A monitoring method and device for data modification

A data modification and data block technology, applied in the field of data processing, can solve the problems of slowing down the review speed, low efficiency of re-auditing, wasting time, etc., to save audit time and improve audit efficiency.

Active Publication Date: 2019-12-06
阿里巴巴华北技术有限公司
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] When the modified process task is re-approved, the traditional method is to assign each data block of the process task to the corresponding user for re-approval, because in general, the initiator may only modify part of the data in the process task block, then during the review process, the data blocks that have not been modified in the process task need to be re-reviewed by the user, which wastes time and slows down the overall review speed, resulting in low re-review efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A monitoring method and device for data modification
  • A monitoring method and device for data modification
  • A monitoring method and device for data modification

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0053] figure 1 It is a method flowchart of a monitoring method for data modification provided by an embodiment of the present invention, and the method includes:

[0054] S101: Acquire a process task and a corresponding task identifier, where the process task includes at least one data block.

[0055] For example, the task identifier corresponds to the process task one by one. Even if the process task fails a certain review and is sent back to the initiator of the process task, after the initiator modifies the process task, it submits the modified process task for review again, and the modified process task The task ID of the task is the same as the task ID of the process task before modification. That is to say, even if the same process task is returned and rejected many times, when it is modified and submitted for review again, or even without modification and resubmitted for review, the task identifier of the process task will not change.

[0056] The data blocks may be...

Embodiment 2

[0077] figure 1 In the corresponding embodiment S104, in addition to possible comparison results with the same comparison, there may also be comparison results with different comparisons.

[0078] exist figure 1 On the basis of the corresponding embodiment, figure 2 It is a method flowchart of a monitoring method for data modification provided by an embodiment of the present invention, and the method includes:

[0079] S201: Acquire a process task and a corresponding task identifier, where the process task includes at least one data block.

[0080] S202: Determine whether the historical audit record of the process task is saved according to the task identifier. If yes, execute S203.

[0081] S203: Determine that the process task is the process task submitted for review for the Nth time, and obtain the data content and review results of the audited data block in the review process of the process task submitted for review for the N-1 time according to the historical review ...

Embodiment 3

[0096] image 3 A device structure diagram of a monitoring device for data modification provided by an embodiment of the present invention, the device includes:

[0097] The first acquiring unit 301 is configured to acquire a process task and a corresponding task identifier, where the process task includes at least one data block.

[0098] For example, the task identifier corresponds to the process task one by one. Even if the process task fails a certain review and is sent back to the initiator of the process task, after the initiator modifies the process task, it submits the modified process task for review again, and the modified process task The task ID of the task is the same as the task ID of the process task before modification. That is to say, even if the same process task is returned and rejected many times, when it is modified and submitted for review again, or even without modification and resubmitted for review, the task identifier of the process task will not ch...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The embodiment of the invention discloses a method and a device for monitoring data modification. The method comprises the steps of: acquiring a flow task and a corresponding task identifier; judging whether a history audit record of the flow task is stored or not according to the task identifier; if yes, determining the flow task as a flow task which is submitted to be audited for the Nth time, acquiring data content of an audited data block, an audit result and a user identifier corresponding relationship in an auditing process of the flow task which is submitted to be audited for a (N-1)th time according to the history audit record, determining same blocks in the flow task submitted to be audited for the Nth time and the flow task submitted to be audited for the (N-1)th time, and comparing whether data content in the same data blocks is the same or not; and if yes, endowing the same data blocks with corresponding audit results in the name of corresponding user identifiers in the Nth audit of the flow task. Through the adoption of the method, when the flow task is re-submitted to be audited, a condition that an unmodified data block is sent to a user again for auditing is avoided, so that the audit efficiency of re-audit is improved.

Description

technical field [0001] The invention relates to the field of data processing, in particular to a monitoring method and device for data modification. Background technique [0002] During the review process of the process task, the data of the process task can be divided into one or more data blocks, and the data blocks will be reviewed by the corresponding users to see if they meet the requirements. When a process task includes multiple data blocks, if a data block meets the audit requirements, the data block will be approved, but if any data block in the task process does not meet the audit requirements, the entire process task will be rejected , and is returned to the originator of the process task. The initiator can modify the data blocks that do not meet the audit requirements, and submit the modified process tasks for re-audit. [0003] When the modified process task is re-approved, the traditional method is to assign each data block of the process task to the correspo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/10G06F16/903
Inventor 姜赟
Owner 阿里巴巴华北技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products