Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

57 results about "Housing construction" patented technology

Construction safety monitoring system for house construction

The invention discloses a construction safety monitoring system for house construction, which belongs to the technical field of safety monitoring and comprises a construction monitoring data integration module, a construction monitoring image denoising module, a construction safety monitoring model building module and a real-time construction safety monitoring module. The method specifically comprises the following steps: respectively extracting three types of noise features and obtaining a weight coefficient, cascading a double-branch enhanced feature map and connecting the feature map with an initial feature map residual error, fusing a security mask, constructing a three-scale encoder and an asymmetric decoder, mapping a deep fusion feature into a noise feature and removing the noise feature, and providing a clear and complete image data support; dividing personnel feature map windows based on double scales, performing weighted fusion on same-scale features and aligning resolutions, extracting local, mesoscale and global features in parallel, weighting query vectors element by element by using importance weights of all positions, screening effective spatial features through convolution and gating weights, and obtaining a query result; and the real-time performance and the accuracy of house construction safety monitoring are improved.
Owner:GUANGDONG FEIRONG CONSTRUCTION ENGINEERING CO LTD

A detachable house structure and a construction method thereof

The application discloses a detachable house structure and a construction method thereof and belongs to the technical field of house construction. The house structure comprises wall bodies, the wall bodies are of a splicing structure, the whole house is spliced by the wall bodies, doors and windows of the house are all cut on the wall bodies, the top of the house is further provided with a ceiling, and the ceiling has the feature of being splicable. The wall surfaces are pre-prepared, the pre-prepared wall surfaces are spliced together, the pre-prepared wall surfaces are reinforced by a supporting structure, the construction of the house is greatly accelerated by the method, the house is convenient to demolish, the stability of the whole house is improved by reinforcing the pre-prepared wall surfaces by the supporting structure, and the wall surfaces of the house are all designed to be hollow, so that the sound insulation effect of the house is improved.
Owner:ANHUI WENDA CONSTR ENG CO LTD

Scaffold for house construction

The utility model relates to wall surface construction tool technical field, and more specifically, relate to a kind of scaffold for house construction, comprising: underframe, it is equipped with at least X mounting surface, and at least Y mounting surface is equipped with sliding slot, X is integer greater than or equal to 4, Y is integer greater than or equal to 3, and X-Y is greater than or equal to 1;Several support leg assemblies, the number is equal to the number of sliding slot, respectively slidably set at each sliding slot, the support leg assembly is used to improve the support stability of the underframe;Multiple side frames, the number is equal to the number of mounting surface of the underframe, respectively detachably set on each mounting surface of the underframe;Connecting frame, set on the upper side of each side frame;Safety frame, set on the upper side of the connecting frame.The scaffold for house construction of the utility model aims at solving the problem that the scaffold cannot keep stability in prior art under the premise of close to wall surface.
Owner:HANGZHOU LEYI CONSTR CO LTD

House construction protection device

The utility model relates to a house construction protection device which comprises a placing base used for being placed on the ground, and an isolation rod is arranged on the placing base. A lifting seat is movably arranged on the isolation rod, an inserting rod used for being inserted into the soft ground is arranged on the lifting seat, a pressing rod spring is arranged on the placing seat, and the pressing rod spring stretches out and draws back in the lifting direction of the lifting seat. The pressing rod spring is used for pushing the lifting base to press downwards, a reset assembly is arranged on the placing base, and the reset assembly is used for pushing the lifting base to reset upwards. Under the fixation of the insertion rods, the stability of the placement seat can be greatly enhanced, and the risk of rollover of the placement seat is not likely to occur; in addition, due to the fact that the inserting rods are independent of one another, even if the ground is uneven, the effect that the inserting rods are firmly inserted into the ground can be guaranteed.
Owner:ZHEJIANG JUNSHENG CONSTRUCTION ENGINEERING CO LTD

Aluminum profile connecting assembly for house construction

The utility model discloses an aluminum profile connecting assembly for house construction, which comprises a first connecting piece which is a main transverse supporting piece, the outer surface of one end of the first connecting piece is movably attached to a second connecting piece, and the first connecting piece and the second connecting piece are internally provided with sliding grooves which are equal to the first connecting piece and the second connecting piece in length respectively. The included angle between the first connecting piece and the second connecting piece is of a right-angle structure. The second connecting piece is a main longitudinal supporting piece, and connecting locking pieces are movably installed in the first connecting piece and the second connecting piece respectively; the connecting locking piece comprises an elastic nut and a limiting column, the limiting column is movably inserted into the second connecting piece, and the elastic nut is in sliding fit with the sliding groove of the first connecting piece. According to the aluminum profile connecting assembly for house construction, the structures of the elastic nuts and the limiting columns are adopted, stress points are distributed at multiple positions, stress of the connecting face is effectively reduced, and the risk of deformation of the connecting face is reduced.
Owner:安徽瀚博建筑工程有限公司

Supporting device for construction of steel structure house

The utility model relates to the field of steel structure house construction discloses a kind of supporting device for steel structure house construction, including stand, the inside fixed connection of stand has round bar, the four corners of stand bottom end are all provided with support assembly, support column is supported by support assembly, the top end fixed connection of stand has metal pipe, the inside sliding connection of metal pipe has slide bar, the top end fixed connection of slide bar has support plate, the top side fixed connection of support plate has rubber pad, the outer wall of metal pipe is provided with positioning assembly, the height of slide bar is fixed by positioning assembly.The utility model in the middle, by increasing the support structure that can be folded to improve the stability of supporting device, prevent device to dump, and facilitate staff to move supporting device, and make supporting device can support different height steel structure, improve the versatility of supporting device.

Percussion drill for house construction

The utility model provides a percussion drill for house construction. The percussion drill comprises a machine shell; the drill body is arranged at one end of the machine shell; the first holding mechanism comprises a surrounding structure, and the surrounding structure is arranged on the outer wall of the machine shell in a sleeving mode in the direction close to the drill body and can rotate relative to the machine shell; the shielding mechanism comprises a shielding structure, and the shielding structure is connected to the surrounding structure, is formed by extending in the axial direction and the circumferential direction of the drill body and is used for shielding particulate matter generated when the drill body works; the cleaning mechanism comprises a collecting body and a pipe body, the pipe body is attached to the outer surface of the shielding structure, one end of the pipe body is connected with the collecting body, the other end of the pipe body extends towards the drill body, and the collecting body is arranged on one side of the machine shell and used for collecting dust generated when the drill body works through the pipe body. The shielding structure and the cleaning mechanism are used in cooperation, so that the pollutant protection capacity of the percussion drill during operation is improved, the cleanness of the construction environment is guaranteed, and the health and safety of constructors are guaranteed.
Owner:JIANGSU HUASHENG ENG CONSULTING CO LTD

Geological exploration digital monitoring management method and visual management system thereof

The invention relates to the field of geological exploration processing, in particular to a geological exploration digital monitoring management method and a visual management system thereof, and the method comprises the steps: obtaining first geological feature distribution of a space in which the action of a drilling machine is located according to dynamic data and environment data during the drilling period of the drilling machine; according to radar detection data in the drilling period of the drilling machine, radar wave transmission characteristics of the surrounding space of the drilling well are determined, so that second geological characteristic distribution of the surrounding space of the drilling well is obtained; comparing the two geologic feature distributions to determine the internal power state of the geologic layer, and predicting the deformation trend; and a visual abnormal three-dimensional layout map is generated according to the deformation trend and the morphological change of the surface of the geological layer, so that real-time, visual and large-scale geological survey is realized, and the safety of a house construction project is improved.
Owner:BEIJING SUPERMAP SOFTWARE CO LTD +1

Steel bar bending device for house construction

PendingCN120734216ARebarMechanical engineering
The invention discloses a reinforcing steel bar bender for house construction, relates to the technical field of building construction equipment, and aims to solve the problems that the structural design of a current reinforcing steel bar bender is relatively single, parameters such as reinforcing steel bar clamping width and bending length cannot be quickly adjusted, equipment needs to be frequently replaced or complex debugging needs to be carried out, and the working efficiency is high. The steel bar bending device comprises a working box, a rotating assembly is installed in the working box, a driving part of the rotating assembly is located at the top of the working box, and a bending rod used for pressing a steel bar to be bent is fixedly installed at the top of the driving part of the rotating assembly; through cooperative cooperation of the rotating assembly, the bending rod and the reinforcing steel bar limiting device, accurate bending of reinforcing steel bars is achieved. The steel bar bending device has the advantages that the size of the clamped steel bar can be adjusted flexibly, the accuracy is high, the operation is easy, and the bending accuracy of the steel bar is improved.
Owner:WENZHOU ZHENHUA CONSTR CO LTD

Matching structure of electrical control cabinet for house construction and use method thereof

The invention discloses a matching structure of an electrical control cabinet for house construction, and relates to the technical field of electrical matching structures, the matching structure comprises a cabinet body, the outer surface of the cabinet body is in coupling connection with two protective doors, an absorption protection assembly is arranged between the opposite inner walls of one protective door, and the absorption protection assembly comprises a gas absorption device. According to the electrical control cabinet for house construction, in order to carry out heat dissipation treatment on electrical equipment in the control cabinet, a gas absorption device and a gas conveying device are started firstly, cooling and ventilation of the electrical equipment in the control cabinet are achieved, two flow guide plates are driven by a driving motor to rotate to the position corresponding to a high-temperature area, and then heat dissipation treatment is carried out on the electrical equipment in the control cabinet. And then the two electric push rods are started respectively, so that the two electric push rods are extended or shortened, a plurality of drainage plates are driven to rotate along the outer surfaces of the positioning pipes respectively, the wind direction is guided to the other direction, and the cooling and ventilation effectiveness of the electrical control cabinet for house construction is ensured.
Owner:TAIZHOU LONGCHEN ELECTROMECHANICAL CO LTD

Conveniently-stored safety net for house construction

The utility model relates to the technical field of safety nets, and discloses a house construction safety net convenient to store, which comprises a left connecting rod and a right connecting rod, the inner walls of the left connecting rod and the right connecting rod are rotatably connected with winding rollers, the outer walls of the winding rollers are fixedly connected with a safety net body, and the other end of the safety net body is fixedly connected with a control rod. Sliding grooves are formed in the opposite ends of the connecting rods, the outer walls of the control rods are slidably connected to the inner walls of the sliding grooves, the control rods are connected with the connecting rods through fixing assemblies, inserting rods are slidably connected to the bottom ends of the inner walls of the connecting rods, and bolts are installed on the opposite sides of the outer walls of the connecting rods in a threaded mode. According to the safety net, the spring coil drives the winding roller to rotate, the safety net body is wound, the safety net body is conveniently stored, the wound safety net body is not prone to being damaged, the integrity of the safety net is guaranteed, splicing use of a plurality of safety nets is achieved, and the requirements of different construction sites are met.
Owner:ZHEJIANG MINGTU CONSTRUCTION CO LTD

A modified biochar, its preparation method and application

This invention discloses a modified biochar, its preparation method, and its application, belonging to the technical field of green building materials. The modified biochar prepared by this invention directly utilizes existing agricultural and forestry waste materials as raw materials, improving resource utilization efficiency. Moreover, after replacing part of the cement with biochar to make reinforced concrete, its permeability, air permeability, and strength are further improved. When applied to road and housing construction under the concept of sponge cities, it is beneficial to solve problems such as urban flooding and water pollution, and improve the living environment.
Owner:CHINA MCC17 GRP CO LTD

A reinforcing bar cutting device for house construction

The utility model relates to the field of reinforcing steel bar cutting discloses a reinforcing steel bar cutting device for house construction, including the support platform for supporting, the top fixedly connected with the clamping seat of support platform, the inside fixedly connected with the push rod of clamping seat, the output fixedly connected with the push plate of push rod, both sides fixedly connected with the moving plate of push plate, the outside slide connection of moving plate in clamping seat's both sides, the top right side fixedly connected with the fixed seat of support platform, the inside rotationally connected with the turnover lever of fixed seat, the outside fixedly connected with cutting knife of turnover lever, the outside fixedly connected with the pull handle of cutting knife, the top installation of support platform has the limit cover to be used for realizing the splashproof of cutting scrap. In the utility model, the device can reduce the brightness of dazzling and the splash of scrap, improve the security of device use, improve the convenience of device to carry out scrap cleaning.
Owner:ZHEJIANG MINGTU CONSTRUCTION CO LTD

Rapid and stable connecting device for aluminum formworks

The utility model provides a rapid and stable aluminum template connecting device, which relates to the technical field of house construction and comprises an aluminum template body. Mounting the assembly; the mounting assembly comprises an inserting hole formed in one side of the aluminum formwork body, a rotating groove is formed in one side of the aluminum formwork body, a rotating block is rotationally connected to the rotating groove, and a clamping block is fixedly connected to the interior of the rotating block; according to the design, connection of the formworks is rapidly completed through simple sliding and clamping actions, the construction efficiency is improved, compared with a traditional bolt connection mode, the connection mode does not need to use complex tools to fasten a plurality of bolts, the situation that the formworks are difficult to detach due to bolt rusting is avoided, it is ensured that the formworks can be repeatedly used, and the construction cost is reduced. And secondly, through the double-clamping design of the hooks and the positioning columns, position deviation between the formworks can be effectively prevented, and the stability and safety of the aluminum formworks in the construction process are guaranteed.
Owner:CHINA OVERSEAS CONSTR LTD

Heat insulation coating mixing device for house building construction

The utility model discloses a heat insulation coating mixing device for house building construction, which relates to the technical field of house building construction and comprises a mixing box. The stirring mechanism is arranged in the middle of the mixing box; the filtering piece is arranged at the top of the mixing box; the protection piece is arranged at the top of the filtering piece; the rolling mechanism is arranged on the surface of the protection part and comprises a second motor, a protection type lead screw, a moving rod and a rolling roller, and the stirring mechanism comprises a first motor. By arranging the rolling mechanism, a second motor can be started to drive a lead screw to rotate during discharging so as to drive a moving rod and a rolling roller to reciprocate, so that raw materials can be rolled to be crushed, the raw materials can conveniently penetrate through a filter plate to enter a mixing box, and by arranging a protective part, the upper part of a connecting frame can be covered; the rolling mechanism is convenient to install, and meanwhile dust drifting to the outside can be reduced in the discharging and rolling process, so that the dust is prevented from influencing the environment and harming the health of workers.
Owner:SICHUAN LINGFENG CONSTR ENG CO LTD

House building carrying frame

The utility model belongs to the technical field of house construction, and particularly relates to a house construction carrying frame which comprises a carrying frame body. A guardrail is fixedly connected to the top of the carrying frame main body; the top of the carrying frame body is fixedly connected with a supporting table. Two groups of limiting grooves are formed in the middle of the supporting table; a storage box is arranged at the top of the supporting table; the bottom of the storage box is rotationally connected with multiple sets of moving wheels, and the multiple sets of moving wheels are arranged on the inner walls of the limiting grooves in a rolling mode. The inner wall of the guardrail is fixedly connected with two groups of connecting pieces; by matching with a movable base plate at the top of the supporting table, the problem that a worker needs to take materials or tools on the inner wall of a storage box at the far end due to an original fixedly-arranged storage box can be solved, the house building construction speed of the worker is increased, meanwhile, the worker can be prevented from repeatedly twisting on the top of the carrying frame body, and the working efficiency is improved. And the integral connecting part of the carrying frame main body is quickly abraded, and the service cycle is short.
Owner:ZHEJIANG LIANCANG CONSTR GRP CO LTD

Heat preservation and noise reduction building panel for house building

The utility model belongs to the technical field of house construction, and discloses a heat preservation and noise reduction building panel for house construction, which comprises a panel body, the panel body comprises an outer side decorative plate, an inner side attaching plate, foam heat preservation plates and a sound insulation cushion layer, the foam heat preservation plates are attached to the side walls of the outer side decorative plate and the inner side attaching plate, and the sound insulation cushion layer is attached to the foam heat preservation plates. A sound insulation cushion layer is installed between the two foam insulation boards in a bonding mode, an edge sealing frame is installed on the outer side wall of the board body in an attached mode, a clamping frame is installed on the upper wall of the edge sealing frame, a positioning pin is installed on the side wall of the clamping frame in an inserted mode, a connecting hole is formed in the side wall of the edge sealing frame, the positioning pin can be installed in the connecting hole in an inserted mode, and a through hole is formed in the side wall of the edge sealing frame. The edge sealing frame is arranged on the outer side of the plate body, and the edge of the plate body is pressed through the clamping frame on the outer side of the edge sealing frame, so that the purpose of preventing edge warping is achieved, the attractiveness of the device is prevented from being affected, meanwhile, a boss is further arranged at the lower end of a positioning pin, and through cooperation of the boss and a clamping block, the edge warping is prevented from being affected. Therefore, the clamping frame is prevented from being separated from the edge sealing frame.
Owner:HUBEI ZIYUN CONSTRUCTION ENGINEERING CO LTD

Aluminum profile right-angle mounting structure for house construction

The utility model discloses an aluminum profile right-angle installation structure for house construction, which comprises a positioning piece, a vertical aluminum profile, a transverse aluminum profile and a splicing aluminum profile, the vertical aluminum profile is positioned at the bottom end of the positioning piece, and the transverse aluminum profile and the splicing aluminum profile are arranged in the direction parallel to the positioning piece. Guide grooves are formed in the vertical aluminum profile, the transverse aluminum profile and the spliced aluminum profile respectively, two transverse force equalizing blocks are arranged on the outer surface of the positioning piece and are in transverse angle connection, and two positioning holes are formed in the bottom end of the positioning piece and are in vertical angle connection. According to the aluminum profile right-angle mounting structure for house construction, by arranging the positioning piece, the vertical force equalizing block and the transverse force equalizing block, uniform distribution of supporting points is achieved. Compared with a traditional bolt fixing mode, more stable and reliable support is provided, the stress of the structure in the vertical direction is more uniform, and the problem that in the prior art, supporting points are only limited to the connecting end face of a bolt and an aluminum profile is effectively solved.
Owner:安徽瀚博建筑工程有限公司

Construction frame for house building construction

The utility model discloses a scaffold for house building construction. The scaffold comprises a vertical frame mechanism, supporting mechanisms arranged on the periphery of the vertical frame mechanism and a containing platform arranged in the middle of the vertical frame mechanism. The vertical frame mechanism comprises horizontal stand columns, vertical stand columns arranged between the horizontal stand columns and rotating fasteners. The vertical stand columns are used for supporting the whole scaffold, and the horizontal stand columns are used for stabilizing the vertical stand columns. The supporting mechanism comprises a bottom plate, a threaded short rod rotationally connected with the bottom plate, and a supporting pipe meshed with the threaded short rod; the supporting pipe is hollow, and the bottom of the threaded short rod is fixedly connected with a rotating piece. The placing platform comprises a connecting pipe and a bearing plate clamped with the connecting pipe; the connecting pipe is connected with the vertical frame mechanism through a rotating fastener, and a plurality of bearings and fixing fasteners are arranged on the connecting pipe; and by adjusting the threaded short rods, the flexibility of the scaffold is greatly improved, the use scenes of the scaffold are increased, and the practicability of the scaffold is improved.
Owner:JIANGSU SHUANGLOU CONSTR GRP

Prefabricated wall for house building

The utility model discloses a house building prefabricated wall, and particularly relates to the technical field of house building prefabricated walls. Connecting pieces used for connecting the adjacent wallboards are arranged outside the wallboards. The connecting piece comprises two assembling columns installed on one side of the wall plate, a through hole is formed in the outer portion of each assembling column, an assembling ring is installed in each through hole, a detachably-connected clamping column is arranged in each assembling ring, an assembling groove is formed in the side, away from the assembling columns, of the wall plate, and the assembling grooves correspond to the assembling columns in the left-right direction. The clamping columns are in threaded connection with the assembling rings, so that the clamping columns and the assembling columns are connected into a whole, the assembling columns are limited through the clamping columns, assembling and mounting of two adjacent wallboards are achieved, when assembling errors occur, the clamping columns are reversely rotated to be separated from the assembling rings, the assembling columns are not limited, the wallboards can be conveniently adjusted in time, and the assembling efficiency is improved. Therefore, operability during wallboard assembly is improved.
Owner:SINOCHEM COMMUNICATIONS CONSTRUCTION (SHANGHAI) ENGINEERING CO LTD

House construction steel bar bending machine

ActiveCN223588213UGear wheelRebar
The house construction steel bar bending machine comprises a frame body, a pushing rod, a bending head, a gear, a rocker, a pushing pile and a limiting rod, a limiting hole is formed in the side face of the frame body, a handle is arranged at the upper end of the frame body, a fixing rod is connected to the bottom of the bending head and penetrates through a fixing box, a spring is arranged in the fixing box, and the gear is arranged on the gear. The bending device comprises a fixing box, a bending base is connected to the front portion of the fixing box, a bending abutting rod is fixed to the bending base, a connecting piece is arranged on the fixing box, the other end of the connecting piece is connected with a frame body, a pushing pile is arranged in the frame body, a pushing rod is connected to one side of the pushing pile, a gear is arranged above the pushing pile, and a hoop piece is connected to the gear. The house construction reinforcing steel bar bending machine is provided with the connecting piece and the handle, the device can be folded through the bolt structure and the connecting piece in the device, the size of the device is reduced, the requirement for reinforcing steel bar bending work of small house construction is met, the structure is simple, and transportation is easy and convenient.
Owner:NANJING QINGTIAN CONSTR ENG CO LTD

Adjustable formwork supporting system for house construction

The utility model provides an adjustable formwork supporting system for house construction, and relates to the technical field of house construction, the adjustable formwork supporting system comprises a bottom plate, a stand column is fixedly installed on the top surface of the bottom plate, a control terminal is fixedly arranged on the surface of one side of the stand column, a vertical groove is formed in the top surface of the stand column, and an adjusting assembly is arranged on the surface of the inner wall of the bottom of the vertical groove; supporting assemblies are arranged on the surfaces of the two sides of the adjusting assembly, the adjusting assembly comprises a threaded rod, the threaded rod is installed on the surface of the inner wall of the bottom of the vertical groove through a bearing, and the bottom end of the surface of the outer wall of the threaded rod is fixedly sleeved with a large gear. According to the utility model, the supporting plate can be randomly adjusted according to the building height of a house, and meanwhile, on-site building is not needed, so that the time is saved, and the building construction efficiency of the house is improved.
Owner:JIANGXI HONGSHUN CONSTR ENG CO LTD

Safe suspension device for high-altitude construction of housing building

The invention belongs to the technical field of house building, and particularly relates to a safe suspension device for high-altitude construction of house building. Comprising a driving device, a lifting device is arranged on the inner side of the driving device, a connecting device is arranged at the movable end of the lifting device, and a hanging basket device is arranged below the connecting device. Through the driving device and the lifting device, the driving device can drive the hanging basket device to move in the front-back direction, and then the lifting device is matched to drive the hanging basket device to move transversely and adjust the height, so that the position of the hanging basket device can be adaptively adjusted according to construction requirements, and meanwhile, the whole adjusting process adopts mechanical operation; and manual adjustment is not needed, the construction efficiency is improved, the labor intensity of constructors is reduced, the stability and safety of the hanging basket device are enhanced, and the safety of the constructors can be ensured even in a complex and changeable construction environment.
Owner:NINGBO KAITOU REAL ESTATE CO LTD

Intelligent monitoring system and method for rural house construction

The invention discloses an intelligent monitoring system and method for rural house construction. The method comprises the following steps: acquiring image data of a target house; obtaining feature data of the target house based on the image data of the target house; based on the feature data of the target house, obtaining a plurality of standard monitoring items corresponding to the target house in the current construction stage and a monitoring result of each standard monitoring item; the monitoring result comprises normal monitoring and abnormal monitoring; when the monitoring result of one standard monitoring item is abnormal monitoring, generating alarm information corresponding to the standard monitoring item; and at the end of the current construction stage, obtaining a construction evaluation corresponding to the current construction stage based on the monitoring results of the plurality of standard monitoring items. The technical problem of low supervision efficiency in the rural house reconstruction process in the prior art is solved.
Owner:CHONGQING SURVEY PLANNING & DESIGN CO LTD

Roof drainage device for house construction

The utility model provides a roof drainage device for house construction, which relates to the technical field of house drainage and comprises a drainage hopper for collecting drained rainwater, a drainage pipe movably embedded at one end of the drainage hopper along the vertical direction, and a filter plate movably embedded at one end of the drainage hopper far away from the drainage pipe, so that a first filter plate can rotate in the drainage hopper, and a second filter plate can rotate in the drainage hopper; the baffle is fixedly arranged on the edge of one end of the drainage hopper away from the drainage pipe. The problems that water drainage efficiency is low and accumulated water is easily formed due to pipeline blockage caused by falling of impurities such as leaves and the like are solved, water flow can be better filtered for the second time through the filter plate and the barrier plate, impurities and leaves in rainwater can be better separated, meanwhile, the filter plate is arranged to be rotatable, and the water drainage efficiency is improved. And when too many leaves are accumulated on the filter plate, the filter plate can be better pressed to rotate, and then the drainage effect is improved.
Owner:SHAANXI JIANAN LIBO CONSTR ENG CO LTD

Polymer waterproofing membrane (cross-laminated)

1. The name of the design product: polymer waterproofing membrane (cross grid). 2. The use of the design product: waterproofing membrane used in the process of house construction and renovation. 3. The design points of the design product: in shape. 4. The picture or photo that best indicates the design points: Design 1 perspective view. 5. Design 1 is designated as the basic design.
Owner:LIAONING DAYU WATERPROOF TECH DEV

Hanging bracket for house construction

The utility model relates to a hanging bracket for house construction. The hanging bracket comprises a fixed support erected on a building, a winch is arranged at the rear end of the fixed support, the top end of the fixed support extends forwards and is rotationally connected with an extending support, an inhaul cable extends forwards on the extending support along the winch, and a positioning support close to the extending end of the extending support extends on one side of the fixed support; the positioning support is provided with a positioning structure which is transversely staggered with the top end of the extension support and abuts against the bottom end of the extension support, an unlocking structure corresponding to the lower portion of the extension support is arranged below the positioning support, the unlocking structure comprises an abutting disc fixed to the movable end of the inhaul cable, and the abutting disc abuts against the unlocking structure. The unlocking structure drives the positioning structure to transversely slide and is staggered with the extension bracket; and a hydraulic support rod is movably connected between the extension bracket and the fixed bracket. The unloading device has the effects that goods can be located on the inner side of the building during unloading, personnel are prevented from stretching out of the building, and unloading is safely conducted.
Owner:ZHEJIANG JUNSHENG CONSTRUCTION ENGINEERING CO LTD

Building material transportation device for house building

The utility model discloses a building material transportation device for house building, which relates to the technical field of building material transportation, and comprises a transportation fixing mechanism, a lifting driving mechanism is rotatably arranged in the transportation fixing mechanism, and one side of the lifting driving mechanism is connected with a lifting mechanism capable of lifting. According to the building material transportation device, the problems that an existing building material transportation device can transversely transport building materials, but in the actual operation process, a special lifting transportation device needs to be arranged for construction at the high position of house construction, and safety is enhanced are solved, the device can be moved through the arrangement of the transportation fixing mechanism and the moving wheels, and the construction efficiency is improved. Adjusting feet are arranged to support the device and enhance stability, crossed lifting of the lifting mechanisms on the two sides is achieved through driving arrangement of the lifting driving mechanism on the lifting mechanisms and rotation of the chain, the conveying efficiency is improved, meanwhile, indoor constructors are reduced to go up and down a ladder, safety is guaranteed, and a rotating supporting groove provides steering supporting force for the rotary table mechanism.
Owner:JIANGSU HUASHENG ENG CONSULTING CO LTD