Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Cable management method, device and system

A management method and management device technology, which is applied in the field of cable management methods, devices and systems, can solve problems such as inability to effectively realize cable management and control, and achieve the effect of improving cable management and control efficiency and improving operation and maintenance levels

Active Publication Date: 2021-01-05
STATE GRID BEIJING ELECTRIC POWER +1
View PDF18 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The embodiment of the present invention provides a cable management method, device and system to at least solve the technical problem in the prior art that the cable management and control in the power maintenance process cannot be effectively realized

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cable management method, device and system
  • Cable management method, device and system
  • Cable management method, device and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0024] According to an embodiment of the present invention, an embodiment of a cable management method is provided. It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions, and, although A logical order is shown in the flowcharts, but in some cases the steps shown or described may be performed in an order different from that shown or described herein.

[0025] figure 1 is a flowchart of a cable management method according to an embodiment of the present invention, such as figure 1 As shown, the cable management method includes the following steps:

[0026] Step S102, collecting monitoring data of the target cable;

[0027] As an optional embodiment, collecting monitoring data of the target cable includes: collecting first monitoring data of the target cable, wherein the first monitoring data includes at least one of the following: body monitoring data, enviro...

Embodiment 2

[0063] According to another aspect of the embodiments of the present invention, a cable management device is also provided, figure 2 is a schematic diagram of a cable management device according to an embodiment of the present invention, such as figure 2 As shown, the cable management device 20 includes: a collection module 22 , a determination module 24 and a management module 26 . The cable management device 20 will be described in detail below.

[0064] The collection module 22 is used to collect the monitoring data of the target cable; the determination module 24 is connected to the above-mentioned collection module 22 and is used to determine the task type for managing the target cable; the management module 26 is connected to the above-mentioned determination module 24 and is used for determining according to Task type and monitoring data to manage the target cable.

[0065] In the above-mentioned embodiments of the present invention, the cable management device can ...

Embodiment 3

[0075] According to another aspect of the embodiments of the present invention, a cable management system is also provided, image 3 is a schematic diagram of a cable management system according to an embodiment of the present invention, such as image 3 As shown, the cable management system 30 includes the cable management device 20 described above.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a cable management method, device and system. The method comprises the following steps: acquiring monitoring data of a target cable; determining a task type for managing the target cable; and managing the target cable according to the task type and the monitoring data. The technical problem that in the prior art, cable management and control in the power protection processcannot be effectively achieved is solved.

Description

technical field [0001] The present invention relates to the field of cable operation and maintenance, in particular to a cable management method, device and system. Background technique [0002] In the original political power protection process, first, due to the large number of power protection lines and various types of power protection equipment involved, it was impossible to effectively allocate the tasks of power protection personnel. Second, there are many maintenance manufacturers of monitoring devices, and the data display methods of each manufacturer are diversified, which makes it impossible to carry out effective data integration and utilization. The third is that the personnel involved in the power guarantee cannot carry out effective management and control, and the on-site power guarantee information cannot be fed back in real time. Fourth, it is impossible to provide timely feedback or delay in information feedback to emergencies in the process of power prote...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02G1/00H02J13/00
CPCH02G1/00H02J13/00001H02J13/00002H02J13/00032
Inventor 赵洋王金双周弋熊益多张成郭甜
Owner STATE GRID BEIJING ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products