High strength heat resistant bridging plugging agent and preparation method thereof
A high-strength, leakage agent technology, applied in the field of oil drilling, can solve the problems of leakage of the lost layer, low temperature and pressure resistance, and reduced pressure bearing capacity.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] Base slurry: bentonite 5; sodium carbonate (Na 2 CO 3 ): 0.25; water: 100.
[0049] Plugging material:
[0050] Engineering Polypropylene: 5;
[0051] Feldspar: 50;
[0052] EPDM: 6;
[0053] 3mm polyester fiber (diameter range 13-21μm): 0.5;
[0054] Shielding temporary blocking agent PB-1:20.
[0055] The engineering polypropylene, EPDM and feldspar are pulverized into particles with a particle size distribution range of 0.1 mm to 2 mm.
[0056] Na 2 CO 3Add in water, stir evenly, add bentonite, stir for 30 minutes, let stand at 25°C for 24 hours, then add shielding temporary plugging agent PB-1 into the prepared base slurry, stir for 10 minutes, then add other plugging components in sequence , and stirred for 10 min, to obtain a plugging slurry. Experiments were carried out with a high-temperature, high-pressure pressure-bearing plugging experimental device, and the temperature was set at 150°C. The plugging slurry can effectively plug artificial cracks wit...
Embodiment 2
[0058] Base pulp: bentonite 5; Na 2 CO 3 : 0.25; water: 100.
[0059] Engineering polypropylene: 7;
[0060] Feldspar: 55;
[0061] EPDM: 8;
[0062] 3mm polypropylene fiber (diameter range 13-21μm): 0.5;
[0063] Shielding temporary blocking agent PB-1:20.
[0064] The engineering polypropylene, EPDM and feldspar are pulverized into particles with a particle size distribution range of 0.1 mm to 3 mm. Na 2 CO 3 Add in water, stir evenly, add bentonite, stir for 30 minutes, let stand at 25°C for 24 hours, then add shielding temporary plugging agent PB-1 into the prepared base slurry, stir for 10 minutes, then add other plugging components in sequence , and stirred for 10 min, to obtain a plugging slurry. Experiments were carried out with a high-temperature and high-pressure pressure-bearing plugging experimental device, and the temperature was set at 150°C. The plugging slurry can effectively plug artificial cracks with a width of 3 mm. The pressure was slowly increase...
Embodiment 3
[0066] Base pulp: bentonite 5; Na 2 CO 3 : 0.25; water: 100.
[0067] Engineering polypropylene: 10;
[0068] Feldspar: 69;
[0069] EPDM: 12;
[0070] 5mm polyester fiber (diameter range 13-21μm): 0.6;
[0071] Shielding temporary blocking agent PB-1:20.
[0072] The engineering polypropylene, EPDM and feldspar are pulverized into particles with a particle size distribution range of 0.1 mm to 4 mm.
[0073] Na 2 CO 3 Add in water, stir evenly, add bentonite, stir for 30 minutes, let stand at 25°C for 24 hours, then add shielding temporary plugging agent PB-1 into the prepared base slurry, stir for 10 minutes, then add other plugging components in sequence , and stirred for 10 min, to obtain a plugging slurry. Experiments were carried out with a high-temperature, high-pressure pressure-bearing plugging experimental device, and the temperature was set at 150°C. The plugging slurry can effectively plug artificial cracks with a width of 4mm. Slowly pressurize at a speed ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle size | aaaaa | aaaaa |
| length | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
Abstract