Efficient and energy-saving electric heater and control method thereof

By designing multiple sub-heating chambers and independently controlled heating pipe components in the electric heater, combining machine learning algorithms to optimize heating parameters and self-test modules to detect working status, the problem of reduced efficiency caused by uneven liquid temperature and dirt in the heating pipe is solved, and efficient energy-saving and reliable heating effects are achieved.

CN119573243APending Publication Date: 2025-03-07YANCHENG KEANDA MASCH MFG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411795558.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-09
Publication Date
2025-03-07

AI Technical Summary

Technical Problem

During the heating process, existing electrical heaters have uneven liquid temperature and reduced efficiency caused by dirt on the surface of the heating pipe, and lack effective monitoring and cleaning mechanisms.

Method used

A high-efficiency and energy-saving electric heater is designed, using multiple heating pipe components and partition partitions to form multiple sub-heating chambers. The independent control of different heating pipes is achieved through the heating controller, and a flushing port and sensor are set on the heater shell. Combined with machine learning algorithms to optimize heating parameters, the working status of the heating pipe is regularly detected.

Benefits of technology

It improves the uniformity of liquid heating and heat transfer efficiency, reduces energy consumption, extends the service life of the heating pipe, and promptly detects and deals with dirt and aging problems of the heating pipe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119573243A_ABST
    Figure CN119573243A_ABST
Patent Text Reader

Abstract

The invention discloses an efficient and energy-saving electric heater and a control method thereof. The electric heater comprises a cylindrical heater shell arranged in the horizontal direction, a heating pipe assembly arranged in a heating cavity of the heater shell, a heating controller connected with the heating pipe assembly, a main liquid inlet pipe and a liquid outlet pipe, wherein the main liquid inlet pipe and the liquid outlet pipe are arranged on the heater shell. The liquid heat-conducting medium forms rotational flow in the heating cavity of the heater shell, so that the heat transfer efficiency between the liquid heat-conducting medium and the heating pipe can be effectively improved; and the heating pipe can be conveniently washed through the washing opening, so that substances such as dirt on the surface of the heating pipe are removed, and the heating efficiency of the heating pipe is guaranteed. By adopting the machine learning algorithm model and taking the total flow of the liquid heat-conducting medium and the target temperature as input, the working parameters capable of enabling the total energy consumption of the heating pipe assembly to be relatively minimum can be obtained, so that under the condition that the heating requirement is met, the energy loss can be reduced, and the purpose of saving energy is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of electric heaters, and in particular to a high-efficiency and energy-saving electric heater and a control method thereof. Background Art

[0002] Electric heater is an internationally popular electric heating equipment, which is used to increase, keep warm and heat the flowing liquid and gaseous medium. When the heating medium passes through the heating chamber of the electric heater under pressure, the huge heat generated by the electric heating element is evenly taken away by the principle of fluid thermodynamics, so that the temperature of the heated medium reaches the user's process requirements.

[0003] Since the heat generated by the heating tube in the electric heater is locally concentrated, it is easy to cause the liquid in the heater to be heated unevenly. Patent CN221858826U discloses a heat energy pipeline liquid electric heater, which can effectively improve the uniformity of the liquid being heated in the electric heater, thereby reducing the large fluctuation of the liquid temperature when it is output from the electric heater, but its structure is relatively complex.

[0004] After long-term use, the heating tube will have carbon or scale on its surface, which will reduce the working efficiency of the heating tube. When there is too much dirt, it needs to be cleaned in time to ensure the working effect of the heating tube. In addition, after long-term use, the heating tube is prone to device aging, which will also cause a significant reduction in heating efficiency. However, traditional electric heaters lack the function of monitoring the dirt on the surface of the heating tube and its working status.

[0005] Therefore, it is necessary to improve the existing technology to provide a more reliable solution. Summary of the invention

[0006] The technical problem to be solved by the present invention is to provide a high-efficiency and energy-saving electric heater and a control method thereof in view of the deficiencies in the above-mentioned prior art.

[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is as follows: In a first aspect of the present invention, a high-efficiency and energy-saving electric heater is provided, comprising a heater housing arranged in a horizontal direction and in a cylindrical shape, a heating tube assembly arranged in a heating chamber of the heater housing, a heating controller connected to the heating tube assembly, and a main liquid inlet pipe and a liquid outlet pipe arranged on the heater housing, wherein the end of the main liquid inlet pipe is connected in parallel with a main liquid inlet pipe and an auxiliary liquid inlet pipe;

[0008] The heating chamber is divided by a first partition and a second partition to form a first sub-heating chamber, a second sub-heating chamber and a third sub-heating chamber in sequence, the main liquid inlet pipe is arranged at the first end of the heater housing in a horizontal direction and communicates with the first sub-heating chamber, the heating tube assembly includes a first heating tube arranged in the first sub-heating chamber, a second heating tube arranged in the second sub-heating chamber and a third heating tube arranged in the third sub-heating chamber;

[0009] The heating controller is arranged at the second end of the heater housing, and the ends of the first heating tube, the second heating tube and the third heating tube all extend from the second end of the heater housing and are all connected to the heating controller;

[0010] The heating controller controls the first heating tube, the second heating tube, and the third heating tube to operate at the same voltage and different currents to achieve different operating temperatures;

[0011] The liquid heat-conducting medium entering from the main liquid inlet pipe is heated by the first heating pipe, the second heating pipe, and the third heating pipe in sequence, and is discharged from the liquid outlet pipe after reaching the target temperature.

[0012] Preferably, the auxiliary liquid inlet pipe is arranged on the outer wall of the first end of the heater housing, the auxiliary liquid inlet pipe is tangentially connected to the cylindrical outer wall of the heater housing, the auxiliary liquid inlet pipe is connected to the first sub-heating chamber, and the auxiliary liquid inlet pipe is perpendicular to the main liquid inlet pipe;

[0013] The outer wall of the heater housing is also provided with a first shunt liquid outlet pipe communicating with the first sub-heating chamber, a first shunt liquid inlet pipe communicating with the second sub-heating chamber, a second shunt liquid outlet pipe communicating with the second sub-heating chamber, and a second shunt liquid inlet pipe communicating with the third sub-heating chamber. The first shunt liquid inlet pipe and the second shunt liquid inlet pipe are both tangentially connected and arranged on the cylindrical outer wall of the heater housing, and are both perpendicular to the main liquid inlet pipe.

[0014] The auxiliary liquid inlet pipe is located below the heater housing, the first shunt liquid outlet pipe and the first shunt liquid inlet pipe are both located above the heater housing, and the second shunt liquid outlet pipe and the second shunt liquid inlet pipe are both located below the heater housing;

[0015] A first guide port connecting the first sub-heating chamber and the second sub-heating chamber is formed above the first partition plate, and a second guide port connecting the second sub-heating chamber and the third sub-heating chamber is formed below the second partition plate.

[0016] Preferably, the main liquid inlet pipe and the auxiliary liquid inlet pipe are respectively provided with a main pipe solenoid valve and an auxiliary pipe solenoid valve;

[0017] The first shunt outlet pipe and the first shunt inlet pipe are connected via a first shunt branch pipe, the second shunt outlet pipe and the second shunt inlet pipe are connected via a second shunt branch pipe, and the first shunt branch pipe and the second shunt branch pipe are respectively provided with a first shunt solenoid valve and a second shunt solenoid valve.

[0018] Preferably, the main liquid inlet pipe and the liquid outlet pipe are respectively provided with a first medium temperature sensor and a second medium temperature sensor, the first heating tube, the second heating tube and the third heating tube are respectively provided with a first heat pipe temperature sensor for detecting the working temperature of the first heating tube, a second heat pipe temperature sensor for detecting the working temperature of the second heating tube, and a third heat pipe temperature sensor for detecting the working temperature of the third heating tube, and the main liquid inlet pipe is also provided with a flow meter for detecting the flow rate of the liquid heat transfer medium in the main liquid inlet pipe.

[0019] Preferably, the heating controller comprises a control module, a heating parameter optimization module and a self-checking module, wherein the heating parameter optimization module is a parameter optimization network model based on a machine learning algorithm;

[0020] The heating parameter optimization module is based on the total flow rate Qz of the liquid heat-conducting medium input into the total liquid inlet pipe, the target temperature T of the liquid heat-conducting medium to be heated FL The heating parameters are optimized, including: the working temperature T1 of the first heating tube, the working temperature T2 of the second heating tube, the working temperature T3 of the third heating tube, and the ratio K1 of the flow rate of the liquid heat-conducting medium in the auxiliary liquid inlet pipe to the total flow rate Qz, the ratio K2 of the flow rate of the liquid heat-conducting medium in the first branch liquid outlet pipe to the total flow rate Qz, and the ratio K3 of the flow rate of the liquid heat-conducting medium in the second branch liquid outlet pipe to the total flow rate Qz;

[0021] The heater shell is provided with a first flushing port, a second flushing port, and a third flushing port which are respectively connected to the first sub-heating chamber, the second sub-heating chamber, and the third sub-heating chamber for flushing the heating tube assembly; the self-inspection module detects the working status of the heating tube assembly to determine whether the heating tube assembly needs to be flushed or repaired.

[0022] A second aspect of the present invention provides a control method for the energy-efficient electric heater as described above, comprising the following steps:

[0023] S1, the heating parameter optimization module is based on the total flow rate Qz of the liquid heat-conducting medium input into the total liquid inlet pipe, the preset target temperature T of the liquid heat-conducting medium to be heated FL Get the optimized heating parameters C y , the heating parameter C y Including working temperature parameter group and flow ratio parameter group;

[0024] The working temperature parameter group includes: the working temperature T of the first heating tube 1y , the working temperature of the second heating tube T 2y , the working temperature of the third heating tube T 3y ;

[0025] The flow ratio parameter group includes: the ratio K of the flow rate of the liquid heat transfer medium in the auxiliary liquid inlet pipe to the total flow rate Qz 1y , the ratio K of the flow rate of the liquid heat-conducting medium in the first branch outlet pipe to the total flow rate Qz 2y , the ratio K of the flow rate of the liquid heat-conducting medium in the second branch outlet pipe to the total flow rate Qz 3y ;

[0026] S2, the control module obtains the result of the heating parameter optimization module, and according to the heating parameter C y Control the first heating tube to have a voltage U and a current I 1y Working to reach the working temperature T 1y ; Make the second heating tube with voltage U and current I 2y Working to reach the working temperature T 2y ; Make the third heating tube with voltage U and current I 3y Working to reach the working temperature T 3y ;

[0027] The control module is based on the heating parameter C y :

[0028] The main solenoid valve and the auxiliary solenoid valve are controlled so that the ratio of the flow rate of the liquid heat transfer medium in the auxiliary liquid inlet pipe to the total flow rate Qz is K 1y ;

[0029] The first flow splitting solenoid valve is controlled so that the ratio of the flow rate of the liquid heat-conducting medium in the first flow splitting outlet pipe to the total flow rate Qz is K 2y ;

[0030] The second flow splitting solenoid valve is controlled so that the ratio of the flow rate of the liquid heat-conducting medium in the second flow splitting outlet pipe to the total flow rate Qz is K 3y ;

[0031] S3. The self-check module regularly checks the working status of the heating tube assembly to determine whether the heating tube assembly needs to be flushed or repaired.

[0032] Preferably, the heating parameter optimization module is constructed by the following method:

[0033] S1-1. Construct training data set U:

[0034] S1-1-1, fixed total flow Qz, target temperature T FL The flow ratio parameter group K1, K2, and K3 remain unchanged, and the N groups of different heating tube working temperature combination values ​​Z are obtained within the set temperature limit range. Ti , Z Ti Including the working temperature T of the first heating tube 1i , the working temperature of the second heating tube T 2i , the working temperature of the third heating tube T 3i , denoted by Z Ti =(T 1i 、T 2i 、T 3i ); Among them, in each heating tube working temperature combination value Z Ti Under this condition, the temperature of the liquid heat transfer medium discharged from the liquid outlet pipe is T FL ;

[0035] Where i = 1, 2, ..., N; the temperature limit range specifically includes: γ1T FL ≤T 1i <γ2T FL ,γ2T FL ≤T 2i ≤γ3T FL , and γ3T FL ≤T 3i ≤γ4T FL ; Wherein γ1, γ2, γ3, and γ4 are all pre-set temperature coefficients, and γ1<γ2<γ3<γ4, γ1, γ2, and γ3 are all less than 1, and γ4 is greater than 1;

[0036] In each heating tube working temperature combination value Z Ti Under this condition, the total energy consumption of the first heating tube, the second heating tube and the third heating tube is calculated, and then the minimum value is obtained, which is recorded as the extremely low energy consumption value gMin Wi ;

[0037] Very low energy consumption gMin Wi The corresponding heating tube working temperature combination value is recorded as the extremely low energy consumption optimized temperature parameter combination value Z Ti-gmin , Z Ti-gmin =(T 1i-gmin 、T 2i-gmin 、T 3i-gmin ), T 1i-gmin 、T 2i-gmin 、T 3i-gmin Respectively represent the corresponding working temperatures of the first heating tube, the second heating tube and the third heating tube at this time;

[0038] S1-2. Change the values ​​of flow ratio parameter groups K1, K2, and K3 in the same way as step 1, obtain the corresponding extremely low energy consumption value under each flow ratio parameter group, and then obtain the minimum value from all extremely low energy consumption values, which is recorded as the minimum energy consumption value Min. W , minimum energy consumption value Min W The corresponding working temperatures of the first heating tube, the second heating tube and the third heating tube are respectively recorded as T 1-min 、T 2-min 、T 3-min , the corresponding flow ratio parameter group is recorded as K 1-min , K 2-min , K 3-min , T 1-min 、T 2-min 、T 3-min , K 1-min , K 2-min , K 3-min Combined, we get the total flow rate Qz and target temperature T FL The optimal heating parameter under y-op (T, K), that is, C y-op (T, K) = (T 1-min 、T 2-min 、T 3-min , K 1-min , K 2-min , K 3-min ), Qz, T FL , C y-op (T, K) is combined into a training data u;

[0039] S1-3, change the value of total flow Qz and target temperature T FL According to the method of steps 1-2, obtain several training data, combine all the training data, and obtain the training data set U;

[0040] S1-4, using the training data set U, with total flow Qz, target temperature T FL is the input, optimal heating parameter C y-op (T, K) is the target output, and the RNN recurrent neural network is trained. After the training is completed, the heating parameter optimization module is obtained.

[0041] Preferably, γ1=0.8, γ2=0.85, γ3=0.95, γ4=1.15;

[0042] Preferably, step S3 specifically comprises:

[0043] S3-1. Obtain the test comparison data in advance by the following methods:

[0044] The detection comparison data includes the standard working curve f of the first heating tube.B1 , Standard working curve f of the second heating tube B2 And the standard working curve f of the third heating tube B3 ;

[0045] S3-1-1. Fill the heater housing with liquid heat-conducting medium, control the main solenoid valve and the auxiliary solenoid valve to remain closed, and control the first heating tube, the second heating tube, and the third heating tube to stop working; the first heating tube, the second heating tube, and the third heating tube are all new products with clean surfaces and qualified quality;

[0046] Get the temperature value T detected by the first heat pipe temperature sensor B01 , control the first heating tube to work under the set voltage U1 and current I1, and control the first heating tube to work alone until the temperature value detected by the first heat pipe temperature sensor reaches T max , record the time t at this time B01 In this process, the temperature values ​​detected by the first heat pipe temperature sensor at different working times are collected, and the time-heat pipe temperature curve of the first heating pipe is plotted with the working time as the horizontal axis and the temperature value detected by the first heat pipe temperature sensor as the vertical axis, that is, the standard working curve f of the first heating pipe B1 , where the time when the first heating tube starts working is taken as time 0, and the temperature value detected by the first heat pipe temperature sensor at time 0 is T B01 , f B1 The origin is (0, T B01 );

[0047] S3-1-2, according to the same method as step S3-1-1, control the second heating tube and the third heating tube to work separately, and obtain the standard working curve f of the second heating tube B2 And the standard working curve f of the third heating tube B3 ;

[0048] S3-2. At fixed intervals, the heating parameter optimization module collects self-detection data of the heating tube assembly using the following method:

[0049] The self-test data includes the actual working curve f of the first heating tube. B1 , the actual working curve f of the second heating tube B2 And the actual working curve f of the third heating tube B3 ;

[0050] S3-2-1, obtaining the self-detection data f1 of the first heating tube:

[0051] The main solenoid valve and the auxiliary solenoid valve are controlled to remain closed, and the first heating tube, the second heating tube, and the third heating tube are controlled to stop working;

[0052] Get the temperature value T detected by the first heat pipe temperature sensor 01 , control the first heating tube to work alone at the set voltage U1 and current I1 until the temperature value detected by the first heat pipe temperature sensor reaches 1.5T 01 , record the time t at this time 01 In this process, the temperature values ​​detected by the first heat pipe temperature sensor at different working times are collected, and the time-heat pipe temperature curve of the first heating pipe is plotted with the working time as the horizontal axis and the temperature value detected by the first heat pipe temperature sensor as the vertical axis, that is, the actual working curve f1 of the first heating pipe, wherein the time when the first heating pipe starts working is taken as time 0, and the temperature value detected by the first heat pipe temperature sensor at time 0 is T 01 , then the origin and end point of f1 are (0, T 01 )、(t 01 , 1.5T 01 );Among them, 1.5T 01 <T max ;

[0053] S3-2-2, obtaining the self-detection data f2 of the second heating tube and the self-detection data f3 of the third heating tube in the same manner as step 3-2-1;

[0054] S3-3, judging the working state of the first heating tube:

[0055] S3-3-1. Data extraction:

[0056] The curve f B1 and f1 are placed in the same coordinate system, and the following data are obtained on the actual working curve f1: end point (t 01 , 1.5T 01 ) and the origin (0, T 01 ) is the slope k of the line between 01 ;

[0057] In the standard working curve f B1 Get the data from the top: first get the temperature of 1.5T 01 The corresponding horizontal coordinate value t B01 , then get the point (t B01 , 1.5T 01 ) and point (0, T 01 ) is the slope k of the line between B01 ;

[0058] The end point of the curve f1 (t 01 , 1.5T 01 ) and curve f B1 Point on (t B01 , 1.5T 01) Connect through line segment L to obtain curve f1, line segment L and curve f B1 The area of ​​the closed area formed between them is △S1; get the vertical coordinate range in T 01 Up to 1.5T 01 Between, curve f B1 The area S of the region surrounded by the horizontal axis B1 ;

[0059] S3-3-2. Compare and analyze data to determine the working status:

[0060] When k 01 ≥A1k B01 ,△S1≤B1S B1 When the first heating tube is judged to be in a normal working state;

[0061] When A2k B01 ≤k 01 <A1k B01 、B1S B1 <△S1≤B2S B1 When the first heating tube is in a high power consumption working state, it is judged that the first heating tube needs to be cleaned;

[0062] When k 01 <A2k B01 Or △S1>B2S B1 When the first heating tube is abnormal, it is judged that the first heating tube is working abnormally and needs to be repaired;

[0063] S3-4. According to the same method as step S3-3, the working states of the second heating tube and the third heating tube are determined respectively.

[0064] Preferably, A1=0.85-0.95, A2=0.75-0.85; B1=0.01-0.1, B2=0.1-0.35.

[0065] The beneficial effects of the present invention are:

[0066] The present invention provides an efficient and energy-saving electric heater and a control method thereof. The present invention forms a vortex in the heating chamber of the heater shell through the liquid heat-conducting medium, which can effectively improve the heat transfer efficiency between the liquid heat-conducting medium and the heating tube. By setting a flushing port, the heating tube can be easily flushed to remove dirt and other substances on the surface of the heating tube, thereby ensuring the heating efficiency of the heating tube.

[0067] The present invention adopts a machine learning algorithm model and takes the total flow rate of liquid heat transfer medium and the target temperature as input to obtain the operating parameters (including operating temperature parameters and flow ratio parameters) that can minimize the total energy consumption of the heating tube assembly, thereby reducing energy loss and achieving energy saving while meeting the heating demand.

[0068] The present invention compares the actual working curve of the heating tube with the standard working curve through the self-check module. Taking the standard working curve as a reference, the reduction of the heating efficiency of the heating tube can be judged, thereby judging its working state, so that the heating tube assembly can be flushed or repaired in time to ensure the working effect of the electric heater. BRIEF DESCRIPTION OF THE DRAWINGS

[0069] Figure 1 It is a schematic diagram of the external structure of the high-efficiency and energy-saving electric heater of the present invention;

[0070] Figure 2 It is a schematic diagram of the principle structure of the high-efficiency and energy-saving electric heater of the present invention;

[0071] Figure 3 It is a schematic structural diagram of the auxiliary liquid inlet pipe and the heater housing of the present invention being connected in cooperation;

[0072] Figure 4 It is a structural schematic diagram of the first branch liquid inlet pipe and the heater housing being connected in cooperation with each other according to the present invention;

[0073] Figure 5 It is a structural schematic diagram of the second flow-dividing liquid inlet pipe and the heater housing being connected in cooperation with each other according to the present invention;

[0074] Figure 6 It is a schematic diagram of the principle structure of the heating controller of the present invention;

[0075] Figure 7 This is a schematic diagram of data extraction and data comparison analysis in Example 2 of the present invention.

[0076] Description of reference numerals:

[0077] 1—heater housing; 11—first sub-heating chamber; 12—second sub-heating chamber; 13—third sub-heating chamber; 14—first baffle; 15—second baffle; 141—first flow guide port; 151—second flow guide port; 16—first flushing port; 17—second flushing port; 18—third flushing port; 19—drainage port;

[0078] 2—heating tube assembly; 21—first heating tube; 22—second heating tube; 23—third heating tube;

[0079] 3—heating controller; 31—control module; 32—heating parameter optimization module; 33—self-test module;

[0080] 4—main liquid inlet pipe; 41—main liquid inlet pipe; 42—auxiliary liquid inlet pipe; 43—main pipe solenoid valve; 44—auxiliary pipe solenoid valve;

[0081] 5—Liquid outlet pipe;

[0082] 61—first shunt liquid outlet pipe; 62—first shunt liquid inlet pipe; 63—first shunt branch pipe; 64—second shunt liquid outlet pipe; 65—second shunt liquid inlet pipe; 66—second shunt branch pipe; 67—first shunt solenoid valve; 68—second shunt solenoid valve. DETAILED DESCRIPTION

[0083] The present invention is further described in detail below in conjunction with embodiments so that those skilled in the art can implement the invention with reference to the description.

[0084] It should be understood that the terms such as “having”, “including” and “comprising” used herein do not exclude the existence or addition of one or more other elements or combinations thereof.

[0085] The test methods used in the following examples are conventional methods unless otherwise specified. The materials and reagents used in the following examples are all commercially available unless otherwise specified. In the following examples, if no specific conditions are specified, the experiments were carried out under conventional conditions or conditions recommended by the manufacturer. The reagents or instruments used, if the manufacturer is not specified, are all conventional products that can be purchased commercially.

[0086] Example 1

[0087] Reference Figure 1-6 The present embodiment provides an energy-efficient electric heater, comprising a cylindrical heater housing 1 arranged in a horizontal direction, a heating tube assembly 2 arranged in a heating chamber of the heater housing 1, a heating controller 3 connected to the heating tube assembly 2, a main liquid inlet pipe 4 and a liquid outlet pipe 5 arranged on the heater housing 1, and a main liquid inlet pipe 41 and an auxiliary liquid inlet pipe 42 are connected in parallel to the end of the main liquid inlet pipe 4;

[0088] The heating chamber is divided by a first partition 14 and a second partition 15 to form a first sub-heating chamber 11, a second sub-heating chamber 12 and a third sub-heating chamber 13 in sequence. The main liquid inlet pipe 41 is arranged at the first end of the heater housing 1 in the horizontal direction and communicates with the first sub-heating chamber 11. The heating tube assembly 2 includes a first heating tube 21 arranged in the first sub-heating chamber 11, a second heating tube 22 arranged in the second sub-heating chamber 12 and a third heating tube 23 arranged in the third sub-heating chamber 13.

[0089] The heating controller 3 is arranged at the second end of the heater housing 1, and the ends of the first heating tube 21, the second heating tube 22, and the third heating tube 23 all extend from the second end of the heater housing 1 and are all connected to the heating controller 3;

[0090] The heating controller 3 controls the first heating tube 21, the second heating tube 22, and the third heating tube 23 to work at the same voltage and different currents to achieve different working temperatures;

[0091] The liquid heat-conducting medium entering from the main liquid inlet pipe 4 is heated in sequence by the first heating pipe 21 , the second heating pipe 22 , and the third heating pipe 23 , and is discharged from the liquid outlet pipe 5 after reaching the target temperature.

[0092] In this embodiment, the auxiliary liquid inlet pipe 42 is arranged on the outer wall of the first end of the heater housing 1, and the auxiliary liquid inlet pipe 42 is tangentially connected to the cylindrical outer wall of the heater housing 1, and the auxiliary liquid inlet pipe 42 is connected to the first sub-heating chamber 11, and the auxiliary liquid inlet pipe 42 is perpendicular to the main liquid inlet pipe 41;

[0093] The outer wall of the heater housing 1 is also provided with a first branch liquid outlet pipe 61 communicating with the first sub-heating chamber 11, a first branch liquid inlet pipe 62 communicating with the second sub-heating chamber 12, a second branch liquid outlet pipe 64 communicating with the second sub-heating chamber 12, and a second branch liquid inlet pipe 65 communicating with the third sub-heating chamber 13. The first branch liquid inlet pipe 62 and the second branch liquid inlet pipe 65 are both tangentially connected and arranged on the cylindrical outer wall of the heater housing 1, and are both perpendicular to the main liquid inlet pipe 41.

[0094] The auxiliary liquid inlet pipe 42 is located below the heater housing 1, the first branch liquid outlet pipe 61 and the first branch liquid inlet pipe 62 are both located above the heater housing 1, and the second branch liquid outlet pipe 64 and the second branch liquid inlet pipe 65 are both located below the heater housing 1;

[0095] A first guide port 141 connecting the first sub-heating chamber 11 and the second sub-heating chamber 12 is formed above the first partition 14 , and a second guide port 151 connecting the second sub-heating chamber 12 and the third sub-heating chamber 13 is formed below the second partition 15 .

[0096] In this embodiment, a main solenoid valve 43 and an auxiliary solenoid valve 44 are respectively provided on the main liquid inlet pipe 41 and the auxiliary liquid inlet pipe 42; the first shunt liquid outlet pipe 61 and the first shunt liquid inlet pipe 62 are connected through a first shunt branch pipe 63, and the second shunt liquid outlet pipe 64 and the second shunt liquid inlet pipe 65 are connected through a second shunt branch pipe 66; the first shunt branch pipe 63 and the second shunt branch pipe 66 are respectively provided with a first shunt solenoid valve 67 and a second shunt solenoid valve 68.

[0097] The liquid heat-conducting medium in the main liquid inlet pipe 41 enters the first sub-heating chamber 11 in the horizontal direction, providing a liquid flow power in the horizontal direction (axial direction), and the liquid heat-conducting medium in the auxiliary liquid inlet pipe 42 enters the first sub-heating chamber 11 tangentially along the outer periphery of the heater housing 1, providing a circumferential rotating flow. The two fluids form a rightward swirl in the first sub-heating chamber 11, thereby improving the heat transfer efficiency between the liquid heat-conducting medium and the first heating tube 21 and promoting uniform heat transfer.

[0098] A portion of the liquid heat-conducting medium in the first sub-heating chamber 11 enters the second sub-heating chamber 12 from the first flow guide port 141 above the first partition plate 14, and another portion enters the second sub-heating chamber 12 tangentially along the outer periphery of the heater housing 1 after passing through the first branch liquid outlet pipe 61, the first branch branch pipe 63 and the first branch liquid inlet pipe 62, providing a circumferential rotating flow, thereby forming a rightward swirling flow in the second sub-heating chamber 12, which can improve the heat transfer efficiency between the liquid heat-conducting medium and the second heating tube 22;

[0099] A portion of the liquid heat-conducting medium in the second sub-heating chamber 12 enters the third sub-heating chamber 13 from the second guide port 151 below the second partition plate 15, and the other portion passes through the second branch liquid outlet pipe 64, the second branch branch pipe 66 and the second branch liquid inlet pipe 65, and then enters the third sub-heating chamber 13 tangentially along the outer periphery of the heater shell 1, providing a circumferential rotating flow, thereby forming a rightward vortex in the third sub-heating chamber 13, which can improve the heat transfer efficiency between the liquid heat-conducting medium and the third heating tube 23; the liquid heat-conducting medium in the third sub-heating chamber 13 is finally discharged from the upper liquid outlet pipe 5.

[0100] Among them, insulation layers are installed on all pipelines to reduce heat loss.

[0101] Among them, the first heating tube 21, the second heating tube 22, and the third heating tube 23 are all heating tubes made of conventional metal materials, and have the following characteristics: the higher the temperature, the greater the resistance value. This is because the electrons in the metal will collide with the atomic array that makes up the metal during movement, forming resistance; when the temperature rises, the thermal motion of the atomic array becomes more intense, and the hindering effect on electrons is greater, thereby causing the resistance to increase.

[0102] In this embodiment, the main liquid inlet pipe 4 and the liquid outlet pipe 5 are respectively provided with a first medium temperature sensor and a second medium temperature sensor, the first heating tube 21, the second heating tube 22 and the third heating tube 23 are respectively provided with a first heat pipe temperature sensor for detecting the working temperature of the first heating tube 21, a second heat pipe temperature sensor for detecting the working temperature of the second heating tube 22, and a third heat pipe temperature sensor for detecting the working temperature of the third heating tube 23, and the main liquid inlet pipe 4 is also provided with a flow meter for detecting the flow rate of the liquid heat transfer medium in the main liquid inlet pipe 4.

[0103] In this embodiment, the heating controller 3 includes a control module 31, a heating parameter optimization module 32 and a self-checking module 33, wherein the heating parameter optimization module 32 is a parameter optimization network model based on a machine learning algorithm;

[0104] The heating parameter optimization module 32 calculates the total flow rate Qz of the liquid heat-conducting medium input into the total liquid inlet pipe 4, the target temperature T of the liquid heat-conducting medium to be heated, and the total flow rate Qz of the liquid heat-conducting medium input into the total liquid inlet pipe 4. FLThe heating parameters are optimized, including: the working temperature T1 of the first heating tube 21, the working temperature T2 of the second heating tube 22, the working temperature T3 of the third heating tube 23, and the ratio K1 of the flow rate of the liquid heat-conducting medium in the auxiliary liquid inlet pipe 42 to the total flow rate Qz, the ratio K2 of the flow rate of the liquid heat-conducting medium in the first branch liquid outlet pipe 61 to the total flow rate Qz, and the ratio K3 of the flow rate of the liquid heat-conducting medium in the second branch liquid outlet pipe 64 to the total flow rate Qz;

[0105] The heater housing 1 is provided with a first flushing port 16, a second flushing port 17, and a third flushing port 18, which are connected to the first sub-heating chamber 11, the second sub-heating chamber 12, and the third sub-heating chamber 13, respectively, for flushing the heating tube assembly 2; the self-test module 33 detects the working state of the heating tube assembly 2 to determine whether the heating tube assembly 2 needs to be flushed or repaired. A sewage outlet 19 is provided on the heater housing 1 corresponding to each sub-heating chamber for sewage discharge during flushing. The first flushing port 16, the second flushing port 17, and the third flushing port 18 are kept sealed and normally closed. When the heating tube assembly 2 needs to be flushed, the flushing ports at the corresponding positions are opened, and then the heating tube is flushed to remove dirt and other substances on the surface of the heating tube to ensure the heating efficiency of the heating tube.

[0106] Example 2

[0107] A control method for an energy-efficient electric heater according to Embodiment 1 comprises the following steps:

[0108] S1, the heating parameter optimization module 32 calculates the total flow rate Qz of the liquid heat-conducting medium input into the total liquid inlet pipe 4 and the preset target temperature T of the liquid heat-conducting medium to be heated. FL Get the optimized heating parameters C y , the heating parameter C y Including working temperature parameter group and flow ratio parameter group;

[0109] The working temperature parameter group includes: the working temperature T of the first heating tube 21 1y , the working temperature T of the second heating tube 22 2y , the working temperature T of the third heating tube 23 3y ;

[0110] The flow ratio parameter group includes: the ratio K of the flow rate of the liquid heat-conducting medium in the auxiliary liquid inlet pipe 42 to the total flow rate Qz 1y , the ratio K of the flow rate of the liquid heat-conducting medium in the first branch outlet pipe 61 to the total flow rate Qz 2y , the ratio K of the flow rate of the liquid heat-conducting medium in the second branch outlet pipe 64 to the total flow rate Qz 3y ;

[0111] S2, the control module 31 obtains the result of the heating parameter optimization module 32, and calculates the heating parameter C according to the heating parameter C. y Control the first heating tube 21 to provide a voltage U and a current I 1y Working to reach the working temperature T 1y ; Make the second heating tube 22 with voltage U, current I 2y Working to reach the working temperature T 2y ; Make the third heating tube 23 with voltage U, current I 3y Working to reach the working temperature T 3y ;

[0112] The first heat pipe temperature sensor, the second heat pipe temperature sensor and the third heat pipe temperature sensor are used to detect the working temperatures of the first heating pipe 21, the second heating pipe 22 and the third heating pipe 23, and conventional feedback regulation is used to ensure that each heating pipe reaches the required working temperature.

[0113] The control module 31 controls the heating parameters C y :

[0114] The main solenoid valve 43 and the auxiliary solenoid valve 44 are controlled so that the ratio of the flow rate of the liquid heat-conducting medium in the auxiliary liquid inlet pipe 42 to the total flow rate Qz is K 1y ;

[0115] The first flow splitting solenoid valve 67 is controlled so that the ratio of the flow rate of the liquid heat-conducting medium in the first flow splitting outlet pipe 61 to the total flow rate Qz is K 2y ;

[0116] The second flow splitting solenoid valve 68 is controlled so that the ratio of the flow rate of the liquid heat-conducting medium in the second flow splitting outlet pipe 64 to the total flow rate Qz is K 3y ;

[0117] S3. The self-check module 33 regularly checks the working status of the heating tube assembly 2 to determine whether the heating tube assembly 2 needs to be flushed or repaired.

[0118] In this embodiment, the heating parameter optimization module 32 is constructed by the following method:

[0119] S1-1. Construct training data set U:

[0120] S1-1-1, fixed total flow Qz, target temperature T FL The flow ratio parameter group K1, K2, and K3 remain unchanged, and the N groups of different heating tube working temperature combination values ​​Z are obtained within the set temperature limit range. Ti , Z Ti Including the working temperature T of the first heating tube 21 1i, the working temperature T of the second heating tube 22 2i , the working temperature T of the third heating tube 23 3i , denoted by Z Ti =(T 1i 、T 2i 、T 3i ); Among them, in each heating tube working temperature combination value Z Ti Under this condition, the temperature of the liquid heat transfer medium discharged from the liquid outlet pipe 5 is T FL ;

[0121] Where i = 1, 2, ..., N; the temperature limit range specifically includes: γ1T FL ≤T 1i <γ2T FL ,γ2T FL ≤T 2i ≤γ3T FL , and γ3T FL ≤T 3i ≤γ4T FL ; Wherein γ1, γ2, γ3, and γ4 are all pre-set temperature coefficients, and γ1<γ2<γ3<γ4, γ1, γ2, and γ3 are all less than 1, and γ4 is greater than 1;

[0122] In each heating tube working temperature combination value Z Ti Under the above conditions, the total energy consumption of the first heating tube 21, the second heating tube 22 and the third heating tube 23 is calculated, and then the minimum value is obtained, which is recorded as the extremely low energy consumption value gMin. Wi ;

[0123] Very low energy consumption gMin Wi The corresponding heating tube working temperature combination value is recorded as the extremely low energy consumption optimized temperature parameter combination value Z Ti-gmin , Z Ti-gmin =(T 1i-gmin 、T 2i-gmin 、T 3i-gmin ), T 1i-gmin 、T 2i-gmin 、T 3i-gmin Respectively represent the corresponding working temperatures of the first heating tube 21, the second heating tube 22 and the third heating tube 23 at this time;

[0124] S1-2. Change the values ​​of flow ratio parameter groups K1, K2, and K3 in the same way as step 1, obtain the corresponding extremely low energy consumption value under each flow ratio parameter group, and then obtain the minimum value from all extremely low energy consumption values, which is recorded as the minimum energy consumption value Min. W , minimum energy consumption value Min W The corresponding working temperatures of the first heating tube 21, the second heating tube 22 and the third heating tube 23 are respectively denoted as T 1-min、T 2-min 、T 3-min , the corresponding flow ratio parameter group is recorded as K 1-min , K 2-min , K 3-min , T 1-min 、T 2-min 、T 3-min , K 1-min , K 2-min , K 3-min Combined, we get the total flow rate Qz and target temperature T FL The optimal heating parameter under y-op (T, K), that is, C y-op (T, K) = (T 1-min 、T 2-min 、T 3-min , K 1-min , K 2-min , K 3-min ), Qz, T FL , C y-op (T, K) is combined into a training data u;

[0125] S1-3, change the value of total flow Qz and target temperature T FL According to the method of steps 1-2, obtain several training data, combine all the training data, and obtain the training data set U;

[0126] S1-4, using the training data set U, with total flow Qz, target temperature T FL is the input, optimal heating parameter C y-op (T, K) is the target output, and the RNN recurrent neural network is trained. After the training is completed, a heating parameter optimization module 32 is obtained.

[0127] In this embodiment, γ1=0.8, γ2=0.85, γ3=0.95, γ4=1.15;

[0128] It can be seen that in this embodiment, T 1i <T 2i <T 3i, the working temperatures of the first heating tube 21, the second heating tube 22 and the third heating tube 23 increase in sequence, that is, the liquid heat transfer medium is heated by heating temperatures from low to high; the three heating tubes are all made of conventional metal materials, which have the following characteristics: the higher the temperature, the greater the resistance. The working temperature of the heating tube will affect its working efficiency. Generally speaking, the higher the working temperature of the heating tube, the greater the temperature difference, the higher the heat transfer efficiency, but the energy loss of the heating tube itself will also be greater. The present invention can reduce its energy loss while meeting the heating requirements by optimizing the working temperature of the heating tube. At the same time, the flow ratio (K1, K2, K3) of the two liquid heat transfer media in the vertical and horizontal directions in the three heating chambers will also affect the heating efficiency, and is also a parameter that needs to be optimized. These parameters: the working temperature of the heating tube, the relationship between the flow ratio and the flow ratio is difficult to express through a specific formula, but by adopting a machine learning network model and summarizing and learning empirical data, its internal relationship can be obtained more accurately, thereby realizing the optimization of heating parameters.

[0129] Specifically, the main idea of ​​the present invention is to firstly set the total flow rate Qz and the target temperature T FL Under different heating tube working temperatures (T1, T2, T3) and different flow ratio parameters (K1, K2, K3), the total energy required to heat to the target temperature is obtained, and the minimum value is taken to obtain a current total flow Qz, target temperature T FL Then change the total flow rate Qz, target temperature T FL , obtain the parameter optimization data under different total flow rates and different target temperatures, and combine these data to obtain a data set with a large number of optimization parameters. Use this data set to train the RNN recurrent neural network to obtain the final parameter optimization network model, that is, the heating parameter optimization model. Through this heating parameter optimization model, the total flow rate Qz, target temperature T FL As input, the working parameters that can make the total energy consumption of the heating tube assembly 2 relatively minimum can be obtained, thereby reducing energy loss and achieving energy saving while meeting the heating demand.

[0130] In this embodiment, step S3 is specifically as follows:

[0131] S3-1. Obtain the test comparison data in advance by the following methods:

[0132] The detection comparison data includes the standard working curve f of the first heating tube 21. B1 , the standard working curve f of the second heating tube 22 B2 and the standard working curve f of the third heating tube 23 B3 ;

[0133] S3-1-1, fill the heater housing 1 with liquid heat-conducting medium, control the main solenoid valve 43 and the auxiliary solenoid valve 44 to remain closed, and control the first heating tube 21, the second heating tube 22, and the third heating tube 23 not to work first; wherein, the first heating tube 21, the second heating tube 22, and the third heating tube 23 used are all new products with clean surfaces and qualified quality; that is, use qualified new heating tubes as standard parts to obtain standard data, and then compare the relevant data of the heating tubes after working for a period of time with them to evaluate the working status of the heating tubes after working;

[0134] Get the temperature value T detected by the first heat pipe temperature sensor B01 , control the first heating tube 21 to work under the set voltage U1 and current I1, and control the first heating tube 21 to work alone until the temperature value detected by the first heat pipe temperature sensor reaches T max , record the time t at this time B01 In this process, the temperature values ​​detected by the first heat pipe temperature sensor at different working times are collected, and the time-heat pipe temperature curve of the first heating pipe 21 is plotted with the working time as the horizontal axis and the temperature value detected by the first heat pipe temperature sensor as the vertical axis, that is, the standard working curve f of the first heating pipe 21 B1 , wherein the time when the first heating tube 21 starts working is 0, and the temperature value detected by the first heat tube temperature sensor at 0 is T B01 , f B1 The origin is (0, T B01 );

[0135] S3-1-2, according to the same method as step S3-1-1, control the second heating tube 22 and the third heating tube 23 to work separately, and obtain the standard working curve f of the second heating tube 22 B2 and the standard working curve f of the third heating tube 23 B3 ;

[0136] S3-2, at regular intervals (for example, every 5 days, which is selected according to actual work requirements), the heating parameter optimization module 32 collects self-detection data of the heating tube assembly 2 using the following method:

[0137] The self-detection data includes the actual working curve f of the first heating tube 21. B1 , the actual working curve f of the second heating tube 22 B2 and the actual working curve f of the third heating tube 23 B3 ;

[0138] S3-2-1, obtaining the self-detection data f1 of the first heating tube 21:

[0139] The main pipe solenoid valve 43 and the auxiliary pipe solenoid valve 44 are controlled to remain closed, and the first heating pipe 21, the second heating pipe 22, and the third heating pipe 23 are controlled to stop working;

[0140] Get the temperature value T detected by the first heat pipe temperature sensor 01 , control the first heating tube 21 to work alone at the set voltage U1 and current I1 until the temperature value detected by the first heat pipe temperature sensor reaches 1.5T 01 , record the time t at this time 01 In this process, the temperature values ​​detected by the first heat pipe temperature sensor at different working times are collected, and the time-heat pipe temperature curve of the first heating pipe 21 is plotted with the working time as the horizontal axis and the temperature value detected by the first heat pipe temperature sensor as the vertical axis, that is, the actual working curve f1 of the first heating pipe 21, wherein the time when the first heating pipe 21 starts working is taken as time 0, and the temperature value detected by the first heat pipe temperature sensor at time 0 is T 01 , then the origin and end point of f1 are (0, T 01 )、(t 01 , 1.5T 01 );Among them, 1.5T 01 <T max ;

[0141] S3-2-2, obtaining the self-detection data f2 of the second heating tube 22 and the self-detection data f3 of the third heating tube 23 in the same manner as step 3-2-1;

[0142] S3-3, judging the working state of the first heating tube 21:

[0143] S3-3-1. Data extraction:

[0144] Reference Figure 7 , the curve f B1 and f1 are placed in the same coordinate system, and the following data are obtained on the actual working curve f1: end point (t 01 , 1.5T 01 ) and the origin (0, T 01 ) is the slope k of the line l1 between 01 ;

[0145] In the standard working curve f B1 Get the data from the top: first get the temperature of 1.5T 01 The corresponding horizontal coordinate value t B01 , then get the point (t B01 , 1.5T 01 ) and point (0, T 01 ) B The slope k B01 ;

[0146] The end point of the curve f1 (t 01 , 1.5T 01 ) and curve f B1 Point on (t B01 , 1.5T 01 ) Connect through line segment L to obtain curve f1, line segment L and curve f B1 The area of ​​the closed area formed between them is △S1; get the vertical coordinate range in T 01 Up to 1.5T 01 Between, curve f B1 The area S of the region surrounded by the horizontal axis B1 ;

[0147] S3-3-2. Compare and analyze data to determine the working status:

[0148] When k 01 ≥A1k B01 ,△S1≤B1S B1 When the first heating tube 21 is judged to be in a normal working state;

[0149] When A2k B01 ≤k 01 <A1k B01 、B1S B1 <△S1≤B2S B1 When the first heating tube 21 is in a high power consumption working state, it is judged that cleaning is required;

[0150] When k 01 <A2k B01 Or △S1>B2S B1 When the first heating tube 21 is abnormal, it is judged that the first heating tube 21 is working abnormally and needs to be repaired;

[0151] S3-4. According to the same method as step S3-3, the working states of the second heating tube 22 and the third heating tube 23 are determined respectively.

[0152] After long-term use, the heating tube will have carbon deposits or scale on its surface, which will reduce the working efficiency of the heating tube. When there is too much dirt, it needs to be cleaned in time to ensure the working effect of the heating tube. However, traditional electric heaters lack the function of monitoring the dirt on the surface of the heating tube. In addition, after long-term use, the heating tube is prone to component aging, which will also significantly reduce the heating efficiency.

[0153] In the present invention, the self-check module 33 can detect the working state of the heating tube and determine whether it needs to be cleaned or repaired. Specifically:

[0154] The working curve of the heating tube (time-heat tube temperature curve) can reflect the heating efficiency of the heating tube and other conditions. By comparing the actual working curve of the heating tube with the standard working curve and taking the standard working curve as a benchmark, it is possible to determine the decrease in the heating efficiency of the heating tube and thus determine its working status.

[0155] Continue to refer to Figure 7 , the slope k of the line l1 01 It can reflect the heating efficiency of the heating tube in this range as a whole, and the slope k 01 The larger the value, the higher the efficiency and the closer it is to the standard curve f B1 The connection l B The slope k B01 ; The size of the area difference △S1 actually reflects the difference between the actual working curve f1 and the standard working curve f B1 The smaller the △S1, the lower the difference. B1 The higher the similarity, the closer the working state of the heating tube is to the standard state. △S1 can reflect the difference between the overall working state of the heating tube (heating efficiency, temperature rise characteristics, etc.) and the standard state. 01 Combined with the area difference △S1, the working state of the heating tube can be better judged. Compared with the judgment by a single parameter, this method can improve the accuracy. For example, when there is a lot of dirt on the surface, the slope k 01 will be significantly reduced, △S1 will be significantly increased; but the slope k 01 If the decrease is too large or △S1 increases too much, it means that the heating tube may have aging components and other phenomena, causing significant performance reduction, and needs to be repaired.

[0156] Therefore, in the above judgment method, when k 01 ≥A1k B01 ,△S1≤B1S B1 When A2k B01 ≤k 01 <A1k B01 、B1S B1 <△S1≤B2S B1 When k 01 <A2k B01 Or △S1>B2S B1 When the heating tube is judged to have excessive performance degradation, it is likely that the device is aged or damaged and needs to be repaired in time.

[0157] In a preferred embodiment, A1=0.85-0.95, A2=0.75-0.85, B1=0.01-0.1, B2=0.1-0.35. Further, in this embodiment, A1=0.9, A2=0.85, B1=0.05, B2=0.15.

[0158] Effect test

[0159] Test Case

[0160] Based on the electric heater of Example 1, the method of Example 2 is used to control the heating of the liquid heat-conducting medium, and the total flow rate Qz of the liquid heat-conducting medium input into the total liquid inlet pipe 4 is set to 50m 3 / h, and tested the total energy consumption of the heating tube assembly 2 under different target temperatures (i.e., the temperature to which the liquid heat-conducting medium needs to be heated) compared with the control example.

[0161] Comparison Example

[0162] The only difference between the control example and the test example is that all heating tubes maintain the same operating temperature so that the liquid heat-conducting medium reaches the target temperature (the temperature of the liquid heat-conducting medium after heating is detected by the second medium temperature sensor on the liquid outlet pipe 5, and the operation of the heating tube is controlled by a conventional feedback adjustment mechanism so that the temperature value detected by the second medium temperature sensor is maintained near the target temperature); the flow ratio parameters use fixed values, and K1, K2, and K3 are all 1 / 8.

[0163] The total energy consumption value W of the heating tube assembly 2 of the control example is D As a benchmark, the total energy consumption W of the heating tube assembly 2 in the test example is C Compare with the control example and calculate the energy consumption coefficient η:

[0164]

[0165] That is, the lower the energy consumption coefficient η, the smaller the energy consumption value;

[0166] The results are shown in Table 1 below:

[0167] Table 1

[0168] Target temperature / ℃ 120 150 180 Energy consumption coefficient η Test Case 91.4% 90.6% 89.7%

[0169] It can be seen from the test results that after the heating parameters are optimized according to Example 2, the energy consumption can be significantly reduced.

[0170] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes. They can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to specific details.

Claims

1. A highly efficient and energy-saving electric heater, characterized in that: The heater comprises a cylindrical heater housing arranged in a horizontal direction, a heating tube assembly arranged in a heating chamber of the heater housing, a heating controller connected to the heating tube assembly, a main liquid inlet pipe and a liquid outlet pipe arranged on the heater housing, wherein the end of the main liquid inlet pipe is connected in parallel with a main liquid inlet pipe and an auxiliary liquid inlet pipe; The heating chamber is divided by a first partition and a second partition to form a first sub-heating chamber, a second sub-heating chamber and a third sub-heating chamber in sequence, the main liquid inlet pipe is arranged at the first end of the heater housing in a horizontal direction and communicates with the first sub-heating chamber, the heating tube assembly includes a first heating tube arranged in the first sub-heating chamber, a second heating tube arranged in the second sub-heating chamber and a third heating tube arranged in the third sub-heating chamber; The heating controller is arranged at the second end of the heater housing, and the ends of the first heating tube, the second heating tube and the third heating tube all extend from the second end of the heater housing and are all connected to the heating controller; The heating controller controls the first heating tube, the second heating tube, and the third heating tube to operate at the same voltage and different currents to achieve different operating temperatures; The liquid heat-conducting medium entering from the main liquid inlet pipe is heated by the first heating pipe, the second heating pipe, and the third heating pipe in sequence, and is discharged from the liquid outlet pipe after reaching the target temperature.

2. The energy-efficient electric heater according to claim 1, characterized in that: The auxiliary liquid inlet pipe is arranged on the outer wall of the first end of the heater housing, the auxiliary liquid inlet pipe is arranged on the cylindrical outer wall of the heater housing in a tangential communication, the auxiliary liquid inlet pipe is communicated with the first sub-heating chamber, and the auxiliary liquid inlet pipe is perpendicular to the main liquid inlet pipe; The outer wall of the heater housing is also provided with a first shunt liquid outlet pipe communicating with the first sub-heating chamber, a first shunt liquid inlet pipe communicating with the second sub-heating chamber, a second shunt liquid outlet pipe communicating with the second sub-heating chamber, and a second shunt liquid inlet pipe communicating with the third sub-heating chamber. The first shunt liquid inlet pipe and the second shunt liquid inlet pipe are both tangentially connected and arranged on the cylindrical outer wall of the heater housing, and are both perpendicular to the main liquid inlet pipe. The auxiliary liquid inlet pipe is located below the heater housing, the first shunt liquid outlet pipe and the first shunt liquid inlet pipe are both located above the heater housing, and the second shunt liquid outlet pipe and the second shunt liquid inlet pipe are both located below the heater housing; A first guide port connecting the first sub-heating chamber and the second sub-heating chamber is formed above the first partition plate, and a second guide port connecting the second sub-heating chamber and the third sub-heating chamber is formed below the second partition plate.

3. The energy-efficient electric heater according to claim 2, characterized in that: The main liquid inlet pipe and the auxiliary liquid inlet pipe are respectively provided with a main pipe solenoid valve and an auxiliary pipe solenoid valve; The first shunt outlet pipe and the first shunt inlet pipe are connected via a first shunt branch pipe, the second shunt outlet pipe and the second shunt inlet pipe are connected via a second shunt branch pipe, and the first shunt branch pipe and the second shunt branch pipe are respectively provided with a first shunt solenoid valve and a second shunt solenoid valve.

4. The energy-efficient electric heater according to claim 3, characterized in that: The main liquid inlet pipe and the liquid outlet pipe are respectively provided with a first medium temperature sensor and a second medium temperature sensor; the first heating tube, the second heating tube and the third heating tube are respectively provided with a first heat pipe temperature sensor for detecting the working temperature of the first heating tube, a second heat pipe temperature sensor for detecting the working temperature of the second heating tube and a third heat pipe temperature sensor for detecting the working temperature of the third heating tube; the main liquid inlet pipe is also provided with a flow meter for detecting the flow rate of the liquid heat transfer medium in the main liquid inlet pipe.

5. The energy-efficient electric heater according to claim 4, characterized in that: The heating controller includes a control module, a heating parameter optimization module and a self-checking module, wherein the heating parameter optimization module is a parameter optimization network model based on a machine learning algorithm; The heating parameter optimization module is based on the total flow rate Qz of the liquid heat-conducting medium input into the total liquid inlet pipe, the target temperature T of the liquid heat-conducting medium to be heated FL The heating parameters are optimized, including: the working temperature T1 of the first heating tube, the working temperature T2 of the second heating tube, the working temperature T3 of the third heating tube, and the ratio K1 of the flow rate of the liquid heat-conducting medium in the auxiliary liquid inlet pipe to the total flow rate Qz, the ratio K2 of the flow rate of the liquid heat-conducting medium in the first branch liquid outlet pipe to the total flow rate Qz, and the ratio K3 of the flow rate of the liquid heat-conducting medium in the second branch liquid outlet pipe to the total flow rate Qz; The heater shell is provided with a first flushing port, a second flushing port, and a third flushing port which are respectively connected to the first sub-heating chamber, the second sub-heating chamber, and the third sub-heating chamber for flushing the heating tube assembly; the self-inspection module detects the working status of the heating tube assembly to determine whether the heating tube assembly needs to be flushed or repaired.

6. A control method for a high-efficiency energy-saving electric heater as claimed in claim 5, characterized in that: The following steps are involved: S1, the heating parameter optimization module is based on the total flow rate Qz of the liquid heat-conducting medium input into the total liquid inlet pipe, the preset target temperature T of the liquid heat-conducting medium to be heated FL Get the optimized heating parameters C y , the heating parameter C y Including working temperature parameter group and flow ratio parameter group; The working temperature parameter group includes: the working temperature T of the first heating tube 1y , the working temperature of the second heating tube T 2y , the working temperature of the third heating tube T 3y ; The flow ratio parameter group includes: the ratio K of the flow rate of the liquid heat transfer medium in the auxiliary liquid inlet pipe to the total flow rate Qz 1y , the ratio K of the flow rate of the liquid heat-conducting medium in the first branch outlet pipe to the total flow rate Qz 2y , the ratio K of the flow rate of the liquid heat-conducting medium in the second branch outlet pipe to the total flow rate Qz 3y ; S2, the control module obtains the result of the heating parameter optimization module, and according to the heating parameter C y Control the first heating tube to have a voltage U and a current I 1y Working to reach the working temperature T 1y ; Make the second heating tube with voltage U and current I 2y Working to reach the working temperature T 2y ; Make the third heating tube with voltage U and current I 3y Working to reach the working temperature T 3y ; The control module is based on the heating parameter C y : The main solenoid valve and the auxiliary solenoid valve are controlled so that the ratio of the flow rate of the liquid heat transfer medium in the auxiliary liquid inlet pipe to the total flow rate Qz is K 1y ; The first flow splitting solenoid valve is controlled so that the ratio of the flow rate of the liquid heat-conducting medium in the first flow splitting outlet pipe to the total flow rate Qz is K 2y ; The second flow splitting solenoid valve is controlled so that the ratio of the flow rate of the liquid heat-conducting medium in the second flow splitting outlet pipe to the total flow rate Qz is K 3y ; S3. The self-check module regularly checks the working status of the heating tube assembly to determine whether the heating tube assembly needs to be flushed or repaired.

7. The control method of the energy-efficient electric heater according to claim 6, characterized in that: The heating parameter optimization module is constructed by the following method: S1-1. Construct training data set U: S1-1-1, fixed total flow Qz, target temperature T FL The flow ratio parameter group K1, K2, and K3 remain unchanged, and the N groups of different heating tube working temperature combination values ​​Z are obtained within the set temperature limit range. Ti , Z Ti Including the working temperature T of the first heating tube 1i , the working temperature of the second heating tube T 2i , the working temperature of the third heating tube T 3i , denoted by Z Ti =(T 1i , T 2i , T 3i ); Among them, in each heating tube working temperature combination value Z Ti Under this condition, the temperature of the liquid heat transfer medium discharged from the liquid outlet pipe is T FL ; Where i = 1, 2, ..., N; the temperature limit range specifically includes: γ1T FL ≤T 1i <γ2T FL ,γ2T FL ≤T 2i ≤γ3T FL , and γ3T FL ≤T 3i ≤γ4T FL ; Wherein γ1, γ2, γ3, and γ4 are all pre-set temperature coefficients, and γ1<γ2<γ3<γ4, γ1, γ2, and γ3 are all less than 1, and γ4 is greater than 1; In each heating tube working temperature combination value Z Ti Under this condition, the total energy consumption of the first heating tube, the second heating tube and the third heating tube is calculated, and then the minimum value is obtained, which is recorded as the extremely low energy consumption value gMin Wi ; Extremely low energy consumption gMin Wi The corresponding heating tube working temperature combination value is recorded as the extremely low energy consumption optimized temperature parameter combination value Z Ti-gmin , Z Ti-gmin =(T 1i-gmin , T 2i-gmin , T 3i-gmin ), T 1i-gmin , T 2i-gmin , T 3i-gmin Respectively represent the corresponding working temperatures of the first heating tube, the second heating tube and the third heating tube at this time; S1-2. Change the values ​​of flow ratio parameter groups K1, K2, and K3 in the same way as step 1, obtain the corresponding extremely low energy consumption value under each flow ratio parameter group, and then obtain the minimum value from all extremely low energy consumption values, which is recorded as the minimum energy consumption value Min. W , minimum energy consumption value Min W The corresponding working temperatures of the first heating tube, the second heating tube and the third heating tube are respectively recorded as T 1-min , T 2-min , T 3-min , the corresponding flow ratio parameter group is recorded as K 1-min , K 2-min , K 3-min , T 1-min , T 2-min , T 3-min , K 1-min , K 2-min , K 3-min Combined, we get the total flow rate Qz and target temperature T FL The optimal heating parameter under y-op (T, K), that is, C y-op (T, K) = (T 1-min , T 2-min , T 3-min , K 1-min , K 2-min , K 3-min ), Qz, T FL , C y-op (T, K) is combined into a training data u; S1-3, change the value of total flow Qz and target temperature T FL According to the method of steps 1-2, obtain several training data, combine all the training data, and obtain the training data set U; S1-4, using the training data set U, with total flow Qz, target temperature T FL is the input, optimal heating parameter C y-op (T, K) is the target output, and the RNN recurrent neural network is trained. After the training is completed, the heating parameter optimization module is obtained.

8. The control method of the high-efficiency and energy-saving electric heater according to claim 7, characterized in that: γ1=0.8, γ2=0.85, γ3=0.95, γ4=1.

15.

9. The control method of the energy-efficient electric heater according to claim 6, characterized in that: Step S3 is specifically as follows: S3-1. Obtain the test comparison data in advance by the following methods: The detection comparison data includes the standard working curve f of the first heating tube. B1 , Standard working curve f of the second heating tube B2 And the standard working curve f of the third heating tube B3 ; S3-1-1. Fill the heater housing with liquid heat-conducting medium, control the main solenoid valve and the auxiliary solenoid valve to remain closed, and control the first heating tube, the second heating tube, and the third heating tube to stop working; the first heating tube, the second heating tube, and the third heating tube are all new products with clean surfaces and qualified quality; Get the temperature value T detected by the first heat pipe temperature sensor B01 , control the first heating tube to work under the set voltage U1 and current I1, and control the first heating tube to work alone until the temperature value detected by the first heat pipe temperature sensor reaches T max , record the time t at this time B01 In this process, the temperature values ​​detected by the first heat pipe temperature sensor at different working times are collected, and the time-heat pipe temperature curve of the first heating pipe is plotted with the working time as the horizontal axis and the temperature value detected by the first heat pipe temperature sensor as the vertical axis, that is, the standard working curve f of the first heating pipe B1 , where the time when the first heating tube starts working is taken as time 0, and the temperature value detected by the first heat pipe temperature sensor at time 0 is T B01 , f B1 The origin is (0, T B01 ); S3-1-2, according to the same method as step S3-1-1, control the second heating tube and the third heating tube to work separately, and obtain the standard working curve f of the second heating tube B2 And the standard working curve f of the third heating tube B3 ; S3-2. At fixed intervals, the heating parameter optimization module collects self-detection data of the heating tube assembly using the following method: The self-test data includes the actual working curve f of the first heating tube. B1 , the actual working curve f of the second heating tube B2 and the actual working curve f of the third heating tube B3 ; S3-2-1, obtaining the self-detection data f1 of the first heating tube: The main solenoid valve and the auxiliary solenoid valve are controlled to remain closed, and the first heating tube, the second heating tube, and the third heating tube are controlled to stop working; Get the temperature value T detected by the first heat pipe temperature sensor 01 , control the first heating tube to work alone at the set voltage U1 and current I1 until the temperature value detected by the first heat pipe temperature sensor reaches 1.5T 01 , record the time t at this time 01 In this process, the temperature values ​​detected by the first heat pipe temperature sensor at different working times are collected, and the time-heat pipe temperature curve of the first heating pipe is plotted with the working time as the horizontal axis and the temperature value detected by the first heat pipe temperature sensor as the vertical axis, that is, the actual working curve f1 of the first heating pipe, wherein the time when the first heating pipe starts working is taken as time 0, and the temperature value detected by the first heat pipe temperature sensor at time 0 is T 01 , then the origin and end point of f1 are (0, T 01 )、(t 01 , 1.5T 01 );Among them, 1.5T 01 <T max ; S3-2-2, obtaining the self-detection data f2 of the second heating tube and the self-detection data f3 of the third heating tube in the same manner as step 3-2-1; S3-3, judging the working state of the first heating tube: S3-3-1. Data extraction: The curve f B1 and f1 are placed in the same coordinate system, and the following data are obtained on the actual working curve f1: end point (t 01 , 1.5T 01 ) and the origin (0, T 01 ) is the slope k of the line between 01 ; In the standard working curve f B1 Get the data from the top: first get the temperature of 1.5T 01 The corresponding horizontal coordinate value t B01 , then get the point (t B01 , 1.5T 01 ) and point (0, T 01 ) is the slope k of the line between B01 ; The end point of the curve f1 (t 01 , 1.5T 01 ) and curve f B1 Point on (t B01 , 1.5T 01 ) Connect through line segment L to obtain curve f1, line segment L and curve f B1 The area of ​​the closed area formed between them is △S1; get the vertical coordinate range in T 01 Up to 1.5T 01 Between, curve f B1 The area S of the region surrounded by the horizontal axis B1 ; S3-3-2. Compare and analyze data to determine the working status: When k 01 ≥A1k B01 ,△S1≤B1S B1 When the first heating tube is judged to be in a normal working state; When A2k B01 ≤k 01 <A1k B01 、B1S B1 <△S1≤B2S B1 When the first heating tube is in a high power consumption working state, it is judged that the first heating tube needs to be cleaned; When k 01 <A2k B01 Or △S1>B2S B1 When the first heating tube is abnormal, it is judged that the first heating tube is working abnormally and needs to be repaired; S3-4. According to the same method as step S3-3, the working states of the second heating tube and the third heating tube are determined respectively.

10. The control method of the high-efficiency and energy-saving electric heater according to claim 9, characterized in that: in, A1=0.85~0.95, A2=0.75~0.85; B1=0.01~0.1, B2=0.1~0.35.

Citation Information

Patent Citations

  • Heat energy pipeline type liquid electric heater

    CN221858826U