Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Digital management method and system used for water conservancy and hydropower engineering construction process

A technology for engineering construction, water conservancy and hydropower, applied in the field of data management system, can solve the problems of complex construction process of water conservancy and hydropower project, inability to realize process quality control, and many construction specialties.

Inactive Publication Date: 2015-12-23
武汉英思工程科技股份有限公司
View PDF2 Cites 36 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The construction process of water conservancy and hydropower projects is complicated, there are many construction specialties, and the process quality and progress control is difficult. Traditional management methods cannot achieve refined process quality control

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Digital management method and system used for water conservancy and hydropower engineering construction process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] Combine below Attached picture The present invention is described in further detail with specific embodiment.

[0017] Such as figure 1 As shown, the present invention is applicable to the rapid entry method of batch data acquisition on the construction site comprising:

[0018] The first step is to establish a comprehensive data collection and analysis platform for the construction process.

[0019] The platform adopts a distributed software architecture, and uses technologies such as the Internet of Things and mobile applications to realize multi-means comprehensive data collection for construction sites; it supports cross-unit business workflow, custom forms, custom reports and picture Table display; establish a unified project breakdown structure (PBS), work breakdown structure (WBS), quality breakdown structure (QBS) and organization structure breakdown (OBS), to meet the application requirements of various construction process management.

[0020] Establish...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention relates to a digital management method and system used for a water conservancy and hydropower engineering construction process. The method comprises the steps of establishing a construction process integrated data acquisition and analysis platform; establishing a building information model (BIM) management platform by taking a three dimensional platform as the basis; integrating the simulation and analysis services to realize the dynamic evaluation and the analysis prediction; realizing the process management facing a construction technology by taking the integrated data acquisition and analysis platform as the basis; integrating the specialized sub-systems to realize the comprehensive analysis and evaluation; integrating the digital construction equipment to realize the on-site digital monitoring and the intelligent control. According to the present invention, by taking a building information model as the basis, taking a digital construction cooperative working platform as the core, and facing a concrete construction specialty, an integrated, digital and intelligent management platform covering the engineering on-site construction full process is realized, the refinement construction is realized, the engineering progress and the quality management level are improved, the dynamic safety of the engineering structures is guaranteed, and the full life circle management of an engineering is served.

Description

technical field [0001] The invention relates to a data management system, in particular to a digital management method and system for the construction process of water conservancy and hydropower projects. Background technique [0002] The construction process of water conservancy and hydropower projects is complex, there are many construction specialties, and the process quality and progress control is difficult. Traditional management methods cannot achieve refined process quality control. Contents of the invention [0003] In view of the deficiencies of the above-mentioned prior art, the purpose of the present invention is to provide a digital management method and system for the construction process of water conservancy and hydropower projects. The present invention is based on the building information model (BIM), and the digital construction collaborative work platform is the core. Facing specific construction majors, realize a comprehensive digital and intelligent ma...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08
Inventor 林恩德彭华张攀峰李俊平
Owner 武汉英思工程科技股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products