Mark post for building construction measurement
By designing a benchmark for automatic fixing and measuring for building construction, the existing benchmark needs to be manually controlled and easily lead to measurement errors is solved, and more efficient and accurate measurement is achieved, and construction quality is ensured.
Patent Information
- Application Number
- CN202421454428.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2034-06-25
AI Technical Summary
The existing benchmarks need to be controlled manually, which is inconvenient to use, which increases the labor intensity of construction workers and can easily lead to the benchmarks being unperpendicular, resulting in errors in measurement results and affecting the quality of building construction.
A benchmark for building construction measurement is designed, including base, load-bearing structure, fixed structure, horizontal structure, telescopic structure, support structure and detection structure. Through the combination and adjustment of these structures, automatic fixing and measurement can be achieved, and manual intervention is reduced.
This benchmark is more convenient to measure during housing construction, reducing the labor intensity of construction workers, reducing measurement errors, and ensuring the quality of housing construction.
Smart Images

Figure CN222577778U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a benchmark for building construction measurement. Background Art
[0002] Building construction refers to the technical work such as survey, planning, design, construction, installation and maintenance for the construction, reconstruction or expansion of buildings and ancillary structures. In order to complete the various building construction tasks, surveying operations are required, and surveying poles are generally used in the surveying operations.
[0003] Existing benchmarks usually need to be held manually, which is inconvenient to use and increases the labor intensity of construction workers. In addition, manual holding can easily make the benchmark not vertical, resulting in errors in measurement results and affecting the quality of building construction. Therefore, in order to solve this problem, it is very necessary to design a benchmark for building construction measurement. Utility Model Content
[0004] The utility model aims to solve the technical problems that the existing benchmarks in the prior art usually need to be held manually, which is inconvenient to use and increases the labor intensity of construction workers. Moreover, the manual holding pole easily makes the benchmark not vertical, resulting in errors in measurement results and affecting the quality of building construction. A benchmark for building construction measurement is provided.
[0005] In order to solve the above technical problems, the technical solution of the utility model is as follows:
[0006] A benchmark for building construction measurement, comprising:
[0007] Base;
[0008] A bearing structure, the bearing structure is installed on the upper surface of the base, and the bearing structure is used for bearing;
[0009] A first fixing structure, wherein the first fixing structure is installed on the lower surface of the base and is used for fixing;
[0010] A second fixing structure, the second fixing structure is installed on the lower surface of the base, and the second fixing structure is used for fixing;
[0011] A third fixing structure, the third fixing structure is installed on the lower surface of the base, and the third fixing structure is used for fixing;
[0012] A horizontal structure, wherein the horizontal structure is installed on the bearing structure and is used for adjustment;
[0013] A telescopic structure, wherein the telescopic structure is mounted on the bearing structure and is used for measurement;
[0014] A supporting structure, wherein the supporting structure is installed on the telescopic structure and is used for supporting;
[0015] The detection structure is installed on the supporting structure and is used for detection.
[0016] Preferably, the bearing structure comprises: a bearing shell;
[0017] The bearing shell is installed on the upper surface of the base.
[0018] Preferably, the first fixing structure comprises: a first support rod and a first fixing cone;
[0019] The first support rod is installed at the center of the lower surface of the base, and the first fixing cone is installed on the lower surface of the first support rod.
[0020] Preferably, the second fixing structure comprises: three pairs of fixing rings, three rotating round rods, three fixing buckles and three supporting fixing cone rods;
[0021] Three pairs of the fixed rings are installed on the lower surface of the base, each rotating round rod is installed on a corresponding pair of the fixed rings, each fixed buckle is installed on a corresponding fixed ring, and the fixed buckle matches the rotating round rod, and each supporting fixed cone rod is installed on a corresponding rotating round rod.
[0022] Preferably, the third fixing structure comprises: three supporting shells, three threaded rods, three tapered adjustment rods and three adjustment handles;
[0023] The base is provided with three through holes, each of the supporting shells is installed on the corresponding through holes, each of the supporting shells is provided with a threaded through hole, each of the threaded rods is installed on the corresponding threaded through holes, each of the conical adjustment rods is installed on the corresponding threaded rods, and each of the adjustment handles is installed on the corresponding threaded rods.
[0024] Preferably, the horizontal structure comprises: a first fixing frame and a level;
[0025] The first fixing frame is installed on the upper surface of the bearing structure, and the level is installed on the first fixing frame.
[0026] Preferably, the telescopic structure comprises: a seat body and a telescopic pole;
[0027] The seat body is installed on the upper surface of the bearing structure, and the telescopic pole is installed on the upper surface of the seat body.
[0028] Preferably, the support structure comprises: a horizontal support plate;
[0029] The horizontal support plate is installed on the upper surface of the telescopic pole.
[0030] Preferably, the detection structure comprises: a first connecting block, a hanging rope, an infrared transmitter, a second fixing frame and a target;
[0031] The first connecting block is installed at the front end of the lower surface of the horizontal support plate, the hanging rope is installed at the lower surface of the first connecting block, the infrared transmitter is installed on the hanging rope, the second fixing frame is installed on the upper surface of the bearing shell, and the target is installed on the second fixing frame.
[0032] Preferably, a control button is provided on the carrying shell, and a storage battery is provided on the carrying shell.
[0033] The utility model has the following beneficial effects:
[0034] The building construction measurement benchmark can be used for better measurement during building construction, is very convenient, reduces unnecessary trouble, can be fixed, reduces the labor intensity of construction personnel, and is not prone to errors in measurement results, thereby ensuring the quality of building construction. The structure is relatively simple and easy to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] The utility model is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0036] Figure 1 This is a structural schematic diagram of a benchmark for building construction measurement according to the utility model;
[0037] Figure 2 This is a main structural diagram of a benchmark for building construction measurement of the utility model;
[0038] Figure 3 This is a front view of a benchmark for building construction measurement according to the utility model;
[0039] Figure 4 The utility model is a top view of a benchmark for building construction measurement.
[0040] The reference numerals in the figures indicate:
[0041] Base 10, bearing structure 20, first fixed structure 30, second fixed structure 40, third fixed structure 50, horizontal structure 60, telescopic structure 70, supporting structure 80, detection structure 90, control button 100, battery 110;
[0042] A bearing housing 21;
[0043] A first support rod 31 and a first fixing cone 32;
[0044] A fixed circular ring 41, a rotating circular rod 42, a fixed buckle 43, and a supporting fixed cone rod 44;
[0045] Support housing 51, threaded rod 52, tapered adjustment rod 53, adjustment handle 54;
[0046] A first fixing frame 61, a level 62;
[0047] The seat body 71 and the telescopic pole 72;
[0048] Horizontal support plate 81;
[0049] A first connecting block 91 , a suspension rope 92 , an infrared transmitter 93 , a second fixing frame 94 , and a target 95 . DETAILED DESCRIPTION
[0050] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model; it should be noted that in this application, for the convenience of description, the "left side" in the current view is the "first end", the "right side" is the "second end", the "upper side" is the "first end", and the "lower side" is the "second end". The purpose of such description is to clearly express the technical solution, and it should not be understood as an improper limitation on the technical solution of this application.
[0051] See also Figure 1-4 As shown, a benchmark for building construction measurement includes: a base 10, a bearing structure 20, the bearing structure 20 is installed on the upper surface of the base 10, and the bearing structure 20 is used for bearing, a first fixing structure 30, the first fixing structure 30 is installed on the lower surface of the base 10, and the first fixing structure 30 is used for fixing, a second fixing structure 40, the second fixing structure 40 is installed on the lower surface of the base 10, and the second fixing structure 40 is used for fixing, a third fixing structure 50, the third fixing structure 50 is installed on the lower surface of the base 10, and the third fixing structure 50 is used for fixing, a horizontal structure 60, the horizontal structure 60 is installed on the bearing structure 20, and the horizontal structure 60 is used for adjustment, a telescopic structure 70, the telescopic structure 70 is installed on the bearing structure 20, and the telescopic structure 70 is used for measurement, a supporting structure 80, the supporting structure 80 is installed on the telescopic structure 70, and the supporting structure 80 is used for supporting, and a detection structure 90, the detection structure 90 is installed on the support structure 80, and the detection structure 90 is used for detection.
[0052] The bearing structure 20 includes a bearing shell 21 , which is mounted on the upper surface of the base 10 .
[0053] The first fixing structure 30 includes: a first support rod 31 and a first fixing cone 32 . The first support rod 31 is installed at the center of the lower surface of the base 10 , and the first fixing cone 32 is installed on the lower surface of the first support rod 31 .
[0054] The second fixing structure 40 includes: three pairs of fixing rings 41, three rotating round rods 42, three fixing buckles 43 and three supporting fixing cone rods 44. The three pairs of fixing rings 41 are installed on the lower surface of the base 10, each rotating round rod 42 is installed on a corresponding pair of fixing rings 41, each fixing buckle 43 is installed on a corresponding fixing ring 41, and the fixing buckle 43 matches the rotating round rod 42, and each supporting fixing cone rod 44 is installed on a corresponding rotating round rod 42.
[0055] The third fixed structure 50 includes: three supporting shells 51, three threaded rods 52, three conical adjustment rods 53 and three adjustment handles 54. Three through holes are provided on the base 10. Each supporting shell 51 is installed on the corresponding through hole. Each supporting shell 51 is provided with a threaded through hole. Each threaded rod 52 is installed on the corresponding threaded through hole. Each conical adjustment rod 53 is installed on the corresponding threaded rod 52. Each adjustment handle 54 is installed on the corresponding threaded rod 52.
[0056] The horizontal structure 60 includes: a first fixing frame 61 and a level 62 . The first fixing frame 61 is installed on the upper surface of the supporting structure 20 , and the level 62 is installed on the first fixing frame 61 .
[0057] The telescopic structure 70 includes a seat body 71 and a telescopic rod 72 . The seat body 71 is installed on the upper surface of the bearing structure 20 , and the telescopic rod 72 is installed on the upper surface of the seat body 71 .
[0058] The support structure 80 includes a horizontal support plate 81 , which is installed on the upper surface of the telescopic pole 72 .
[0059] The detection structure 90 includes: a first connecting block 91, a hanging rope 92, an infrared transmitter 93, a second fixing frame 94 and a target 95. The first connecting block 91 is installed at the front end of the lower surface of the horizontal support plate 81, the hanging rope 92 is installed on the lower surface of the first connecting block 91, the infrared transmitter 93 is installed on the hanging rope 92, the second fixing frame 94 is installed on the upper surface of the supporting shell 21, and the target 95 is installed on the second fixing frame 94.
[0060] A control button 100 is disposed on the carrying shell 21 , and a storage battery 110 is disposed on the carrying shell 21 .
[0061] In summary, the bearing structure 20 on the upper surface of the base 10 of the present application is used for bearing, the first fixing structure 30 on the lower surface of the base 10 is used for fixing, the second fixing structure 40 on the lower surface of the base 10 is used for fixing, the third fixing structure 50 on the lower surface of the base 10 is used for fixing, the horizontal structure 60 on the bearing structure 20 is used for adjustment, the telescopic structure 70 on the bearing structure 20 is used for measurement, the supporting structure 80 on the telescopic structure 70 is used for support, and the detection structure 90 on the supporting structure 80 is used for detection. The battery 110 on the bearing shell 21 is used for power supply, and the control button 100 on the bearing shell 21 is used for control. First, the first fixing cone 32 on the first support rod 31 is fixed at a preset position, and then Turn on the infrared transmitter 93 and turn on the level 62 on the first fixed frame 61 at the same time. Drive the tapered adjustment rod 53 under the threaded rod 52 by adjusting the handle 54 to cooperate with the level 62 on the first fixed frame 61 and the infrared transmitter 93 for adjustment. When the infrared light on the infrared transmitter 93 is out of the target 95, it means that the telescopic mark rod 72 on the seat body 71 is not in a horizontal state. When the infrared light on the infrared transmitter 93 is irradiated on the target 95, it means that the telescopic mark rod 72 on the seat body 71 is in a horizontal state. After the adjustment is completed, open the fixing buckle 43 on the fixing ring 41, lower the supporting fixing cone rod 44, and fix it. After the fixing is completed, lock the fixing buckle 43 to fix it, which is very convenient.
[0062] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A benchmark for building construction measurement, characterized in that: include: Base (10); A bearing structure (20), the bearing structure (20) being mounted on the upper surface of the base (10), and the bearing structure (20) being used for bearing; A first fixing structure (30), the first fixing structure (30) being mounted on the lower surface of the base (10), and the first fixing structure (30) being used for fixing; a second fixing structure (40), the second fixing structure (40) being mounted on the lower surface of the base (10), and the second fixing structure (40) being used for fixing; a third fixing structure (50), the third fixing structure (50) being mounted on the lower surface of the base (10), and the third fixing structure (50) being used for fixing; A horizontal structure (60), wherein the horizontal structure (60) is installed on the bearing structure (20), and the horizontal structure (60) is used for adjustment; a telescopic structure (70), the telescopic structure (70) being mounted on the bearing structure (20), and the telescopic structure (70) being used for measurement; A support structure (80), wherein the support structure (80) is installed on the telescopic structure (70), and the support structure (80) is used for supporting; A detection structure (90), wherein the detection structure (90) is installed on the support structure (80), and the detection structure (90) is used for detection.
2. A building construction surveying pole as claimed in claim 1, characterized in that: The bearing structure (20) comprises: a bearing shell (21); The bearing shell (21) is mounted on the upper surface of the base (10).
3. A building construction surveying pole as claimed in claim 1, characterized in that: The first fixing structure (30) comprises: a first support rod (31) and a first fixing cone (32); The first support rod (31) is mounted at the center of the lower surface of the base (10), and the first fixing cone (32) is mounted on the lower surface of the first support rod (31).
4. A building construction surveying pole as claimed in claim 1, characterized in that: The second fixing structure (40) comprises: three pairs of fixing rings (41), three rotating round rods (42), three fixing buckles (43) and three supporting fixing cone rods (44); Three pairs of the fixed circular rings (41) are mounted on the lower surface of the base (10), each of the rotating circular rods (42) is mounted on a corresponding pair of the fixed circular rings (41), each of the fixed buckles (43) is mounted on a corresponding fixed circular ring (41), and the fixed buckles (43) match the rotating circular rods (42), and each of the supporting fixed conical rods (44) is mounted on a corresponding rotating circular rod (42).
5. A building construction surveying pole as claimed in claim 1, characterized in that: The third fixing structure (50) comprises: three supporting shells (51), three threaded rods (52), three tapered adjustment rods (53) and three adjustment handles (54); The base (10) is provided with three through holes, each of the support shells (51) is mounted on a corresponding through hole, each of the support shells (51) is provided with a threaded through hole, each of the threaded rods (52) is mounted on a corresponding threaded through hole, each of the tapered adjustment rods (53) is mounted on a corresponding threaded rod (52), and each of the adjustment handles (54) is mounted on a corresponding threaded rod (52).
6. A building construction surveying pole as claimed in claim 2, characterized in that: The horizontal structure (60) comprises: a first fixing frame (61) and a level (62); The first fixing frame (61) is mounted on the upper surface of the bearing structure (20), and the level (62) is mounted on the first fixing frame (61).
7. A building construction surveying pole as claimed in claim 2, characterized in that: The telescopic structure (70) comprises: a seat body (71) and a telescopic pole (72); The seat body (71) is mounted on the upper surface of the bearing structure (20), and the telescopic pole (72) is mounted on the upper surface of the seat body (71).
8. A building construction surveying pole as claimed in claim 7, characterized in that: The support structure (80) comprises: a horizontal support plate (81); The horizontal support plate (81) is mounted on the upper surface of the telescopic pole (72).
9. A building construction surveying pole as claimed in claim 7, characterized in that: The detection structure (90) comprises: a first connection block (91), a suspension rope (92), an infrared transmitter (93), a second fixing frame (94) and a target (95); The first connecting block (91) is mounted on the front end of the lower surface of the horizontal support plate (81), the hanging rope (92) is mounted on the lower surface of the first connecting block (91), the infrared transmitter (93) is mounted on the hanging rope (92), the second fixing frame (94) is mounted on the upper surface of the bearing shell (21), and the target (95) is mounted on the second fixing frame (94).
10. A building construction surveying pole as claimed in claim 2, characterized in that: A control button (100) is provided on the carrying shell (21), and a storage battery (110) is provided on the carrying shell (21).