AI Technical Summary
During the construction of Bere beams, the existing safety net installation structure is inconvenient and not firm enough, making it difficult to adapt to different bridge widths and construction needs.
The sliding installation welding locking connection method is adopted. By setting up multiple columns, distribution beams, installation structural parts, fixing sleeves and limiting rods, the installation network is achieved convenient and firmly installed, and the number of welding is controlled according to the bridge width and actual needs.
It realizes the convenient and firm installation of the safety net, enhances the applicability of the installation structure, and ensures safety and stability during construction.
Smart Images

Figure CN222294706U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of Bailey beam construction, in particular to a Bailey beam construction safety net installation structure. Background Art
[0002] Bridges built with Bailey beams can be used to build suspension bridges, floating bridges and railway bridges. When building a bridge, in order to prevent people and objects from falling, it is necessary to install a safety net during the construction of the Bailey beam bridge to avoid and reduce injuries from falling objects. In order to facilitate the installation of the safety net and make it more applicable, it is necessary to design a Bailey beam construction safety net installation structure that adopts a sliding installation welding and locking connection method. The installation structure can control the number of welds according to the width of the bridge and actual needs, so that the installation of the safety net is convenient, firm and more applicable. Utility Model Content
[0003] The purpose of the utility model is to provide a Bailey beam construction safety net installation structure, which adopts a sliding installation welding and locking connection method, and the installation structure can control the number of welds according to the width of the bridge and actual needs, so that the installation of the safety net is convenient, firm and more applicable, so as to solve the problems raised by the above-mentioned background technology.
[0004] The utility model solves the above-mentioned technical problems with a technical solution as follows: a Bailey beam construction safety net installation structure, which is arranged between two piers, a distribution beam is welded on the top of each row of columns, a plurality of Bailey beams are installed on the top of a plurality of columns, an installation net is arranged between two distribution beams, a plurality of installation structural members are welded on both sides of the distribution beam, the installation structural members include a plurality of short columns welded on the top and bottom of both sides of the distribution beam, two short columns opposite to each other on the left and right are respectively welded with fixing sleeves at opposite ends, the inner cavity of the fixing sleeve is slidably connected to a limiting rod, and after the installation net is placed in the inner cavity of the installation structural member, the two ends of the limiting rod are respectively welded to the short column and the fixing sleeve.
[0005] Preferably, a plurality of rows of columns are arranged between the two piers, and the columns include a concrete base cast on the ground, a steel column is fixedly installed on the top of the concrete base, and a sand cylinder is installed on the top of the steel column.
[0006] Preferably, a connecting piece is sleeved on the surface of each of the steel columns, and two adjacent connecting pieces are welded to each other.
[0007] Preferably, the distribution beam is composed of two I-beams.
[0008] Preferably, a bottom plate is laid on top of the plurality of Bailey beams.
[0009] Preferably, a receiving rod is welded between the two distribution beams, and the receiving rod is arranged at the bottom of the installation net.
[0010] 1. The beneficial effects of the utility model are as follows: the utility model enables multiple distribution beams to be installed through the arrangement of multiple columns, and multiple Bailey beams and multiple mounting structural members to be installed through the arrangement of multiple distribution beams. The coordinated use of multiple fixing sleeves and limit rods facilitates the installation of the installation net between two distribution beams, thereby achieving the purpose of making the installation of the safety net convenient, firm and more applicable.
[0011] 2. The utility model provides a connection piece so that a plurality of concrete bases in the same row have an integral structure, thereby making the overall structure of the column more stable, thereby making the support of the column to the Bailey beam more stable.
[0012] 3. The utility model provides a receiving rod to support the bottom of the installation net, thereby preventing heavy objects from falling on the top of the installation net and gathering at the center of the top of the installation net, causing damage to the installation net. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] in:
[0014] Figure 1 This is a main perspective schematic diagram of an embodiment of the utility model;
[0015] Figure 2 This is a bottom-up stereoscopic schematic diagram of a mounting net in one embodiment of the utility model;
[0016] Figure 3 This is an embodiment of the utility model Figure 2 A is an enlarged schematic diagram;
[0017] Figure 4 This is a front perspective schematic diagram of an installation structure of an embodiment of the utility model before it is welded closed.
[0018] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0019] 1. Bridge pier, 2. Column, 21. Concrete base, 22. Steel column, 23. Sand cylinder, 24. Connector, 3. Distribution beam, 4. Bailey beam, 5. Bottom plate, 6. Installation net, 7. Installation structure, 71. Short column, 72. Fixed sleeve, 73. Limit rod, 8. Receiver rod. DETAILED DESCRIPTION
[0020] Hereinafter, embodiments of the Bailey beam construction safety net installation structure of the present invention will be described with reference to the accompanying drawings.
[0021] Embodiment 1:
[0022] Figure 1-4A Bailey beam construction safety net installation structure of an embodiment of the utility model is shown, and the structure is arranged between two bridge piers 1: multiple rows of columns 2 are arranged between the two bridge piers 1, and the columns 2 include a concrete base 21 cast on the ground, a steel column 22 is fixedly installed on the top of the concrete base 21, and a sand cylinder 23 is installed on the top of the steel column 22. The surface of each steel column 22 is sleeved with a connecting piece 24, and two adjacent connecting pieces 24 are welded. Through the arrangement of the connecting piece 24, multiple concrete bases 21 in the same row have integrity, and then the overall structure of the columns 2 is made more stable, so that the columns 2 support the Bailey beams 4 more stably, and the top of each row of columns 2 is welded with a distribution beam 3, and multiple Bailey beams 4 are installed on the top of multiple columns 2. Two distribution beams 3 are welded on the top of each row of columns 2. A mounting net 6 is arranged between the beams 3, and a plurality of mounting structures 7 are welded on both sides of the distribution beam 3. The mounting structures 7 include a plurality of short columns 71 welded on the top and bottom of both sides of the distribution beam 3, and a fixing sleeve 72 is welded on the opposite ends of the two short columns 71 opposite to each other on the left and right sides, respectively. The inner cavity of the fixing sleeve 72 is slidably connected with a limiting rod 73. After the mounting net 6 is placed in the inner cavity of the mounting structure 7, the two ends of the limiting rod 73 are respectively welded to the short column 71 and the fixing sleeve 72, and a receiving rod 8 is welded between the two distribution beams 3. The receiving rod 8 is arranged at the bottom of the mounting net 6. Through the arrangement of the receiving rod 8, the bottom of the mounting net 6 is supported, thereby preventing heavy objects from falling on the top of the mounting net 6 and gathering at the center of the top of the mounting net 6 to damage the mounting net 6.
[0023] Embodiment 2:
[0024] Figure 1-4 A Bailey beam construction safety net installation structure of an embodiment of the utility model is shown, which is arranged between two piers 1: a distribution beam 3 is welded on the top of each row of columns 2, the distribution beam 3 is composed of two I-beams, a plurality of Bailey beams 4 are installed on the top of the plurality of columns 2, a bottom plate 5 is laid on the top of the plurality of Bailey beams 4, a mounting net 6 is arranged between the two distribution beams 3, a plurality of mounting structural members 7 are welded on both sides of the distribution beams 3, the mounting structural member 7 includes a plurality of short columns 71 welded to the top and bottom of both sides of the distribution beams 3, two short columns 71 opposite to each other on the left and right are respectively welded to the opposite ends of fixed sleeves 72, the inner cavity of the fixed sleeve 72 is slidably connected to the limit rod 73, and the mounting net 6 is placed in the inner cavity of the mounting structural member 7, and the two ends of the limit rod 73 are respectively welded to the short column 71 and the fixing sleeve 72.
[0025] Working principle: When the utility model is used, the user builds the bridge width according to actual needs or welds multiple installation structures 7 at the top and bottom of both sides of the distribution beam 3 according to on-site construction needs, and then hangs the installation net 6 in the inner cavity of the multiple installation structures 7 on the opposite side between the two distribution beams 3, and then rotates the limit rod 73 upward in the inner cavity of the fixing sleeve 72, and then welds the end of the limit rod 73 that is exposed to the outside to the short column 71. If it is feared that the single-sided welding is not strong enough, it can be welded again at the connection position between the fixing sleeve 72 and the limit rod 73. At this time, the limited installation of the installation net 6 is completed, and then multiple receiving rods 8 are welded between the two distribution beams 3 according to actual needs, so that the support shape of the receiving rod 8 of the installation net 6 is as follows. Figure 2 As shown, the purpose of making the installation of the safety net convenient, firm and more applicable can be achieved.
[0026] In summary: the Bailey beam construction safety net installation structure, through the arrangement of multiple columns 2, multiple distribution beams 3 can be installed, through the arrangement of multiple distribution beams 3, multiple Bailey beams 4 and multiple installation structural members 7 can be installed, through the coordinated use of multiple fixing sleeves 72 and limit rods 73, the installation net 6 can be easily installed between two distribution beams 3, so as to achieve the purpose of making the installation of the safety net convenient, firm and more applicable.
Claims
1. A Bailey beam construction safety net installation structure, characterized in that: The structure is arranged between two bridge piers (1): a plurality of rows of columns (2) are arranged between the two bridge piers (1), a distribution beam (3) is welded to the top of each row of columns (2), a plurality of Bailey beams (4) are installed on the tops of the plurality of columns (2), a mounting net (6) is arranged between the two distribution beams (3), a plurality of mounting structural members (7) are welded to both sides of the distribution beam (3), the mounting structural members (7) comprise a plurality of short columns (71) welded to the top and bottom of both sides of the distribution beam (3), a fixing sleeve (72) is respectively welded to the opposite ends of two short columns (71) opposite to each other on the left and right, the inner cavity of the fixing sleeve (72) is slidably connected to a limiting rod (73), and after the mounting net (6) is placed in the inner cavity of the mounting structural member (7), the two ends of the limiting rod (73) are respectively welded to the short column (71) and the fixing sleeve (72).
2. A Bailey beam construction safety net installation structure according to claim 1, characterized in that: The column (2) comprises a concrete base (21) cast on the ground, a steel column (22) is fixedly mounted on the top of the concrete base (21), and a sand cylinder (23) is mounted on the top of the steel column (22).
3. A Bailey beam construction safety net installation structure according to claim 2, characterized in that: A connecting piece (24) is sleeved on the surface of each of the steel columns (22), and two adjacent connecting pieces (24) are welded to each other.
4. A Bailey beam construction safety net installation structure according to claim 3, characterized in that: The distribution beam (3) is composed of two I-beams.
5. A Bailey beam construction safety net installation structure according to claim 4, characterized in that: A bottom plate (5) is laid on the top of the plurality of Bailey beams (4).
6. A Bailey beam construction safety net installation structure according to claim 5, characterized in that: A receiving rod (8) is welded between the two distribution beams (3), and the receiving rod (8) is arranged at the bottom of the installation net (6).