Construction method of foundation prefabrication for transmission line engineering

A technology of transmission lines and construction methods, applied in infrastructure engineering, manufacturing tools, construction, etc., can solve problems such as the inevitable decline in concrete quality, increase in manpower and material resources, and increase in project construction costs, so as to easily meet design and specification requirements, The effect of improving construction efficiency and reducing the workload of field construction

Active Publication Date: 2019-10-18
POWER CHINA HENAN ENG CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

During construction during the rainy period, there are certain difficulties in transporting raw materials and equipment required for foundation construction such as steel bars, ready-made concrete (or gravel, cement, water), mixers, and personnel entering and leaving the site; After severe water accumulation or even landslide in the foundation pit, a lot of manpower and material resources need to be invested for rework; when the channel coordination is difficult, it is easy for a large number of construction workers to stop working, especially when there is a blockage during the pouring process, not only need to stop work and wait for the channel Coordination and once the concrete pouring is interrupted for too long, the quality of the concrete will inevitably decline, and even the foundation being poured needs to be scrapped and re-constructed, causing serious losses
Therefore, during the construction period, external factors such as weather and channel coordination often lead to long construction times and additional human and material resources, which in turn affect the entire construction period and cause adverse consequences such as increased construction costs.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0047] Embodiment, a method for prefabricated construction of transmission line engineering foundation, the specific construction steps are as follows:

[0048] A. Construction preparation stage:

[0049] 1) Site selection: The prefabricated site is selected in an open place with complete water and electricity, which is convenient for large-scale basic prefabrication and storage operations; the site should be close to the main traffic road, which is convenient for the transportation of construction raw materials and finished products; after the prefabricated site is determined, the planned pouring Concrete is laid on the manufacturing site and carefully leveled. After leveling, the height difference of the concrete floor within the scope of the foundation floor should not exceed 5mm; the leveling site should meet the requirements of continuous assembly line operations within 7 working days at least; at the same time, enough space should be reserved between the leveling site Th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an electric transmission line project foundation prefabricated construction method. The electric transmission line project foundation prefabricated construction method comprisesthe steps of a construction preparation stage, foundation prefabricated construction, prefabricated foundation transporting, excavation of a foundation pit and construction of an under layer, foundation hoisting in position, foundation backfilling and the like. The construction preparation stage comprises the steps of field selection, manufacturing of a movable type construction platform, manufacturing of a template, manufacturing of a suspension center pre-buried piece, hoisting of a steel wire rope and the like. The foundation prefabricated construction comprises the steps of preparation, mounting of inserting angle iron, rib braiding and template erecting, pouring, foundation identification, transferring and maintenance of the prefabricated foundation, quality detection of raw materials and concrete and the like. The prefabricated field in the construction method is fixed, the reshipment quantity of the construction raw materials, equipment and instruments are reduced, wear and loss in the reshipment process of the materials and the instruments are reduced, interference of outside factors is eliminated, resource investment is reduced, the influence of terrain to construction iseliminated, the operation frequency and time in the foundation pit are decreased, construction potential safety hazards are lowered, and the labor condition is improved.

Description

[0001] 1. Technical field: [0002] The invention relates to a prefabricated construction method for a power transmission line engineering foundation, and belongs to the technical field of power transmission line engineering construction. [0003] 2. Background technology: [0004] In the construction of transmission line engineering, whether the foundation construction can be successfully completed is the key to whether the entire project can be completed on schedule. During the foundation construction process, a series of processes such as pit excavation, cushioning, reinforcement, formwork support, pouring, formwork removal, and backfilling will take at least 4 days to complete. During construction during the rainy period, there are certain difficulties in transporting raw materials and equipment required for foundation construction such as steel bars, ready-made concrete (or gravel, cement, water), mixers, and personnel entering and leaving the site; After severe water acc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E02D27/01E02D27/42B28B23/02
Inventor 赵冬辉乔志强邓帅郑言张松旺
Owner POWER CHINA HENAN ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products