Energy-saving fabricated wall component

By designing the wall, groove, frame and bolts in the energy-saving prefabricated wall components, the problem of the hanging rope pressing the bottom of the wall during the lifting process is solved, and the convenience of lifting and disassembly is achieved and the construction is achieved. Improved efficiency.

CN222295376UInactive Publication Date: 2025-01-03郯城县城乡建设工程监理咨询有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421091427.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-20
Publication Date
2025-01-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the lifting process, the existing energy-saving prefabricated wall components lack lifting connection components, causing the lifting rope to press down below the wall, making it inconvenient to disassemble, affecting the overall construction efficiency.

Method used

A component including a wall, groove body, frame body and bolt is designed. It is inserted into the wall groove body through the frame body and connected to the wall thread. It is hung on the frame column by an external hanging rope for lifting. After being placed, it is placed. It can be quickly detached and the predetermined positioning and fixed connection can be achieved through the coordination of the card slot and card blocks of the first frame and the second frame.

Benefits of technology

It realizes the convenience of lifting and disassembly, reduces construction time, and the frame can be reused without affecting the overall construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222295376U_ABST
    Figure CN222295376U_ABST
Patent Text Reader

Abstract

The utility model discloses an energy-saving assembly type wall body component which comprises a wall body, a groove body is machined in the wall body, a frame body is inserted in the groove body, a bolt is connected to the frame body in a threaded mode, and the bolt is connected with the wall body in a threaded mode. According to the utility model, the frame body is inserted into the pre-processed groove body of the wall body, and the bolt at the frame body is in threaded connection with the wall body, so that the frame body can be quickly fixed on the wall body, and the wall body can be hoisted by hanging the frame body at the two groups of column bodies of the frame body through an external hoisting rope at the moment; disassembly can be completed only by separating an external lifting rope from the frame body, disassembly and assembly are convenient, time consumption is low, the overall building efficiency cannot be affected, and meanwhile the frame body can be taken down to be installed on other walls for repeated use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field related to assembled walls, and in particular to an energy-saving assembled wall component. Background Art

[0002] Energy-saving prefabricated walls refer to measures that improve the thermal insulation capabilities of walls. For example, in terms of thermal insulation technology for walls including roofs, new energy-saving materials are selected to achieve building energy-saving effects while also providing a building structure for prefabricated walls. An energy-saving prefabricated wall component (application number: 202223416980.2) is currently available. Through the setting of assembly components, when assembling the outer wall, after pressing the limit block to insert the plug into the slot, the spring's rebound force will drive the limit block to pop out from the slot into the slot, that is, the limit block can limit the position of the first assembly block and the second assembly block, thereby reducing the shaking of the outer wall when it is lifted, solving the problem in the background technology that the hanging of the prefabricated wall will cause shaking, resulting in greater difficulty in assembly.

[0003] The above-mentioned problem is that when the wall is assembled, it needs to be hoisted. Since the wall has no hoisting connection components, a hoisting rope is usually put on the wall for hoisting. Although the wall can be moved, part of the hoisting rope will be placed under the wall. When the wall is placed on the ground, the hoisting rope will be pressed down, and it is inconvenient to remove the hoisting rope, which will affect the overall construction efficiency. Utility Model Content

[0004] The utility model aims to solve the shortcomings in the prior art and proposes an energy-saving assembled wall component.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] An energy-saving assembled wall component comprises a wall, wherein a groove is processed on the wall, a frame is inserted into the groove, a bolt is threadedly connected to the frame, and the bolt is threadedly connected to the wall.

[0007] Preferably, one end and the other end of the wall are respectively fixedly connected to a first frame and a second frame, one end and the other end of the first frame are both processed with a card slot, and the second frame is slidably connected with two groups of card blocks, and multiple groups of springs are fixedly connected between the two groups of card blocks.

[0008] Preferably, two groups of rubber sleeves are fixedly connected to the frame, and a handle is fixedly connected to the bolt.

[0009] Preferably, a plurality of groups of second holes are processed on the first frame.

[0010] Preferably, a plurality of groups of first holes are processed on the second frame.

[0011] Preferably, one end of the two groups of card blocks are designed with a bevel.

[0012] Preferably, one end of the first frame is designed with an arc-shaped edge.

[0013] The beneficial effects of the utility model are:

[0014] 1. Through the coordination between the set wall, trough, frame and bolts, the frame is inserted into the pre-processed trough of the wall, and the bolts at the frame are connected with the wall threads, so that the frame can be quickly fixed on the wall. At this time, the wall can be lifted by hanging the external hanging rope on the two sets of columns of the frame. After the wall is placed on the ground, it can be disassembled by separating the external hanging rope from the frame. It is convenient to disassemble and assemble, takes less time, and does not affect the overall construction efficiency. At the same time, the frame can be removed and installed with other walls for repeated use;

[0015] 2. Through the cooperation between the first frame, the second frame, the slot and the card block, when the two sets of walls are connected, the first frame and the second frame can be docked. At this time, the card block will automatically move into the second frame because its own inclined surface contacts the arc surface of the first frame, and move to the slot of the first frame to re-protrude and engage with the slot. The two sets of walls can be pre-positioned, which is convenient for the subsequent installation of connecting parts at the first hole body and the second hole body to fix the two sets of walls. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a structural schematic diagram of an energy-saving assembled wall component proposed by the utility model;

[0017] Figure 2 for Figure 1 Structural schematic diagram of the middle tank body, frame body and bolts;

[0018] Figure 3 for Figure 1 A schematic diagram of the structure of the first frame, the slot and the second hole;

[0019] Figure 4 for Figure 1 A schematic diagram of the structure of the second frame;

[0020] Figure 5 for Figure 1 Schematic diagram of the connection structure between the first frame and the second frame.

[0021] In the figure: 1, wall; 2, trough; 3, frame; 4, bolt; 5, first frame; 6, slot; 7, second frame; 8, block; 9, spring; 10, rubber sleeve; 11, handle; 12, first hole; 13, second hole. DETAILED DESCRIPTION

[0022] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0023] Example 1, reference Figures 1 to 5 An energy-saving assembled wall component includes a wall 1, a groove 2 is processed on the wall 1, a frame 3 is inserted in the groove 2, two groups of columns of the frame 3 can be inserted in the groove 2 and placed, a bolt 4 is threadedly connected on the frame 3, the bolt 4 is threadedly connected to the wall 1, and the frame 3 can be fixed on the wall 1 by connecting the bolt 4 to the thread of the wall 1. The wall 1 can be moved by putting an external lifting rope on the two groups of columns of the frame 3. After the wall 1 is placed on the ground, the external lifting rope is removed at the frame 3, and the frame 3 is separated from the wall 1, and the frame 3 can be reinstalled on other walls 1 for repeated use.

[0024] In this embodiment, the first frame body 5 and the second frame body 7 are fixedly connected at one end and the other end of the wall body 1 respectively, and the first frame body 5 and the second frame body 7 of the two groups of walls 1 can be docked. The first frame body 5 and the other end are processed with a card slot 6, and the second frame body 7 is slidably connected with two groups of card blocks 8. After the card blocks 8 are engaged with the card slots 6, the first frame body 5 and the second frame body 7 can be quickly connected. The two groups of walls 1 can be pre-connected, which is convenient for the subsequent two groups of walls 1 to install connecting parts at the first hole body 12 and the second hole body 13 for connection and fixing. Multiple groups of springs 9 are fixedly connected between the two groups of card blocks 8, and the springs 9 give the two groups of card blocks 8 a force to engage with the corresponding card slots 6. Two groups of rubber sleeves 10 are fixedly connected to the frame body 3. The rubber sleeve 10 is used to increase the contact stability between the external lifting rope and the frame body 3. A handle 11 is fixedly connected to the bolt 4, and the handle 11 can drive the bolt 4 to rotate. Multiple groups of second holes 13 are processed on the first frame body 5, and multiple groups of first holes 12 are processed on the second frame body 7. When the first frame body 5 and the second frame body 7 are connected, the second holes 13 and the first holes 12 will be connected correspondingly. At this time, the external connecting parts are passed through and installed, and the two groups of wall bodies 1 can be fixed and installed. One end of the two groups of clamping blocks 8 are designed with a bevel, so that when the clamping block 8 contacts with the first frame body 5, the contact between the arc edge and the bevel is used, and the clamping block 8 can be moved into the second frame body 7 and clamped when it moves to the card slot 6. One end of the first frame body 5 is designed with a curved edge.

[0025] The working principle of this embodiment is as follows: when in use, the frame 3 is inserted into the groove 2 of the wall 1, and the bolt 4 is threadedly connected to the wall 1. At this time, the frame 3 will be fixed on the wall 1, and the external lifting rope is placed on the two groups of columns of the frame 3. The external lifting rope can be used to transport the wall 1, and the wall 1 can be moved to dock with another group of walls 1. When the wall 1 is docked with another group of walls 1, the first frame 5 of the wall 1 can be fitted with the second frame 7 of the other group of walls 1, or the second frame 7 of the wall 1 can be fitted with the first frame 5 of the other group of walls 1. At this time, due to the inclined surface of the block 8 at the second frame 7 and the arc of the first frame 5 When the two walls 1 are in contact with each other, the block 8 will be retracted into the second frame 7 until the second frame 7 is connected to the first frame 5, and the block 8 will pop into the slot 6 of the first frame 5. The two sets of walls 1 can complete the pre-connection operation. After the operation is completed, the external lifting rope is removed at the frame 3, and the bolt 4 is turned to cancel the threaded connection with the wall 1, and the frame 3 is removed. The frame 3 can be reinstalled with other walls 1, and the lifting operation can be continued with the external lifting rope. The two sets of walls 1 that have completed the pre-connection will use the second hole 13 of the first frame 5 and the first hole 12 of the second frame 7 to install the external connecting parts, so that the two sets of walls 1 can be fixed and installed to complete the assembly.

[0026] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An energy-saving assembled wall component, comprising a wall (1), characterized in that: A groove body (2) is processed on the wall body (1), a frame body (3) is inserted into the groove body (2), a bolt (4) is threadedly connected to the frame body (3), and the bolt (4) is threadedly connected to the wall body (1).

2. An energy-saving assembled wall component according to claim 1, characterized in that: The wall (1) is fixedly connected to a first frame (5) and a second frame (7) at one end and the other end respectively; a clamping groove (6) is processed at one end and the other end of the first frame (5); two groups of clamping blocks (8) are slidably connected to the second frame (7); and a plurality of groups of springs (9) are fixedly connected between the two groups of clamping blocks (8).

3. The energy-saving assembled wall component according to claim 1, characterized in that: Two groups of rubber sleeves (10) are fixedly connected to the frame (3), and a handle (11) is fixedly connected to the bolt (4).

4. The energy-saving assembled wall component according to claim 2, characterized in that: The first frame (5) is processed with a plurality of groups of second holes (13).

5. The energy-saving assembled wall component according to claim 2, characterized in that: The second frame (7) is processed with a plurality of first hole bodies (12).

6. The energy-saving assembled wall component according to claim 2, characterized in that: One end of the two groups of clamping blocks (8) are both designed with an inclined surface.

7. The energy-saving assembled wall component according to claim 2, characterized in that: One end of the first frame (5) is designed with an arc-shaped edge.