Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

41results about How to "Enhanced heat storage function" patented technology

Low-temperature denitration and heat storage integrated catalytic type honeycomb ceramic material

The invention discloses a low-temperature denitration and heat storage integrated catalytic type honeycomb ceramic material. The ceramic material is characterized by being mainly prepared from 70 to 80 parts of nano-scale aluminum oxide, 35 to 40 parts of nanometer magnesia, 30 to 35 parts of nano titanium dioxide, 1 to 3 parts of boron nitride, 50 to 60 parts of silicon dioxide powder, 4 to 10 parts of methyl methacrylate-butadiene-styrene terpolymer, 3 to 8 parts of glass fiber, 0.8 to 1 part of stearic acid, 0.8 to 1 part of a macromolecular polymer fiber and 0.8 to 1 part of aminocellulose. The ceramic material is prepared by kneading the components to form catalyst mud, decaying the catalyst mud, extruding and forming the catalyst mud, forming a catalyst, drying a wet green body and calcining the wet green body. According to the low-temperature denitration and heat storage integrated catalytic type honeycomb ceramic material disclosed by the invention, the catalysis efficiency ofthe catalyst is improved, and the use cost of the catalyst is reduced; by the adding of the stearic acid, forming and demolding of the catalyst are facilitated, and the finished product ratio of catalyst manufacturing is increased. The preparation steps are simple; reaction conditions under a medium-temperature environment are mild; the cost is low.
Owner:HUBEI SHENWU THERMAL ENERGY TECH

Heat accumulation and exchange integrated tower-type solar power generation system

The invention relates to a heat accumulation and exchange integrated tower-type solar power generation system which comprises a heliostat field, a saturated water heat absorber, a water heat accumulator, a superheated heat absorber, a heat accumulation / heat exchange device, a steam turbine, a generator set, a condenser, a condensate pump, a deaerator, a water feed pump and a plurality of block valves. The first block valve is arranged between the saturated water heat absorber and the water heat accumulator, the second block valve is arranged between the water heat accumulator and the superheated heat absorber, the third block valve is arranged between the superheated heat absorber and the heat accumulation / heat exchange device, and the fourth block valve is arranged between the water heat accumulator and the heat accumulation / heat exchange device. Under the state that solar rays are sufficient, the first block valve, the second block valve and the third block valve are opened, the fourth block valve is closed, superheated steam is buffered through the heat accumulation / heat exchange device, and heat is accumulated through the heat accumulation / heat exchange device. Under the state that the solar rays are insufficient, the first block valve, the second block valve and the third block valve are closed, the fourth block valve is opened, and heat exchange is carried out on saturated steam through the heat accumulation / heat exchange device to form the superheated steam.
Owner:QINGHAI SUPCON SOLAR POWER GENERATION

Phase-change energy storage system of PHC (Prestressed High-strength Concrete) pipe pile and construction method thereof

The invention relates to a phase-change energy storage system of a PHC (Prestressed High-strength Concrete) pipe pile and a construction method thereof. The phase-change energy storage system comprises the PHC pipe pile and a pipe pile tip, wherein a cavity of the PHC pipe pile is internally filled with a high-temperature phase-change energy storage material and is internally provided with a water supplying main pipe, a plurality of water returning branch pipes and an energy-storage material maintaining pipe; and the water returning branch pipes are communicated with a water returning main pipe. The phase-change energy storage system and the construction method have the advantages that the space in the PHC pipe pile is provided with a heat exchange pipeline and is filled with the high-temperature phase-change energy storage material, and the phase-change energy storage system with high efficiency and large heat capacity is formed by the heat exchange pipeline, the high-temperature phase-change energy storage material, the PHC pipe pile and rock bodies outside the PHC pipe pile, so that cold storage in winter and heat storage in summer are realized; compared with the existing system, the phase-change energy storage system and the construction method also have the advantages that the space of a building is not additionally occupied, the heat insulation is not needed, the effective energy storage time is long, cold storage or heat storage can be respectively realized and the energy storage efficiency is high.
Owner:CHINA RAILWAY CONSTR GROUP +2

Heat storage water tank

InactiveCN102901255AImprove the weakness of insufficient medium heat exchangeIncrease the flow rate of heat transfer mediumSolar heat devicesHeat storage plantsCollector deviceProcess engineering
The invention discloses a heat storage water tank. The water tank is characterized in that a heating liner is arranged inside a water tank; a cavity is designed at the top of the heating liner; phase change heat storage media with melting points being about 50 DEG C are filled inside the cavity; media with boiling points being about 30 DEG C are filled in the heating liner; and a convergent-divergent type spray tube is designed. By adopting the design, the circulation speed of heat-conducting media can be increased, the speed of heat exchange between a solar heat collector and the water tank can be increased; when the hot water temperature is higher than 50 DEG C, heat storage materials store plenty of heat absorbed from hot water, and when the water temperature decreases, the heat storage materials release heat to stabilize the water temperature at about 50 DEG C.
Owner:JIANGSU QIZHENG NEW ENERGY

Heat storage type domestic central air-conditioning, heat supply and water heating three-purpose machine

InactiveCN108800650AAvoid affecting equipment efficiencyCycle simpleFluid heatersMechanical apparatusFour-way valveWater cycling
The invention discloses a heat storage type domestic central air-conditioning, heat supply and water heating three-purpose machine. The heat storage type domestic central air-conditioning, heat supplyand water heating three-purpose machine comprises a refrigerant, heat supply/air conditioning water circulation and control system, and is characterized by further comprising a domestic hot water heat exchanging and heat storing machine; the domestic hot water heat exchanging and heat storing machine consists of a preceding-stage water heat exchanger, a hot water tank and a domestic hot water heat exchange tube; a refrigerant circulation system comprises a loop which is formed by sequential connection of a compressor, the preceding-stage water heat exchanger, a four-way valve, a water heat exchanger, a throttling valve, an outdoor air heat exchanger, a four-way valve, an air and liquid separator and a compressor; a heat supply/air conditioning water circulation system comprises a loop formed by sequential connection of a circulating water pump, a water access of the water heat exchanger, a coil tube fan and a dual-purpose water tank; a loop for generating domestic hot water by using aheat pump in spring and autumn consists of a circulating water pump, a water access of the water heat exchanger, a hot water tank and a dual-purpose water tank which are connected in sequence; the hot water tank is used for storing heat and supplying domestic hot water; and the heat exchange amount of the preceding-stage water heat exchanger is smaller than 1/5 of that of the water heat exchanger. The three-purpose machine disclosed by the invention has the functions of supplying head, conditioning air and supplying domestic hot water in four seasons, is extremely simple in both structure andcontrol, is high in efficiency and saves energy.
Owner:陈则韶

Movable greenhouse and method for conducting winter concrete ballast bed construction through the same

The invention discloses a movable greenhouse comprising a movable trolley, a fan heater, flame-retardant cotton cloth and a steel wire rope. The movable trolley is covered with the flame-retardant cotton cloth; the movable greenhouse is simple to manufacture, low in resource investment and high in turnover utilization rate, and the effect of running water maintenance construction is achieved; thegreenhouse is small in heat storage area, the heat preservation and heat storage maintenance effects of concrete are effectively improved, the early-stage solidification strength of a concrete ballastbed is improved, the running condition of a rail car is met, the construction progress is improved, the economic effect is good, and energy conservation and environmental protection are achieved. Themovable greenhouse is convenient to construct and operate, low in potential safety hazard and high in safety and reliability. The invention further discloses a movable greenhouse and a method for conducting winter concrete ballast bed construction. The method comprises the steps of concrete mixing, movable greenhouse erecting, concrete pouring and maintenance and winter concrete ballast bed construction quality and inspection. The problem that the northern winter rail transit concrete ballast bed is difficult to maintain and construct is solved; through the structural size and the arrangementdistance of the movable greenhouse, the unit time energy consumption of a single movable greenhouse is accurately calculated, and theoretical and practical bases are provided for selecting a warm airblower which is energy-saving and environment-friendly and meets concrete ballast bed construction in winter.
Owner:CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD +1

Device used for energy storage heating, sterilizing and PM2.5 reducing through off-peak power and used for small-sized apartment

The invention relates to a device used for energy storage heating, sterilizing and PM2.5 reducing through off-peak power and used for a small-sized apartment. A unique three-chamber combination module is adopted, and the device comprises an equipment shell, a first-stage draught fan, a balancing chamber, a second-stage draught fan, a wind distributing passageway, a front normal-temperature wind passageway, a rear normal-temperature wind passageway, a left normal-temperature wind passageway, a right normal-temperature wind passageway, a left rising pre-heating chamber, a right rising pre-heating chamber, a falling heat storage chamber, an electric heating chamber, an electric heating element, an acid fire-resistant material heat storage body, an alkaline fire-resistant material heat storage body, a long heat-resistant steel bar, a short heat-resistant steel bar, a phase-change heat storage body, a left heat-resistant steel partition plate, a right heat-resistant steel partition plate, a device bottom plate, a heat storage box bottom plate, a wind distributing passageway bottom plate, a wind distributing passageway front side plate, a wind distributing passageway rear side plate, a device top plate, a heat storage box top plate, a warm wind passageway, a warn wind spraying guiding plate, an intelligent-control power supply box, various heat-resistant steel partition plates and the like. According to the device used for energy storage heating, sterilizing and PM2.5 reducing through the off-peak power and used for the small-sized apartment, heating can be achieved all day long by using the off-peak power, the functions of high-temperature burning, high-temperature adsorbing combination, transverse heat transmission and waste heat recovering are further achieved, indoor air can be thoroughly purified without cost, secondary pollution is not generated, and the device is suitable for indoor energy storage heating and air purifying in winter.
Owner:唐山精研实业有限责任公司

Inner liner material for industrial kiln furnace

The invention discloses an inner liner material for an industrial kiln furnace. The inner liner material comprises a base body and a high-emissivity coating, wherein the base body is a prefabricated element with a semi-sealed cavity and is formed through adding 10 percent of explosion-proof fiber into high-temperature fire-resistance materials, carrying out sufficient stirring and carrying out sintering or casting. The explosion-proof fiber starts to soften, contract and melt after reaching a certain temperature in the sintering process along with the prefabricated element, finally, a plurality of irregular micro holes are formed, antioxidant and sintering agents are brushed and coated on the inner wall of the semi-sealed cavity of the prefabricated element, then, bonding agents are coated, next, the high-emissivity coating with the thickness being 0.2 to 2mm is sprayed and coated, natural drying in the shade is carried out at room temperature, finally, high-temperature heating solidification is carried out, the heating speed is 10 DEG C / min, the sintering is completed after heat insulation for 5 hours at 1300 DEG C, and black body sources are formed. The inner liner material has the advantages that the heat storage function is strong, the radiance is high, the heat transfer area of a furnace hearth can be greatly increased, the furnace liner inner wall blackness and the irradiance can also be improved, the temperature uniformity of the furnace hearth is improved, and the service life of the furnace is prolonged.
Owner:四川科达节能技术有限公司

Heat storage air conditioning system and control method

The invention discloses a thermal storage air conditioning system and a control method, belonging to the technical field of air conditioning. The air conditioning system includes a refrigerant pipeline, a thermal storage branch, a heat dissipation branch and a solenoid valve device. The refrigerant pipeline includes a first refrigerant circuit and a second refrigerant circuit. The first refrigerant circuit is formed by the outdoor unit and the heat exchange unit through the pipeline. The second refrigerant circuit is composed of the indoor unit and the heat exchange unit connected by pipelines. The first refrigerant circuit and the second refrigerant circuit perform heat exchange through the heat exchange unit. The heat storage branch includes a heat storage device and a solenoid valve device. Control the connection and disconnection of the refrigerant pipeline, heat storage branch and heat dissipation branch. The beneficial effect of the present invention: by designing the hardware pipeline of the heat storage device, the combined linkage and complementarity of the heat storage function, heat dissipation function of the heat storage device and the heat supply function of the outdoor unit can be increased, and the design capacity of the outdoor unit can be effectively reduced. For the overall air conditioning system, it can reduce the use of electric energy and improve the efficiency of the system.
Owner:QINGDAO HAIER AIR CONDITIONING ELECTRONICS CO LTD +1

A PHC pipe pile phase change energy storage system and its construction method

The invention relates to a phase-change energy storage system of a PHC (Prestressed High-strength Concrete) pipe pile and a construction method thereof. The phase-change energy storage system comprises the PHC pipe pile and a pipe pile tip, wherein a cavity of the PHC pipe pile is internally filled with a high-temperature phase-change energy storage material and is internally provided with a water supplying main pipe, a plurality of water returning branch pipes and an energy-storage material maintaining pipe; and the water returning branch pipes are communicated with a water returning main pipe. The phase-change energy storage system and the construction method have the advantages that the space in the PHC pipe pile is provided with a heat exchange pipeline and is filled with the high-temperature phase-change energy storage material, and the phase-change energy storage system with high efficiency and large heat capacity is formed by the heat exchange pipeline, the high-temperature phase-change energy storage material, the PHC pipe pile and rock bodies outside the PHC pipe pile, so that cold storage in winter and heat storage in summer are realized; compared with the existing system, the phase-change energy storage system and the construction method also have the advantages that the space of a building is not additionally occupied, the heat insulation is not needed, the effective energy storage time is long, cold storage or heat storage can be respectively realized and the energy storage efficiency is high.
Owner:CHINA RAILWAY CONSTR GROUP +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products