Asphalt pipeline embedded in heat conduction oil pipe

By using thermal oil pipe inline design and metal hose heating in asphalt pipes, combined with the movable metal guard structure, the fracture problems caused by asphalt coking and deformation during the heating process of asphalt pipes are solved, ensuring product quality and safety.

CN222277719UActive Publication Date: 2024-12-31JIANGSU HIGH SPEED NEW MATERIAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420938007.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2024-12-31
Estimated Expiration
2034-04-30

AI Technical Summary

Technical Problem

During the heating process of asphalt pipes, the asphalt pipe embedded in the thermal oil pipe has the problems of asphalt coking and pipeline deformation leading to fracture, which affects product quality and safety.

Method used

The thermal oil pipe is designed to be embedded in asphalt pipes, heated through metal hoses and wrapped outside the asphalt pipes to prevent asphalt from entering the thermal oil pipes, and use movable metal guards at the pipe connection to deal with deformation and prevent brittle breakage.

Benefits of technology

It effectively avoids coking caused by direct contact between asphalt and thermal oil, ensures product quality, and adapts to pipeline displacement through the deformation of metal hoses, prevents brittle breakage, and extends the service life of the pipeline.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222277719U_ABST
    Figure CN222277719U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of asphalt pipelines, in particular to a heat-conducting oil pipe embedded asphalt pipeline which comprises a base, an asphalt pipe and a heat-conducting oil pipe are arranged on the base, the heat-conducting oil pipe surrounds the asphalt pipe, asphalt is arranged in the asphalt pipe, heat-conducting oil is arranged in the heat-conducting oil pipe, and the heat-conducting oil pipe is connected with the base. A heat conduction pipe is arranged on the surface of the outer wall of the asphalt pipe, a metal hose is wound on the outer wall of the asphalt pipe, a plurality of protection pieces are fixedly arranged on the surface of the outer wall of the base, when the asphalt pipe is broken, asphalt cannot enter the heat conduction oil pipe, the asphalt pipe can be repaired in time, and waste is reduced; in addition, direct contact with asphalt is avoided, the coking condition is prevented, and the product quality is guaranteed; rigid brittle failure is avoided, and the asphalt pipe and the heat conduction oil pipe are protected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of asphalt pipelines, in particular to an asphalt pipeline embedded in a heat transfer oil pipe. Background Art

[0002] Asphalt pipeline refers to a pipeline system used to transport closed substances such as asphalt. Asphalt is a high-viscosity, organic mixture that requires a certain temperature to maintain its fluidity during transportation. Therefore, asphalt pipelines are characterized by thicker pipe walls and higher requirements for pipeline materials. Asphalt pipelines are widely used in engineering construction, mainly in the construction of pavement concrete, transportation of oil and natural gas, and other fields.

[0003] As disclosed in a Chinese patent: an asphalt pipeline system, application number: CN202022680662.1, comprising an asphalt pipeline, wherein both ends of the asphalt pipeline are fixedly connected with connecting flanges, an outer shell is provided on the outside of the asphalt pipeline, both ends of the outer shell are fixedly connected to the connecting flanges, a detection ring is sleeved on the asphalt pipeline, electromagnetic heating rings are provided on both sides of the detection ring, an ultrasonic transmitter is provided in the upper end of the detection ring, an ultrasonic receiver is provided in the lower end of the detection ring, motors are fixedly connected to the outside of both ends of the outer shell, and a rotating shaft is fixedly connected to the output end of the motor. By arranging the detection ring on the asphalt pipeline and by arranging the outer shell on the outside of the asphalt pipeline, thermal insulation is improved and heat loss is reduced. At the same time, a motor is arranged on the outer shell, and the pull rope is reeled by the motor, and the detection ring is pulled to move along the asphalt pipeline, so as to detect and heat and dredge the asphalt pipeline, and the detection is comprehensive and easy to use.

[0004] However, in the above technical solution, the temperature has a great influence on the asphalt during the asphalt production process. The pipeline is a rigid part and will be displaced when heated. In order to heat the asphalt pipeline, most production units adopt the method of embedding the asphalt pipeline in the heat transfer oil pipe to form a casing to heat the asphalt. However, this asphalt heating method has a significant defect. When the asphalt pipeline is embedded in the heat transfer oil pipe, when the asphalt pipeline is broken, the asphalt will enter the heat transfer oil, affecting the quality of the heat transfer oil.

[0005] When the heat transfer oil pipe is heated, the asphalt in the pipe will be continuously heated, causing the asphalt in direct contact with the heat transfer oil pipe to coke due to the high temperature. On the one hand, it adheres to the asphalt pipe wall and affects the heating effect, and on the other hand, it affects the product quality of the asphalt.

[0006] Asphalt pipelines are rigid parts. When the pipeline is at the tank inlet or outlet, the pipeline will be deformed due to the sedimentation of asphalt, and in severe cases, it may cause the pipeline to break. Utility Model Content

[0007] The main purpose of the utility model is to provide a heat transfer oil pipe embedded with asphalt pipe, which can effectively solve the problems in the background technology.

[0008] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0009] The heat transfer oil pipe is embedded with an asphalt pipe and comprises a base. The base is provided with an asphalt pipe and a heat transfer oil pipe. The heat transfer oil pipe surrounds the asphalt pipe. Asphalt is provided in the asphalt pipe. Heat transfer oil is provided in the heat transfer oil pipe. A heat transfer pipe is provided on the outer wall surface of the asphalt pipe. A metal hose is wrapped around the outer wall of the asphalt pipe. A plurality of protective sheets are fixedly provided on the outer wall surface of the base.

[0010] Preferably, the winding distance interval of the metal hose is 5 cm.

[0011] Preferably, the heat pipe comprises a heat pipe base, a first groove is arranged on the heat pipe base, and a limiting baffle is arranged on one side of the heat pipe base.

[0012] Preferably, two metal guard plates are slidably arranged in the first groove, a plurality of guide grooves are arranged on the inner wall of the first groove, and guide sliding blocks are arranged in the guide grooves.

[0013] Preferably, a mounting groove is provided on the metal guard plate, and a plurality of connecting plugs are fixedly provided on the inner wall of the mounting groove.

[0014] Preferably, the guide slide block is fixedly connected to the metal guard plate, the asphalt pipe is located in the mounting groove, and the connecting plug block is located in the asphalt pipe.

[0015] Compared with the prior art, the utility model has the following beneficial effects:

[0016] (1) When the utility model is used, the metal hose is heated by the heat transfer oil pipe, and then the metal hose heats the asphalt pipe through the heat transfer pipe, thereby heating the asphalt in the asphalt pipe. When the asphalt pipe is broken, the asphalt will not enter the heat transfer oil pipe, and when the asphalt pipe needs to be repaired, the two metal guards are taken out from the first groove, and then there will be nothing blocking the outside of the asphalt pipe, so that it is convenient for the staff to repair the asphalt pipe, and the asphalt pipe can be repaired in time to reduce waste; and it avoids direct contact with asphalt, prevents coking, and ensures product quality; when the metal hose is used to connect the pipeline inlet or outlet, when the tank body sinks due to asphalt, the connected metal hose will deform accordingly according to the displacement, avoiding rigid brittle fracture and protecting the asphalt pipe and the heat transfer oil pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1This is a schematic diagram of the cross-sectional structure of the utility model of the heat transfer oil pipe embedded in the asphalt pipe;

[0018] Figure 2 This is a schematic diagram of the structure of a heat transfer oil pipe embedded in an asphalt pipeline according to the utility model;

[0019] Figure 3 It is a schematic diagram of the cross-sectional three-dimensional structure of the heat transfer pipe in the utility model in which the heat transfer oil pipe is embedded in the asphalt pipeline;

[0020] Figure 4 The utility model is a schematic diagram of the cross-sectional structure of a heat-conducting pipe in a heat-conducting oil pipe embedded in an asphalt pipeline.

[0021] In the figure: 1. base; 2. asphalt pipe; 3. heat transfer oil pipe; 4. asphalt; 5. heat transfer oil; 6. heat transfer pipe; 601. heat transfer pipe base; 602. first groove; 603. limit baffle; 604. metal guard plate; 605. guide slide groove; 606. guide slider; 607. installation groove; 608. connecting plug; 7. metal hose; 8. protective sheet. DETAILED DESCRIPTION

[0022] The following will be combined with the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] like Figure 1 and Figure 2 As shown, the heat transfer oil pipe is embedded with an asphalt pipe, comprising a base 1, on which an asphalt pipe 2 and a heat transfer oil pipe 3 are arranged, the heat transfer oil pipe 3 surrounds the asphalt pipe 2, asphalt 4 is arranged in the asphalt pipe 2, heat transfer oil 5 is arranged in the heat transfer oil pipe 3, a heat transfer pipe 6 is arranged on the outer wall surface of the asphalt pipe 2, a metal hose 7 is wrapped around the outer wall of the asphalt pipe 2, and a plurality of protective sheets 8 are fixedly arranged on the outer wall surface of the base 1.

[0024] like Figure 3 and Figure 4 As shown, in another embodiment of the utility model, the heat pipe 6 includes a heat pipe base 601, a first groove 602 is provided on the heat pipe base 601, and a limit baffle 603 is provided on one side of the heat pipe base 601;

[0025] Two metal guard plates 604 are slidably arranged in the first groove 602, a plurality of guide grooves 605 are arranged on the inner wall of the first groove 602, and a guide slider 606 is arranged in the guide groove 605;

[0026] The metal guard plate 604 is provided with an installation groove 607, and a plurality of connecting plugs 608 are fixedly provided on the inner wall of the installation groove 607. When the asphalt pipe 2 needs to be repaired, the two metal guard plates 604 are taken out from the first groove 602, and the moving direction of the metal guard plates 604 is guided by the guide groove 605 and the guide slider 606. Then, the metal guard plates 604 drive the asphalt pipe 2 to move through the connecting plugs 608. After the two metal guard plates 604 leave the first groove 602, the two metal guard plates 604 are separated, and then the outside of the asphalt pipe 2 will no longer be blocked, so that it is convenient for the staff to repair the asphalt pipe 2. After the repair is completed, the outside of the asphalt pipe 2 is wrapped with the two metal guard plates 604, and then the two metal guard plates 604 are reinserted into the first groove 602, and the position of the metal guard plates 604 is limited to a certain extent by the limit baffle 603 to prevent the metal guard plates 604 from excessive movement.

[0027] The working principle of the thermal oil pipe embedded with asphalt pipe:

[0028] When in use, first input asphalt 4 into asphalt pipe 2, then input heat transfer oil 5 into heat transfer oil pipe 3, then heat metal hose 7 through heat transfer oil pipe 3, then metal hose 7 heats asphalt pipe 2 through heat transfer pipe 6, thereby heating asphalt 4 in asphalt pipe 2, by means of metal hose 7 surrounding heat transfer oil pipe 3, asphalt pipe 2 is heated with the help of metal hose 7, when asphalt pipe 2 is broken, asphalt will not enter into heat transfer oil pipe 3, and when asphalt pipe 2 needs to be repaired, two metal guard plates 604 are taken out from first groove 602, and the moving direction of metal guard plates 604 is guided by guide groove 605 and guide slider 606, Then the metal guard plate 604 drives the asphalt pipe 2 to move through the connecting plug block 608. After the two metal guard plates 604 leave the first groove 602, the two metal guard plates 604 are separated. Then, there will be nothing blocking the outside of the asphalt pipe 2, which is convenient for the staff to repair the asphalt pipe 2. The asphalt pipe 2 can be repaired in time to reduce waste; it also avoids direct contact with asphalt, prevents coking, and ensures product quality; when the metal hose 7 is used to connect the pipeline inlet or outlet, when the tank body settles due to asphalt, the connected metal hose 7 will undergo corresponding deformation according to the displacement, avoiding rigid brittle fracture and protecting the asphalt pipe 2 and the heat transfer oil pipe 3.

[0029] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not limitations on the implementation methods of the present invention. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made on the basis of the above description. It is impossible to list all the implementation methods here. All obvious changes or modifications derived from the technical solution of the present invention are still within the scope of protection of the present invention.

Claims

1. A heat transfer oil pipe embedded with an asphalt pipe, comprising a base (1), characterized in that: An asphalt pipe (2) and a heat transfer oil pipe (3) are arranged on the base (1); the heat transfer oil pipe (3) surrounds the asphalt pipe (2); asphalt (4) is arranged in the asphalt pipe (2); heat transfer oil (5) is arranged in the heat transfer oil pipe (3); a heat transfer pipe (6) is arranged on the outer wall surface of the asphalt pipe (2); a metal hose (7) is wound around the outer wall of the asphalt pipe (2); and a plurality of protective sheets (8) are fixedly arranged on the outer wall surface of the base (1).

2. The asphalt pipeline embedded in the heat transfer oil pipe according to claim 1 is characterized in that: The winding distance of the metal hose (7) is 5 cm.

3. The asphalt pipeline embedded in the heat transfer oil pipe according to claim 2 is characterized in that: The heat conducting pipe (6) comprises a heat conducting pipe base (601), a first groove (602) is provided on the heat conducting pipe base (601), and a limit baffle (603) is provided on one side of the heat conducting pipe base (601).

4. The asphalt pipeline embedded in the heat transfer oil pipe according to claim 3 is characterized in that: Two metal guard plates (604) are slidably arranged in the first groove (602), a plurality of guide grooves (605) are arranged on the inner wall of the first groove (602), and a guide sliding block (606) is arranged in the guide groove (605).

5. The asphalt pipeline embedded in the heat transfer oil pipe according to claim 4, characterized in that: The metal guard plate (604) is provided with a mounting groove (607), and a plurality of connecting plug blocks (608) are fixedly provided on the inner wall of the mounting groove (607).

6. The asphalt pipeline embedded in the heat transfer oil pipe according to claim 5, characterized in that: The guide slide block (606) is fixedly connected to the metal guard plate (604), the asphalt pipe (2) is located in the installation groove (607), and the connecting plug block (608) is located in the asphalt pipe (2).