Cement Concrete Bridge Deck Pavement and Construction Method

A cement concrete and bridge deck paving technology, applied in bridges, bridge construction, bridge parts, etc., can solve the problems of poor flatness of the pavement layer, difficult construction quality control, misplaced secondary construction surfaces, etc., and saves money. Construction materials, good economic and technical benefits, and the effect of convenient construction
CN110820559BActive Publication Date: 2021-05-25QINGDAO HAIDE ROAD & BRIDGE ENG

Patent Information

Authority / Receiving Office
CN Β· China
Patent Type
Patents(China)
Current Assignee / Owner
QINGDAO HAIDE ROAD & BRIDGE ENG
Publication Date
2021-05-25

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention provides a cement concrete bridge deck pavement and construction method. The cement concrete bridge deck pavement and construction method comprises: cement concrete bridge deck reinforcement cage in situ binding tire frame, cement concrete bridge deck tool type support formwork, cement concrete bridge deck Bridge deck track sliding type operation platform and cement concrete bridge deck track sliding type pouring device. The overall structure first uses the tire frame to bind the steel bars, and then uses the formwork tool to support the formwork. After the formwork is supported, the integrated operation platform is used to pour and level it. After the leveling is completed, the pouring device is used to chisel and maintain .
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to a bridge deck pavement and a construction method, in particular to a cement concrete bridge deck pavement and a construction method. Background technique

[0002] The concrete bridge deck pavement mainly plays the role of protecting the bridge deck, distributing the concentrated load of the wheels and preventing the corrosion of the concrete and steel bars of the main girder. Construction quality control is very important. In the past, after the steel mesh was installed or bound and accepted, the elevation control belt made in advance was generally used to divide the half-width into 2 to 3 pours, and the vibrator, plate vibrator, and vibrating beam were used to vibrate and compact. The grout roller puts out the grout on the surface, and finally finishes shaping and roughening. This traditional construction method is labor-intensive and time-consuming, and there are often phenomena such as poor flatness of the pavement layer, m...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine