Power outage influence comprehensive evaluation method based on improved extension theory
A comprehensive evaluation, theoretical technique, applied in the field of electric power
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0070] Such as figure 1 As shown, a comprehensive evaluation method of power outage impact based on improved extension theory, the specific steps are as follows:
[0071] Step 1. Matter-element setting of power outage impact evaluation. In the power outage impact assessment, the value range of indicators corresponding to each power outage impact evaluation level can be expressed through the classical domain, as shown in formula (1):
[0072]
[0073] In the formula, N j is the impact evaluation level of the jth power outage; c 1 ~ c 6 6 indicators of the indicator layer in turn; 1 ,b 1 > means c under the jth evaluation level 1 The value range of the indicator;
[0074] The entire value range of each index in the power outage impact assessment system is represented by the node field, as shown in formula (2):
[0075]
[0076] In the formula, N represents the overall power outage impact level; 1 ,e 1 > means c 1 The range of values for all evaluation levels of ;...
Embodiment 2
[0123] Take the blackout event of two 110kV substations in Guangdong Power Grid as an example. The statistical data of blackout events and the parameters of substations are shown in Table 2, and the classification and corresponding standards of each index are shown in Table 3, where k1~k5 represent the five assessment levels of minor, slight, serious, relatively serious and extremely serious in turn. In order to improve comparability, the grading standard value and statistical value of each indicator are converted into per unit value. The benchmark values used are taken from the substation parameters in Table 2, where the benchmark of the importance classification index is the total number of users of this type brought by the substation, the time benchmark is 30 days, and the power benchmark is the capacity of the substation. The standard of evaluation level is mainly based on the statistical data and expert opinions of most of the 110kV substations in the past.
[0124] Ta...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com