Construction method of BIM (Building Information Modeling)-based cross-high-speed bridge construction traffic control

A traffic control and bridge construction technology, applied in the field of construction, can solve the problems of low disclosure efficiency, inability to directly reflect the specific attributes and quality control points of the disclosure content, and achieve the effects of improving construction efficiency, reducing construction costs, and avoiding mutual interference

Inactive Publication Date: 2016-01-27
CHINA MCC17 GRP
View PDF10 Cites 21 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the past, bridge construction disclosures were usually made in written form, which could not directly reflect t

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of BIM (Building Information Modeling)-based cross-high-speed bridge construction traffic control
  • Construction method of BIM (Building Information Modeling)-based cross-high-speed bridge construction traffic control
  • Construction method of BIM (Building Information Modeling)-based cross-high-speed bridge construction traffic control

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] The present invention will be further described below in conjunction with the accompanying drawings.

[0018] In the figure, a kind of construction method based on BIM cross-speed bridge construction traffic control of the present invention comprises the following construction steps:

[0019] Step 1. At the beginning of the project, Revit software was used as the bridge modeling platform to establish the bridge and site BIM model, Navisworks was selected as the model integration platform, and the bridge model was split according to the construction process to ensure that the model matched the actual site, and then each The model corresponds to a code. Through the process code, the construction site and construction date of each component can be known, and the automatic matching between the model and the plan can be realized through the process code, and the construction simulation can be generated. The construction simulation can intuitively reflect the entire constructi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method of BIM (Building Information Modeling)-based cross-high-speed bridge construction traffic control. The construction method comprises the following steps: establishing a bridge and site BIM model, selecting Navisworks as a model integration platform, splitting a bridge model according to construction working procedures to guarantee that the model is matched with site practicality, then, causing one code to correspond to each model, knowing the construction position and the construction date of each component through the codes of the working procedures, automatically matching the model with a plan through the codes of the working procedures, generating construction simulation, visually reflecting the whole constriction process through the construction simulation, and simulating connection between every two working procedures through a time axis so as to optimize a cross-rapid-transit control construction scheme. The construction method has the advantages that a reasonable cross-high-speed bridge construction traffic control scheme is formulated through simulation analysis and optimization on the basis of the characteristics of visualization and simulation of the BIM three-dimensional model, construction efficiency is improved, and construction cost is lowered.

Description

technical field [0001] The present invention relates to a building construction method, and more specifically, relates to a construction method based on BIM-based traffic control for cross-highway bridge construction. Background technique [0002] BIM technology is a digital tool applied to engineering design and construction management. It integrates relevant information of various projects through parametric models, and shares and transmits them in the whole life cycle of project planning, operation and maintenance, so that engineering and technical personnel Correct understanding and efficient response to various building information provide the basis for collaborative work for the design team and all construction entities including the building operation unit, and play an important role in improving production efficiency, saving costs and shortening the construction period. The full English name of BIM is Building Information Modeling, and the relatively consistent Chine...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/08G06Q50/30
Inventor 于华黄超周如明肖来兵
Owner CHINA MCC17 GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products