Project data processing method and device, server and medium
A data processing and project technology, applied in the field of data processing, can solve the problem that the method cannot be executed before the project, and achieve the effect of reducing the risk of delayed delivery
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] figure 1 It is a flow chart of a project data processing method provided in Embodiment 1 of the present invention. This embodiment is applicable to the situation of selecting employees who can deliver the project to be executed as expected, and the method can be executed by the project data processing device provided by the embodiment of the present invention, and the project data processing device can be realized by software and / or hardware. Such as figure 1 As shown, the method may include:
[0027] Step 101: Determine the ability value of the employee to be selected according to the employee's historical project difficulty coefficient, historical project expected time, historical project completion time, number of remaining problems, and difficulty coefficient of the technology stack to which the remaining problems belong.
[0028] Wherein, the employee to be selected refers to an employee who is currently in a working idle state. The difficulty coefficient of his...
Embodiment 2
[0057] figure 2 It is a flow chart of a project data processing method provided by Embodiment 2 of the present invention. This embodiment provides a specific implementation manner for the above embodiments, such as figure 2 As shown, the method may include:
[0058] Step 201, according to the ratio between the historical project expected time of the candidate employee and the historical project completion time, determine the characteristic value of the completion time.
[0059] Exemplarily, assuming that an employee to be selected has an expected historical project time of 10 days and a historical project completion time of 15 days, the characteristic value of the completion time is 10 / 15=2 / 3.
[0060] Step 202: Determine the characteristic value of the remaining problems according to the ratio between the number of remaining problems of the employee to be selected and the difficulty coefficient of the technology stack to which the remaining problems belong.
[0061] Exem...
Embodiment 3
[0078] image 3 It is a schematic structural diagram of a project data processing device provided in Embodiment 3 of the present invention, which can execute a project data processing method provided in any embodiment of the present invention, and has corresponding functional modules and beneficial effects for executing the method. Such as image 3 As shown, the device may include:
[0079] Ability value determination module 31, used to determine the ability value of the candidate employee according to the difficulty factor of the candidate employee's historical project, the expected time of the historical project, the completion time of the historical project, the number of remaining problems, and the difficulty coefficient of the technology stack to which the remaining problem belongs ;
[0080] The risk factor determination module 32 is used to match the ability value with the difficulty factor of the technology stack in the project to be executed to obtain the risk facto...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com