A diversion device and construction method for foundation pit support construction in narrow areas
By using the combined structure of Larson steel sheet piles and high-pressure jet grouting piles in deep foundation pit construction to form a diversion trough foundation pit and perform underwater concrete sealing, the existing technology's insufficient foundation pit support and diversion capabilities are solved. problem, achieving stable support of the foundation pit and improving construction efficiency.
Patent Information
- Application Number
- CN201911082298.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-07
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2039-11-07
AI Technical Summary
During the construction process, the existing deep foundation pit supporting structures have problems such as insufficient bearing capacity, inflexible construction, high cost, large space constraints, slow hole formation speed and lack of diversion capacity. It is especially difficult to construct foundation pits in narrow areas. Effective support and diversion.
Larson steel sheet piles and H-shaped steel internal supports are used to form the foundation pit support structure, and high-pressure jet grouting piles in the inner and outer rings are arranged around the interception well to form the diversion trough foundation pit, and the combined structure of high-pressure jet grouting piles and H-shaped steel is used for construction. Water stopping and support, combined with underwater concrete sealing wall and reinforced concrete internal support, achieve stable support and diversion of the foundation pit.
It achieves stable support and diversion capacity of the foundation pit, reduces head loss and siltation in bends, improves construction efficiency and quality, reduces disturbance to surrounding buildings, and ensures the safety of the foundation pit.
Smart Images

Figure CN110700280B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a deep foundation pit support structure and a construction method, and more specifically to a diversion device and a construction method for foundation pit support construction in a narrow area. Background Art
[0002] At present, the deep foundation pit support of urban rainwater and sewage culvert renovation projects, the support structure and construction diversion method used for the side walls of the foundation pit and the surrounding environment have the following defects: 1. The single cement soil retaining wall lacks bearing capacity and has large deformation under stress; 2. The soil is squeezed seriously during the sinking of reinforced concrete sheet piles, which is costly, inflexible in construction, and subject to large space restrictions; 3. Bored piles are not suitable for small foundation pits, and the quality is difficult to control, labor-intensive and time-consuming, and the hole-making speed is slow; 4. Traditional foundation pit support only has support bearing capacity, but no construction diversion capacity. Based on this, the improved construction process proposed for the existing deep foundation pit support is as follows:
[0003] The deep foundation pit support of the interception well forms a water-stopping and retaining system through the construction of SMW method piles. After the construction of SMW method piles, the old box culvert is intercepted by the full-section blocking method, and then a submersible pump is used for drainage. The interception well foundation pit is excavated to the top of the box culvert, and the internal support system of the foundation pit is constructed. The excavation continues to the bottom of the interception well foundation pit, and the main structure is constructed. After the construction of the interception well bottom plate and the bottom plate force transmission belt is completed, the steel section is removed.
[0004] However, the above-mentioned deep foundation pit support construction technology is often inflexible, limited by space, difficult to control concrete quality, labor-intensive and time-consuming, and has a slow hole-making speed, which leads to delays in the construction period. Summary of the invention
[0005] The present invention aims to solve the above technical problems at least to a certain extent. To this end, the present invention proposes a diversion device and construction method for foundation pit support construction in a narrow area, so as to meet the needs of foundation pit support while having construction diversion capabilities, thereby achieving foundation pit stability and maintaining the original box culvert flow capacity.
[0006] To achieve the above object, the present invention adopts the following technical solution:
[0007] A diversion device for foundation pit support construction in a narrow area, the structural features of which are:
[0008] The interception well foundation pit is formed by Larsen steel sheet piles and H-shaped steel internal supports to form the foundation pit support structure, and the interception well is used to cut the original box culvert into two sections.
[0009] Construct two inner and outer circles of high-pressure rotary jet piles with the center of the interception well as the center of the circle and arranged concentrically on the periphery of the interception well foundation pit; the inner circle of high-pressure rotary jet piles are inserted with H-shaped steel in a dense insertion manner; the outer circle of high-pressure rotary jet piles are arc-shaped and are inserted with H-shaped steel in a one-by-one insertion manner, with both ends extending to the original box culverts of the front and rear sections respectively, and connected to the inner circle of high-pressure rotary jet piles through a structure of full-hall reinforcement of high-pressure rotary jet piles directly above the original box culverts of the front and rear sections; reinforced concrete inner supports are arranged at a set interval along the circumferential direction between the inner and outer circles of high-pressure rotary jet piles, and a diversion trough foundation pit is excavated between the inner and outer circles of high-pressure rotary jet piles to form a water-stop curtain with the inner and outer circles of high-pressure rotary jet piles, and together with the reinforced concrete inner supports, form a ring-bracing support structure for the diversion trough foundation pit;
[0010] The front and rear sections of the original box culverts are respectively opened with holes on the side walls connected to the diversion trough, which are connected to the diversion trough; the front and rear sections of the original box culverts respectively use the part directly below the H-shaped steel inserted into the upper inner circle high-pressure rotary jet piles as the blocking part, and the blocking part is formed with underwater concrete to form a temporary blocking wall between the interception well, and the wall is equipped with bidirectional steel bars connected to the top and bottom plates of the box culvert by embedded reinforcement.
[0011] The structural characteristics of the present invention also lie in:
[0012] The bottom of the inner and outer circles of high-pressure jet grouting piles located just above the box culvert is 0.2m above the top of the box culvert, and the high-pressure jet grouting piles are fully reinforced to a height of 0.5m above the top of the box culvert.
[0013] Concrete crown beams and concrete waist beams are respectively arranged on the top and waist of the inner and outer circle high-pressure jet spray piles, and two upper and lower reinforced concrete inner supports are formed between the inner and outer circle concrete crown beams and concrete waist beams.
[0014] The specifications of the inner and outer circle high-pressure rotary jet piles are Φ900@600, the specifications of the inserted H-shaped steel are 700X300X13X24mm, the specifications of the concrete crown beam are 1100×1000mm, the specifications of the upper reinforced concrete internal support between the concrete crown beams are 600×600@2000, the specifications of the concrete waist beam are 600×600mm, and the specifications of the lower reinforced concrete internal support between the concrete waist beams are 400×500@2000. The two ends of the outer circle high-pressure rotary jet piles and the inner circle high-pressure rotary jet piles are fully reinforced with Φ700@400 high-pressure rotary jet piles.
[0015] The blocking parts of the front and rear box culverts are temporary blocking walls formed by 250mm thick C25 underwater concrete, and 12@200 bidirectional steel bars are configured inside the walls.
[0016] The present invention also proposes a construction method based on the above narrow area foundation pit support construction diversion device, which is carried out according to the following steps:
[0017] Step 1: Relocate the pipelines in advance, clear and level the site to the designed excavation elevation;
[0018] Step 2: construct all high-pressure jet grouting piles including the reinforcement area, including constructing inner and outer circles of high-pressure jet grouting piles with the center of the interception well as the center of the circle on the periphery of the interception well foundation pit, inserting H-shaped steel in the manner of dense insertion of the inner circle and one insertion of the outer circle, and constructing high-pressure jet grouting piles for full-hall reinforcement between the two ends of the outer circle high-pressure jet grouting piles and the inner circle high-pressure jet grouting piles directly above the original box culverts at the front and rear sections;
[0019] Step 3: excavate a diversion trough foundation pit between the inner and outer circle high-pressure jet grouting piles. After the diversion trough foundation pit is constructed, two upper and lower reinforced concrete internal supports are constructed between the crown beam and the waist beam on the inner and outer circle high-pressure jet grouting piles;
[0020] Step 4: After the support construction in the diversion channel is completed, holes are opened in the front and rear sections of the original box culvert according to the corresponding positions connected with the diversion channel, so that the front and rear sections of the original box culvert are connected with the diversion channel, and underwater concrete is used for temporary blocking at the position just below the H-shaped steel inserted in the upper inner circle high-pressure rotary jet pile to form a temporary blocking wall between the interception well, and the wall is equipped with bidirectional steel bars connected to the top and bottom plates of the box culvert by planting reinforcement;
[0021] Step 5: After the opening and sealing measures of the original box culvert are completed, the intercepting well foundation pit is excavated to the top of the box culvert, the original box culvert is demolished, and the residue is removed before constructing the Larsen steel sheet piles and H-shaped steel inner supports. Thereafter, excavation is continued to the bottom of the intercepting well foundation pit to construct the main structure. After the construction of the intercepting well bottom plate and the bottom plate force transmission belt is completed, the steel sheet pile support is removed and the construction of the main structure is continued until completion.
[0022] In step 3, the diversion channel is cushioned with 150mm thick C20 plain concrete.
[0023] In step 5, the bottom plate force transfer belt is made of C30 plain concrete force transfer belt, which is cast in one piece with the same thickness as the bottom plate of the intercepting well.
[0024] In step 5, a 9-meter-long FSP-IV type Larsen steel sheet pile plus an H-shaped steel inner support is used to support the interception well foundation pit. The H-shaped steel inner support is connected between the Larsen steel sheet piles using an H-shaped steel purlin with a specification of 700X300X13X24mm, and an H-shaped steel with a specification of 700X300X13X24mm is used for internal support.
[0025] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0026] The present invention adopts a new type of foundation pit support form of high-pressure rotary jet piles inserted with H-shaped steel and concrete ring support, forms an outer diversion groove foundation pit between the inner and outer circles of high-pressure rotary jet piles with the H-shaped steel inserted, and opens holes in the side walls of the original box culvert to connect it with the diversion groove, and then blocks the box culvert by forming a temporary blocking wall with underwater concrete and arranging bidirectional steel bars in the wall just below the H-shaped steel inserted in the inner circle of high-pressure rotary jet piles. Under the premise of not affecting the overall rigidity, stability and waterproof performance of the enclosure, the present invention makes full use of the water-stopping effect of the water-stopping curtain formed by the high-pressure rotary jet pile, and at the same time utilizes the high strength and rigidity of the H-shaped steel, and relies on good bending resistance to effectively resist the deformation and displacement of the soil outside the foundation pit, meet the bearing capacity and deformation control requirements of the support structure, form a diversion groove to maintain the original box culvert flow capacity and ensure that the construction diversion requirements are met, so that while meeting the foundation pit support requirements, it also has the construction diversion ability, providing a perfect transition for water flowing through the pipe corner or interface. The setting of this diversion device can greatly reduce the head loss, reduce the siltation of the bend, and is conducive to making the water flow smooth. The present invention has the advantages of good effect, fast construction, and high construction quality, brings less disturbance to the surrounding buildings, and ensures the safety of the foundation pit and adjacent buildings (structures) during the excavation process. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the planar layout structure of the present invention;
[0028] Figure 2 yes Figure 1 Schematic diagram of the cross-sectional structure along the AA direction;
[0029] Figure 3 yes Figure 1 Schematic diagram of the cross-sectional structure along the BB direction.
[0030] In the figure, 1 interception well; 2 box culvert; 3 diversion channel; 4 inner circle high-pressure rotary jet piles; 5 outer circle high-pressure rotary jet piles; 6 concrete crown beam; 7 concrete waist beam; 8 upper reinforced concrete inner support; 9 lower reinforced concrete inner support; 10 bottom plate force transmission belt; 11 Larsen steel sheet piles; 12 H-shaped steel purlin; 13 H-shaped steel support; 14 box culvert breaking line; 15 plain concrete cushion layer; 16 full-hall reinforcement area of high-pressure rotary jet piles; 17 temporary blocking wall. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] Please refer to Figures 1 to 3 The structure of the diversion device for foundation pit support construction in a narrow area of this embodiment is set as follows:
[0033] The interception well 1 foundation pit is formed with Larsen steel sheet piles 11 and H-shaped steel internal supports to form a foundation pit support structure, and the interception well 1 is used to cut the original box culvert 2 into two sections, front and rear;
[0034] Construct inner and outer circles of high-pressure rotary jet piles with the center of the intercepting well 1 as the center of the circle and arranged concentrically on the periphery of the foundation pit of the intercepting well 1; the inner circle of high-pressure rotary jet piles 4 are inserted with H-shaped steel in a densely inserted manner; the outer circle of high-pressure rotary jet piles 5 are arc-shaped and are inserted with H-shaped steel in a one-by-one manner, with both ends extending to the original box culverts 2 of the front and rear sections respectively, and are connected to the inner circle of high-pressure rotary jet piles 4 through a structure reinforced by high-pressure rotary jet piles right above the original box culverts 2 of the front and rear sections; reinforced concrete inner supports are arranged at a set interval along the circumferential direction between the inner and outer circles of high-pressure rotary jet piles 5, and a diversion trough 3 foundation pit is excavated between the inner and outer circles of high-pressure rotary jet piles, and a water-stop curtain is formed by the inner and outer circles of high-pressure rotary jet piles, and together with the reinforced concrete inner supports, a ring-bracing support structure of the diversion trough 3 foundation pit is formed;
[0035] The front and rear sections of the original box culvert 2 are respectively opened on the side walls connected to the diversion groove 3, and are connected to the diversion groove 3; the front and rear sections of the original box culvert 2 use the part directly below the H-shaped steel inserted in the upper inner circle high-pressure rotary jet pile 4 as the blocking part, and the blocking part is formed with underwater concrete to form a temporary blocking wall 17 between the interception well 1, and the wall is equipped with bidirectional steel bars connected to the top and bottom plates of the box culvert 2 by embedded reinforcement.
[0036] In the specific implementation, the corresponding structural settings also include:
[0037] The bottom of the inner and outer circle high-pressure rotary jet piles located directly above the box culvert 2 is 0.2m high from the top of the box culvert 2, and the high-pressure rotary jet piles are fully reinforced to a height of 0.5m above the top of the box culvert 2.
[0038] Concrete crown beams 6 and concrete waist beams 7 are respectively arranged at the top and waist of the inner and outer circle high-pressure jet grouting piles 5, and two upper and lower reinforced concrete internal supports are formed between the inner and outer circle concrete crown beams 6 and concrete waist beams 7.
[0039] As mentioned above, this deep foundation pit support adopts high-pressure jet grouting piles with inserted steel and internal reinforced concrete support ring support, which is a new construction scheme with both construction diversion and deep foundation pit support capabilities. Among them, the specifications of the inner and outer ring high-pressure jet grouting piles 5 are Φ900@600, the specifications of the inserted H-shaped steel are 700X300X13X24mm, the specifications of the concrete crown beam 6 are 1100×1000mm, the specifications of the upper reinforced concrete internal support 8 between the concrete crown beams 6 are 600×600@2000, the specifications of the concrete waist beam 7 are 600×600mm, and the specifications of the lower reinforced concrete internal support 9 between the concrete waist beams 7 are 400×500@2000. The ends of the outer ring high-pressure jet grouting piles 5 and the inner ring high-pressure jet grouting piles 4 are fully reinforced with Φ700@400 high-pressure jet grouting piles, and the radial center distance between the inner and outer ring high-pressure jet grouting piles 5 is 2900mm. The above specifications are all in mm.
[0040] The blocking parts of the front and rear box culverts 2 are both temporary blocking walls formed by 250mm thick C25 underwater concrete, and 12@200 bidirectional steel bars are arranged inside the wall.
[0041] The support and diversion measures for the urban rainwater and sewage culvert 2 reconstruction project are optimized. The device can meet the foundation pit support requirements and have diversion capacity. The retaining, water-stopping and diversion effects can all have good performance. The device construction occupies a small area and has a short construction period. It can be better applied to the urban rainwater and sewage culvert 2 reconstruction project. The construction method can be carried out according to the following steps:
[0042] Step 1: Relocate the pipelines in advance, clear the surface and level the site to the excavation design elevation; if there are houses and existing pipelines around the foundation pit, the buried depth of the house foundation and pipelines is relatively shallow, so they should be relocated and cleared in advance;
[0043] Step 2, construct all high-pressure rotary jet piles including the reinforcement area, including constructing inner and outer circle high-pressure rotary jet piles 5 with the center of the interception well 1 as the center of the circle on the periphery of the location of the foundation pit of the interception well 1, and inserting H-shaped steel in a manner of dense insertion of the inner circle and one insertion of the outer circle, and constructing high-pressure rotary jet piles for full-hall reinforcement between the two ends of the outer circle high-pressure rotary jet piles 5 and the inner circle high-pressure rotary jet piles 4, respectively, just above the original box culvert 2 in the front and rear sections; this step is to use high-pressure gas to cut the soil, spray cement slurry into the soil through a rotating nozzle and mix to form a cement-soil reinforcement body, and then insert H-shaped steel to improve the structural bearing capacity;
[0044] Step 3, dig the diversion trough 3 foundation pit between the inner and outer circle high pressure jet grouting piles 5. After the diversion trough 3 foundation pit construction is completed, two reinforced concrete internal supports are constructed between the crown beam and the waist beam on the inner and outer circle high pressure jet grouting piles 5; in this way, both support and diversion capacity are taken into consideration;
[0045] Step 4: After the support construction in the diversion trough 3 is completed, holes are opened in the front and rear sections of the original box culvert 2 according to the corresponding positions connected with the diversion trough 3, so that the front and rear sections of the original box culvert 2 are connected with the diversion trough 3, and 250mm thick C25 underwater concrete is used for temporary blocking at the position just below the H-shaped steel inserted in the upper inner circle high-pressure rotary jet pile 4 to form a temporary blocking wall between the interception well 1, and 12@200 bidirectional steel bars are arranged in the wall, and the top and bottom plates of the box culvert 2 are connected by planting steel bars;
[0046] Step 5: After the hole opening and plugging measures of the original box culvert 2 are completed, the foundation pit of the interception well 1 is excavated to the top of the box culvert 2, the original box culvert 2 is broken, and the Larsen steel sheet piles 11 and H-shaped steel inner supports are constructed after the residues are removed. Then, the excavation is continued to the bottom of the foundation pit of the interception well 1, and the main structure is constructed. After the construction of the bottom plate of the interception well 1 and the bottom plate force transmission belt 10 is completed, the steel sheet pile support is removed, and the main structure is continued to be constructed until the end. The steel sheet piles are not removed in the later stage, and the H-shaped steel is removed as appropriate.
[0047] In the above construction steps, the order of foundation pit excavation and installation and removal of supporting structures must strictly abide by the principles of supporting first and then excavating, supporting within a limited time, excavating in sections and layers, and strictly over-excavating. The thickness of each layer refers to the vertical spacing of the support. For non-silty soil, the excavation thickness of each layer shall not be greater than 1.5m, and for silty soil, the excavation thickness of each layer shall not be greater than 1.0m; the support time limit for each small section of excavation shall not be greater than 24 hours; at the same time, a ditches or water-retaining earth embankments should be set outside the top of the slope to prevent surface water from scouring the slope and drainage outside the foundation pit from flowing back into the pit. The surface within the support range around the foundation pit should be repaired, and protective railings, drainage measures and cement mortar or concrete floors should be constructed to prevent surface precipitation from infiltrating into the underground.
[0048] In step 2, the high-pressure jet grouting piles use P.0.42.5 grade ordinary Portland cement, with a diameter of 700 / 900mm, a lap length of 300mm between piles, a cement content of 25%, and a water-cement ratio of 0.8 (which can be adjusted appropriately depending on the on-site soil conditions). The standard value of the 28d unconfined compressive strength of the high-pressure jet grouting piles should not be less than 1.0Mpa, and the verticality deviation of the high-pressure jet grouting piles should not exceed 1 / 150;
[0049] The triple pipe method should be used for the construction of high-pressure jet grouting piles. Pressure control: air pressure should not be less than 0.7Mpa, and cement slurry pressure should be greater than 20Mpa. The jet grouting lifting speed is 15-25cm / min, and the cement slurry flow rate is greater than 30L / min. When the grouting pipe is placed in the borehole, the nozzle can be sprayed and grouting can be performed when it reaches the design elevation. After the jet grouting parameters reach the specified value, the grouting pipe is lifted according to the process requirements of the jet grouting pile, and the grouting is sprayed from bottom to top. The speed of the drill rod during the lifting process is 15-20r / min, and the overlap length of the grouting pipe section lifting should be greater than 100mm.
[0050] In step 2, the steel section should be inserted immediately after the cement soil mixing pile mixing process is completed. Before insertion, the positioning card mold should be installed to ensure that the center of the positioning card mold is consistent with the center of the high-pressure rotary jet pile. Generally, the self-weight sinking method is used for insertion. When the self-weight sinking of the steel section cannot reach the design elevation, the mechanical pressurization method can be used to make it reach the sinking elevation. The verticality of the sinking must be strictly guaranteed. The method of combining hanging a vertical chain on the pile foundation and visual measurement with a theodolite can be used to ensure that the verticality deviation is not greater than the specified value.
[0051] The length of the steel section is prepared according to the engineering design. When the length cannot meet the design requirements, it needs to be spliced in advance. The splicing is made into a groove welding. The number of steel section joints per piece is no more than 2, and it is not suitable to be in a position subject to large bending and shear. If necessary, a two-way fishtail tenon is made in the middle of the joint to strengthen the joint rigidity. The welding surface should be consistent with the original plane of the steel section to ensure lifting and recovery. The lifting of the steel section should be carried out after the foundation pit construction is completed and backfilled, and it should be carried out one by one. Before lifting, the crown beam is used as a reaction force platform. The steel section is lifted and pulled first by a hydraulic jack. After the steel section is loosened, it is slowly lifted and pulled. After it is lifted to a certain height, it is lifted by a crane. During the lifting process, the steel section should be kept vertically rising to reduce the lifting resistance and keep the steel section from deformation. The empty holes formed in the high-pressure rotary jet pile body after the steel section is pulled out should be filled with sand and soil in time.
[0052] In step 3, the diversion channel 3 is provided with a 150 mm thick C20 plain concrete cushion layer 15.
[0053] In step 5, the bottom plate force transfer belt 10 is made of C30 plain concrete and is cast in one piece with the same thickness as the bottom plate of the intercepting well 1.
[0054] In step 5, a 9-meter-long FSP-IV type Larsen steel sheet pile 11 plus an H-shaped steel inner support is used to support the foundation pit of the interception well 1. The H-shaped steel inner support is connected between the Larsen steel sheet piles 11 using an H-shaped steel purlin 12 with a specification of 700X300X13X24mm, and the H-shaped steel support 13 with a specification of 700X300X13X24mm constitutes the inner support. The connection of the H-shaped steel purlin 12 needs to be welded into a whole.
[0055] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A diversion device for foundation pit support construction in narrow areas, Its characteristics are: The interception well foundation pit is formed by Larsen steel sheet piles and H-shaped steel internal supports to form the foundation pit support structure, and the interception well is used to cut the original box culvert into two sections. Construct two inner and outer circles of high-pressure rotary jet piles with the center of the interception well as the center of the circle and arranged concentrically on the periphery of the interception well foundation pit; the inner circle of high-pressure rotary jet piles are inserted with H-shaped steel in a dense insertion manner; the outer circle of high-pressure rotary jet piles are arc-shaped and are inserted with H-shaped steel in a one-by-one insertion manner, with both ends extending to the original box culverts of the front and rear sections respectively, and connected to the inner circle of high-pressure rotary jet piles through a structure of full-hall reinforcement of high-pressure rotary jet piles directly above the original box culverts of the front and rear sections; reinforced concrete inner supports are arranged at a set interval along the circumferential direction between the inner and outer circles of high-pressure rotary jet piles, and a diversion trough foundation pit is excavated between the inner and outer circles of high-pressure rotary jet piles to form a water-stop curtain with the inner and outer circles of high-pressure rotary jet piles, and together with the reinforced concrete inner supports, form a ring-bracing support structure for the diversion trough foundation pit; The front and rear sections of the original box culvert are respectively opened on the side walls connected to the diversion groove, and are connected to the diversion groove; the front and rear sections of the original box culvert are respectively blocked by the part directly below the H-shaped steel inserted into the upper inner circle of high-pressure jet grouting piles, and the blocking part is formed with underwater concrete to form a temporary blocking wall between the blocking part and the interception well, and the wall is equipped with bidirectional steel bars connected to the top and bottom plates of the box culvert by planting reinforcement; The bottom of the inner circle high-pressure jet grouting piles located directly above the box culvert is 0.2m above the top of the box culvert, and the high-pressure jet grouting piles are fully reinforced to a height of 0.5m above the top of the box culvert; Concrete crown beams and concrete waist beams are respectively arranged on the top and waist of the inner and outer circle high-pressure jet spray piles, and two upper and lower reinforced concrete inner supports are formed between the inner and outer circle concrete crown beams and concrete waist beams.
2. The diversion device for foundation pit support construction in a narrow area according to claim 1, Its characteristics are: The specifications of the inner and outer circle high-pressure rotary jet piles are Φ900@600, the specifications of the inserted H-shaped steel are 700×300×13×24mm, the specifications of the concrete crown beam are 1100×1000mm, the specifications of the upper reinforced concrete internal support between the concrete crown beams are 600×600@2000, the specifications of the concrete waist beam are 600×600mm, and the specifications of the lower reinforced concrete internal support between the concrete waist beams are 400×500@2000. The two ends of the outer circle high-pressure rotary jet piles and the inner circle high-pressure rotary jet piles are fully reinforced with Φ700@400 high-pressure rotary jet piles.
3. The diversion device for foundation pit support construction in a narrow area according to claim 1, Its characteristics are: The blocking parts of the front and rear box culverts are temporary blocking walls formed by 250mm thick C25 underwater concrete, and 12@200 bidirectional steel bars are configured inside the walls.
4. A construction method for a diversion device for foundation pit support construction in a narrow area based on any one of claims 1 to 3, Its characteristics are Follow these steps: Step 1: Relocate the pipelines in advance, clear and level the site to the designed excavation elevation; Step 2: construct all high-pressure jet grouting piles including the reinforcement area, including constructing inner and outer circles of high-pressure jet grouting piles with the center of the interception well as the center of the circle on the periphery of the interception well foundation pit, inserting H-shaped steel in the manner of dense insertion of the inner circle and one insertion of the outer circle, and constructing high-pressure jet grouting piles for full-hall reinforcement between the two ends of the outer circle high-pressure jet grouting piles and the inner circle high-pressure jet grouting piles directly above the original box culverts at the front and rear sections; Step 3: excavate a diversion trough foundation pit between the inner and outer circle high-pressure jet grouting piles. After the diversion trough foundation pit is constructed, two upper and lower reinforced concrete internal supports are constructed between the crown beam and the waist beam on the inner and outer circle high-pressure jet grouting piles; Step 4: After the support construction in the diversion channel is completed, holes are opened in the front and rear sections of the original box culvert according to the corresponding positions connected with the diversion channel, so that the front and rear sections of the original box culvert are connected with the diversion channel, and underwater concrete is used for temporary blocking at the position just below the H-shaped steel inserted in the upper inner circle high-pressure rotary jet pile to form a temporary blocking wall between the interception well, and the wall is equipped with bidirectional steel bars connected to the top and bottom plates of the box culvert by planting reinforcement; Step 5: After the opening and sealing measures of the original box culvert are completed, the intercepting well foundation pit is excavated to the top of the box culvert, the original box culvert is demolished, and the residue is removed before constructing the Larsen steel sheet piles and H-shaped steel inner supports. Thereafter, excavation is continued to the bottom of the intercepting well foundation pit to construct the main structure. After the construction of the intercepting well bottom plate and the bottom plate force transmission belt is completed, the steel sheet pile support is removed and the construction of the main structure is continued until completion.
5. According to claim 4, the construction method of the diversion device for foundation pit support construction in a narrow area, Its characteristics are: In step 3, a 150 mm thick C20 plain concrete cushion is set in the diversion channel.
6. The construction method of the diversion device for foundation pit support construction in a narrow area according to claim 4, Its characteristics are: In step 5, the bottom plate force transfer belt is made of C30 plain concrete force transfer belt, which is cast in one piece with the same thickness as the bottom plate of the intercepting well.
7. The construction method of the diversion device for foundation pit support construction in a narrow area according to claim 4, Its characteristics are: In step 5, a 9-meter-long FSP-IV type Larsen steel sheet pile plus an H-shaped steel inner support is used to support the interception well foundation pit. The H-shaped steel inner support is connected between the Larsen steel sheet piles using an H-shaped steel purlin with a specification of 700×300×13×24mm, and an H-shaped steel with a specification of 700×300×13×24mm is used for internal support.