Suspended ceiling conversion layer steel framework system
Through the steel frame system with long connection holes, the design of bolted connections and sliding sub-beams is used to solve the problems of stability and material waste in the construction of traditional ceiling conversion layers, rapid construction and efficient construction are achieved, and construction period and labor consumption are reduced. .
Patent Information
- Application Number
- CN202420497886.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2034-03-14
AI Technical Summary
The traditional ceiling conversion layer construction method has the problem of difficulty in ensuring stability and waste of materials, especially because the suspension boom is large in length and requires a large number of welding connections, resulting in long construction cycles and waste of materials.
A steel frame system with long connection holes is used, and the main beam is connected by steel columns fixed to the ground and the main beam. The secondary beam can be slid and fixed in different positions. The hanging rod is connected by bolts to avoid a large amount of welding work. The hanging rod is adjusted by connecting nuts. high.
It improves construction efficiency, reduces material waste, shortens construction period, greatly improves on-site construction efficiency and reduces labor consumption.
Smart Images

Figure CN222295313U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a suspended ceiling transfer layer steel skeleton system. Background Art
[0002] Large steel structure buildings such as single-story steel structure factories and steel structure venues have developed rapidly. The demand for building office rooms in the form of "rooms within rooms" inside the main steel structure buildings is increasing. However, the main steel structure buildings have high floor heights, most of which are more than 10 meters, while the floor height of office rooms is generally around 3 meters. The height difference between the two is large, which brings great difficulties to the construction of the roof ceiling conversion layer of office rooms. The traditional method is to hang hangers and counter supports from the main steel structure roof structure as the roof ceiling conversion layer of the office room, or to build a fixed steel frame from the ground as the roof ceiling conversion layer of the office room. Both methods have obvious disadvantages.
[0003] The first and second methods are difficult to ensure the stability of the ceiling system due to the large length of the hanging rod; the second method uses welding to fix the steel frame, and cannot consider the actual installation position of the subsequent hanger in advance. It is necessary to set up a conversion layer as the rooting point of the hanger, and a lot of welding work is required to connect the hanger with the conversion layer, which causes material waste and long construction period. Therefore, there is an urgent need for a steel frame system that can be quickly built and can also serve as a rooting point for the ceiling. The steel frame secondary beam with long connection holes can connect the hanger and the steel frame with bolts to avoid a lot of welding work. The steel frame main beam with long connection holes can fix the secondary beam at different positions on the main beam, so that it can also serve as the rooting point of the office room hanger. In actual construction, it can greatly improve construction efficiency and avoid material waste. Utility Model Content
[0004] The utility model aims to address the deficiencies in the prior art and provides a steel skeleton system for a suspended ceiling transition layer, comprising steel columns fixed on the ground, wherein four steel columns are interconnected by a main beam, wherein the main beam is made of H-shaped steel, a secondary beam is arranged on the main beam, a plurality of long elliptical holes are respectively provided on both sides of the upper and lower flanges of the main beam, the secondary beam is fixed in the upper and lower flanges of the main beam by means of bolts using the long elliptical holes, the long elliptical holes of the upper and lower flanges are staggered with each other so that the upper and lower elliptical holes are evenly distributed over the entire length of the main beam, the main beam plays a role in supporting the secondary beam, the secondary beam can slide at different positions on the main beam, long elliptical holes are respectively provided at both ends of the upper and lower flanges of the secondary beam, which play a role in connecting and fixing the suspension rod, and the suspension rod is used to hang the keel and decorative panel of the suspended ceiling to a certain height.
[0005] Preferably, an embedded plate is provided at the bottom of the steel column, 4 bolt holes are opened on the embedded plate, 4 bolts are embedded in designated positions on the ground, and the steel column is fixed to the ground by the embedded bolts.
[0006] Preferably, the steel column has two rows of bolt holes at a certain height on the upper part of each side surface for connecting to the main beam. A connecting plate is welded at both ends of the main beam, and two rows of bolt holes are formed on the connecting plate. The spacing between the bolt holes corresponds to the bolt holes on the upper part of the steel column. The main beam and the steel column are connected and fixed by bolts.
[0007] Preferably, the suspension rod is engraved with a through-length thread, and the upper end of the suspension rod is connected and fixed to the secondary beam by a connecting nut, and the lower end of the suspension rod is connected to the ceiling hanger by a connecting nut, and the hanger is connected to the keel frame.
[0008] Preferably, the size of the nut is adapted to the hanger rod thread, and the height of the keel frame can be increased or decreased by tightening or loosening the connecting nut.
[0009] Compared with the prior art, the beneficial effects of the utility model are as follows: the ceiling conversion layer skeleton system of the utility model improves the construction efficiency of the ceiling conversion layer steel skeleton system and reduces material waste. With the characteristics of being able to serve as the rooting point of the hanger rod and the bolt connection, it greatly improves the on-site construction efficiency, reduces labor consumption, avoids material waste, and shortens the construction period. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0011] Figure 1 It is a structural schematic diagram of the utility model steel column;
[0012] Figure 2 This is a schematic diagram of the main crossbeam structure of the utility model;
[0013] Figure 3 It is a structural schematic diagram of the secondary crossbeam of the utility model;
[0014] Figure 4 It is a schematic diagram of the overall structure of the utility model.
[0015] In the figure: 1-steel column, 2-main beam, 3-secondary beam, 4-hanging rod, 5-connecting nut. DETAILED DESCRIPTION
[0016] The technical solution of the utility model is described in detail below with reference to the accompanying drawings, but the protection scope of the utility model is not limited to the embodiments.
[0017] Reference Figures 1 to 4 The utility model discloses a steel frame system of a suspended ceiling transfer layer, comprising a steel column 1, a main beam 2, a secondary beam 3, a suspension rod 4, and a connecting nut 5.
[0018] The steel column 1 plays the role of supporting the entire ceiling conversion layer skeleton system. An embedded plate is set at the bottom of the steel column 1, and 4 bolt holes are opened on the embedded plate. First, 4 bolts are embedded in the specified position on the ground, and then the steel column 1 is fixed to the ground through the embedded bolts. The steel column 1 has 2 rows of bolt holes at a certain height on the upper part of each side for connection with the main beam 2. The specific structure is shown in the attached Figure 1 .
[0019] The main beam 2 supports the secondary beam 3, and the secondary beam 3 can slide at different positions on the main beam 2. It is made of H-shaped steel. A connecting plate is welded at both ends of the main beam 2, and two rows of bolt holes are opened on the connecting plate. The spacing of the bolt holes corresponds to the bolt holes on the upper part of the steel column 1. The main beam 2 is connected and fixed to the steel column 1 by bolts. A plurality of long elliptical holes are opened on both sides of the upper and lower flanges of the main beam 2, and the secondary beam 3 is fixed in the upper and lower flanges of the main beam 2 by bolts through the long elliptical holes. The long elliptical holes of the upper and lower flanges are staggered so that the upper and lower elliptical holes are distributed on the entire length of the main beam 2. When the position of the elliptical hole of the lower flange does not meet the requirements, the secondary beam 3 can be fixed by the hole of the upper flange. For details, see the attached Figure 2 .
[0020] The secondary cross beam 3 serves to connect and fix the suspension rod 4. Long elliptical holes are respectively provided at both ends of the upper and lower flanges of the secondary cross beam 3. Bolts are passed through the long elliptical holes of the secondary cross beam 3 to fix the suspension rod 4 at the set position of the secondary cross beam 3. For details, see the attached Figure 3 .
[0021] The suspension rod 4 is used to hang the keel and decorative panels of the suspended ceiling to a certain height. It is made of steel bars. The suspension rod 4 is engraved with a full-length thread. The upper end of the suspension rod 4 is connected and fixed to the secondary crossbeam 3 using a nut. The lower end of the suspension rod 4 is also connected to the ceiling hanger using a nut. The hanger is connected to the keel frame, and finally the keel and decorative panels of the entire suspended ceiling are hung to a set height. By tightening or loosening the nut connecting the upper end of the suspension rod 4 to the secondary crossbeam 3, the height of the keel frame can be raised or lowered.
[0022] The connecting nut 5 is used in conjunction with the suspension rod 4 to hang the keel and decorative panel of the ceiling to a certain height. The size of the nut is adapted to the thread of the suspension rod 4. By tightening or loosening the connecting nut 5, the height of the keel frame can be increased or decreased.
[0023] The installation method of the utility model is as follows:
[0024] Install steel column 1: first measure the position of steel column 1 on the ground, and embed the ground bolts in advance, place steel column 1 on the ground, pass the ground bolts through the bolt holes at the bottom of steel column 1, and then use nuts to connect and fix the ground bolts to steel column 1.
[0025] Install the main beam 2: Align the bolt holes at both ends of the main beam 2 with the bolt holes on the upper part of the steel column 1, and use bolts to connect and fix the main beam 2 and the steel column 1.
[0026] Place the secondary crossbeam 3: Place the secondary crossbeam 3 between the upper and lower flanges of the main crossbeam 2 so that the secondary crossbeam 3 can slide along the "track" formed between the upper and lower flanges of the main crossbeam 2.
[0027] Install the hanger rod 4: pass the hanger rod 4 through the long elliptical hole of the lower flange of the secondary beam 3, and connect the hanger rod 4 to the upper and lower surfaces of the lower flange of the secondary beam 3 using connecting nuts 5, so that the hanger rod 4 is installed on the secondary beam 3.
[0028] Adjust the hanger rod 4 and the secondary beam 3: According to the actual needs when installing the suspended ceiling, adjust the positions of the hanger rod 4 and the secondary beam 3 along the long elliptical holes of the secondary beam 3 and the long elliptical holes of the main beam 2 respectively, so that the position of the hanger rod 4 meets the needs of the suspended ceiling installation.
[0029] Fix the secondary beam 3 and the hanger 4: Use bolts to pass through the long elliptical holes of the main beam 2 and the secondary beam 3 to fix the secondary beam 3 to the main beam 2; tighten the connecting nuts 5 on the upper and lower surfaces of the lower flange of the secondary beam 3 and the hanger 4 to fix the hanger 4 on the secondary beam 3.
[0030] Install the hanging parts and the roof ceiling: Use the connecting nut 5 to install the hanging parts on the lower end of the suspension rod 4, install the main keel of the roof ceiling in the hook of the hanging parts, and then the construction of the roof ceiling can be carried out.
[0031] As above, although the utility model has been shown and described with reference to a specific preferred embodiment, it should not be interpreted as limiting the utility model itself. Various changes can be made to it in form and detail without departing from the spirit and scope of the utility model defined in the attached claims.
Claims
1. A ceiling transfer layer steel skeleton system, characterized by: It includes steel columns fixed on the ground, and four steel columns are interconnected by a main beam. The main beam is made of H-shaped steel. A secondary beam is arranged on the main beam. A plurality of long elliptical holes are respectively opened on both sides of the upper and lower flanges of the main beam. The secondary beam is fixed in the upper and lower flanges of the main beam by means of bolts using the long elliptical holes. The long elliptical holes of the upper and lower flanges are staggered so that the upper and lower elliptical holes are distributed on the entire length of the main beam. The main beam supports the secondary beam, and the secondary beam can slide at different positions on the main beam. Long elliptical holes are respectively opened at both ends of the upper and lower flanges of the secondary beam to connect and fix the suspension rod. The suspension rod is used to hang the keel and decorative panel of the ceiling to a certain height.
2. The steel skeleton system of suspended ceiling transfer layer according to claim 1, characterized in that: An embedded plate is arranged at the bottom of the steel column, 4 bolt holes are opened on the embedded plate, 4 bolts are embedded in designated positions on the ground, and the steel column is fixed to the ground by the embedded bolts.
3. The steel skeleton system of suspended ceiling transfer layer according to claim 2 is characterized in that: The steel column has two rows of bolt holes at a certain height on the upper part of each side surface for connecting to the main beam. A connecting plate is welded at both ends of the main beam. Two rows of bolt holes are formed on the connecting plate. The spacing between the bolt holes corresponds to the bolt holes on the upper part of the steel column. The main beam and the steel column are connected and fixed by bolts.
4. The steel skeleton system of the suspended ceiling transfer layer according to claim 3 is characterized in that: The suspension rod is engraved with a full-length thread, and the upper end of the suspension rod is connected and fixed to the secondary crossbeam by a connecting nut, and the lower end of the suspension rod is connected to the ceiling hanger by a connecting nut, and the hanger is connected to the keel frame.
5. The steel skeleton system of suspended ceiling transfer layer according to claim 4, characterized in that: The size of the nut is adapted to the thread of the suspension rod, and the height of the keel frame can be raised or lowered by tightening or loosening the connecting nut.