. Connecting key. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0033] The utility model is further described below in conjunction with embodiments.
[0034] The terms “left”, “right”, “front”, “back”, “up” and “down” mentioned in the following description are oriented in the viewing direction of the front view.
[0035] Example 1
[0036] Please refer to the instruction manual Figure 1-5 , an ultra-long prefabricated pipe pile forming structure, comprising a pipe support 1 and a steel strand 2;
[0037] The left and right end surfaces of the pipe support 1 are both provided with locking devices 3 for fixing the pipe support 1;
[0038] The locking device 3 includes a locking component 31, a plug component 32 and a fixing structure 33. The locking component 31 is fixedly connected to the left and right ends of the pipe support 1. The plug component 32 is movably connected to the outer wall of the locking component 31. The fixing structure 33 fixes the plug component 32 to the locking component 31.
[0039] The outer side of the plug-in assembly 32 is movably connected with a stretching mechanism 4 for stretching the steel strand 2 at the connection of the pipe support 1;
[0040] The stretching mechanism 4 includes a first stretching structure 41 movably connected to one end of the pipe support 1 and a second stretching structure 42 movably connected to the other end of the pipe support 1;
[0041] The first tensile structure 41 is fixedly connected to the second tensile structure 42 via the connecting structure 5;
[0042] The surfaces of the first tensile structure 41 and the second tensile structure 42 penetrate and slide with the steel strand 2 , and both ends of the steel strand 2 are fixedly connected to the locking components 31 of the pipe supports 1 on both sides respectively.
[0043] First, the locking components 31 are fixed at both ends of the pipe support 1 respectively, and then the first tensile structure 41 is fixedly installed on the locking component 31 on one side of the pipe support 1 through the plug-in component 32, and then the second tensile structure 42 is fixedly installed on the locking component 31 on the other side of the pipe support 1 through the plug-in component 32. When the pipe support 1 is spliced, the right end of the left pipe support 1 is docked with the left end of the right pipe support 1. At this time, the first tensile structure 41 is flush with the second tensile structure 42, and the first tensile structure 41 and the second tensile structure 42 are limited by the connecting structure 5, the steel strand 2 is slid through the surface of the first tensile structure 41 and the second tensile structure 42, and the two ends of the steel strand 2 are respectively fixed to the end faces of the locking components 31 of the left and right pipe supports 1, and then the steel strand 2 is stretched through the structural connection between the first tensile structure 41 and the second tensile structure 42 and placed in the mold, so that after pouring cement, it can enhance the connection strength and reduce the effect of internal stress damage.
[0044] Example 2
[0045] like Figure 1-5 As shown, as a preferred embodiment of the utility model, the locking assembly 31 includes a locking plate 311 and a locking groove 312, the locking plate 311 is fixed to the end surface of the pipe support 1, and the locking groove 312 is provided on the outer wall of the locking plate 311;
[0046] The plug-in assembly 32 includes a plug-in block 321 and a plug-in rod 322. The plug-in rod 322 is fixed at the center of the outer wall of the plug-in block 321. The plug-in block 321 is rotated and clamped inside the locking groove 312.
[0047] The fixing structure 33 includes bolt blocks 331 , which are fixed at both ends of the plug-in block 321 , and the bolt blocks 331 are fixed to the locking plate 311 by bolts;
[0048] The first stretching structure 41 includes a stretching seat 411 and a connecting tube 412. The stretching seat 411 is fixed to the outer end of the plug-in rod 322, and the connecting tube 412 is fixed to the outer wall of the stretching seat 411.
[0049] The second stretching structure 42 has the same structure as the first stretching structure 41 and the second stretching structure 42 further includes a threaded rod 421 that rotates with the outer wall of the connecting tube 412;
[0050] The connecting pipe 412 of the first tensile structure 41 is threadedly connected to the threaded rod 421 of the second tensile structure 42;
[0051] The connection structure 5 includes a connection key 51, and the surfaces of the connection pipes 412 on both sides of the pipe support 1 are penetrated by the sliding connection key 51 and are fixed at the ends of the connection key 51 by bolts respectively;
[0052] Two ends of the steel strand 2 penetrate the surfaces of the tensioning seats 411 on both sides and are respectively fixed to the outer walls of the locking plates 311 of the pipe supports 1 on both sides.
[0053] First, the locking plate 311 is fixed to the outer wall of the pipe support 1 by bolts. The pipe support 1 is composed of an end panel and a steel mesh. The locking plate 311 and the end panel are fixed, and then the stretching seat 411 is fixed to the plug rod 322, and the plug block 321 is inserted into the locking groove 312 and rotated by rotating the plug block 321, and then the bolt block 331 is fixed to the locking plate 311 by bolts to achieve a fixed connection, and then the connecting pipe 412 at one end of the pipe support 1 is provided with a threaded groove, and the outer end of the connecting pipe 412 at the other end of the pipe support 1 is rotated with a threaded rod 421, Then, the connecting pipe 412 at one end of the pipe support 1 is threadedly connected with the threaded rod 421 at the other end of the pipe support 1, and the distance between the pipe supports 1 on both sides is lengthened by rotating the threaded rod 421. After the rotation is completed, the threaded rod 421 and the connecting pipe 412 are fixed by bolts, thereby stretching the steel strand 2. Finally, the connecting pipe 412 and the threaded rod 421 are limited and fixed by the bolts of the connecting key 51, thereby ensuring that the strength of the connection between the pipe supports 1 is sufficient and the steel strand can withstand more internal stress, thereby increasing the service life.
[0054] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An ultra-long prefabricated pipe pile forming structure, comprising a pipe support (1) and a steel strand (2), characterized in that: The left and right end surfaces of the pipe support (1) are both provided with locking devices (3) for fixing the pipe supports (1); The locking device (3) comprises a locking component (31), a plug-in component (32) and a fixing structure (33); the locking component (31) is fixedly connected to the left and right ends of the pipe support (1); the plug-in component (32) is movably connected to the outer wall of the locking component (31); and the fixing structure (33) fixes the plug-in component (32) and the locking component (31); The outer side of the plug-in assembly (32) is movably connected to a stretching mechanism (4) for stretching the steel strand (2) at the connection of the pipe support (1); The stretching mechanism (4) comprises a first stretching structure (41) movably connected to one end of the pipe support (1) and a second stretching structure (42) movably connected to the other end of the pipe support (1); The first stretching structure (41) is fixedly connected to the second stretching structure (42) via a connecting structure (5); The surfaces of the first tensile structure (41) and the second tensile structure (42) slide through the steel strand (2), and the two ends of the steel strand (2) are respectively fixedly connected to the locking components (31) of the pipe supports (1) on both sides.
2. The ultra-long prefabricated pipe pile forming structure according to claim 1 is characterized in that: The locking assembly (31) comprises a locking plate (311) and a locking groove (312); the locking plate (311) is fixed to the end surface of the pipe support (1); and the locking groove (312) is formed on the outer wall of the locking plate (311).
3. The super-long prefabricated pipe pile forming structure according to claim 2 is characterized in that: The plug-in assembly (32) comprises a plug-in block (321) and a plug-in rod (322), wherein the plug-in rod (322) is fixed at the center of the outer wall of the plug-in block (321), and the plug-in block (321) is rotatably engaged inside the locking groove (312).
4. The super-long prefabricated pipe pile forming structure according to claim 3 is characterized in that: The fixing structure (33) comprises a bolt block (331), wherein the bolt block (331) is fixed at two ends of the plug-in block (321), and the bolt block (331) is fixed to the locking plate (311) by bolts.
5. The ultra-long prefabricated pipe pile forming structure according to claim 3 is characterized in that: The first stretching structure (41) comprises a stretching seat (411) and a connecting tube (412); the stretching seat (411) is fixed to the outer end of the plug-in rod (322); and the connecting tube (412) is fixed to the outer wall of the stretching seat (411).
6. The super-long prefabricated pipe pile forming structure according to claim 5 is characterized in that: The second stretching structure (42) has the same structure as the first stretching structure (41), and the second stretching structure (42) further comprises a threaded rod (421) that rotates with the outer wall of the connecting tube (412).
7. The super-long prefabricated pipe pile forming structure according to claim 6 is characterized in that: The connecting pipe (412) of the first tensile structure (41) is threadedly connected to the threaded rod (421) of the second tensile structure (42).
8. The super-long prefabricated pipe pile forming structure according to claim 5 is characterized in that: The connection structure (5) comprises a connection key (51), and the surfaces of the connection pipes (412) on both sides of the pipe support (1) pass through the sliding connection key (51) and are fixed at the ends of the connection key (51) by bolts, and the two ends of the steel strand (2) pass through the surfaces of the tension seats (411) on both sides and are fixed to the outer walls of the locking plates (311) of the pipe supports (1) on both sides.