Cable laying system applied to garbage drying tunnel bin

The cable laying system addresses aeration blockage and sealing issues in garbage drying tunnel bins by providing coordinated power and control mechanisms for multi-dimensional material distribution, optimizing automation and reducing power consumption.

CN222282639UActive Publication Date: 2024-12-31ZHONGCHEN LVJIAN TECH LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323340900.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-08
Publication Date
2024-12-31
Estimated Expiration
2033-12-08

Smart Images

  • Figure CN222282639U_ABST
    Figure CN222282639U_ABST
Patent Text Reader

Abstract

The utility model discloses a cable laying system applied to garbage drying tunnel bins, which comprises a plurality of garbage drying tunnel bins, a power box, a first fixing device, a pulley guide rail and two second movable belt conveyors, and movable pulleys are distributed on the pulley guide rail; the second movable belt conveyor is arranged in the Y direction, the second movable belt conveyor is provided with a first movable belt conveyor, the first movable belt conveyor is arranged in the X direction, the first movable belt conveyor is provided with a movable frame, and the movable frame is provided with a second fixing device, a first electric cabinet and a spring type cable drum; a third fixing device, a fourth fixing device, a fifth fixing device, a second electric cabinet and a second driving mechanism are arranged on the first movable belt conveyor; and a tank moving chain, a sixth fixing device, a seventh fixing device, a third driving mechanism and a third electric control box are arranged on the second moving belt conveyor. According to the scheme, effective power supply and control are provided for a moving device in the garbage drying tunnel bin, and the working environment of personnel and the intelligent degree of the system are greatly optimized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of garbage treatment, in particular to a cable laying system applied to a garbage drying tunnel bin. Background Art

[0002] Tunnel bins are an important measure and method for garbage biological drying. Loaders can be used to spread materials in tunnel bins, but the aeration system will be blocked during the spreading process, resulting in a poor working environment. Grab buckets can also be used for feeding, but grab bucket feeding requires the entire tunnel site to be sealed and covered. The large opening makes it difficult to seal the bin door, and the power consumption of the materials is high. Therefore, this design designs a set of cable laying devices with multi-dimensional material spreading functions for the solution of fixed-point automatic material spreading in tunnel bins, which solves the current problem of single / double-sided and multi-dimensional uniform material spreading in tunnel bins. Utility Model Content

[0003] In view of the current technical problems, the utility model provides a cable laying system applied to a garbage drying tunnel bin to solve the problems in the prior art.

[0004] In order to achieve the above-mentioned invention object, the utility model provides the following technical solutions:

[0005] A cable laying system for a garbage drying tunnel bin, comprising a plurality of garbage drying tunnel bins, a power box, a first fixing device, a pulley guide rail and two symmetrically arranged second mobile belt conveyors, a plurality of mobile pulleys are distributed on the pulley guide rail, a cable clamping device is arranged at each of the mobile pulleys, a fixed length of cable is left between two adjacent mobile pulleys through the cable clamping device, and a feed port is arranged on the garbage drying tunnel bin;

[0006] The second mobile belt conveyor is arranged along the Y direction, the first mobile belt conveyor is arranged on the two second mobile belt conveyors, the first mobile belt conveyor is arranged along the X direction, a mobile frame is arranged on the first mobile belt conveyor, and a second fixing device, a first electric control box, and a spring-type cable reel are arranged on the mobile frame;

[0007] The first mobile belt conveyor is provided with a third fixing device, a fourth fixing device, a fifth fixing device, a second electric control box and a second driving mechanism, and the second driving mechanism drives the first mobile belt conveyor to move along the X direction;

[0008] The second mobile belt conveyor is provided with a tank moving chain, a sixth fixing device, a seventh fixing device, a third driving mechanism and a third electric control box. One end of the tank moving chain is connected to the fifth fixing device, and the other end is connected to the sixth fixing device. The third driving mechanism drives the second mobile belt conveyor to move along the Y direction.

[0009] In this solution, the cable is led out through the power box, fixed at the first fixing device, passed through the last cable clamping device, and then fixed at the second fixing device to connect to the first electric control box, then fixed through the third fixing device and connected to the second electric control box, and then connected to the third electric control box after passing through the fourth fixing device, the fifth fixing device, the sixth fixing device and the seventh fixing device, so as to provide effective power supply for the motion devices and control mechanisms that cooperate with each other in the system, and further optimize and realize the automatic fabric distribution of the system.

[0010] Preferably, tracks are provided on the tops of the two opposite garbage drying tunnel bins respectively, the tracks are arranged along the Y direction, and the movable frame moves along the tracks under the drive of the first driving mechanism.

[0011] Preferably, the distance between the first fixing device and the second fixing device is a minimum redundant amount of cable sag when the last movable pulley moves close to the second fixing device.

[0012] Preferably, the sixth fixing device is arranged on the tank moving chain.

[0013] Since the fifth fixing device is arranged on the first moving belt conveyor and the seventh fixing device is arranged on the second moving belt conveyor, with such arrangement, the moving distance of the lower volume of the tank moving chain is twice that of the upper volume, which greatly saves the travel space.

[0014] Preferably, a synchronous moving electric control box is arranged on the first electric control box. With such arrangement, when the moving frame moves, the wired control of the whole system can be realized.

[0015] Preferably, a cable guiding device is provided on the movable frame.

[0016] Compared with the prior art, the beneficial effects of the utility model are as follows: this solution provides a cable laying system for multi-dimensional material distribution functions in garbage drying tunnel warehouses, provides effective power supply and control solutions for three sets of relatively coordinated motion devices in the system, further optimizes the automatic material distribution of the system, and greatly optimizes the working environment of personnel and the intelligence level of the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is the front view of the utility model;

[0018] Figure 2 for Figure 1 Bottom view of

[0019] Figure 3 for Figure 1 A schematic diagram of the structure of the second moving belt in FIG.

[0020] Figure 4 for Figure 3 Schematic diagram of the status after moving. DETAILED DESCRIPTION

[0021] The present invention is further described in detail below in combination with test examples and specific implementation methods. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0022] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0023] As attached Figure 1 -Attached Figure 4 A cable laying system for garbage drying tunnel bins is shown, comprising a plurality of garbage drying tunnel bins, a power box 1, a first fixing device 2, a pulley guide rail 4 and two symmetrically arranged second mobile belt conveyors 32, wherein a plurality of mobile pulleys 3 are distributed on the pulley guide rail 4, each of the mobile pulleys 3 is provided with a cable clamping device 5, a fixed length of cable is left between two adjacent mobile pulleys 3 through the cable clamping device 5, the mobile pulleys 3 move in the same direction on the pulley guide rail 4 in sequence with the movement of the mobile frame 30, and a softening surround design is installed at all fixing points provided with fixing devices to protect the cable from mechanical damage.

[0024] Multiple garbage drying tunnel bins are symmetrically distributed in two rows. A feed port 23 is provided on the garbage drying tunnel bin. Tracks 91 are respectively provided on the tops of two opposite garbage drying tunnel bins. The tracks 91 are arranged along the Y direction. The movable frame 30 moves along the tracks 91 under the drive of the first driving mechanism 9.

[0025] The second moving belt conveyor 32 is arranged along the Y direction, and the first moving belt conveyor 31 is arranged on the two second moving belt conveyors 32, and the first moving belt conveyor 31 is arranged along the X direction. The first moving belt conveyor 31 is provided with a moving frame 30, and the moving frame 30 is provided with a second fixing device 7, a first electric control box 8, a spring-type cable drum 20 and a cable guide device 19. The spring-type cable drum 20 has its own spring force, which can realize the self-retraction of the cable. The distance between the first fixing device 2 and the second fixing device 7 is the minimum redundancy of the cable 6 when the last moving pulley 3 moves close to the second fixing device 7.

[0026] The first mobile belt conveyor 31 is provided with a third fixing device 10, a fourth fixing device 13, a fifth fixing device 14, a second electric control box 11 and a second driving mechanism 12, and the second driving mechanism 12 drives the first mobile belt conveyor 31 to move along the X direction; the spring-type cable reel 20 is arranged on the mobile frame 30, and the third fixing device 10 is arranged on the first mobile belt conveyor 31, so that when the first mobile belt conveyor 31 moves back and forth in the X direction, the cable can be correspondingly retracted and released on the spring-type cable reel 20. The second electric control box 11 provides power to the second driving mechanism 12, and also provides power to the second mobile belt conveyor 32.

[0027] The second moving belt conveyor 32 is provided with a tank moving chain 15, a sixth fixing device 16, a seventh fixing device 17, a third driving mechanism 21 and a third electric control box 18. One end of the tank moving chain 15 is connected to the fifth fixing device 14, and the other end is connected to the sixth fixing device 16. The third driving mechanism 21 drives the second moving belt conveyor 32 to move along the Y direction. In this embodiment, the sixth fixing device 16 is specifically provided on the tank moving chain 15.

[0028] The cable 6 forms two force points under the action of the fourth fixing device 13 on the first moving belt conveyor 31 and the fifth fixing device 14 on the second moving belt conveyor 32. When serial number 12 reciprocates in the y direction, the tank moving chain 15 follows the movement under the action of the sixth fixing device 16 and the seventh fixing device 17. The fifth fixing device 14 is arranged on the first moving belt conveyor 31, the sixth fixing device 16 is arranged on the tank moving chain 15, and the seventh fixing device 17 is arranged on the second moving belt conveyor 32. In this way, the moving distance of the lower volume of the tank moving chain 15 is twice that of the upper volume, which greatly saves the travel space. The seventh fixing device 17 is connected to the third electric control box 18, and the third electric control box 18 synchronously provides power and control for the second moving belt conveyor 32.

[0029] The design of this embodiment realizes the wired control of the whole system. In this case, a synchronous mobile electric control box can be set on the first electric control box 8, so that when the mobile frame 30 moves, the wired control of the whole system can be realized. At the same time, a receiving device can be set on the first electric control box 8, so that remote control can be realized through remote wireless operation. A corresponding origin calibration design can be set in the tunnel warehouse, thereby realizing unmanned automatic material distribution in the tunnel warehouse.

[0030] The cable 6 is led out through the power box 1, fixed at the first fixing device 2, and connected to the first electric control box 8 after being fixed at the second fixing device 7 after passing through the last cable clamping device 5. At this point, the power box 1 successfully realizes that the movable frame 30 reciprocates in the Y direction and transmits electricity to the second fixing device 7 at the moving end; the cable is then fixed through the third fixing device 10 and connected to the second electric control box 11, and then connected to the third electric control box 18 after passing through the fourth fixing device 13, the fifth fixing device 14, the sixth fixing device 16 and the seventh fixing device 17, so as to provide effective power supply for the mutually cooperating motion mechanism and control mechanism in the system, and further optimize and realize the automatic fabric distribution of the system.

[0031] The functions realized by this system are as follows: garbage enters the tunnel bin from the feed port 23. Before work, the mobile frame 30 moves to the corresponding working bin, and the first mobile belt conveyor 31 moves to the bottom of the feed port 23 to transfer the garbage entering from the feed port 23 to the first mobile belt conveyor 31. The mobile frame 30 can move in the x direction on the first mobile belt conveyor 31 to meet the movement requirements in the x direction. The two second mobile belt conveyors 32 are arranged at both ends of the sequence number 31 and can realize movement in the y direction. Through the above steps, the distribution on the x-axis and y-axis in the bin can be completed, thereby realizing uniform distribution of the garbage in the working tunnel bin.

[0032] The above describes the preferred specific embodiments of the utility model. It should be understood that ordinary technicians in this field can make many modifications and changes based on the concept of the utility model without creative work. Therefore, all technical solutions that can be obtained by technicians in this technical field based on the concept of the utility model through logical analysis, reasoning or limited experiments on the basis of the existing technology should be within the scope of protection determined by the claims.

Claims

1. A cable laying system for garbage drying tunnel, characterized in that: The invention comprises a plurality of garbage drying tunnel bins, a power supply box (1), a first fixing device (2), a pulley guide rail (4) and two symmetrically arranged second mobile belt conveyors (32), wherein a plurality of mobile pulleys (3) are distributed on the pulley guide rail (4), each of the mobile pulleys (3) is provided with a cable clamping device (5), a cable of a fixed length is left between two adjacent mobile pulleys (3) through the cable clamping device (5), and a feed port (23) is provided on the garbage drying tunnel bin; The second movable belt conveyor (32) is arranged along the Y direction, a first movable belt conveyor (31) is arranged on the two second movable belt conveyors (32), the first movable belt conveyor (31) is arranged along the X direction, a movable frame (30) is arranged on the first movable belt conveyor (31), and a second fixing device (7), a first electric control box (8) and a spring-type cable reel (20) are arranged on the movable frame (30); The first movable belt conveyor (31) is provided with a third fixing device (10), a fourth fixing device (13), a fifth fixing device (14), a second electric control box (11) and a second driving mechanism (12), and the second driving mechanism (12) drives the first movable belt conveyor (31) to move along the X direction; The second moving belt conveyor (32) is provided with a tank moving chain (15), a sixth fixing device (16), a seventh fixing device (17), a third driving mechanism (21) and a third electric control box (18); one end of the tank moving chain (15) is connected to the fifth fixing device (14), and the other end is connected to the sixth fixing device (16); the third driving mechanism (21) drives the second moving belt conveyor (32) to move along the Y direction.

2. A cable laying system for garbage drying tunnel according to claim 1, characterized in that: Tracks (91) are respectively provided on the tops of the two opposite garbage drying tunnel bins, the tracks (91) being arranged along the Y direction, and the movable frame (30) moves along the tracks (91) under the drive of the first driving mechanism (9).

3. A cable laying system for garbage drying tunnel according to claim 1 or 2, characterized in that: The distance between the first fixing device (2) and the second fixing device (7) is the minimum redundancy of the cable sagging when the last movable pulley (3) moves close to the second fixing device (7).

4. The cable laying system for garbage drying tunnel according to claim 1 is characterized in that: The sixth fixing device (16) is arranged on the tank moving chain (15).

5. The cable laying system for garbage drying tunnel according to claim 1 is characterized in that: A synchronously movable electric control box is arranged on the first electric control box (8).

6. A cable laying system for garbage drying tunnel according to claim 1 or 2, characterized in that: A cable guiding device (19) is provided on the movable frame (30).