Construction information collection processing method

A processing method and information collection technology, applied in data processing applications, instruments, office automation, etc., can solve problems that cannot be called lean management, cannot be correlated, and compared, and achieve the effect of promoting on-site management informatization

Inactive Publication Date: 2017-06-13
SHANGHAI CONSTRUCTION GROUP
View PDF4 Cites 24 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the construction implementation plan can be dynamically displayed in the BIM model through BIM technology, but the limitation of BIM technology for on-site acceptance application is that it cannot effectively integrate the status of the implemented object-component itself with the BIM model and planning tasks. association, comparison
That is to say, the installation status of each subcontractor and each component itself cannot be dynamically displayed and summarized in a visual way. Currently, statistics and summaries are still performed in the form of forms. For general contracting companies, it cannot be called Lean management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction information collection processing method
  • Construction information collection processing method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] In order to make the above objects, features and advantages of the present invention more comprehensible, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0036] Such as figure 1 As shown, the present invention provides a method for collecting and processing construction information, including:

[0037] Step S1, automatically encode the components in the BIM construction information model to obtain the encoding information, and associate the encoding information with the two-dimensional code; here, a construction information model with sufficient depth is established according to the needs of the site construction, and unified according to the requirements of national standards perform automatic coding;

[0038] Step S2, using the mobile Internet platform as an information collection device, scanning the QR code in the process of manufacturing, transportation, construction installa...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present invention provides a construction information collection processing method. A mobile platform application is developed and construction information is collected offline on the spot by scanning a two-dimensional code; a cloud-end/server-end program is developed to performing background processing; an information processing result such as a graph or a model; and finally, a set of digital solutions is developed. The database can convert construction information, and synchronize with a mobile platform and server-end software, so that model to list, model lightweight to cloud end, association of the model with the database, association of the database with sampling, dynamic update of the database and such more data transfer, conversion and association functions can be realized. The method provided by the present invention can provide technical support for progress management of component levels in the electromechanical installation project, greatly reduce the workload of the project management team, increase the utilization level of construction information in the BIM model, fill in gaps of processing control means of project management of the BIM technology, and shorten the period of the installation project.

Description

technical field [0001] The invention relates to a method for collecting and processing construction information. Background technique [0002] Taking the electromechanical installation project of a large-scale comprehensive construction project as an example, in addition to the general electromechanical contract, there are generally several different subcontractors, each subcontractor has many work surfaces, and there are many processes carried out on each work surface at the same time. Each process requires several people, and each person is responsible for more than one work surface. Eventually, the number of on-site workers can reach thousands, and the progress management of the entire installation project is in a chaotic state. [0003] Under this current situation, the conventional progress control method is to carry out preliminary planning through the construction organization schedule, and the implementation results often need to be summarized and submitted in the fo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08
Inventor 刘平董建曦沈丹丹
Owner SHANGHAI CONSTRUCTION GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products