An automatic three-stage lifting painting equipment for corridor bridges
A kind of painting equipment and automatic technology, which is applied in the direction of construction and building construction, and can solve the problems of low efficiency, slow speed, long working time, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] An automatic three-stage lifting painting equipment for corridor bridges, such as Figure 1-5 As shown, it includes a fixed plate 1, a wheel 2, a first bearing seat 3, a screw mandrel 4, a handle 5, a nut 6, a connecting block 7, a first connecting rod 8, a first guide sleeve 9, a first guide rail 10, The second connecting rod 11, the second guide rail 12, the second guide sleeve 13, the nozzle 14, the installation block 15, the positioning sleeve 16, the first spring 17, the first cone block 18, the second cone block 19, the installation rod 20, the installation Plate 21, support rod 22, electric wheel 23, first gear 24, first fixed block 25, second gear 26, winding wheel 27, pull wire 28, paint box 29, water pump 30 and infusion tube 31, fixed plate 1 The side is connected with the wheel 2, the middle part of the upper side of the fixed plate 1 is connected with the first bearing seat 3, the first bearing seat 3 is connected with the screw rod 4, the upper end of the ...
Embodiment 2
[0030] An automatic three-stage lifting painting equipment for corridor bridges, such as Figure 1-5 As shown, it includes a fixed plate 1, a wheel 2, a first bearing seat 3, a screw mandrel 4, a handle 5, a nut 6, a connecting block 7, a first connecting rod 8, a first guide sleeve 9, a first guide rail 10, The second connecting rod 11, the second guide rail 12, the second guide sleeve 13, the nozzle 14, the installation block 15, the positioning sleeve 16, the first spring 17, the first cone block 18, the second cone block 19, the installation rod 20, the installation Plate 21, support rod 22, electric wheel 23, first gear 24, first fixed block 25, second gear 26, winding wheel 27, pull wire 28, paint box 29, water pump 30 and infusion tube 31, fixed plate 1 The side is connected with the wheel 2, the middle part of the upper side of the fixed plate 1 is connected with the first bearing seat 3, the first bearing seat 3 is connected with the screw rod 4, the upper end of the ...
Embodiment 3
[0033] An automatic three-stage lifting painting equipment for corridor bridges, such as Figure 1-5As shown, it includes a fixed plate 1, a wheel 2, a first bearing seat 3, a screw mandrel 4, a handle 5, a nut 6, a connecting block 7, a first connecting rod 8, a first guide sleeve 9, a first guide rail 10, The second connecting rod 11, the second guide rail 12, the second guide sleeve 13, the nozzle 14, the installation block 15, the positioning sleeve 16, the first spring 17, the first cone block 18, the second cone block 19, the installation rod 20, the installation Plate 21, support rod 22, electric wheel 23, first gear 24, first fixed block 25, second gear 26, winding wheel 27, pull wire 28, paint box 29, water pump 30 and infusion tube 31, fixed plate 1 The side is connected with the wheel 2, the middle part of the upper side of the fixed plate 1 is connected with the first bearing seat 3, the first bearing seat 3 is connected with the screw rod 4, the upper end of the s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com