Novel scaffold for building construction and using method
A technology for building construction and scaffolding, which is applied to the accessories of scaffolding, construction, building structure, etc., can solve the problems of prolonging construction time, increasing the weight of scaffolding, complicated installation and disassembly, etc., and achieves simple height adjustment, reduced occupied area, practical high sex effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] like Figure 1 to Figure 8 As shown, the embodiment of the present invention provides a new type of scaffolding for building construction, which includes two supporting plates 1 arranged opposite each other, and two supporting legs 2 are oppositely arranged at the lower end of each supporting plate 1, and are installed between the two supporting plates 1 There is a support part, the support part includes a retractable support part, the two ends of the support part are respectively fixedly connected with the support plate 1, the top of the support part is detachably installed with a number of pedals 3, and an inlet 4 is opened near any support plate 1; There is a lifting part under the support, the lifting part includes a plurality of sets of lifting parts, and the lifting parts and the pedals 3 are arranged in a one-to-one correspondence, and the top of each set of lifting parts is detachably connected to the pedals 3 through a connecting piece; The parts are provided w...
Embodiment 2
[0055] like Figure 1 to Figure 7 As shown, two X-shaped reinforcement plates 20 are disposed between the two support plates 1 , and two ends of the X-shaped reinforcement plates 20 are respectively detachably connected to the legs 2 under the two support plates 1 . When the scaffold is in use, the X-shaped reinforcing plate 20 can be fixed between the two legs 2 , so as to improve the supporting effect of the pedal 3 .
Embodiment 3
[0057] like Figure 8 As shown, protective plates 21 are provided on both sides of the ladder plate, a protective plate 22 is installed at the top of the support plate 1, and the pedal 3 is located in the protective plate 22. By setting the protective plates 21, the safety of construction personnel when climbing is improved. By arranging the protective plate 22, the safety of the construction personnel during the construction process is improved.
[0058] like Figure 9 As shown, an embodiment of the present invention provides a method for using a novel scaffold for building construction, comprising the following steps:
[0059] In the first step, the outriggers 1 are opened, and after the long board 6 and the short board 7 are in the stretched position, the long board 6 and the short board 7 are fixed by adjusting bolts 9 .
[0060] The second step is to fix the support member and the ladder 5 in different positions, so that the support member corresponds to the position of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com