Concrete pouring building template for building construction
By introducing pressure-bearing components into the building formwork, the impact of expansion force on the formwork during concrete pouring is solved, and multiple buffering and dispersion of expansion force is achieved, extending the service life of the formwork.
Patent Information
- Application Number
- CN202421296866.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2034-06-07
AI Technical Summary
During the concrete pouring process, due to the increase in the pouring height, the concrete expansion force suffered by the building formwork increases, making it difficult for the formwork to resist the expansion force, affecting the service life of the formwork.
A concrete poured building formwork for building construction is designed, using pressure-bearing components, including accommodating grooves, pressure-bearing parts, conductive parts and connectors. Through the structural design of these components, multiple buffering and dispersing of concrete expansion force can be achieved.
Through the design of pressure-bearing components, the concrete expansion force can be effectively buffered and dispersed, greatly improving the strength of the building formwork and extending the service life of the formwork.
Smart Images

Figure CN222558110U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building construction, in particular to a concrete pouring building template for building construction. Background Art
[0002] Building formwork is a temporary supporting structure, which is made according to the design requirements to shape the concrete structure and components into the specified position and geometric dimensions, maintain their correct position, and bear the deadweight of the building formwork and the external loads acting on it. The building formwork is the mold shell and support for concrete pouring. The purpose of formwork engineering is to ensure the quality and construction safety of concrete engineering, speed up the construction progress and reduce the project cost.
[0003] When pouring concrete, it is necessary to shape and pour the concrete by splicing multiple building formworks together. However, in the prior art, during the concrete pouring process, as the pouring height becomes higher and higher, the concrete expansion force borne by the multiple building formworks at the bottom becomes larger and larger. This results in that it is difficult to resist the expansion force generated by the concrete by relying solely on the splicing and fixation between the multiple building formworks and the strength of the building formworks themselves, thereby affecting the service life of the building formworks. Utility Model Content
[0004] The utility model aims to provide a concrete pouring building template for building construction to solve the problems raised in the background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a concrete pouring building formwork for construction, comprising a building formwork body and a pressure-bearing component; the pressure-bearing component is arranged in the building formwork body; wherein the pressure-bearing component comprises a receiving groove, a pressure-bearing member, a conductive member and a connecting member; a receiving groove is provided in the building formwork body; a plurality of the pressure-bearing members are fixedly arranged in a linear array on both sides of the inner wall of the receiving groove; two conductive members are symmetrically fixedly arranged at both ends of the pressure-bearing member; the connecting member is fixedly connected to the conductive member, and the opposite ends of two adjacent connecting members are fixedly connected.
[0006] As a preferred embodiment, the pressure-bearing member is in an isosceles trapezoidal structure, and the size of the side of the pressure-bearing member close to the inner wall of the accommodating groove is smaller than the size of the side of the pressure-bearing member away from the inner wall of the accommodating groove.
[0007] As a preferred embodiment, the conductive member is in an inclined structure, and the high end of the conductive member is arranged close to the pressure-bearing member, and the low end of the conductive member is arranged away from the pressure-bearing member.
[0008] As a preferred embodiment, it further comprises a supporting member; the supporting member is arranged on opposite surfaces of the four conductive members.
[0009] As a preferred embodiment, the support member is in an X-shaped structure.
[0010] As a preferred embodiment, it also includes a buffer member; two of the buffer members are symmetrically fixed on both sides of the inner wall of the accommodating groove, and both ends of the buffer member are fixedly connected to the connecting members on both sides of the inner wall of the accommodating groove.
[0011] As a preferred embodiment, the buffer member is in a bow-shaped structure, and the bowed end of the buffer member is arranged away from the connecting member.
[0012] Compared with the prior art, the technical effects and advantages of the utility model are as follows:
[0013] The concrete pouring building formwork for construction, through the provided pressure-bearing component, when in use, multiple building formwork bodies are spliced together, and then concrete is poured into the pouring cavity formed between the multiple building formwork bodies. At this time, the expansion force generated by the concrete will be transmitted to the pressure-bearing part through the building formwork body, so that the pressure-bearing part preliminarily buffers the expansion force generated by the concrete and disperses it to the conductive part, so that the inclined surface of the conductive part can buffer the expansion force of the concrete after being buffered by the pressure-bearing part again, so that the utility model can perform multiple buffering and dispersion on the expansion force generated by the concrete, greatly improving the self strength of the building formwork body, thereby extending the service life of the building formwork body.
[0014] The concrete pouring building formwork for building construction is provided with support members, which are arranged into an X-shaped structure. When the conductive member is subjected to the expansion force generated by the concrete, the shape of the support members can improve the strength of the conductive member itself, so that the conductive member can withstand a greater expansion force of the concrete, thereby improving the practicality of the utility model.
[0015] The concrete pouring building formwork for building construction is provided with a buffer member, which is arranged into a bow-shaped structure, and the bowed end of the buffer member is arranged away from the connecting member. When the concrete expansion force borne by the conductive member is transmitted to the buffer member through the connecting member, the buffer member can further buffer the concrete expansion force through the arc surface of the buffer member, thereby further improving the practicality of the utility model. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 It is a cross-sectional view of the overall structure of the utility model;
[0019] Figure 3 This is a cross-sectional view of the main structure of the building template of the utility model;
[0020] Figure 4 It is a schematic diagram of the partial structure disassembly of the utility model;
[0021] Figure 5 For the utility model Figure 2 Enlarged schematic diagram at point A in the middle.
[0022] Description of reference numerals:
[0023] In the figure:
[0024] 1. Building formwork body; 2. Pressure-bearing components; 3. Support components; 4. Buffer components;
[0025] 201. Receiving groove; 202. Pressure bearing member; 203. Conducting member; 204. Connecting member. DETAILED DESCRIPTION
[0026] In the following description, a large number of specific details are given to provide a more thorough understanding of the utility model. However, it is obvious to those skilled in the art that the utility model can be implemented without one or more of these details. In other examples, in order to avoid confusion with the utility model, some technical features known in the art are not described.
[0027] Unless otherwise defined, the directions of up, down, left, right, front, back, inside and outside involved in this document are based on the directions of up, down, left, right, front, back, inside and outside in the figures shown in the present utility model, and are explained here together.
[0028] The connection method can be bonding, welding, bolt connection, etc., depending on actual needs.
[0029] See also Figures 1 to 5 As shown, this embodiment includes a building template body 1 and a pressure-bearing component 2; the pressure-bearing component 2 is arranged in the building template body 1; wherein the pressure-bearing component 2 includes a receiving groove 201, a pressure-bearing member 202, a conductive member 203 and a connecting member 204; a receiving groove 201 is opened in the building template body 1; a plurality of pressure-bearing members 202 are fixedly arranged on both sides of the inner wall of the receiving groove 201 in a linear array; the pressure-bearing member 202 is fixed in the receiving groove 201 by screws; two conductive members 203 are symmetrically fixed on both ends of the pressure-bearing member 202; the connecting member 204 is fixedly connected to the conductive member 203, and the opposite ends of two adjacent connecting members 204 are fixedly connected.
[0030] The utility model is provided with a pressure-bearing component 2. When in use, multiple building formwork bodies 1 are spliced together, and then concrete is poured into the pouring cavity formed between the multiple building formwork bodies 1. At this time, the expansion force generated by the concrete will be transmitted to the pressure-bearing member 202 through the building formwork body 1, so that the pressure-bearing member 202 can initially buffer the expansion force generated by the concrete and disperse it to the conductive member 203, so that the inclined surface of the conductive member 203 can buffer the expansion force of the concrete after being buffered by the pressure-bearing member 202 again, so that the utility model can perform multiple buffering and dispersion on the expansion force generated by the concrete, greatly improving the self-strength of the building formwork body 1, thereby extending the service life of the building formwork body 1.
[0031] As a preferred embodiment, the pressure bearing member 202 is in an isosceles trapezoidal structure, and the size of the side of the pressure bearing member 202 close to the inner wall of the receiving groove 201 is smaller than the size of the side of the pressure bearing member 202 away from the inner wall of the receiving groove 201. This facilitates the pressure bearing member 202 to disperse and buffer the expansion force generated by the concrete through its own shape.
[0032] As a preferred embodiment, the conductive member 203 is in an inclined structure, and the high end of the conductive member 203 is arranged close to the pressure-bearing member 202, and the low end of the conductive member 203 is arranged away from the pressure-bearing member 202. This facilitates the concrete expansion force buffered by the pressure-bearing member 202 to be transmitted to the conductive member 203, and the concrete expansion force can be buffered and dispersed again through the inclined surface of the conductive member 203.
[0033] As a preferred embodiment, it further includes a support member 3; the support member 3 is arranged on the opposite surface of the four conductive members 203; wherein the support member 3 is in an X-shaped structure. The utility model arranges the support member 3, and arranges the support member 3 in an X-shaped structure, so that when the conductive member 203 bears the expansion force generated by the concrete, the shape of the support member 3 can improve the strength of the conductive member 203 itself, so that the conductive member 203 can bear a greater concrete expansion force, thereby improving the practicality of the utility model.
[0034] As a preferred embodiment, a buffer 4 is also included; two buffers 4 are symmetrically fixed on both sides of the inner wall of the receiving groove 201, and the two ends of the buffer 4 are respectively fixedly connected to the connecting members 204 on the two sides of the inner wall of the receiving groove 201; wherein the buffer 4 is in an arched structure, and the arched end of the buffer 4 is arranged away from the connecting member 204. The utility model arranges the buffer 4 in an arched structure, and the arched end of the buffer 4 is arranged away from the connecting member 204, so that when the concrete expansion force borne by the conductive member 203 is transmitted to the buffer 4 through the connecting member 204, the buffer 4 can further buffer the concrete expansion force through the arc surface of the buffer 4, further improving the practicality of the utility model.
[0035] How it works
[0036] When using the concrete pouring building formwork for construction, multiple building formwork bodies 1 are spliced together, and then concrete is poured into the pouring cavity formed between the multiple building formwork bodies 1. At this time, the expansion force generated by the concrete will be transmitted to the pressure-bearing member 202 through the building formwork body 1, so that the pressure-bearing member 202 can preliminarily buffer the expansion force generated by the concrete and disperse it to the conductive member 203, so that the inclined surface of the conductive member 203 can buffer the concrete expansion force buffered by the pressure-bearing member 202 again, and when the conductive member 203 bears the concrete expansion force, due to the action of the support member 3, the bearing strength of the conductive member 203 will be higher, and the concrete expansion force buffered by the conductive member 203 will be transmitted to the buffer member 4 through the connecting member 204, so that the buffer member 4 can further buffer the concrete expansion force.
[0037] It should be noted that, in this article, relational terms such as one and two are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".
[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A concrete pouring building formwork for building construction, characterized in that: include: Building formwork body (1); A pressure-bearing component (2) is arranged inside the building formwork body (1); The pressure-bearing component (2) comprises a receiving groove (201), a pressure-bearing member (202), a conducting member (203) and a connecting member (204); the building template body (1) is provided with a receiving groove (201); a plurality of the pressure-bearing members (202) are fixedly arranged in a linear array on both sides of the inner wall of the receiving groove (201); two conducting members (203) are symmetrically fixedly arranged on both ends of the pressure-bearing member (202); the connecting member (204) is fixedly connected to the conducting member (203), and the opposite ends of two adjacent connecting members (204) are fixedly connected.
2. A concrete pouring building formwork for construction according to claim 1, characterized in that: The pressure-bearing member (202) is in an isosceles trapezoidal structure, and the size of the side of the pressure-bearing member (202) close to the inner wall of the containing groove (201) is smaller than the size of the side of the pressure-bearing member (202) away from the inner wall of the containing groove (201).
3. A concrete pouring building formwork for construction according to claim 2, characterized in that: The conductive member (203) has an inclined structure, and the high end of the conductive member (203) is arranged close to the pressure-bearing member (202), while the low end of the conductive member (203) is arranged away from the pressure-bearing member (202).
4. A concrete pouring building formwork for construction according to claim 3, characterized in that: Also includes: The support member (3) is arranged on the opposite surface of the four conductive members (203).
5. A concrete pouring building formwork for construction according to claim 4, characterized in that: The support member (3) has an X-shaped structure.
6. A concrete pouring building formwork for construction according to claim 1, characterized in that: Also includes: The buffer members (4) are two in number and are symmetrically fixed on both sides of the inner wall of the accommodating groove (201), and the two ends of the buffer members (4) are respectively fixedly connected to the connecting members (204) on both sides of the inner wall of the accommodating groove (201).
7. A concrete pouring building formwork for construction according to claim 6, characterized in that: The buffer member (4) has a bow-shaped structure, and the bowed end of the buffer member (4) is arranged away from the connecting member (204).