Method and system for displaying project progress by subway map
A technology of project progress and subway map, applied in the field of data processing, can solve the problems of complex and chaotic display information, and achieve the effect of convenient project management
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0065] Such as figure 1 As shown, in one embodiment, a method for displaying project progress on a subway map, the method includes:
[0066] In step S110, a first project task node set is obtained, and the first project task node set includes several first project task nodes.
[0067] In this embodiment, a complete project includes several project tasks. For example, the project can be a commercial housing construction project, and the commercial housing construction project includes obtaining land planning permits, obtaining construction permits, project start, obtaining pre-sale permits, etc. Task. The project tasks will be displayed in the form of the first project task nodes, for example, all the project tasks of the entire commercial housing construction project correspond to the first project task node set. There are multiple sub-projects between the adjacent first project task nodes. For example, the project task nodes from the start of the project to the acquisition ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com