Construction method of science and technology tree structure
Through the implementation of the scientific and technological tree structure construction method, including the installation of embedded sections, facade grid shells, top roofs and cantilever beams, the repeated construction of each section is achieved by using scaffolding and hoisting, which solves the complexity and efficiency of the existing construction process. The problem of low construction efficiency significantly improves construction flow and simplifies the process.
Patent Information
- Application Number
- CN202411359861.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure CN119041574A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of building construction technology, and in particular, relates to a technology tree structure construction method. Background Art
[0002] The Science and Technology Tree building has a safety grade of Level 2, a design service life of 50 years, a fire resistance grade of Level 1, and a seismic resistance grade of Level 3. The foundation is a pile foundation, the Science and Technology Tree adopts a steel cross-shell structure, and the roof adopts a steel frame structure.
[0003] like Figure 1 As shown, the technology tree structure can be divided into four parts according to its appearance, position and function: ① top grid shell roof structure; ② facade grid shell structure; ③ steel beam frame; ④ embedded section. Among them, the side facade steel structure is composed of horizontal Wei pipes (arc steel pipes) and longitudinal Wei pipes (arc steel pipes), and the bottom is connected to the lower concrete structure with steel columns.
[0004] The existing construction process is complex and the construction efficiency is low. Therefore, there is an urgent need for a high-efficiency construction method. Summary of the invention
[0005] The purpose of this application is to overcome the problems of complex process and low construction efficiency in the prior art, and to disclose a technology tree structure construction method.
[0006] The purpose of this application is achieved through the following technical solutions:
[0007] A technology tree structure construction method, the technology tree structure construction method comprising the following steps:
[0008] S1: Installation of embedded parts in the embedded section;
[0009] S2: Installation of each segment of the facade lattice shell structure and the steel beams in the corresponding segment;
[0010] S3: Installation of top gridshell roof structure: The roof is divided into several unit blocks and patching sections, which are installed symmetrically from the center to the surrounding areas;
[0011] S4: Cantilever beam installation steps: install the cantilever beam from the side close to the floor, and first install the cantilever beam close to the main structure of the technology tree, and finally install the side beam;
[0012] S5: After the roof membrane structure construction is completed and the water is cut off, the scaffolding is used to carry out the construction of the technology tree steel structure fire retardant coating, putty and topcoat.
[0013] According to a preferred embodiment, in step S2, before installing each segment of the facade grid shell structure, the outer ring scaffolding is first erected, and then the components of the corresponding segments are hoisted, and after the hoisting is completed, the inner ring scaffolding is erected, and then fine-tuning and welding are started.
[0014] According to a preferred embodiment, each segment component of the facade lattice shell structure is a cross-shaped structure.
[0015] According to a preferred embodiment, in step S2, after the installation of the components of the corresponding segment of the facade lattice shell structure is completed, the layered steel beams within the segment are installed.
[0016] According to a preferred embodiment, in step S2, the working platform is made of wooden slats or steel gangplanks.
[0017] According to a preferred embodiment, in step S2, a horizontal net is set at the lower part of the working area, and the range is 3m beyond the working area.
[0018] According to a preferred embodiment, in step S3, scaffolding is erected before installing the roof beams to ensure that there is enough platform for installation.
[0019] According to a preferred embodiment, in step S3, the rectangular tubes in the roof are welded by four-way symmetrical welding, two people weld the web and then the wing plate of a single rectangular tube at the same time, and the temporary support points are gradually cut off after the welding of the rectangular tubes on the roof is completed.
[0020] The aforementioned main scheme of the present application and its further options can be freely combined to form multiple schemes, all of which are schemes that can be adopted and claimed for protection in the present application. After understanding the scheme of the present application, those skilled in the art can understand that there are multiple combinations based on the prior art and common knowledge, all of which are technical schemes to be protected by the present application, and they are not exhaustively listed here.
[0021] Beneficial effects of this application:
[0022] The technology tree structure construction method of this application has a simple process and only requires construction personnel to repeat the construction of each section, which reduces the complexity of construction, reduces the possibility of errors in the construction process, and improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a schematic diagram of the technology tree structure of this application;
[0024] Figure 2 It is a schematic diagram of the embedded section structure of the technology tree structure of this application;
[0025] Figure 3 It is a schematic diagram of the facade lattice shell structure of the technology tree structure of this application;
[0026] Figure 4 It is a schematic diagram of the top grid shell roof structure of the technology tree structure of this application. DETAILED DESCRIPTION
[0027] The following describes the embodiments of the present application through specific examples, and those skilled in the art can easily understand other advantages and effects of the present application from the contents disclosed in this specification. The present application can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present application. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.
[0028] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0029] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the application is usually placed when in use. They are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0030] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0031] In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0032] In addition, the present application would like to point out that, in the present application, unless the specific structure, connection relationship, positional relationship, power source relationship, etc. are specifically written out, the structure, connection relationship, positional relationship, power source relationship, etc. involved in the present application are all known by those skilled in the art on the basis of the prior art without creative work.
[0033] Figure 1 This is a schematic diagram of the technology tree structure of this application; Figure 2 It is a schematic diagram of the embedded section structure of the technology tree structure of this application; Figure 3 It is a schematic diagram of the facade lattice shell structure of the technology tree structure of this application; Figure 4 It is a schematic diagram of the top grid shell roof structure of the technology tree structure of this application.
[0034] The present application discloses a technology tree structure construction method, which includes the following steps.
[0035] Step S1: installing the embedded parts of the embedded section.
[0036] Step S2: Install each segment of the facade gridshell structure and the steel beams in the corresponding segment.
[0037] Preferably, in step S2, before installing each segment of the facade grid shell structure, the outer ring scaffolding is first erected, and then the components of the corresponding segment are hoisted, and after the hoisting is completed, the inner ring scaffolding is erected, and then fine-tuning and welding are started. The components of each segment of the facade grid shell structure are a cross-shaped structure.
[0038] Preferably, in step S2, after the installation of the components of the corresponding segment of the facade lattice shell structure is completed, the layered steel beams within the segment are installed.
[0039] Preferably, in step S2, the working platform is made of wooden slats or steel gangplanks.
[0040] Preferably, in step S2, a horizontal net is set at the lower part of the working area, and the range is 3m beyond the working area.
[0041] Step S3: Installation of the top gridshell roof structure: The roof is divided into a number of unit blocks and patching sections, which are installed symmetrically from the center to the surrounding areas.
[0042] Preferably, in step S3, scaffolding is erected before installing the roof beams to ensure that there is a sufficient platform for installation.
[0043] Preferably, in step S3, the rectangular tubes in the roof are welded by four-way symmetrical welding, two people weld the web and then the wing plates of a single rectangular tube at the same time, and the temporary support points are gradually cut off after the welding of the rectangular tubes on the roof is completed.
[0044] Step S4: cantilever beam installation step, install the cantilever beam from the side close to the floor, and first install the cantilever beam close to the main structure of the technology tree, and finally install the side beam.
[0045] Step S5: After the roof membrane structure construction is completed and the water is cut off, the scaffolding is used to carry out the construction of the technology tree steel structure fire retardant coating, putty and topcoat.
[0046] Example
[0047] Take a certain technology tree structure construction scene as an example.
[0048] The main body of the technology tree is hoisted under the working conditions of a 350-ton crawler crane tower arm, with a main arm of 60m and a tower arm of 48m. The crawler crane hoisting site needs to be backfilled and compacted with original soil + 40cm crushed stone + 30cm reinforced concrete (single-layer C22@200 steel mesh). A 0.2*2.4*6m roadbed box is laid at the bottom of the crawler crane hoisting area. A trial hoisting is required before hoisting. The component is lifted 200mm off the ground and left to stand for 10 minutes. After observing that there are no abnormalities in the ground roadbed and the crane, formal hoisting can be carried out.
[0049] Tech tree structure construction methods include:
[0050] 1. Installation of embedded parts (first section of steel column), a total of 12 pieces (installed according to the design plan).
[0051] 2. Divide the facade gridshell structure into ten sections and repeat the construction and installation in sections.
[0052] 2.1 Installation of the first section steel column
[0053] ①Erect the outer ring scaffolding and hoist the first section.
[0054] ②After the lifting is completed, set up the inner circle scaffolding, and then start fine-tuning and welding.
[0055] ③After the construction is completed, the layer steel beams will be installed.
[0056] ④ The working platform is made of wooden slats or steel springboards, and a horizontal net is set at the bottom of the working area, with a range of 3m beyond the working area.
[0057] ⑤ The hoisting of the steel structure in this section has floor restrictions. During the hoisting process, the falling point of the component must be strictly controlled within the inner circle to avoid collision.
[0058] 2.2 Hoist the second and third sections in the same way as the first section
[0059] ①Erect the outer ring scaffolding and hoist the second section.
[0060] ②After the lifting is completed, set up the inner circle scaffolding, and then start fine-tuning and welding.
[0061] ③ The working platform is made of wooden slats or steel springboards, and a horizontal net is set at the bottom of the working area, with a range of 3m beyond the working area.
[0062] ④ The hook loosening conditions of the second and third sections are the same as those of the first section. At the same time, there are floor restrictions for hoisting of steel structures. During the hoisting process, the falling point of the components must be strictly controlled within the inner circle to avoid collision.
[0063] 2.3 Lifting of the fourth and fifth sections
[0064] ①Erection of outer ring scaffolding and hoisting of the fourth section.
[0065] ②After the lifting is completed, set up the inner circle scaffolding, and then start fine-tuning and welding.
[0066] ③ The working platform is made of wooden slats or steel springboards, and a horizontal net is set at the bottom of the working area, with a range of 3m beyond the working area.
[0067] ④ Some components in Section 5 and Section 4 need to adopt self-reinforcement measures because they have no adjacent fixed parts to the main building.
[0068] ⑤ The fourth and fifth sections of the steel structure are hoisted at a distance of 0.5m from the operating frame. During the hoisting process, the falling point must be strictly controlled to be in the circle, and then approach the positioning point. At the same time, the center of gravity of the component is adjusted inward through the hoist so that the bottom approaches the positioning point first.
[0069] 2.4 Section 6 Hoisting
[0070] ①Erection of outer ring scaffolding and hoisting of the sixth section.
[0071] ②After the lifting is completed, set up the inner circle scaffolding, and then perform fine-tuning and welding.
[0072] ③ The working platform is made of wooden slats or steel springboards, and a horizontal net is set at the bottom of the working area, with a range of 3m beyond the working area.
[0073] ④The components of the sixth section are similar to those of the fifth section, some of which are fixed and stable to the main building, and some of which have their own reinforcement measures.
[0074] ⑤ Two layers of steel beams are added to the sixth section for installation. The sixth section has no inner circle tube and adopts F-type internal support.
[0075] 2.5 Install the seventh and eighth column steel beams in the same way as the sixth section.
[0076] ① The stabilization measures were changed from F-type to 7-type.
[0077] ②Construction process: erection of outer ring operating frame → installation of steel columns → installation of inner ring scaffolding → correction and preliminary welding of steel columns → installation of steel beams → construction of truss plates and concrete.
[0078] ③ Since there are floors in the inner circle, the height of the scaffolding cannot exceed the position of the steel beam. The inner circle scaffolding should be removed in time after the steel column correction and welding are completed and the steel beam installation is completed.
[0079] ④ The conditions for loosening the hook are that the welding of the two steel columns at the bottom of each component is completed (weld length 2.7m), and each docking interface of the remaining parts is limited on site by at least one 200*150 horse plate.
[0080] 2.6 Installation of the ninth segment
[0081] Since it is higher than the floor, you can choose to fix part of it in a 7-shape and install part of it with vertical support on the concrete floor.
[0082] ①Construction process: installation of temporary support columns for floor faces → erection of outer ring operating frame → installation of steel columns → installation of inner ring scaffolding → fine-tuning and welding of steel columns.
[0083] ②Since there are floors in the inner circle, the scaffolding needs to be set up away from the temporary support installation location of the next floor.
[0084] ③ The conditions for loosening the hook are that the welding of the two steel columns at the bottom of each component is completed (weld length 2.7m), and each docking interface of the remaining parts is limited on site by at least one 200*150 horse plate.
[0085] 2.7 Installation of the tenth segment
[0086] Because it is higher than the floor, one part is fixed in a 7-shape, and the other part is installed with vertical support on the concrete floor.
[0087] ① Construction process: installation of temporary support columns for floor faces → erection of outer ring scaffolding operating frame → installation of steel columns → installation of inner ring scaffolding → fine-tuning and welding of steel columns.
[0088] 3. Roof layer rectangular tube installation
[0089] ①The roof layer is installed using temporary support and overall structural force.
[0090] ②The roof is divided into several unit blocks and patching sections, which are installed from the middle to the surrounding areas in a symmetrical manner.
[0091] ③ Complete the scaffolding erection before installing the roof beams to ensure there is enough platform for installation.
[0092] ④ The rectangular tube is welded in a four-way symmetrical manner. Two people weld the web and wing plates of a single rectangular tube at the same time. After the welding of the roof rectangular tube is completed, the temporary support points are gradually cut off.
[0093] 4. Cantilever steel beam installation
[0094] ①Install from the side close to the floor, first install the cantilever beam close to the technology tree, and finally install the side beam.
[0095] ② Loose hook requirements: The web of the rectangular tube beam is symmetrically welded on one side for more than 300mm.
[0096] ③The cantilever beam needs to be installed after the construction of the main buildings on both sides is completed.
[0097] 5. After the roof membrane structure construction is completed and the water is cut off, the scaffolding is used to apply fire retardant coating, putty and topcoat to the technology tree steel structure.
[0098] The technology tree structure construction method of this application has a simple process and only requires construction personnel to repeat the construction of each section, which reduces the complexity of construction, reduces the possibility of errors in the construction process, and improves construction efficiency.
[0099] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A technology tree structure construction method, characterized in that: The technology tree structure construction method comprises the following steps: S1: Installation of embedded parts in the embedded section; S2: Installation of each segment of the facade lattice shell structure and the steel beams in the corresponding segment; S3: Installation of top gridshell roof structure: The roof is divided into several unit blocks and patching sections, which are installed symmetrically from the center to the surrounding areas; S4: Cantilever beam installation steps: install the cantilever beam from the side close to the floor, and first install the cantilever beam close to the main structure of the technology tree, and finally install the side beam; S5: After the roof membrane structure construction is completed and the water is cut off, the scaffolding is used to carry out the construction of the technology tree steel structure fire retardant coating, putty and topcoat.
2. The technology tree structure construction method according to claim 1, characterized in that: In step S2, before installing each segment of the facade grid shell structure, the outer ring scaffolding is first erected, and then the components of the corresponding segments are hoisted. After the hoisting is completed, the inner ring scaffolding is erected, and then fine-tuning and welding are started.
3. The technology tree structure construction method according to claim 2, characterized in that: Each segment component of the facade grid shell structure is a M-shaped structure.
4. The technology tree structure construction method according to claim 2, characterized in that: In step S2, after the installation of the components of the corresponding segment of the facade lattice shell structure is completed, the layered steel beams in the segment are installed.
5. The technology tree structure construction method according to claim 1, characterized in that: In step S2, the working platform is made of wooden slats or steel gangplanks.
6. The technology tree structure construction method according to claim 4, characterized in that: In step S2, a horizontal net is set at the lower part of the working area, and the range is 3m beyond the working area.
7. The technology tree structure construction method according to claim 1, characterized in that: In step S3, scaffolding is erected before installing the roof beams to ensure that there is enough platform for installation.
8. The technology tree structure construction method according to claim 1, characterized in that: In step S3, the rectangular tubes in the roof are welded in a four-way symmetrical manner. Two people weld the web and then the wing plates of a single rectangular tube at the same time. After the welding of the rectangular tubes on the roof is completed, the temporary support points are gradually cut off.
Citation Information
Patent Citations
Construction method of Z-shaped large-span aluminum alloy frame roof
CN113756502A
Lotus tower steel structure construction method
CN115162520A
High-rise umbrella-shaped eccentric cantilever steel structure and construction method thereof
CN116446530A
Installation and construction method for large-span asymmetric space reticulated shell structure
CN117967051A
Umbrella-shaped circular tube space truss construction method
CN118622014A