A new method of caisson blasting to assist sinking
A caisson and well wall technology, which is applied in caisson, construction, infrastructure engineering and other directions, can solve the problems of deep well foundations failing to sink smoothly, delaying construction progress, unable to overcome the reaction force of bottom support force, etc., and achieving safe, reliable and practical , Improve the effect of sinking effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] The invention discloses a method for assisting sinking by caisson blasting. as attached Figure 1-3 As shown, the equipment includes a pre-embedded steel pipe 2, a pre-embedded PVC pipe 3, a PVC casing 4, a dredger 8, a geological drilling rig 9, a seismic source charge 10, a nonel detonator 11, a fixed steel bar 12, and a connecting sleeve 13. When making the caisson platform, bury the pre-buried PVC pipe 3 and the connecting sleeve 13 in the caisson wall 1 according to a certain hole row spacing, as the drilling guide pipe; Reinforcing bar 12 connects two pipes firmly. Before drilling and blasting, use the dredge 8 to suck up the loose layer 6 to provide a free surface for the blasting in the mud suction blind area. After the caisson platform cannot sink normally by its own weight, use the geological drilling rig 9 to place the drill bit 5 downward along the pre-buried drilling guide pipe, and start drilling when the drill bit 5 reaches the clay layer 7; After the...
Embodiment 2
[0053] The invention discloses a method for assisting sinking by caisson blasting. Except following technical parameter, all the other are with embodiment 1. In the caisson blasting operation of the main tower foundation of a bridgehead in Hanyang, Wuhan, the inner diameter of the pre-embedded PVC pipe 3 is 146mm; the diameter of the drill bit 5 is 110mm; the drilling depth is measured with a measuring rope to ensure that the drill bit drills at least 3m after it comes out of the well wall; Carry out the charging operation for the required drilling holes, and use a 90mm drill bit to send the PVC-U pipe with an outer diameter of 100mm to the bottom of the hole for the drilling holes that do not meet the requirements, so as to ensure that 50cm of the PVC-U pipe remains in the embedded pipe.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com