Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Fabricated building construction organization and progress management method based on BIM technology

A technology for building construction and progress management, applied in 3D modeling, image data processing, special data processing applications, etc., can solve problems such as low efficiency of construction progress control, and achieve the effect of low efficiency and good control effect

Pending Publication Date: 2021-12-07
HUAIYIN INSTITUTE OF TECHNOLOGY
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, when many enterprises are carrying out refined construction management, there are still many problems, especially the problem of low efficiency in the construction progress control of existing prefabricated buildings

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fabricated building construction organization and progress management method based on BIM technology
  • Fabricated building construction organization and progress management method based on BIM technology
  • Fabricated building construction organization and progress management method based on BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] This embodiment is based on BIM technology assembled building construction organization and progress management method, including the following steps:

[0025] (1) Establish an indicator system for construction organization and management influencing factors

[0026] The construction of assembly construction is divided into five stages: plant components prefabrication, plant components stack, component transport, construction area components, construction area components installation. Construction.

[0027] Establishing the factors system index system for assembled building construction organizations and management, establishing 19 indicators, a total of 19 indicators, including 19 indicators, including 19 indicators, including 19 indicators, including 19 metrics Table 1 shows. The influencing factors selected together constitute an indicator system to prepare for the implementation of construction organization and control.

[0028] Table 1 Influencing factors indicator sys...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a fabricated building construction organization and progress management method based on a BIM technology. The method comprises the steps: establishing an index system of construction organization and management influence factors; calculating weights of influence factors of construction organization and progress management; building a BIM model; and controlling the construction progress. According to the method, the BIM model is constructed, a building construction progress control framework is built, key points of construction progress control are analyzed, a real building engineering construction organization design scheme and key construction technologies are visually, statically and dynamically simulated, and scientific control over the prefabricated building construction progress can be achieved.

Description

Technical field [0001] The present invention relates to building construction methods, and more particularly to assembled building construction organizations and progress management methods based on BIM technology. Background technique [0002] Assembly architecture refers to the transfer of a large number of live operations in traditional construction methods to the factory, producing building components and accessories in factory (such as floor board, wall panel, stairs, balcony, etc.), transportation to the construction site, pass through Reliable connection is installed on site. However, the construction management of assembled buildings is different from traditional buildings. It is necessary to increase component production, build transport programs, component stacking programs, connection schemes, etc., including the construction site of the component production and construction and transportation options, not in construction site, pouring on-site construction There is a b...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/20G06T17/00
CPCG06F30/20G06T17/00
Inventor 高妍妍刘剑雄董云武精科李锦柱马跃红刘泽俊曹茂柏
Owner HUAIYIN INSTITUTE OF TECHNOLOGY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products