A tool for laying anti-seepage coiled material at the corner of a groove
By designing a tool for anti-seepage coil laying at the corners of the groove including a triangle hanging frame and an auxiliary hoisting structure, the problem that existing equipment is difficult to ensure the quality of laying at the corners of the corners is solved, and efficient vertical laying of anti-seepage coils is achieved.
Patent Information
- Application Number
- CN201810120399.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-02-06
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2038-02-06
AI Technical Summary
The existing vertical laying equipment for anti-seepage coils is difficult to ensure good laying quality in corners and reduces construction efficiency.
A tool for laying anti-seepage coils at the corners of the grooves including a triangle hanger and an auxiliary hoisting structure was designed. Through the cooperation of the isosceles triangle hanger and an auxiliary hoisting structure, the flat and stable lowering of the anti-seepage coils is achieved.
It effectively improves the laying quality and construction efficiency of anti-seepage coils at corners, and can meet the laying needs of corners in grooves with different angles and side lengths.
Smart Images

Figure CN108104486B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of vertical anti-seepage, and in particular to a tool for laying anti-seepage coiled materials at groove corners. Background Art
[0002] With the increase of environmental protection efforts, the control of pollutants in China is becoming increasingly strict, and building vertical anti-seepage walls around pollutants is an effective means to prevent the spread of pollutants. Conventional vertical anti-seepage walls cannot meet the requirements of environmental protection and anti-seepage due to their single function. Therefore, in order to solve this problem, the current vertical anti-seepage technology is to add high-performance geotechnical anti-seepage materials, such as GCL, geomembrane, etc., into conventional anti-seepage walls to form a composite vertical anti-seepage barrier with conventional vertical anti-seepage walls to meet the requirements of environmental protection and anti-seepage. However, the existing anti-seepage rolls are difficult to construct in the vertical direction, especially in vertical anti-seepage walls without human working surfaces. Professional equipment must be used to complete the vertical laying of materials. Although there are more and more equipment for vertical laying of anti-seepage rolls, however, for the vertical laying of anti-seepage rolls at corners, the existing equipment only solves the vertical lowering of anti-seepage rolls, which is not only difficult to ensure the good laying quality of anti-seepage rolls at corners, but also reduces the construction efficiency. Therefore, a special tool for laying anti-seepage rolls at the corners of grooves is needed to improve the laying quality and efficiency of anti-seepage rolls during the vertical construction process of corners. Summary of the invention
[0003] The main purpose of the present invention is to solve the problems existing in the prior art and to provide a simple and practical trench corner anti-seepage roll laying tool which can ensure the smooth and stable lowering of the anti-seepage roll during the vertical construction process of the corners in trenches at different angles, effectively improve the construction efficiency and meet the requirements of good laying quality of the anti-seepage roll in the corners of trenches with different side lengths.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a tool for laying anti-seepage coiled materials at the corner of a groove, wherein the tool for laying anti-seepage coiled materials at the corner of a groove comprises a triangular hanger and an auxiliary hanging structure, the auxiliary hanging structure is fixed on the triangular hanger, and the triangular hanger is arranged to be an isosceles triangle structure;
[0005] The triangular hanger is configured to include two groups of steel waist pipes, a steel bottom pipe and a connecting structure, a connecting portion is formed between the starting ends of the two groups of steel waist pipes, between the end of the steel waist pipe and the starting end of the steel bottom pipe, and between the end of the steel waist pipe and the end of the steel bottom pipe, and the connecting structure is arranged on the connecting portion;
[0006] The auxiliary lifting structure is fixed on the connecting structure.
[0007] Furthermore, the steel bottom tube is configured to include an outer tube, two groups of inner tubes and two groups of locking structures. The two ends of the inner cavity of the outer tube are respectively matched and a group of inner tubes are coaxially inserted, and a slot is opened on the outer tube along its axial direction. A plurality of through holes are opened on the two groups of inner tubes at equal intervals along their axial direction. The two groups of locking structures are penetrated at the joint of the outer tube and the inner tube.
[0008] Furthermore, the locking structure is configured to include a pad 1, a pad 2 and a locking piece, and the pad 1 and the pad 2 are correspondingly arranged on both sides of the outer tube slot, and the locking piece cooperates to pass through the pad 1, the outer tube slot, the inner tube through hole and the pad 2 in sequence.
[0009] Furthermore, the angle between the steel waist pipe and the steel bottom pipe ranges from 60° to 170°.
[0010] Furthermore, an auxiliary installation structure is also provided on the triangular hanger, and the auxiliary installation structure is provided to include steel pipe 1 and steel pipe 2, and the steel pipe 1 and steel pipe 2 are respectively fixed on the steel waist pipe.
[0011] Furthermore, the connection structure is configured to include connecting steel plate one, connecting steel plate two and fasteners, wherein connecting steel plate one and connecting steel plate two are correspondingly arranged on both sides of the connecting portion, and the fasteners pass through connecting steel plate one, the connecting portion and connecting steel plate two in sequence.
[0012] Furthermore, the auxiliary lifting structure is configured to include three groups of lifting ropes, the starting ends of the three groups of lifting ropes are respectively passed through and fixed in the connecting structure, and the ends of the three groups of lifting ropes are fixed together.
[0013] Furthermore, the auxiliary lifting structure is configured to include three groups of lifting chains and lifting ropes, the three groups of lifting chains are passed through and fixed in the connecting structure, and the starting ends of the lifting ropes are respectively fixed on the lifting chains, and the ends of the three groups of lifting ropes are fixed together.
[0014] Furthermore, the locking member and the fastening member are both configured as a bolt or a latch.
[0015] Furthermore, the length of the steel waist pipe is 3.5-4.5m.
[0016] The advantages and positive effects of the present invention are:
[0017] (1) Through the coordination of the isosceles triangle hanger structure and the auxiliary lifting structure, the anti-seepage roll to be laid can be bound to the two steel waist pipes during the vertical laying of the anti-seepage roll in the trench. When the triangle hanger is lifted by the auxiliary lifting structure, the anti-seepage roll to be laid can be lowered flatly and stably. Special corner construction tools are used to effectively ensure the good laying quality and construction efficiency of the anti-seepage roll at the corner of the trench.
[0018] (2) Through the coordination of the outer tube, inner tube and locking structure in the steel bottom tube, when the corner angles of the trench to be laid are inconsistent, the insertion length of the inner tube in the outer tube can be adjusted to adjust the overall length of the steel bottom tube, so that the angle between the two groups of steel waist tubes is the same as the corner angle of the trench to be laid, thereby meeting the laying requirements of different trench corners and improving the applicability of the triangular hanger.
[0019] (3) Through the structure of pad 1, pad 2 and locking piece, the locking piece can pass through pad 1, outer tube slot, inner tube through hole and pad 2 in sequence to lock the inner tube inserted in the outer tube, and pad 1 and pad 2 increase the force-bearing area of the locking position, further improving the locking reliability of the outer tube and inner tube plug-in joint. At the same time, the locking structure is simple and practical, and the cost is low.
[0020] (4) By directly inserting the lifting rope into the connection structure, or by inserting the lifting chain into the connection structure and then tying the lifting rope to the lifting chain, the length of the lifting rope can be conveniently adjusted according to the center of gravity position of the entire triangular hanger on which the anti-seepage membrane to be laid is installed, so as to prevent the entire structure from shifting after lifting, affecting the construction quality and possible safety hazards.
[0021] (5) By setting up the auxiliary installation structure, when the length difference between the two sides of the corner of the groove to be laid is large, the anti-seepage roll material to be laid can be firstly tied thereon, and then the whole structure can be tied to the triangular hanger to assist in achieving good laying of the groove corner with large difference in side length. The structure is simple and easy to operate. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the top structure of the first embodiment of the present invention.
[0023] Figure 2 It is a schematic diagram of the top structure of the second embodiment of the present invention.
[0024] Figure 3 yes Figure 1 Schematic diagram of the local enlarged structure.
[0025] Figure 4 It is a schematic diagram of the connection structure part in the present invention.
[0026] Figure 5 It is a schematic diagram of the locking structure part of the present invention.
[0027] Figure 6 It is a structural schematic diagram of the steel bottom pipe part in the present invention.
[0028] Figure 7 It is a working state structure diagram of the present invention.
[0029] In the figure: triangular hanger 10, steel waist tube 101, steel bottom tube 102, connecting steel plate 1 103, connecting steel plate 2 104, fastener 105, outer tube 106, inner tube 107, slot 108, through hole 109, pad 1 110, pad 2 111, locking piece 112, auxiliary lifting structure 20, lifting rope 201, lifting chain 202, auxiliary installation structure 30, steel pipe 1 301, steel pipe 2 302. DETAILED DESCRIPTION
[0030] In order to better understand the present invention, the present invention is further described below in conjunction with specific embodiments and drawings.
[0031] Embodiment 1: Figure 1 As shown, a tool for laying anti-seepage coiled materials at the corner of a groove includes a triangular hanger 10 and an auxiliary hanging structure 20. The auxiliary hanging structure 20 is fixed on the triangular hanger 10, and the triangular hanger 10 is arranged to be an isosceles triangle structure. The triangular hanger 10 is arranged to include two groups of steel waist pipes 101, a steel bottom pipe 102 and a connecting structure. A connecting part is formed between the starting ends of the two groups of steel waist pipes 101, between the end of the steel waist pipe 101 and the starting end of the steel bottom pipe 102, and between the end of the steel waist pipe 101 and the end of the steel bottom pipe 102, and the angle between the steel waist pipe 101 and the steel bottom pipe 102 is in the range of 6 0°-170°, the length of the steel waist pipe 101 is 3.5-4.5m, and through the cooperation of the isosceles triangle hanger 10 structure and the auxiliary lifting structure 20, the anti-seepage coiled material to be laid can be bound to the two steel waist pipes 101 during the vertical laying of the anti-seepage coiled material in the groove, so that when the triangle hanger 10 is lifted by the auxiliary lifting structure 20, the anti-seepage coiled material to be laid can be lowered flatly and stably, thereby effectively ensuring the good laying quality of the anti-seepage coiled material in the groove corner, avoiding the problem of multiple adjustments of the anti-seepage coiled material to meet the laying effect when the groove corner is directly laid, thereby improving the construction efficiency. Figure 3 and Figure 4 As shown, the connection structure is arranged on the connection part, and the connection structure is arranged to include a connection steel plate 103, a connection steel plate 104 and a fastener 105. The connection steel plate 103 and the connection steel plate 104 are correspondingly arranged on both sides of the connection part, and the fastener 105 passes through the connection steel plate 103, the connection part and the connection steel plate 104 in sequence. Through the structure of the connection steel plate 103, the connection steel plate 104 and the fastener 105, the reliable fastening of the connection part can be guaranteed, and the connection structure is easy to install and has low cost.
[0032] like Figure 5As shown, the steel bottom pipe 102 is configured to include an outer pipe 106, two groups of inner pipes 107 and two groups of locking structures. Two ends of the inner cavity of the outer pipe 106 are respectively matched and a group of inner pipes 107 are coaxially inserted, and a slot 108 is provided on the outer pipe 106 along its axial direction, and a plurality of groups of through holes 109 are evenly spaced along the axial direction of the two groups of inner pipes 107. The two groups of locking structures are penetrated at the connection between the outer pipe 106 and the inner pipe 107. Through the cooperation of the outer pipe 106, the inner pipe 107 and the locking structure in the steel bottom pipe 102, when the corner angles of the groove to be laid are inconsistent, the insertion length of the inner pipe 107 in the outer pipe 106 can be adjusted to achieve the adjustment of the overall length of the steel bottom pipe 102, so that the angle between the two groups of steel waist pipes 101 is the same as the corner angle of the groove to be laid, thereby meeting the laying requirements of different groove corners and improving the applicability of the triangular hanger 10. Figure 6 As shown, the locking structure is configured to include a pad 110, a pad 2 111 and a locking piece 112. The pad 110 and the pad 2 111 are correspondingly arranged on both sides of the outer tube slot 108. The locking piece 112 cooperates with the pad 1 110, the outer tube slot 108, the inner tube through hole 109 and the pad 2 111 to sequentially pass through the pad 1 110, the outer tube slot 108, the inner tube through hole 109 and the pad 2 111. Through the structure of the pad 110, the pad 2 111 and the locking piece 112, the locking piece 112 can sequentially pass through the pad 1 110, the outer tube slot 108, the inner tube through hole 109 and the pad 2 111 to achieve locking of the inner tube 107 inserted in the outer tube 106. The pad 110 and the pad 2 111 increase the force area of the locking position, further improving the locking reliability of the outer tube 106 and the inner tube 107 plug-in joint. At the same time, the locking structure is simple, practical and low in cost.
[0033] The locking member 112 and the fastener 105 are both configured as a bolt or a latch, that is, the locking member 112 and the fastener 105 are configured as a bolt-matching nut structure or a latch structure to ensure the locking effect.
[0034] like Figure 1 and Figure 7As shown, the auxiliary lifting structure 20 is fixed on the connecting structure, and the auxiliary lifting structure 20 can be configured to include three groups of lifting ropes 201, the starting ends of the three groups of lifting ropes 201 are respectively passed through and fixed in the connecting structure, and the ends of the three groups of lifting ropes 201 are fixed together; the auxiliary lifting structure 20 can also be configured to include three groups of lifting chains 202 and lifting ropes 201, the three groups of lifting chains 202 are passed through and fixed in the connecting structure, and the starting ends of the lifting ropes 201 are respectively fixed on the lifting chains 202, and the ends of the three groups of lifting ropes 201 are fixed together. By directly passing the lifting ropes 201 through the connecting structure, or by using the structure in which the lifting chains 202 are passed through the connecting structure and then the lifting ropes 201 are tied to the lifting chains 202, the length of the lifting ropes 201 can be conveniently adjusted according to the center of gravity position of the whole triangular hanger 10 on which the anti-seepage membrane to be laid is lifted, so as to prevent the whole from shifting after lifting, affecting the construction quality and possible safety hazards.
[0035] The anti-seepage membrane can be GCL, geomembrane or composite geomembrane, etc. In addition, in order to ensure that the anti-seepage membrane can be lowered flat, a support plate and a counterweight can be added to its bottom, and the angle of the support plate should be the same as the corner.
[0036] Embodiment 2: Figure 2 As shown, a tool for laying anti-seepage coiled materials at the corner of a groove includes a triangular hanger 10 and an auxiliary hanging structure 20. The auxiliary hanging structure 20 is fixed on the triangular hanger 10, and the triangular hanger 10 is arranged to be an isosceles triangle structure. The triangular hanger 10 is arranged to include two groups of steel waist pipes 101, a steel bottom pipe 102 and a connecting structure. A connecting part is formed between the starting ends of the two groups of steel waist pipes 101, between the end of the steel waist pipe 101 and the starting end of the steel bottom pipe 102, and between the end of the steel waist pipe 101 and the end of the steel bottom pipe 102, and the angle between the steel waist pipe 101 and the steel bottom pipe 102 is in the range of 6 0°-170°, the length of the steel waist pipe 101 is 3.5-4.5m, and through the cooperation of the isosceles triangle hanger 10 structure and the auxiliary lifting structure 20, the anti-seepage coiled material to be laid can be bound to the two steel waist pipes 101 during the vertical laying of the anti-seepage coiled material in the groove, so that when the triangle hanger 10 is lifted by the auxiliary lifting structure 20, the anti-seepage coiled material to be laid can be lowered flatly and stably, thereby effectively ensuring the good laying quality of the anti-seepage coiled material in the groove corner, avoiding the problem of multiple adjustments of the anti-seepage coiled material to meet the laying effect when the groove corner is directly laid, thereby improving the construction efficiency. Figure 3 and Figure 4As shown, the connection structure is arranged on the connection part, and the connection structure is arranged to include a connection steel plate 103, a connection steel plate 104 and a fastener 105. The connection steel plate 103 and the connection steel plate 104 are arranged on both sides of the connection part correspondingly. The fastener 105 passes through the connection steel plate 103, the connection part and the connection steel plate 104 in sequence. Through the structure of the connection steel plate 103, the connection steel plate 104 and the fastener 105, the reliable fastening of the connection part can be ensured, and the connection structure is easy to install and has a low cost. An auxiliary installation structure 30 is also arranged on the triangular hanger 10. The auxiliary installation structure 30 is configured to include a steel pipe 1 301 and a steel pipe 2 302. The steel pipe 1 301 and the steel pipe 2 302 are respectively fixed on the steel waist pipe 101, and the lengths of the steel pipe 1 301 and the steel pipe 2 302 are respectively equal to the corresponding lengths of the corners to be laid. Through the setting of the auxiliary installation structure 30, when the lengths of the two sides of the corners of the groove to be laid are very different, the anti-seepage membrane to be laid can be firstly bound thereto, and then the whole membrane can be bound to the triangular hanger 10 to assist in achieving good laying of the groove corners with large differences in side lengths, and the structure is simple and easy to operate.
[0037] like Figure 5 As shown, the steel bottom pipe 102 is configured to include an outer pipe 106, two groups of inner pipes 107 and two groups of locking structures. Two ends of the inner cavity of the outer pipe 106 are respectively matched and a group of inner pipes 107 are coaxially inserted, and a slot 108 is provided on the outer pipe 106 along its axial direction, and a plurality of groups of through holes 109 are evenly spaced along the axial direction of the two groups of inner pipes 107. The two groups of locking structures are penetrated at the connection between the outer pipe 106 and the inner pipe 107. Through the cooperation of the outer pipe 106, the inner pipe 107 and the locking structure in the steel bottom pipe 102, when the corner angles of the grooves to be laid are inconsistent, the insertion length of the inner pipe 107 in the outer pipe 106 can be adjusted to achieve the adjustment of the overall length of the steel bottom pipe 102, so that the angle between the two groups of steel waist pipes 101 is the same as the corner angle of the groove to be laid, thereby meeting the laying requirements of different groove corners and improving the triangular The applicability of the hanger 10, wherein the locking structure is configured to include a pad 110, a pad 111 and a locking piece 112, the pad 110 and the pad 2 111 are correspondingly arranged on both sides of the outer tube slot 108, the locking piece 112 cooperates to pass through the pad 110, the outer tube slot 108, the inner tube through hole 109 and the pad 2 111 in sequence, through the pad 110, the pad 2 111 and the locking piece 112 structure, the locking piece 112 can pass through the pad 110, the outer tube slot 108, the inner tube through hole 109 and the pad 2 111 in sequence to achieve the locking of the inner tube 107 inserted in the outer tube 106, and the pad 110 and the pad 2 111 increase the force area of the locking position, further improve the locking reliability of the outer tube 106 and the inner tube 107 plug-in joint, and at the same time the locking structure is simple and practical, and the cost is low.
[0038] The locking member 112 and the fastener 105 are both configured as a bolt or a latch, that is, the locking member 112 and the fastener 105 are configured as a bolt-matching nut structure or a latch structure to ensure the locking effect.
[0039] like Figure 1 and Figure 7 As shown, the auxiliary lifting structure 20 is fixed on the connecting structure, and the auxiliary lifting structure 20 can be configured to include three groups of lifting ropes 201, the starting ends of the three groups of lifting ropes 201 are respectively passed through and fixed in the connecting structure, and the ends of the three groups of lifting ropes 201 are fixed together; the auxiliary lifting structure 20 can also be configured to include three groups of lifting chains 202 and lifting ropes 201, the three groups of lifting chains 202 are passed through and fixed in the connecting structure, and the starting ends of the lifting ropes 201 are respectively fixed on the lifting chains 202, and the ends of the three groups of lifting ropes 201 are fixed together. By directly passing the lifting ropes 201 through the connecting structure, or by using the structure in which the lifting chains 202 are passed through the connecting structure and then the lifting ropes 201 are tied to the lifting chains 202, the length of the lifting ropes 201 can be conveniently adjusted according to the center of gravity position of the whole triangular hanger 10 on which the anti-seepage membrane to be laid is lifted, so as to prevent the whole from shifting after lifting, affecting the construction quality and possible safety hazards.
[0040] The anti-seepage membrane can be GCL, geomembrane or composite geomembrane, etc. In addition, in order to ensure that the anti-seepage membrane can be lowered flat, a support plate and a counterweight can be added to its bottom, and the angle of the support plate should be the same as the corner.
[0041] Specifically, taking the 6×15m GCL anti-seepage coiled material to be laid as an example, its own weight is about 550kg, which can reach 3 times its own weight after absorbing water. If there is wind at the construction site, the weight of the product will also increase. The triangular hanger 10 can withstand a pulling force of 2 tons so that it will not bend or deform during the lowering process, thereby ensuring the construction quality. Among them, the steel waist tube 101 has mounting holes at 5cm from both ends, which are used to cooperate with the connection structure to achieve the locking of the connection part; the outer tube 106 is 3-5m long, and there is a slot 108 at 10cm from both ends; the inner tube 107 is 3-4m long, and there is a mounting hole at 5cm from the end of the inner tube 107, which is used to cooperate with the connection structure to achieve the locking of the connection part, and a through hole 109 is opened every 10cm along the axial direction of the inner tube 107; a single hanging rope 201 can withstand a pulling force of 3 tons.
[0042] The trench corner anti-seepage roll laying tool provided by the present invention is simple and practical, and can ensure the smooth and stable laying of the anti-seepage roll in the vertical construction process of the corners of the trenches at different angles, effectively improve the construction efficiency, and can meet the good laying quality of the anti-seepage roll in the corners of the trenches with different side lengths. The working process of the vertical laying tool is as follows:
[0043] 1. Assemble the triangular hanger 10: according to the corner angle of the groove to be laid, adjust the insertion length of the inner tube 107 at both ends of the outer tube 106. After it is adjusted in place, ensure that the slot 108 of the outer tube 106 is aligned with the through hole 109 of the inner tube 107, and place the pad 110 and the pad 2 111 at the slot 108 on the outer tube 106 respectively, so that the locking piece 112 passes through from top to bottom in sequence, thereby adjusting the length of the steel bottom tube 102, and then install the connection structure between the starting end of the steel waist tube 101, between the end of the steel waist tube 101 and the starting end of the steel bottom tube 102, and between the end of the steel waist tube 101 and the end of the steel bottom tube 102, that is, the connecting steel plate 103 and the connecting steel plate 2 104 are respectively placed at the upper and lower positions of the connecting part, and the fasteners 105 pass through from top to bottom in sequence, thereby fixing the adjacent steel pipes in the triangular hanger 10, and completing the assembly of the triangular hanger 10;
[0044] 2. Perform overall installation of the vertical laying tool: at the connection structure in step 1, the starting ends of the three groups of lifting ropes 201 in the auxiliary lifting structure 20 are respectively passed through and fixed in the connection structure, and the ends of the three groups of lifting ropes 201 are fixed together, or the three groups of lifting chains 202 in the auxiliary lifting structure 20 are passed through and fixed in the connection structure, and the starting ends of the lifting ropes 201 are respectively fixed on the lifting chains 202, and the ends of the three groups of lifting ropes 201 are fixed together, thereby completing the overall assembly of the vertical laying tool;
[0045] 3. According to the difference in the length of the sides of the corner of the trench to be laid, determine whether to use the auxiliary installation structure 30 to install the anti-seepage coiled material. If the difference in the length of the sides of the corner of the trench to be laid is small, directly tie the anti-seepage coiled material to the two sets of steel waist pipes 101, and adjust the length of the lifting rope 201 according to the overall center of gravity position of the triangular hanger 10 on which the anti-seepage coiled material to be laid is lifted to ensure the smooth lowering of the anti-seepage coiled material. After it is adjusted in place, it is hoisted as a whole to the position of the trench to be laid for laying; if it is to be laid, the anti-seepage coiled material is directly tied to the two sets of steel waist pipes 101, and the length of the lifting rope 201 is adjusted according to the overall center of gravity position of the triangular hanger 10 on which the anti-seepage coiled material to be laid is adjusted to ensure the smooth lowering of the anti-seepage coiled material. After it is adjusted in place, it is hoisted as a whole to the position of the trench to be laid for laying; If the length difference of the sides of the corner of the laying groove is large, select the steel pipe 1 301 and the steel pipe 2 302 with the same length as the corner to be laid, first bind the anti-seepage coiled material to be laid to the steel pipe 1 301 and the steel pipe 2 302, and then make them respectively bind to the steel waist pipe 101, and then adjust the length of the lifting rope 201 according to the center of gravity position of the whole triangular hanger 10 on which the anti-seepage coiled material to be laid is installed, so as to ensure the smooth lowering of the anti-seepage coiled material, and after it is adjusted in place, it is hoisted as a whole to the position of the groove to be laid for laying;
[0046] 4. When it is necessary to lay grooves with different corner angles, repeat the above steps 1-3 to achieve good laying of grooves with different corner angles.
[0047] The embodiments of the present invention are described in detail above, but the contents described are only preferred embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of this patent.
Claims
1. A tool for laying anti-seepage coiled materials at the corner of a groove, characterized in that: The anti-seepage coiled material laying tool at the groove corner comprises a triangular hanger (10) and an auxiliary hanging structure (20), the auxiliary hanging structure (20) is fixed on the triangular hanger (10), and the triangular hanger (10) is arranged to be an isosceles triangle structure; The triangular hanger (10) is configured to include two groups of steel waist tubes (101), a steel bottom tube (102) and a connection structure, a connection portion is formed between the starting ends of the two groups of steel waist tubes (101), between the end of the steel waist tube (101) and the starting end of the steel bottom tube (102), and between the end of the steel waist tube (101) and the end of the steel bottom tube (102), and the connection structure is arranged on the connection portion; The auxiliary lifting structure (20) is fixed on the connection structure; the steel bottom pipe (102) is configured to include an outer pipe (106), two groups of inner pipes (107) and two groups of locking structures; two ends of the inner cavity of the outer pipe (106) are respectively matched and a group of inner pipes (107) are inserted coaxially, and a slot hole (108) is provided on the outer pipe (106) along its axial direction; a plurality of groups of through holes (109) are provided on the two groups of inner pipes (107) along their axial direction at equal intervals; the two groups The locking structure is arranged at the joint between the outer tube (106) and the inner tube (107); the locking structure is configured to include a backing plate 1 (110), a backing plate 2 (111) and a locking piece (112); the backing plate 1 (110) and the backing plate 2 (111) are correspondingly arranged on both sides of the outer tube slot (108); the locking piece (112) cooperates to pass through the backing plate 1 (110), the outer tube slot (108), the inner tube through hole (109) and the backing plate 2 (111) in sequence.
2. The tool for laying anti-seepage coiled material at the corner of a groove according to claim 1, characterized in that: The angle between the steel waist pipe (101) and the steel bottom pipe (102) ranges from 60° to 170°.
3. The tool for laying anti-seepage coiled material at the corner of a groove according to any one of claims 1-2, characterized in that: An auxiliary mounting structure (30) is also provided on the triangular hanger (10). The auxiliary mounting structure (30) is provided to include a first steel pipe (301) and a second steel pipe (302). The first steel pipe (301) and the second steel pipe (302) are respectively fixed on the steel waist pipe (101).
4. The tool for laying anti-seepage coiled material at the corner of a groove according to claim 1, characterized in that: The connection structure is configured to include a connection steel plate one (103), a connection steel plate two (104) and a fastener (105), wherein the connection steel plate one (103) and the connection steel plate two (104) are correspondingly arranged on both sides of the connection portion, and the fastener (105) passes through the connection steel plate one (103), the connection portion and the connection steel plate two (104) in sequence.
5. The tool for laying anti-seepage coiled material at the corner of a groove according to claim 1, characterized in that: The auxiliary lifting structure (20) is configured to include three groups of lifting ropes (201), the starting ends of the three groups of lifting ropes (201) are respectively passed through and fixed in the connection structure, and the ends of the three groups of lifting ropes (201) are fixed together.
6. The tool for laying anti-seepage coiled material at the corner of a groove according to claim 1, characterized in that: The auxiliary lifting structure (20) is configured to include three groups of lifting chains (202) and lifting ropes (201); the three groups of lifting chains (202) are passed through and fixed in the connection structure; the starting ends of the lifting ropes (201) are respectively fixed on the lifting chains (202); and the ends of the three groups of lifting ropes (201) are fixed together.
7. The tool for laying anti-seepage coiled material at the corner of a groove according to claim 1, characterized in that: The length of the steel waist pipe (101) is 3.5-4.5m.
Citation Information
Patent Citations
Instrument is laid to slot corner portion position prevention of seepage coiled material
CN207934466U
