Through the design of drilling pile construction technology and device, the linkage of the ground main frame, hollow drill rod, outer drill barrel and inner drill is achieved by combining the detection camera and slag discharge pipeline, drilling, hole cleaning and pouring concrete is achieved. Construction solves the problem of incoordinated equipment operations and improves construction efficiency and quality.

CN118757082BInactive Publication Date: 2024-12-06CCCC (CHANGSHA) CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411224191.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The equipment operation is inconsistent in the existing drilling pile construction process, resulting in low construction efficiency, difficulty in achieving efficient coordination and equipment transfer, affecting the construction quality.

Method used

A drilling pile construction technology and corresponding construction device were designed. Through the linkage of the ground main frame, hollow drill rod, outer drill barrel and inner drill, combined with the detection camera and slag discharge pipeline, drilling, hole cleaning and pouring concrete The integrated construction uses linkage components and vibrating motors to improve drilling efficiency and concrete pouring quality.

Benefits of technology

It improves construction efficiency, ensures the perpendicularity of the drilling holes and the pouring quality of the concrete, reduces the equipment volume, reduces power consumption, and realizes the synchronous progress of drilling, hole cleaning, monitoring and pouring concrete.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118757082B_ABST
    Figure CN118757082B_ABST
Patent Text Reader

Abstract

The present invention provides a bored pile construction process and a construction device applied thereto, belonging to the technical field of drilling construction, including assembling a ground main frame, pulling a steel wire rope obliquely around the ground main frame, reinforcing the ground main frame, starting a second driving device on the ground main frame to drive a hollow drill rod to move vertically downward, and simultaneously starting a first driving device to drive an outer drill tube and an inner drill on a drill seat at the lower end of the hollow drill rod to rotate and drill holes, passing water through nozzles around the drill seat so that water is continuously ejected from the nozzles, and simultaneously starting detection cameras around the drill seat to take pictures, cleaning a slag discharge pipe and a hollow drill rod, moving the drill seat to the bottom of the bored pile hole, and connecting cement mortar at the end of the slag discharge pipe so that the cement mortar passes from the hollow drill rod and the inner drill into the bored pile hole, and using the reverse rotation vibration of the outer drill tube and the inner drill to vibrate and compact the cement mortar until the bored pile hole is filled with the cement mortar, thereby completing the construction of the bored pile. The present invention can greatly improve the construction efficiency and construction quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of drilling construction, and in particular to a bored pile construction process and a construction device applied to the process. Background Art

[0002] With the increasing complexity of construction projects and the continuous improvement of the safety and reliability of infrastructure, the requirements for the construction process have become more stringent. At present, the bored pile construction process usually involves a variety of equipment, such as drilling rigs, mud circulation systems, grouting equipment, compaction equipment and monitoring equipment. However, the use of these equipment requires different construction personnel to perform precise operations according to different steps. It is difficult for construction personnel to achieve efficient operation coordination. The transfer and placement of different equipment also requires a lot of time, resulting in low construction efficiency. Therefore, how to optimize the bored pile construction process and equipment operation to improve construction efficiency and quality has become an urgent problem to be solved. Summary of the invention

[0003] The purpose of the present invention is to provide a bored pile construction process and a construction device applied to the process, which can greatly improve the construction efficiency and construction quality.

[0004] In a first aspect, an embodiment of the present invention is implemented by the following technical solution: a bored pile construction process, comprising:

[0005] S1: Assemble the ground main frame at the bored pile construction site after leveling. After the ground main frame is assembled, pull the steel wire rope obliquely around the ground main frame, fix the anchor rod at the end of the steel wire rope, and insert the anchor rod into the ground to reinforce the ground main frame;

[0006] S2: Start the second driving device on the ground main frame to drive the hollow drill rod to move vertically downward, and at the same time start the first driving device to drive the outer drill barrel and the inner drill on the drill seat at the lower end of the hollow drill rod to rotate, so that the drill cutters on the outer drill barrel and the inner drill rotate to drill holes;

[0007] S3: passing water through the nozzles around the drill seat so that water is continuously sprayed out from the nozzles, and at the same time starting the detection cameras around the drill seat to take pictures;

[0008] S4: Connect the slag discharge pipe to the upper end of the hollow drill pipe and start the sewage pump to extract the slag liquid;

[0009] S5: After the bored pile is drilled to the designed depth, the bored pile hole is cleaned with water sprayed from the nozzles around the drill seat. During this period, the video recording transmitted to the external monitor by the detection camera is also used to judge whether the inside of the bored hole is qualified. When it is determined that the hole cleaning is completed and the hole is qualified, the first driving device is turned off to stop the rotation of the outer drill tube and the inner drill, and then the second driving device is started to drive the hollow drill rod to move vertically upward, so that the outer drill tube and the inner drill are moved to the outside of the bored pile hole;

[0010] S6: Move the main frame on the ground and use a crane to put the steel cage into the bored pile hole;

[0011] S7: Move the ground main frame to the location of the bored pile hole and use wire ropes and anchors to reinforce it again. Then disassemble and replace the drill seat, outer drill tube and inner drill as a whole with a smaller size. The outer drill tube and inner drill on the drill seat must be located directly above the hole of the bored pile.

[0012] S8: cleaning the slag discharge pipe and the hollow drill rod, moving the drill seat to the bottom of the bored pile hole, and connecting cement mortar to the end of the slag discharge pipe, so that the cement mortar passes through the hollow drill rod and the inner drill into the bored pile hole, during which the second driving device is started to drive the hollow drill rod, the outer drill barrel and the inner drill to gradually move upward, and the cement mortar is vibrated and compacted by the reverse rotation vibration of the outer drill barrel and the inner drill until the cement mortar fills the bored pile hole;

[0013] S9: After the cement mortar hardens, the construction of bored piles is completed.

[0014] In a second aspect, an embodiment of the present invention is implemented through the following technical solutions: a construction device applied to a bored pile construction process, wherein the first driving device comprises a drilling motor and a linkage assembly, the outer drill barrel is located below the drill seat and is coaxially rotatably arranged on the drill seat, the drill seat is hollow, and the two ends of the drill seat along its own diameter direction are respectively connected to the hollow drill rod and the outer drill barrel, the hollow drill rod and the drill seat are detachably connected to each other, the inner drill is located inside the outer drill barrel, and a plurality of drill bits of the inner drill are evenly arranged along the circumference of the rotating shaft of the drilling motor and extend out of the outer drill barrel, and at the same time, one end of the drill bits of all the inner drills is fixedly arranged on the rotating shaft of the drilling motor, and the drill bits of all the inner drills are divergent as a whole, and the drill bits of each inner drill are spirally arranged as a whole along the diameter direction of the drill seat, the bottom of the drill bit of the inner drill is in the shape of a cutting edge, and the drilling motor is coaxially arranged in the cavity of the outer drill barrel, and the linkage assembly is used to drive the outer drill barrel to rotate in the opposite direction when the drilling motor drives the drill bit of the inner drill to rotate.

[0015] Furthermore, the linkage assembly includes a first gear, a second gear and an inner gear ring, the first gear is coaxially fixed on the rotating shaft of the drilling motor, an extension rod is fixed in the cavity of the outer drill barrel, the second gear is rotatably set on the extension rod, the second gear is meshed with the first gear, and the inner gear ring is coaxially fixed on the inner wall of the outer drill barrel, and the second gear is meshed with the inner gear ring.

[0016] Furthermore, a vibration motor is fixedly arranged above the shell of the drilling motor, and a protective shell is provided on the vibration motor and the drilling motor at the same time. The two ends of the protective shell along the diameter direction of the drill seat are in a pointed cone shape, and a plurality of brackets are evenly and fixedly arranged on the circumference of the protective shell. The two end walls of the bracket along the diameter direction of the drill seat are in a protruding pointed shape, and the inner wall of the cavity of the drill seat is provided with a plurality of guide grooves along its own diameter direction, and the bracket is slidably connected in the guide groove, and return springs are fixedly arranged above and below one end of the bracket located in the guide groove, and the two return springs are respectively fixedly connected to the inner wall of the guide groove, and a protective ring is slidably arranged in the cavity of the drill seat, and the protective ring abuts against the inner wall of the cavity of the drill seat, and the brackets are all penetrated on the protective ring.

[0017] Furthermore, an iron plate is fixedly provided at one end of each bracket located in the guide groove, and an electromagnet is fixedly provided at the bottom wall position of each guide groove along the diameter direction of the drill seat.

[0018] Furthermore, the second gear is rotatably connected to the extension rod via a rotating shaft, a stirring rod is fixedly arranged on the rotating shaft of the second gear, the stirring rod is arranged in an inclined manner, and both ends of the stirring rod are arranged in a pointed cone shape.

[0019] Furthermore, a plurality of dividing edges are fixedly provided on the inner arc surface of the drill bit of the inner drill, the dividing edges on each of the drill bits are distributed at intervals, and the dividing edges are arranged along the diameter direction of the drill seat.

[0020] Furthermore, the second driving device includes a shaft, a lifting gear, a worm wheel, a worm, a box shell and a lifting motor. A gear rack is fixedly arranged on the ground main frame, the shaft is rotatably connected to the gear rack, the lifting gear is coaxially fixedly connected to the shaft, the hollow drill rod is provided with tooth grooves along the length direction, the lifting gear and the tooth grooves are meshed with each other, the worm wheel is coaxially fixedly connected to the shaft, the worm is rotatably connected in the box shell, the box shell is fixedly connected to the ground main frame, the worm wheel and the worm are meshed with each other and are simultaneously located in the box shell, the lifting motor is fixedly connected to the box shell, and the rotating shaft of the lifting motor is coaxially fixedly connected to the worm.

[0021] Furthermore, a clamp is provided on the hollow drill rod, and the clamp is fixedly connected to the hollow drill rod by screws, and a plurality of cylinders are fixedly provided circumferentially of the clamp, and the cylinder body of the cylinder is fixedly connected to the clamp, and an arc-shaped support plate is fixedly connected to the piston rod of the cylinder, and the arc-shaped support plate is used to abut against the side wall of the pile hole of the bored pile, and a plurality of balls are rotatably embedded in the outer wall of the arc-shaped support plate, and an inwardly contracted guide surface is provided on the side of the arc-shaped support plate close to the bottom wall of the pile hole of the bored pile.

[0022] Furthermore, the hollow drill rod is arranged in multiple sections spliced ​​together, and each adjacent section of the hollow drill rod is respectively provided with an insert block and a slot, the insert block and the slot are plugged into and matched with each other, and each adjacent section of the hollow drill rod is fastened to the insert block in the slot by a screw thread.

[0023] The technical solution of the embodiment of the present invention has at least the following advantages and beneficial effects:

[0024] 1. The present invention drives the hollow drill rod to move vertically downward by the second driving device, and starts the first driving device to drive the outer drill barrel and the inner drill on the drill seat at the lower end of the hollow drill rod to rotate and drill a hole. At the same time, after the bored pile is drilled to the designed depth, the bored pile hole is cleaned by water sprayed from the nozzles around the drill seat. During this period, it is also necessary to use the video recording of the external display transmitted to the outside by the detection camera to judge whether the inside of the borehole is qualified. Then, cement mortar is connected to the end of the slag discharge pipe to allow the cement mortar to pass from the hollow drill rod and the inner drill into the bored pile hole. During this period, the second driving device is started to drive the hollow drill rod, the outer drill barrel and the inner drill to gradually move upward, and the reverse rotation vibration of the outer drill barrel and the inner drill is used to vibrate and compact the cement mortar until the cement mortar fills the bored pile hole, thereby realizing the integrated construction of drilling, hole cleaning, monitoring and concrete pouring, improving the construction efficiency, ensuring the verticality of the borehole, and ensuring the pouring quality of the concrete.

[0025] 2. The present invention sets a spiral shape for the drill bit of the inner drill so that the drill bit of the inner drill can stir the slag and discharge it from the hollow drill rod and the slag discharge pipe while drilling, thereby realizing the integrated construction of slag discharge and drilling and reducing the volume of the construction equipment. The reversal of the drill bit of the outer drill barrel and the inner drill can improve the drilling efficiency. The drilling motor is installed in the drill seat to reduce power consumption and directly apply the output power of the drilling motor to the drilling hole. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0027] Figure 1 A schematic diagram of the overall structure of the bored pile construction process provided by the present invention and a construction device applied to the process;

[0028] Figure 2 This is a schematic diagram of the three-dimensional structure of the construction device used to demonstrate the process of the present invention;

[0029] Figure 3 It is a structural schematic diagram of the drill base and the outer drill barrel of the present invention;

[0030] Figure 4 This is a schematic diagram of the internal structure of the drill base and the outer drill barrel of the present invention;

[0031] Figure 5 This is a schematic diagram of the structure of the present invention for displaying the linkage assembly and the inner drill;

[0032] Figure 6 It is a structural schematic diagram of the present invention for displaying the cylinder, the arc support plate and the insert block and the slot of the hollow drill rod;

[0033] Figure 7 This is an exploded view of the present invention for showing the second driving device, the connecting head and the slag discharge pipe.

[0034] Icons: 1-ground main frame, 10-guide cylinder, 11-wire rope, 12-anchor rod, 2-first drive device, 21-drilling motor, 22-linkage assembly, 221-first gear, 222-second gear, 2221-extension rod, 2222-stirring rod, 223-inner gear ring, 3-drill seat, 31-nozzle, 311-water pipe joint, 32-detection camera, 33-guide groove, 331-reset spring, 34-iron plate, 35-electromagnet, 36-protection ring, 4-outer drill tube, 41-inner Drill, 411-drilling tool, 4211-dividing blade, 43-vibration motor, 44-protective shell, 45-bracket, 5-hollow drill rod, 50-tooth groove, 51-insert block, 52-slot, 53-slag discharge pipe, 54-connecting head, 6-second driving device, 61-worm gear, 62-worm, 63-lifting motor, 64-lifting gear, 65-shaft rod, 66-gear rack, 67-box shell, 7-clamp, 71-cylinder, 72-arc support plate, 73-ball, 74-retracted guide surface, 8-screw. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0036] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Example

[0037] The present invention is further described below in conjunction with specific embodiments. It is a bored pile construction process, comprising:

[0038] S1: Assemble the ground main frame 1 at the bored pile construction site after leveling. After the ground main frame 1 is assembled, pull the steel wire rope 11 diagonally around the ground main frame 1, fix the anchor rod 12 at the end of the steel wire rope 11, and insert the anchor rod 12 into the ground to reinforce the ground main frame 1;

[0039] S2: Start the second driving device 6 on the ground main frame 1 to drive the hollow drill rod 5 to move vertically downward, and start the first driving device 2 to drive the outer drill barrel 4 and the inner drill 41 on the drill seat 3 at the lower end of the hollow drill rod 5 to rotate, so that the drill cutter 411 on the outer drill barrel 4 and the inner drill 41 rotates to drill holes;

[0040] S3: passing water through the nozzles 31 around the drill seat 3 so that water is continuously sprayed out from the nozzles 31, and at the same time starting the detection cameras 32 around the drill seat 3 to take pictures;

[0041] S4: Connect the slag discharge pipe 53 to the upper end of the hollow drill rod 5, and start the sewage pump to extract the slag liquid;

[0042] S5: After the bored pile is drilled to the designed depth, the bored pile hole is cleaned by water sprayed from the nozzles 31 around the drill seat 3. During this period, the video recording transmitted to the external display by the detection camera 32 is also used to judge whether the inside of the bored hole is qualified. When it is determined that the drilling hole is cleaned and the drilling hole is qualified, the first driving device 2 is turned off to stop the rotation of the outer drill tube 4 and the inner drill 41, and then the second driving device 6 is started to drive the hollow drill rod 5 to move vertically upward, so that the outer drill tube 4 and the inner drill 41 are moved to the outside of the bored pile hole;

[0043] S6: Move the ground main frame 1 and place the steel cage into the bored pile hole using a crane;

[0044] S7: Move the ground main frame 1 to the bored pile hole point, and use the wire rope 11 and anchor rod 12 to reinforce it again, and then disassemble and replace the smaller drill seat 3, the outer drill tube 4 and the inner drill 41 as a whole. The outer drill tube 4 and the inner drill 41 on the drill seat 3 must be located just above the hole of the bored pile;

[0045] S8: Clean the slag discharge pipe 53 and the hollow drill rod 5, move the drill seat 3 to the bottom of the bored pile hole, and connect cement mortar to the end of the slag discharge pipe 53, so that the cement mortar passes from the hollow drill rod 5 and the inner drill 41 into the bored pile hole, during which the second driving device 6 is started to drive the hollow drill rod 5, the outer drill tube 4 and the inner drill 41 to gradually move upward, and use the reverse rotation vibration of the outer drill tube 4 and the inner drill 41 to vibrate and compact the cement mortar until the cement mortar fills the bored pile hole;

[0046] S9: After the cement mortar hardens, the construction of bored piles is completed.

[0047] This process realizes the integrated construction of drilling, hole cleaning, monitoring, concrete pouring and concrete compaction, which improves the construction efficiency, ensures the verticality of the drill hole and ensures the quality of concrete pouring.

[0048] In addition, refer to Figure 1-Figure 7 As shown, a construction device used in bored pile construction technology includes a ground main frame 1, a hollow drill rod 5, a drill seat 3, an outer drill tube 4 and an inner drill 41. A plurality of traveling wheels can be fixedly installed under the frame of the ground main frame 1. The traveling wheels can provide traveling power through a motor to facilitate the traveling, positioning and control of the ground main frame 1. The hollow drill rod 5 is a square rod and is vertically slidably installed on the ground main frame 1. A guide cylinder 10 is vertically welded to the bottom wall of the ground main frame 1. The hollow drill rod 5 is slidably penetrated on the guide cylinder 10 to guide and limit the hollow drill rod 5.

[0049] Reference Figure 3 , Figure 4 The outer drill tube 4 is located below the drill seat 3 and is coaxially rotatably mounted on the drill seat 3. A clamping edge is integrally formed on the top of the outer drill tube 4, which is rotatably connected to the drill seat 3 by the clamping edge of the outer drill tube 4 to prevent the outer drill tube 4 from falling off the drill seat 3. The drill seat 3 is hollow, and the two ends of the drill seat 3 along its own diameter direction are respectively connected to the hollow drill rod 5 and the outer drill tube 4. The hollow drill rod 5 and the drill seat 3 are detachably connected to each other through a flange, and then locked and fixed with screws 8 to facilitate replacement of drill seats 3 of different models. The inner drill 41 is located inside the outer drill tube 4. The inner drill 41 includes a drill cutter 411 of the inner drill 41. A plurality of drill cutters 411 of the inner drill 41 are evenly installed along the circumference of the rotating shaft of the drilling motor 21 and extend out of the outer drill tube 4. At the same time, one end of the drill cutters 411 of all the inner drills 41 is fixedly welded to the rotating shaft of the drilling motor 21, and all the inner The drill bit 411 of the drill 41 is divergent as a whole, and the drill bits 411 of all inner drills 41 are convexly arranged on one side close to the center of the rotating shaft of the drilling motor 21. The drill bits 411 of all inner drills 41 are shaped like a pointed cone to facilitate drilling positioning. The drill bit 411 of each inner drill 41 is spirally arranged along the diameter direction of the drill seat 3 as a whole, and the bottom of the drill bit 411 of the inner drill 41 is in the shape of a cutting edge. A plurality of dividing blades 4211 are fixedly welded on the inner arc surface of the drill bit 411 of the inner drill 41, and the dividing blades 4211 on each drill bit 411 are distributed at intervals, and the dividing blades 4211 are arranged along the diameter direction of the drill seat 3. The dividing blades 4211 can play a role in dividing slag and at the same time can improve the overall strength of the drill bit 411 of the inner drill 41, and the drilling motor 21 is coaxially installed in the cavity of the outer drill barrel 4, and the linkage assembly 22 is used to drive the outer drill barrel 4 to rotate in the reverse direction when the drilling motor 21 drives the drill bit 411 of the inner drill 41 to rotate.

[0050] Reference Figure 4 , Figure 5The linkage assembly 22 includes a first gear 221, a second gear 222 and an inner gear ring 223. The first gear 221 is coaxially fixedly welded on the rotating shaft of the drilling motor 21. An extension rod 2221 is fixedly welded in the cavity of the outer drill tube 4. The second gear 222 is rotatably mounted on the extension rod 2221. A pair of the second gear 222 and the extension rod 2221 are installed and are located on both sides of the first gear 221. The length of the first gear 221 is greater than the length of the second gear 222. The second gear 222 and the first gear 221 are meshed with each other. The inner gear ring 223 is coaxially fixedly welded on the inner wall of the outer drill tube 4. The second gear 222 and the inner gear ring 223 are meshed with each other. When the drilling motor 21 rotates forward, it will drive the first gear The wheel 221 and the second gear 222 rotate, and drive the inner gear ring 223 and the outer drill tube 4 to reverse, so as to improve the drilling efficiency of the drill 411. The second gear 222 is rotatably connected to the extension rod 2221 through the rotating shaft. A stirring rod 2222 is fixedly welded on the rotating shaft of the second gear 222. Two stirring rods 2222 are welded on the rotating shaft of each second gear 222. The stirring rod 2222 is inclined, and the two ends of the stirring rod 2222 are cone-shaped. The stirring rod 2222 can crush the slag and facilitate the slag to enter the hollow drill rod 5. At the same time, the second gear 222 is far away from the center and has a plurality of through holes along its own circumference. The upper and lower sides of the through holes are flared to facilitate the passage of slag or cement mortar.

[0051] Reference Figure 3 , Figure 4A vibration motor 43 is fixedly installed above the shell of the drilling motor 21. A protective shell 44 is provided on the vibration motor 43 and the drilling motor 21 at the same time. The protective shell 44 has pointed cones at both ends along the diameter direction of the drill seat 3. The pointed cone-shaped protective shell 44 can facilitate the passage of slag or cement mortar, wherein a plurality of brackets 45 are uniformly fixedly welded around the circumference of the protective shell 44. In this embodiment, four brackets 45 are installed around the circumference of the protective shell 44, and the two end walls of the bracket 45 along the diameter direction of the drill seat 3 are protruding and pointed. The inner wall of the cavity of the drill seat 3 is provided with a plurality of guide grooves 33 along its own diameter direction. The bracket 45 is slidably connected in the guide groove 33. A return spring 331 is fixedly installed above and below one end of the bracket 45 located in the guide groove 33. The return spring 331 is selected from a strong spring to ensure that the return spring 331 is stable and stable. To prevent the drill bit 411 of the inner drill 41 from retracting after being subjected to external force, the return springs 331 on both sides are respectively fixedly welded on the inner wall of the guide groove 33 and fixedly welded to the bracket 45. At the same time, a protective ring 36 is slidably installed in the cavity of the drill seat 3, and the protective ring 36 abuts against the inner wall of the cavity of the drill seat 3. The brackets 45 are all penetrated on the protective ring 36. The protective ring 36 can prevent slag or cement mortar from entering the guide groove 33. Each bracket 45 is fixedly installed with an iron plate 34 at one end located in the guide groove 33, and an electromagnet 35 is fixedly installed at the bottom wall position of each guide groove 33 along the diameter direction of the drill seat 3. By energizing the electromagnet 35 to attract the iron plate 34, the drill bit 411 of the inner drill 41 can be vibrated up and down or moved slightly, so that the drill bit 411 of the inner drill 41 can be more easily broken stone drilling.

[0052] Reference Figure 2 , Figure 7 , the second driving device 6 is installed with two groups and is located on both sides of the hollow drill rod 5 to improve the stability of driving the hollow drill rod 5 to rise or fall. The second driving devices 6 on both sides of the hollow drill rod 5 include a shaft 65, a lifting gear 64, a worm wheel 61, a worm 62, a box shell 67 and a lifting motor 63. A gear frame 66 is fixedly welded on the ground main frame 1, and the shaft 65 is rotatably connected to the gear frame 66. The lifting gear 64 and the shaft 65 are coaxially fixedly welded together. The hollow drill rod 5 is provided with a tooth groove 50 along the length direction. The tooth groove 50 is located on both sides of the hollow drill rod 5. The lifting gear 64 is meshed with the tooth groove 50. The worm wheel 61 is coaxially fixedly connected to On the shaft 65, the worm 62 is rotatably connected in the box shell 67, and the box shell 67 is fixedly welded on the ground main frame 1. The worm wheel 61 and the worm 62 are meshed with each other and are located in the box shell 67 at the same time. The lifting motor 63 is fixedly connected to the box shell 67 by bolts, and the rotating shaft of the lifting motor 63 is coaxially fixedly connected with the worm 62. Starting the lifting motor 63 can drive the worm 62 and the worm wheel 61 to rotate, and drive the lifting gear 64 to rotate, so that the hollow drill rod 5 moves up or down. Since the worm wheel 61 and the worm 62 have a self-locking function, after the lifting motor 63 stops rotating, the position of the hollow drill rod 5 and the drill seat 3 can be automatically fixed.

[0053] Reference Figure 2 , Figure 6 In order to keep the hollow drill rod 5 moving vertically and prevent the drilling position from shifting, according to the length of the hollow drill rod 5 moving downward, a plurality of clamps 7 can be provided on the hollow drill rod 5, and the clamps 7 are fixedly connected to the hollow drill rod 5 by screws 8, and a plurality of cylinders 71 are fixedly installed around the clamps 7. In this embodiment, four cylinders 71 are installed around the clamps 7, and the cylinder body of the cylinder 71 is fixedly connected to the clamps 7. An arc support plate 72 is fixedly connected to the piston rod of the cylinder 71. The arc support plate 72 is used to abut against the side wall of the pile hole of the bored pile. A plurality of balls 73 are rotatably embedded on the outer wall of the arc support plate 72. The arc support plate 72 is integrally formed with an inwardly contracted guide surface 74 near the bottom wall of the pile hole of the bored pile. The arc support plate 72 abuts against the side wall of the pile hole of the bored pile through the expansion and contraction of the cylinder 71, thereby ensuring that the hollow drill rod 5 keeps moving vertically, wherein the balls 73 can make the hollow drill rod 5 slide down normally along the borehole.

[0054] Reference Figure 6 In order to facilitate the disassembly and installation of the hollow drill rod 5 and improve the adaptability of the drilling depth, the hollow drill rod 5 is arranged in multiple sections and spliced ​​with each other. Each adjacent section of the hollow drill rod 5 is respectively provided with an insert block 51 and a slot 52. The insert block 51 is square, and the insert block 51 and the slot 52 are plugged into each other. Each adjacent section of the hollow drill rod 5 is threadedly fastened with a screw 8 to the insert block 51 in the slot 52.

[0055] Reference Figure 2 , Figure 3 A water pipe joint 311 is fixedly installed on the top wall of the drill base 3, and the water pipe joint 311 is connected to the nozzle 31 through the water channel on the inner wall of the drill base 3. After the hose is connected to the water pipe joint 311, water can be sprayed out smoothly and quickly from the nozzle 31, and a plurality of detection cameras 32 are also fixedly embedded around the drill base 3 to facilitate image detection of the bored pile hole. The data cable of the external display on the ground is connected to the plurality of detection cameras 32, and the operator can observe the pictures taken in the borehole through the external display, so as to make comparative observations to check whether the borehole is qualified.

[0056] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A bored pile construction process, Features: The invention comprises a bored pile construction device, the bored pile construction device comprises a ground main frame (1), a first drive device (2), a second drive device (6) and a detection camera (32), and the bored pile construction process comprises the following construction steps: S1: Assembling a ground main frame (1) at a leveled bored pile construction site. After the ground main frame (1) is assembled, a steel wire rope (11) is obliquely pulled along the four sides of the ground main frame (1), and an anchor rod (12) is fixed to the end of the steel wire rope (11). The anchor rod (12) is inserted into the ground to reinforce the ground main frame (1); S2: starting the second driving device (6) on the ground main frame (1) to drive the hollow drill rod (5) to move vertically downward, and at the same time starting the first driving device (2) to drive the outer drill tube (4) and the inner drill (41) on the drill seat (3) at the lower end of the hollow drill rod (5) to rotate, thereby causing the drill bits (411) on the outer drill tube (4) and the inner drill (41) to rotate and drill holes; S3: passing water through the nozzles (31) around the drill seat (3) so that water is continuously ejected from the nozzles (31), and at the same time starting the detection cameras (32) around the drill seat (3) to take pictures; S4: Connecting the slag discharge pipe (53) to the upper end of the hollow drill rod (5), and starting the sewage pump to extract the slag liquid; S5: After the bored pile is drilled to the designed depth, the bored pile hole is cleaned by using water sprayed from the nozzles (31) around the drill seat (3). During this process, it is also necessary to use the video recording transmitted to the external display by the detection camera (32) to judge whether the inside of the bored hole is qualified. When it is determined that the hole cleaning is completed and the hole is qualified, the first driving device (2) is turned off to stop the rotation of the outer drill tube (4) and the inner drill (41), and then the second driving device (6) is started to drive the hollow drill rod (5) to move vertically upward, so that the outer drill tube (4) and the inner drill (41) are moved to the outside of the bored pile hole; S6: Move the ground main frame (1) and place the steel cage into the bored pile hole using a crane; S7: Move the ground main frame (1) to the location of the bored pile hole, and use the wire rope (11) and anchor rod (12) to reinforce it again, and then disassemble and replace the drill seat (3), the outer drill tube (4) and the inner drill (41) of a smaller size as a whole. The outer drill tube (4) and the inner drill (41) on the drill seat (3) must be located directly above the hole of the bored pile; S8: cleaning the slag discharge pipe (53) and the hollow drill rod (5), moving the drill seat (3) to the bottom of the bored pile hole, and connecting cement mortar to the end of the slag discharge pipe (53) so that the cement mortar passes through the hollow drill rod (5) and the inner drill (41) into the bored pile hole. During this period, the second driving device (6) is started to drive the hollow drill rod (5), the outer drill tube (4) and the inner drill (41) to gradually move upward, and the cement mortar is vibrated and compacted by the reverse rotation vibration of the outer drill tube (4) and the inner drill (41) until the cement mortar fills the bored pile hole; S9: After the cement mortar hardens, the construction of bored piles is completed.

2. The bored pile construction process according to claim 1, Features: The first driving device (2) comprises a drilling motor (21) and a linkage assembly (22); the outer drill tube (4) is located below the drill seat (3) and is coaxially rotatably arranged on the drill seat (3); the drill seat (3) is hollow, and the two ends of the drill seat (3) along its own diameter direction are respectively connected to the hollow drill rod (5) and the outer drill tube (4); the hollow drill rod (5) and the drill seat (3) are detachably connected to each other; the inner drill (41) is located inside the outer drill tube (4); and a plurality of drill bits (411) of the inner drill (41) are evenly arranged along the circumference of the rotating shaft of the drilling motor (21) and extend out of the outer drill tube (4). At the same time, one end of the drill bit (411) of all the inner drills (41) is fixedly arranged on the rotating shaft of the drilling motor (21), and the drill bits (411) of all the inner drills (41) are divergent as a whole. The drill bit (411) of each inner drill (41) is spirally arranged along the diameter direction of the drill seat (3), and the bottom of the drill bit (411) of the inner drill (41) is in the shape of a cutting edge. The drilling motor (21) is coaxially arranged in the cavity of the outer drill barrel (4), and the linkage component (22) is used to drive the outer drill barrel (4) to rotate in the opposite direction when the drilling motor (21) drives the drill bit (411) of the inner drill (41) to rotate.

3. The bored pile construction process as claimed in claim 2, Features: The linkage assembly (22) comprises a first gear (221), a second gear (222) and an inner gear ring (223); the first gear (221) is coaxially fixedly arranged on the rotating shaft of the drilling motor (21); an extension rod (2221) is fixedly arranged in the cavity of the outer drill tube (4); the second gear (222) is rotatably arranged on the extension rod (2221); the second gear (222) and the first gear (221) are meshed with each other; the inner gear ring (223) is coaxially fixedly arranged on the inner wall of the outer drill tube (4); the second gear (222) and the inner gear ring (223) are meshed with each other.

4. The bored pile construction process as claimed in claim 3, Features: A vibration motor (43) is fixedly arranged above the housing of the drilling motor (21), and a protective shell (44) is simultaneously provided on the vibration motor (43) and the drilling motor (21), and the protective shell (44) is in a pointed cone shape at both ends along the diameter direction of the drill seat (3), and a plurality of brackets (45) are evenly fixedly arranged around the circumference of the protective shell (44), and the two end walls of the brackets (45) along the diameter direction of the drill seat (3) are in a protruding pointed shape, and the inner wall of the cavity of the drill seat (3) is provided with a plurality of The guide groove (33) is provided with a support (45) which is slidably connected in the guide groove (33). Return springs (331) are fixedly arranged above and below one end of the support (45) located in the guide groove (33). The two return springs (331) are respectively fixedly connected to the inner wall of the guide groove (33). Meanwhile, a protective ring (36) is slidably arranged in the cavity of the drill seat (3). The protective ring (36) abuts against the inner wall of the cavity of the drill seat (3). The support (45) is penetrated through the protective ring (36).

5. The bored pile construction process as claimed in claim 4, Features: An iron plate (34) is fixedly provided at one end of each bracket (45) located in the guide groove (33), and an electromagnet (35) is fixedly provided at the bottom wall position of each guide groove (33) along the diameter direction of the drill seat (3).

6. The bored pile construction process as claimed in claim 3, Features: The second gear (222) is rotatably connected to the extension rod (2221) via a rotating shaft, and a stirring rod (2222) is fixedly arranged on the rotating shaft of the second gear (222). The stirring rod (2222) is arranged in an inclined manner, and both ends of the stirring rod (2222) are arranged in a pointed cone shape.

7. The bored pile construction process as claimed in claim 2, Features: A plurality of dividing edges (4211) are fixedly arranged on the inner arc surface of the drill bit (411) of the inner drill (41), the dividing edges (4211) on each of the drill bits (411) are distributed at intervals, and the dividing edges (4211) are arranged along the diameter direction of the drill seat (3).

8. The bored pile construction process as claimed in claim 2, Features: The second driving device (6) comprises a shaft (65), a lifting gear (64), a worm wheel (61), a worm (62), a housing (67) and a lifting motor (63); a gear rack (66) is fixedly arranged on the ground main frame (1); the shaft (65) is rotatably connected to the gear rack (66); the lifting gear (64) is coaxially fixedly connected to the shaft (65); a tooth groove (50) is provided along the length direction of the hollow drill rod (5); the lifting gear (64) is connected to the shaft (65) and the lifting gear (64) is connected to the shaft (65) and the lifting gear (64) is connected to the shaft (65) and the lifting gear (64) is connected to the shaft (65) and the lifting gear (66) is connected to the shaft (65) and the lifting gear (64) is connected to the shaft (65) and the lifting gear (66) is connected to the shaft (65) and the lifting gear (64) is connected to the shaft (65) and the lifting gear (66) is connected to the shaft (65) and the lifting gear (66) is connected to the shaft (65) and the lifting gear (64) is connected to the shaft (65) and the lifting gear (66) is connected to the shaft (65) and the lifting gear (66) is connected to the shaft (65) and the lifting gear (66) is connected to the shaft (66) and the lifting gear (64) is connected to the shaft (6 ... The tooth grooves (50) are meshed with each other, the worm wheel (61) is coaxially fixedly connected to the shaft (65), the worm (62) is rotatably connected in the box shell (67), the box shell (67) is fixedly connected to the ground main frame (1), the worm wheel (61) and the worm (62) are meshed with each other and are simultaneously located in the box shell (67), the lifting motor (63) is fixedly connected to the box shell (67), and the rotating shaft of the lifting motor (63) is coaxially fixedly connected to the worm (62).

9. The bored pile construction process as claimed in claim 2, Features: The hollow drill rod (5) is hooped with a clamp (7), and the clamp (7) is fixedly connected to the hollow drill rod (5) by means of screws (8). A plurality of cylinders (71) are fixedly arranged around the clamp (7), and the cylinder bodies of the cylinders (71) are fixedly connected to the clamp (7). An arc-shaped support plate (72) is fixedly connected to the piston rods of the cylinders (71), and the arc-shaped support plate (72) is used to abut against the side wall of the pile hole of the bored pile. A plurality of balls (73) are rotatably embedded on the outer wall of the arc-shaped support plate (72), and an inwardly contracted guide surface (74) is arranged on one side of the arc-shaped support plate (72) close to the bottom wall of the pile hole of the bored pile.

10. The bored pile construction process according to claim 2, Features: The hollow drill rod (5) is provided in multiple sections connected to each other, and each adjacent section of the hollow drill rod (5) is provided with an insert block (51) and a slot (52), respectively. The insert block (51) and the slot (52) are plugged and matched with each other, and each adjacent section of the hollow drill rod (5) is threadedly fastened with a screw (8) to fasten the insert block (51) into the slot (52).