Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

192 results about "Rapid transit" patented technology

Rapid transit or mass rapid transit (MRT), also known as heavy rail, metro, subway, tube, U-Bahn or underground, is a type of high-capacity public transport generally found in urban areas. Unlike buses or trams, rapid transit systems are electric railways that operate on an exclusive right-of-way, which cannot be accessed by pedestrians or other vehicles of any sort, and which is often grade ...

Collaborative flight path intelligent planning method for formation flying of unmanned planes under dynamic environment

The invention discloses a collaborative flight path intelligent planning method for formation flying of unmanned planes under a dynamic environment. The method comprises the steps of offline intelligent planning of a formation pre-flying collaborative flight path of the unmanned planes, online replanning of the flight path for avoiding threats, collaborative rebuilding of a formation team and the like. The offline intelligent planning of the formation pre-flying collaborative flight path of the unmanned planes adopts an intelligent planning method based on a Voronoi graph and an ant colony algorithm, and an integrated optimal pre-flying flight path with collaborative time can be planned off line for the unmanned plane. The replanning of the online flight path adopts an intelligent flight path planning method based on an RRT (Rail Rapid Transit) algorithm, and quick flight path correction can be provided when the unmanned plane formation meets a sudden threat. The collaborative rebuilding of the formation team adopts a method combining unmanned plane formation member flying speed adjustment and coiling maneuvering. According to the method, pre-flying collaborative flight path offline planning and generation of online replanned flight path are provided for the unmanned plane formation, a collaborative rebuilding scheme is provided, and the online rebuilding problem of unmanned plane formation flying cooperativity is solved.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Polymethylmethacrylate waterproof paint and preparation method thereof

ActiveCN102140266AShort hardening timeEasy constructionCoatingsCross-linkCryogenic hardening
The invention relates to a polymethylmethacrylate waterproof paint and a preparation method thereof. The waterproof paint consists of components A and B, wherein the component A is a methacrylic acid resin liquid generated by reaction based on methyl methacrylate (MMA) utilized as a main composition, and the component B is an initiator. When the component A is prepared, a hard monomer, a soft monomer and a cross-linking monomer are put in a reaction kettle and evenly stirred, and then heating is carried out; polymethylmethacrylate moulding plastic is put, and then reaction is carried out for 1-6 hours at the temperature of 70-90 DEG C; cooling is carried out until the temperature is 50-65 DEG C, a polymerization inhibitor, an accelerator, sealing wax and a thixotropic agent are added and evenly stirred; and cooling is carried out until the temperature is 30-45 DEG C, and filtration and packaging are carried out so as to prepare the component A resin liquid. The components A and B are evenly stirred and mixed in a proper proportion, then coated, and finally solidified into a film. The waterproof paint has the characteristics of good strength, good elasticity, low temperature hardness, excellent weather resistance and the like, is simple and convenient for construction, can be solidified rapidly, and can be used for waterproof work of rapid transit railway bridge surfaces and super highway subgrades.
Owner:GUANGZHOU SUPER CHEM COATING CO LTDGUANGZHOU SUPER CHEM COATING CO LTD

Method and device for monitoring state of ballastless track structure through fibber bragg grating sensing

The invention discloses a device for monitoring a state of a ballastless track structure through fibber bragg grating sensing, which comprises M fibber bragg grating steel rail temperature and stress combined sensors, N fibber bragg grating steel rail horizontal displacement, longitudinal displacement and vertical displacement combined sensors, P fibber bragg grating steel rail horizontal acceleration, longitudinal acceleration and vertical acceleration combined sensors, Q fibber bragg grating plate type ballast horizontal displacement, longitudinal displacement and vertical displacement combined sensors, R fibber bragg grating plate type ballast horizontal acceleration, longitudinal acceleration and vertical acceleration combined sensors, a multi-channel fibber bragg grating wavelength demodulator, a data processing terminal and an alarm device. The combined sensors are arranged at state monitoring points of the ballastless track structure of a rapid transit railway, and are directly contacted with the steel rail, the ballast and a base or are fixed by a supporting layer, wavelength output signals of various sensors are respectively transmitted to the demodulator through a transmission fiber and then are transmitted to the real-time data processing terminal and the alarm device, and if an abnormal state is monitored, the alarm device is started for early warning.
Owner:WUHAN UNIV OF TECH

Method for deploying strong wind monitoring points on rapid transit railway

The invention discloses a method for deploying strong wind monitoring points on a rapid transit railway, comprising the following steps: analyzing the gale distribution characteristics and carrying out statistics on the wind speed frequency distribution under each wind direction based on the information of wind speeds, wind directions and the like of weather stations along and around the rapid transit railway line, and deploying basic monitoring points; establishing the correlationship of winds fields between any two monitoring points along the railway line under complicated terrains based on the geographic and geomorphic information, simulating the wind fields along the rapid transit railway line by adopting the computational fluid dynamics (CFD) method theory and method, and deploying interpolated monitoring points; and simulating the wind fields of special road sections, and deploying special monitoring points by combining with wind tunnel tests. The method provided by the invention overcomes the defects of high cost, strong subjectivity, low accuracy and the like in the traditional method which gives priority to field survey and qualitative analysis, realizes deployment of strong wind monitoring points in rapid transit railways under various weather types and environmental conditions, has high simulation accuracy and low monitoring point deploying cost, and provides support for effective monitoring and safety running of rapid transit railways.
Owner:PEKING UNIV

Elevated bus rapid transit system

An elevated public transit bus system that increases the passenger capacity and decreases the passenger trip time of a fixed route bus service traveling in traffic on a city street to provide a high capacity rapid transit system. The high capacity buses are suspended above the motor vehicle traffic lanes by a support structure constructed in the lane adjacent to the public sidewalk. The propulsion system of the electrically powered buses run in a box beam from which the transit passenger cabins are suspended. The beams guide the buses along the existing fixed route service that is being upgraded to the carrying capacity of an elevated rail rapid transit system. The bus stops or lift stations of the elevated buses for passenger pick up and drop off is also constructed in the road lane next to the sidewalk. The lift stations house an enclosed movable platform that lifts passengers from sidewalk level to the floor level of the suspended bus. The high capacity rapid bus system makes efficient use of city streets by significantly increasing the capacity of persons per lane per hour use over that of the private vehicle. This public transportation enhancement reduces traffic congestion, energy consumption, and air pollution by making bus service more attractive, and by increasing the capacity of the street to carry more transit users without taking away business dependant road parking spaces or public sidewalk space.
Owner:STROMBERG DALE MARIE

Construction method of BIM (Building Information Modeling)-based cross-high-speed bridge construction traffic control

InactiveCN105279609AAvoid mutual interferenceSolve the interleaving problemResourcesThree dimensional modelRapid transit
The invention discloses a construction method of BIM (Building Information Modeling)-based cross-high-speed bridge construction traffic control. The construction method comprises the following steps: establishing a bridge and site BIM model, selecting Navisworks as a model integration platform, splitting a bridge model according to construction working procedures to guarantee that the model is matched with site practicality, then, causing one code to correspond to each model, knowing the construction position and the construction date of each component through the codes of the working procedures, automatically matching the model with a plan through the codes of the working procedures, generating construction simulation, visually reflecting the whole constriction process through the construction simulation, and simulating connection between every two working procedures through a time axis so as to optimize a cross-rapid-transit control construction scheme. The construction method has the advantages that a reasonable cross-high-speed bridge construction traffic control scheme is formulated through simulation analysis and optimization on the basis of the characteristics of visualization and simulation of the BIM three-dimensional model, construction efficiency is improved, and construction cost is lowered.
Owner:CHINA MCC17 GRP

Self-adoption precoding method for multi-input multi-output (MIMO) system in rapid transit railway environment

The invention discloses a self-adoption precoding method for a multi-input multi-output (MIMO) system in a rapid transit railway environment. The method is characterized in that long-time precoding operation is performed at a base station end; the main lobe of an antenna aims at the incoming wave of a user; after the long-time precoding operation is performed, the relevance of channels from a base station to a vehicle-mounted station is removed; short-time precoding operation is executed on non-relevant channels; after being subjected to the short-time and long-time precoding operations, two paths of data streams are superposed to form transmitting signals, and the transmitting signals are sent by a port of the antenna; the transmitting signals are blocked by scatterer blocks artificiallyarranged near the base station to form scattering and arrive at the vehicle-mounted station by multiple paths; a vehicle-mounted station end uses pilot frequency to synchronously estimate effective channels; according to the effective channels, the vehicle-mounted station end obtains a minimum mean squared error equalizer by calculation; and the vehicle-mounted station detects the two paths of data stream with the minimum mean squared error equalizer. The method can eliminate the interference among the data streams in the MIMO system in the rapid transit railway environment, thus improving the performances of mobile communication systems in rapid transit railways.
Owner:SHANGHAI UNIV

Control system and method for priority signal facing to rapid public transportation

ActiveCN101409017AReal-time supervisory operationGuaranteed to be on timeControlling traffic signalsPhase responseAnalysis of algorithms
The invention discloses a bus rapid transit-oriented priority signal control system and a method thereof. The system comprises a central management platform used for remote management and maintenance of the whole system and the real-time monitoring of the bus rapid transit operation; a priority signal controller which is used for receiving arrival information of a bus in the bus rapid transit, outputting a priority signal which is analyzed and processed by corresponding priority algorithms to a signal, and outputting the processed related information to the central management platform; a vehicle identification device which is used for acquiring the arrival information and vehicle ID information of the bus in the bus rapid transit, and outputting the information to the priority signal controller; and the signal which is used for responding to a request of the priority signal according to the currently operating phase to cause the bus in the rapid transit to rapidly pass through a road junction. The system and the method have the beneficial effects of strong management, control and statistical capability, can improve the efficiency of processing the bus priority signal, and ensure punctuality of the bus rapid transit.
Owner:浙江银江交通技术有限公司

Bus chassis articulated system for urban bus rapid transit system and working method thereof

The invention discloses a bus chassis articulated system for a urban bus rapid transit system and a working method thereof. The bus chassis articulated system consists of a turntable device, a hydraulic system and a system control unit ECU, wherein the turntable device comprises a turntable connected between a front turntable frame and a rear turntable frame; the central position of the turntable is movably connected with a mandril positioned in a vertical center line of the turntable; the upper free end of the mandril is connected with an articulated angle sensor; the hydraulic system comprises a left hydraulic cylinder, a right hydraulic cylinder, a hydraulic integrated block, a hydraulic pump and an oil tank which are arranged on the rear turntable frame and rotate together with the rear turntable frame; hydraulic arms of the left and right hydraulic cylinders are respectively sleeved with a cylindrical helical compression spring; front and rear cavities of the left and right hydraulic cylinders are in crossed connection and oil ways are communicated through the hydraulic integrated block; and the system control unit ECU comprises a microprocessor CPU. The bus chassis articulated system provides a larger torque during large-angle turning, realizes the self-locking function on the maximum articulated angle, and prevents a second axle from laterally sliding and front and rear bus bodies from shearing.
Owner:JIANGSU UNIV

Running air extraction system for vacuum pipeline rapid transit

The invention provides a method and a device for carrying out air extraction on a vacuum pipeline by an air suction device on the front end of a vehicle in the driving process thereof for vacuum pipeline superspeed transit. Namely that an air collection opening is arranged on the most front part of the vehicle, and then a large capacity compressor is arranged, and collected air is stored in a low-pressure air storage tank nearby. A control room is arranged on the front part of a running direction, a high-pressure air storage tank is installed behind the control room and the large capacity compressor, different grades of compressors are arranged, and finally a radiation heat dispersion device is arranged. The system can be used as a device for extracting the air additionally for the vacuumpipeline or for a vacuum tunnel, aiming at maintaining a rated vacuum degree; when the air pressure in the vacuum pipeline is higher than the rated air pressure, the running air extraction system is used for air extraction; and the system can also be used as an air extraction device for reducing the air pressure of the vacuum pipeline from normal pressure. The running air extraction system can beinstalled on a special vehicle body, can also be commonly installed on passenger-carrying vehicle bodies, and simultaneously accomplishes the operations of vacuum-pumping and pressure reduction of thevacuum pipeline.
Owner:XIJING UNIV

Structure extending open tunnel for existing rapid transit railway tunnel

InactiveCN101806220AAvoid interferenceAvoid the hassle of dismantling the inner moldTunnelsRailway tunnelReinforced concrete
The invention discloses a structure extending an open tunnel for an existing rapid transit railway tunnel, which aims to improve safety and construction efficiency and effectively avoid interference on railway operation. The structure extending the open tunnel is in butt joint outside the portal of the existing tunnel, which comprises two lateral foundation structures, arched formed steel frames (20) fixed on the two lateral foundation structures, reinforced concrete fiberboards fixed on concave surfaces of the arched formed steel frames (20), and reinforced concrete arch parts (40) poured along the formed steel frames (20). In the structure, the reinforced concrete fiberboards closing the concave surfaces of the arched formed steel frames can be used as an inner mold for pouring construction of the reinforced concrete arch parts of the open tunnel, and can also be used as a part of the open tunnel structure so as to solve the problems of erecting the inner mold before concrete construction and detaching the inner mold after construction is completed, so that the structure has short construction period and good safety; and the prefabricated arched formed steel frames can greatly improve the construction process by hoisting on the premise of ensuring the safety.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD

Full-automatic accurate adjustment device for track plate of ballastless track of rapid transit railway

The invention discloses a full-automatic accurate adjustment device for a track plate of a ballastless track of a rapid transit railway, comprising a plurality of adjusters, a console, a power distribution box and a frame, wherein the adjusters are used for adjusting accurate adjustment claws arranged on the track plate required to be accurately adjusted and located; the console is used for synchronously controlling and driving the adjustment direction and adjustment amount of the adjusters according to deviates; the power distribution box is connected with the console; the frame moves forward and backward; the adjuster and the console are arranged suspended on the moveable frame; and each adjuster comprises an altitude adjuster and a direction adjuster, wherein the altitude adjuster and the direction adjuster are respectively connected with the horizontal screw and vertical screw of the accurate adjustment claw through a connection joint sleeve and a double pressing screw. The device can be used for automatically adjusting and accurately locating the track plate instead of manual work under the guide of measurement frame data, thereby effectively improving the adjustment efficiency and location precision of the track plate. The device is simple in structure and is convenient to use and operate.
Owner:CHINA RAILWAY FIRST GRP CO LTD +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products