Project management method and system

A technology for project management and administrators, applied in the field of project management methods and systems, can solve problems such as less allocation and assignment of project personnel

Active Publication Date: 2020-10-20
北京亿宇嘉隆科技有限公司
View PDF8 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The above-mentioned existing technical solutions have the following defects: at present, most project management is biased towards engineering project management. This kind of project is more obvious in that there are objective judgment standards and stable task results in terms of task completion. Therefore, project management The midpoint of the project is mostly on the grasp of links and time nodes, but the allocation and assignment of project personnel is usually less involved. In the current process of more emphasis on responsibility and professional project management, issues such as personnel allocation and assignment are becoming more and more serious. obvious

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project management method and system
  • Project management method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0083] A project management method comprising the steps of:

[0084] The project plan is obtained, and task information is generated according to the project plan, wherein the task information includes task name, task index and task content; the project plan includes at least task information, task quantity and other information.

[0085] Obtain the personnel list, generate a different personnel code for each person in the personnel list, and send the personnel code to the corresponding person; wherein, the personnel code is randomly generated.

[0086] According to the number of task information, the personnel code is divided into multiple personnel groups;

[0087] Split task information into multiple subtask information.

[0088] Respond to the task level input by the outside world, and associate the corresponding task information with the task level;

[0089] Sort the task information according to the task information level, and generate a task sequence list;

[0090] C...

Embodiment 2

[0117] refer to figure 1 , on the basis of Embodiment 1, this application discloses a project management system using a project management method, including:

[0118]The input module 1 includes input devices such as a keyboard, and is used to obtain project plans and personnel lists.

[0119] The generation module 2 is used to call the project plan to generate task information, and call the personnel list to generate personnel codes.

[0120] The split module 3 is used to call the task information, and split the task information into multiple subtask information.

[0121] The combination module 4 is used for invoking the personnel codes, randomly assigning the personnel codes to generate personnel groups; wherein, the number of personnel codes contained in the personnel groups is different.

[0122] The counting module 5 is used to call the personnel code, count the number of subtask information matched by the personnel code, record it as output information, summarize the ou...

Embodiment 3

[0134] Embodiment 3, the difference with embodiment 2 is:

[0135] refer to figure 1 with figure 2 ,

[0136] The project management system also includes:

[0137] The sorting module 71 is used for sorting personnel codes and task information, and specifically includes the following units,

[0138] The fusion unit 711 is used to call the output statistics table and scoring table, generate a summary sequence table, and output the summary sequence table to the matching module 7, wherein the sorting method of the summary sequence table is to prioritize the personnel codes with high personnel scores, and the same personnel score Personnel codes with less production information are prioritized, and personnel codes with the same personnel rating and the same production information are arranged in alphabetical order.

[0139] The division unit 712 is configured to respond to task levels input from the outside, and associate corresponding task information with task levels.

[01...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a project management method and system. The method comprises the following steps of obtaining a project plan, generating task information according to the project plan, obtaining a personnel list, generating different personnel codes for each person in the personnel list, and transmitting the personnel codes to corresponding persons; dividing the personnel codes into a plurality of personnel groups according to the number of the task information, matching the task information with the personnel groups, splitting the task information into a plurality of pieces of sub-task information, and matching the sub-task information with the personnel codes; searching personnel codes corresponding to the sub-task information, associating the personnel codes with other sub-taskinformation, and sending the sub-task information to personnel corresponding to the personnel codes; and when completion information of all the sub-task information is received, counting the number of the sub-task information corresponding to each personnel code, recording the number as yield information, and generating a yield statistical table. The method is advantaged in that tasks and the personnel are matched in a targeted mode, and the task completion degree is improved by adjusting the personnel matching relation.

Description

technical field [0001] The present invention relates to the technical field of project management, in particular to a project management method and system. Background technique [0002] At present, in many fields, due to the need for multi-person collaboration and the complex project process, it is usually necessary to use software and system methods to manage project nodes, personnel, funds, etc. During the management process, the project management system can allow operators to accurately Efficiently know the operation status of the project, the project management system is a kind of management system that is often used and very necessary at present. [0003] For the existing technical solution, please refer to the Chinese invention patent application publication number CN106408172A, which discloses a project management system, including: project progress database, project progress schematic diagram, project progress monitoring system, and project standards generated accor...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10
CPCG06Q10/06316G06Q10/103
Inventor 徐美君
Owner 北京亿宇嘉隆科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products