A mounting process of a lifting unit for a jack-up drilling platform

A lifting unit and drilling platform technology, applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve the problems of low efficiency, inability to achieve smooth installation in sequence, and high labor intensity

Active Publication Date: 2018-11-27
NANTONG BLUE ISLAND OFFSHORE CO LTD
View PDF7 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] During the installation process of the existing lifting unit, multiple lifting units are installed on the pile-fixing frame. The order of installing the lifting unit is complicated, and it is impossible to achieve a smooth installation. The traditional lifting unit is pulled to the pile-fixing frame by manpower, which is time-consuming and labor-intensive. It has high strength and low efficiency, and at the same time causes certain damage to the pile-fixing frame. The most important thing is that it is difficult to achieve the meshing degree between multiple lifting units and the rack. The connection between the lifting unit and the pile-fixing frame is extremely demanding. The traditional installation process Simply placing the lifting unit on the pile-fixing frame cannot guarantee the firmness and stability of the connection between the lifting unit and the pile-fixing frame
Therefore, it is necessary to propose a lifting unit installation process for jack-up drilling platforms that has simple and orderly steps, improves work efficiency, and ensures the firmness and stability of the connection between the lifting unit and the pile-fixing frame, which is bound to be welcomed by offshore construction personnel. After searching, no similar patents were found

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A mounting process of a lifting unit for a jack-up drilling platform
  • A mounting process of a lifting unit for a jack-up drilling platform
  • A mounting process of a lifting unit for a jack-up drilling platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The implementation of the present invention will be illustrated by specific specific examples below, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.

[0035] Such as figure 1 As shown, a lifting unit installation process for a self-elevating drilling platform, the lifting unit includes a motor 1 and a gear box arranged front and back, one end of the motor 1 is flush with one end of the gear box and the transmission is realized through a transmission member 4, The gear box includes a gear shaft 2 and a torque plate 3. The gear shaft 2 is arranged horizontally and horizontally and the torque plate 3 is placed between the gear shaft 2 and the transmission member 4. The torque plate 3 is arranged vertically to the gear shaft 2. The outer casing of the gear shaft 2 has Climbing gear 5, including installing the sliding bushing 8, cleaning the lifting unit, initially in...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a mounting process of a lifting unit for a jack-up drilling platform, the lifting unit comprises a motor and a gearbox arranged in front and back, one end of the motor is arranged flush with one end of the gearbox, A gearbox includes a gear shaft, a torque plate disposed transversely and horizontally of the gear shaft and disposed between the gear shaft and the transmissionmember, the torque plate is arranged perpendicular to the gear shaft, The outer sleeve of the gear shaft is provided with a climbing gear, which is characterized in that the climbing gear comprises asliding shaft sleeve, a cleaning lifting unit, a preliminary installation lifting unit, a pile fixing frame cleaning, a lifting unit traction device positioning, a lifting unit traction device removing, a lifting unit torque plate mounting, a bearing seat cover plate mounting, a lifting unit adjustment pad mounting, and a lubrication pipeline arranging. The invention has the advantages of simpleand orderly steps, improving working efficiency, and ensuring the firmness and stability of the connection between the lifting unit and the pile fixing frame.

Description

technical field [0001] The invention belongs to the field of offshore construction, and in particular relates to a lifting unit installation process for a jack-up drilling platform. Background technique [0002] With the increasing demand for oil energy in the global market and the continuous depletion of land oil energy, countries all over the world have shifted oil extraction from traditional land to oceans rich in oil and gas resources. Jack-up drilling platforms have always been the mainstream equipment for offshore oil exploitation in various countries because of their strong positioning ability, long life, low cost and high reliability. The lifting device in the drilling platform that can realize the platform rising or falling is one of the key components of the whole platform. It is the equipment that realizes the lifting and maintaining the lifting state of the self-elevating drilling platform. [0003] During the installation process of the existing lifting unit, m...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02B17/04E02B17/08
CPCE02B17/04E02B17/08
Inventor 朱军苏小芳张伦伟米智楠吴昊
Owner NANTONG BLUE ISLAND OFFSHORE CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products