Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

11 results about "Project selection" patented technology

Project Selection is a process to assess each project idea and select the project with the highest priority. Projects are still just suggestions at this stage, so the selection is often made based on only brief descriptions of the project.

Fence industry estimating and project management system

Disclosed herein is an estimating and project management method and system built specifically for the fence industry. Its capabilities include chain link, wood, ornamental, vinyl, concrete, agricultural, and any other type of fence, allowing users a fully customizable solution for material calculations and cost. The disclosed system includes products, calculations, configurations and inventory items in a single platform to facilitate design, planning, and purchasing for fence businesses and builders. Such a system further permits users the ability to add or remove items (selections, products, designs, etc.) to and from the system on demand to tailor such a system and method to their individual or entity-wide business needs. The disclosed system additionally permits users to upload plans, specifications, satellite images, and scanned documents, as well as to create blank virtual workspaces in support of such a facilitated fence generating and building platform.
Owner:TURBEVILLE DAN

A project review business management system

The present invention provides a project review business management system, which relates to the technical field of business management, and includes: a project selection module, which is used to select a target project and a responsible unit of the target project in a project database based on a project selection instruction; a data acquisition module, which is used to conduct a first review of the target project, and at the same time, obtain the project data reported by the responsible unit of the target project after the first review is passed, and conduct a second review of the project data; a department preliminary review and expert review module, which is used to conduct a preliminary review of the project data, and distribute the project data to be reviewed to a preset expert group; a final review module, which is used to obtain the review results and the final confirmation results, and conduct a final review of the final confirmation results through the second person in charge of the preset department, and generate the final review results of the project. The present invention can improve the process speed of the post-project review, improve the efficiency of the review, reduce the interference of human factors on the review results, and improve the accuracy and credibility of the project review results.
Owner:HUANENG INFORMATION TECH CO LTD

A high-level planning and scheduling method based on resource constraints, system and medium

The present invention relates to the technical field of industrial Internet of Things, and specifically to an advanced planning and scheduling method, system and medium based on resource constraints; setting priorities between tasks; creating a project and selecting a project type; creating a task and selecting a task type; establishing a predecessor task of the current task as needed, calculating the impact of the predecessor task on the current task, and forming a planned date for the task after being affected by the predecessor task; judging whether the current task is affected, and changing the planned date if affected; detecting the load of each resource and issuing an early warning; through the above-mentioned method, improving the efficiency of enterprise resource management and communication, and reducing the risks and problems of the project caused by resources.
Owner:NANJING XINGJI DIGITAL TECH CO LTD

Animation project management tool

The invention relates to the technical field of project management, in particular to an animation project management tool, which comprises a step of acquiring project information; according to the items displayed in the CgTeamWork, the items to which the items belong are selected; a project information disassembling step; according to the selected item, the item is disassembled into continuous task links, and a visual operation interface is generated; a link state display step; in view of the fact that the manufacturing links are linearly linked, state information of all the links is displayed in sequence; a state information management step; and marking the current state information. And a built-in feedback mechanism allows the user to report and track problems in real time, automatically records the state and reminds related personnel, so that the project delay risk is remarkably reduced. Compared with the prior art, the tool is unique in that information sharing and communication functions which are easy to solve are simplified, so that cross-team cooperation is smoother, the overall project management process is optimized, and the work transparency and the response speed are improved.
Owner:WUHAN JINGCHU DIANSHI DIGITAL DESIGN CO LTD

Engineering project material selection and price combination method and system based on part database, and medium

The invention discloses an engineering project material selection and pricing method and system based on a part database, and a medium, and the method comprises the steps: building a database based on a part summary list, classifying parts according to the parameters and prices of the parts in the database, obtaining the parameters of the parts needed by an engineering project based on an engineering project drawing, the parameters are written into a database, parts conforming to the parameters are screened out through database search to serve as engineering project material selection parts, and pricing calculation is conducted according to prices corresponding to the parts selected from the database to form a material selection quotation list; according to the scheme, the complete database is established by summarizing the parameters and prices of all the parts provided by suppliers, when engineering material selection is carried out, the parts needed by engineering material selection are written into the database for searching, the parts meeting the requirements are automatically screened out from the database, and the material selection quotation list is formed by calculating the prices of the parts corresponding to the database. The working efficiency and the statistical precision are high.
Owner:PUXIN INT ENG CONSULTING CO LTD

Fractal geometry or bio-inspired system for complex file organization and storage

In a system for efficiently organizing, storing, and / or accessing project data, and for visualizing project progress, for a specified project, a fractal-based or bioinspired reference structure is selected. A file organization and storage structure is generated based on the reference structure. The reference structure includes tags that can indicate the appropriate storage locations for different types of project-related data based on the nature of the data. To storage a file, the name and / or contents of the file are analyzed and matched with one or more tags, so that the file can be stored at the location identified by the best matching tag.
Owner:GISH PETER

Project management system, project management method and program

ActiveJP7624788B1Office automationResourcesProject areaProject selection
An object of the present invention is to provide a project management system and the like that is capable of appropriately managing progress while reducing the burden of project management. [Solution] A project management system that manages projects involving multiple people, comprising an account memory unit that stores user account information, a display control unit that displays a project area that displays projects and a chat area that displays messages in a chat group, a project selection unit that selects a project, a message sending unit that sends messages between multiple users, a message selection unit that selects messages displayed in the chat area, and a message memory unit that stores the selected project and the selected message in association with each other.
Owner:LOGIPEACE PTE LTD

Method and system for implementing programmable project research and development scaffolding

PendingCN122363663ASoftware engineeringFactor selection
This disclosure relates to the field of information technology, and in particular to a method and system for implementing an arrangable project development scaffold. The method includes: a factor management module that creates, configures, and publishes multiple scaffolding factors for a project to be developed, and provides a factor management library for storing these multiple scaffolding factors; a template creation module that provides a scaffolding template library storing various preset scaffolding templates, and, in response to a user selecting at least one preset scaffolding template from the library for the project to be developed, and performing factor selection and factor arrangement operations on multiple scaffolding factors within the at least one preset scaffolding template, generating a target scaffolding template; and a scaffolding generation module that, in response to the user's selection of the target scaffolding template, generates a target scaffolding based on the target scaffolding template, so as to utilize the target scaffolding to perform development tasks. This disclosure automates and automates the entire development process through software scaffolding, thereby improving development efficiency and reducing repetitive work.
Owner:CHINA MOBILE GRP GUANGDONG CO LTD +1

Project management system, project management method and program

ActiveJP2025171907AOffice automationResourcesProject areaProject selection
To provide a project management system, etc. capable of appropriately performing progress management while reducing a burden for project management.SOLUTION: A project management system for managing a project involving a plurality of persons includes: an account storage unit for storing account information of users; a display control unit for displaying a project area for displaying projects and a chat area for displaying messages in chat groups; a project selection unit for selecting a project; a message transmission unit for transmitting messages among a plurality of users; a message selection unit for selecting a message displayed in the chat area; and a message storage unit for storing the selected project and the selected message in association with each other.SELECTED DRAWING: Figure 1
Owner:LOGIPEACE PTE LTD

Project management system, project management method and program

PCT designated stageWO2026059503A1Office automationResourcesComputer networkProject area
[Problem to be solved b the invention] The object of the present invention is to provide a project management system and the like which enables appropriate project management with decreasing the burden of project management. [Means for solving the problem] A project management system for managing a project involving a plurality of users, comprising an account storage unit which memorizes account information of the users, a display control unit which causes to display, for the user, a project area in which a project is displayed and a chat area in which a message in a chat group is displayed, a project selection unit which selects a project, a message transmission unit which transmits a message between a plurality of users, a message selection unit which chooses a message displayed in the chat area, and a message storage unit which stores a selected project and a selected message in association with each other.
Owner:LOGIPEACE PTE LTD

Project management system, project management method and program

PendingJP2025171943AResourcesProject areaProject selection
To provide a project management system, etc. capable of appropriately performing progress management while reducing a burden for project management.SOLUTION: A project management system for managing a project involving a plurality of persons includes: an account storage unit for storing account information of users; a display control unit for displaying a project area for displaying projects and a chat area for displaying messages in chat groups; a project selection unit for selecting a project; a message transmission unit for transmitting messages among a plurality of users; a message selection unit for selecting a message displayed in the chat area; and a message storage unit for storing the selected project and the selected message in association with each other.SELECTED DRAWING: Figure 1
Owner:LOGIPEACE PTE LTD