Tower crane foundation and installation method of internal climbing tower crane

By setting up tower crane foundations for corner blocks and cross steel beams at the corners of the shaft wall, the problem that the latter construction party cannot install the internal climbing tower crane is solved, which can quickly install and reduce material waste, improve construction efficiency and avoid environmental pollution. .

CN110747884BActive Publication Date: 2024-11-15NO 2 CONSTR GRP CO LTD OF SHANGHAI CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910965877.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-10-12
Publication Date
2024-11-15
Estimated Expiration
2039-10-12

AI Technical Summary

Technical Problem

During the construction of super high-rise buildings, the latter construction party cannot install the inner climbing tower crane because the previous construction party destroyed the tower crane foundation when removing the tower crane, and the inability to remove the steel components in the prior art leads to waste of materials .

Method used

Design a tower crane foundation, including the installation of corner blocks and cross steel beams at the corners of the shaft wall, and the connection is made by expansion bolts and positioning bolts to form a detachable tower crane foundation, allowing the latter construction party to install the internal crawler without restoring the original foundation. Tower cranes improve construction efficiency and reduce material waste.

Benefits of technology

The latter construction party can quickly install the inner climbing tower crane, improve construction efficiency, reduce material waste, and avoid environmental pollution caused by on-site pouring concrete. It has the advantages of simple structure, easy disassembly and assembly, and reusable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110747884B_ABST
    Figure CN110747884B_ABST
Patent Text Reader

Abstract

The present invention discloses a tower crane foundation of an internal climbing tower crane and an installation method thereof, wherein the tower crane foundation comprises a corner block arranged on a corner of a shaft wall and a cross steel beam connected to the corner block, wherein the cross steel beam comprises four diagonally equal legs, a connecting rod is connected between two adjacent legs, an end of each leg is connected to one of the corner blocks, and a base is arranged near the end of each leg. The present invention is suitable for the installation of an internal climbing tower crane by a later construction party, and has the advantages of simple structure, convenient assembly and disassembly, recyclable utilization, reduced material waste, and green and pollution-free effects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a tower crane foundation, in particular to a tower crane foundation of an inner climbing tower crane and an installation method thereof. Background Art

[0002] In the process of building construction, tower cranes are usually used as the main engineering equipment for vertical transportation during the construction of the main structure. The selection and layout of tower cranes often have a significant impact on the efficient and safe construction of the project. In the construction of super-high-rise buildings, especially super-high-rise buildings with a cylindrical structure, the use of internal climbing tower cranes has gradually become a preferred option due to its safety and economy. Internal climbing tower cranes are usually arranged in the core shaft or elevator shaft of super-high-rise buildings. Before using internal climbing tower cranes, it is necessary to embed the tower crane foundation on the bottom plate of the construction project. When the construction project is constructed by several construction parties in front and behind, when the previous construction party leaves the site, the embedded tower crane foundation is destroyed while dismantling the tower crane, resulting in the next construction party being unable to use the original tower crane foundation. In particular, when the ground structure has formed several layers, the next construction party cannot re-embed the tower crane foundation on the bottom plate. Therefore, how to design the tower crane foundation has become a technical problem that the next construction party needs to solve urgently during the construction of the construction project. In addition, in the prior art, when the tower crane foundation embedded in the bottom plate is dismantled, the exposed steel components are directly cut, and most of the steel components embedded in the bottom plate cannot be taken out, resulting in a waste of material costs. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a tower crane foundation of an inner climbing tower crane and an installation method thereof, so as to solve the problem that the latter construction party cannot install the inner climbing tower crane.

[0004] In order to solve the above technical problems, the present invention provides a tower crane foundation of an internal climbing tower crane, including a corner block arranged on the corner of a shaft wall and a cross steel beam connected to the corner block, the cross steel beam including four diagonally equal legs, a connecting rod being connected between two adjacent legs, an end of each leg being connected to one of the corner blocks, and a base being arranged near the end of each leg.

[0005] Furthermore, the tower crane foundation of the internal climbing tower crane provided by the present invention, the corner block includes a first wing plate and a second wing plate parallel to the walls on both sides of the shaft corner, a web plate connected between the first wing plate and the second wing plate, a stiffening plate is connected between the web plate and the first wing plate and / or the second wing plate, the corner block also includes an upper plate, a lower plate and expansion bolts, the upper plate is connected to the upper ends of the web plate and the stiffening plate, the lower plate is connected to the lower ends of the web plate and the stiffening plate, and the expansion bolts are arranged on the first wing plate and the second wing plate.

[0006] Furthermore, in the tower crane foundation of the inner climbing tower crane provided by the present invention, the cross steel beam also includes a head plate perpendicular to the end of the leg, and positioning bolts are connected between the head plate and the web plate.

[0007] Furthermore, in the tower crane foundation of the inner climbing tower crane provided by the present invention, the hoistway is square, and the cross steel beams are cross steel beams.

[0008] Furthermore, in the tower crane foundation of the inner climbing tower crane provided by the present invention, the lower end surface of the corner block and the lower end surface of the cross steel beam are arranged on the foundation bottom plate in the hoistway.

[0009] Furthermore, in the tower crane foundation of the inner climbing tower crane provided by the present invention, the hoistway is an elevator hoistway or a core tube hoistway.

[0010] Furthermore, in the tower crane foundation of the inner climbing tower crane provided by the present invention, the base is a regular polygonal steel plate, a rectangular steel plate or a circular steel plate, and the base is provided with bolt holes for connecting the inner climbing tower crane.

[0011] In order to solve the above-mentioned technical problems, the present invention also provides an installation method for the tower crane foundation of an internal climbing tower crane, including an installation method in the initial installation stage of the tower crane foundation to form a ground-based tower crane foundation; the installation method in the initial installation stage of the tower crane foundation includes: fixing two adjacent legs in the cross steel beam through a connecting rod; setting the lower end surface of the corner block and the lower end surface of the cross steel beam on the foundation bottom plate in the shaft; fixing the first wing plate and the second wing plate on the two side walls of the shaft corner by expansion bolts respectively to connect the corner block to the shaft corner; adjusting the distance between the head plate and the web plate by positioning bolts to position the cross steel beam and the corner block, and then welding the upper plate to the upper end surface of the cross steel beam, and welding the lower plate to the lower end surface of the cross steel beam to connect the cross steel beam to the corner block; connecting the base to the upper end surface of the legs of the cross steel beam.

[0012] Furthermore, the installation method of the tower crane foundation of the internal climbing tower crane provided by the present invention also includes an installation method in the climbing stage of the tower crane foundation to form a suspended tower crane foundation; the installation method in the climbing stage of the tower crane foundation includes: fixing two adjacent legs in the cross steel beam through a connecting rod; suspending the lower end face of the corner block without contacting the foundation bottom plate in the shaft, fixing the first wing plate and the second wing plate on the two side walls of the shaft corner by expansion bolts respectively to connect the corner block to the shaft corner; suspending the cross steel beam without contacting the foundation bottom plate in the shaft, adjusting the distance between the head plate and the web plate by positioning bolts to position the cross steel beam and the corner block, and then welding the upper plate to the upper end face of the cross steel beam, and welding the lower plate to the lower end face of the cross steel beam to connect the cross steel beam to the corner block; connecting the base to the upper end face of the legs of the cross steel beam.

[0013] Compared with the prior art, the tower crane foundation and installation method of the internal climbing tower crane provided by the present invention, in the case that the previous construction party leaves the site to dismantle the tower crane and destroys the pre-buried tower crane foundation at the bottom plate, in order to take over the construction of the construction project, a tower crane foundation consisting of corner blocks, cross steel beams and a base is set in the completed shaft, and the internal climbing tower crane is installed through the tower crane foundation. This allows the subsequent construction party to continue the lifting construction of the construction project through the internal climbing tower crane. The tower crane foundation of the present invention is set in the completed shaft, and the cross steel beams serve as the bearing body. The cross steel beams are fixedly connected by corner blocks set on the corners of the shaft wall. The base is used to expand the installation contact surface with the internal climbing tower crane, so that the connection between the internal climbing tower crane and the tower crane foundation is more reliable and stable. In the case that the pre-buried tower crane foundation at the bottom plate is damaged by the previous construction party, the present invention does not need to repair the pre-buried tower crane foundation, but realizes the installation of the inner climbing tower crane through the tower crane foundation arranged in the shaft, which can improve the construction efficiency, and there is no need to wait for the repair period of the pre-buried tower crane foundation, and the tower crane foundation composed of the corner block, the cross steel beam and the base can be directly installed on site. When installing the tower crane foundation of the present invention, the corner block is installed first, then the cross steel beam is installed, and finally the base is installed. When dismantling, the base is dismantled first, then the cross steel beam is dismantled, and then the corner block is dismantled. Therefore, it has the advantages of simple structure, convenient disassembly and assembly, and can be repeatedly recycled. When dismantling, only the expansion bolts of the corner block cannot be dismantled and lost, which reduces the waste of materials compared with the situation in the prior art that the large area of ​​steel components at the bottom plate cannot be dismantled, and there is no need to pour concrete on site, and the environmental pollution caused by pouring concrete will not be generated, which has a green and pollution-free effect. The tower crane foundation installation method of the present invention forms a ground-type tower crane foundation and a suspended tower crane foundation by determining whether the lower end surfaces of the corner blocks and the cross steel beams are in contact with the foundation bottom plate in the hoistway. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1is a structural schematic diagram of a tower crane foundation according to an embodiment of the present invention;

[0015] Figure 2 is a schematic diagram of the structure of a corner block according to an embodiment of the present invention;

[0016] Figure 3 yes Figure 2 Sectional view along the middle line AA;

[0017] Figure 4 yes Figure 2 Sectional view along the middle edge BB;

[0018] Figure 5 It is a flow chart of a tower crane foundation installation method according to an embodiment of the present invention.

[0019] As shown in the figure: 60, shaft, 100, tower crane foundation, 110, corner block, 111, first wing plate, 112, second wing plate, 113, web plate, 114, stiffening plate, 115, upper plate, 116, lower plate, 117, expansion bolts, 118, positioning bolts, 120, cross steel beam, 121, support leg, 122, head plate, 130, connecting rod 130, 140, base. DETAILED DESCRIPTION

[0020] The present invention is described in detail below in conjunction with the accompanying drawings:

[0021] Please refer to Figure 1 to Figure 2 The embodiment of the present invention provides a tower crane foundation 100 of an inner climbing tower crane, comprising a corner block 110 arranged at the corner of a shaft 60 and a cross steel beam 120 connected to the corner block 110, wherein the cross steel beam 120 comprises four diagonally equal legs 121, a connecting rod 130 may be connected between two adjacent legs 121, the end of each leg 121 is connected to one of the corner blocks 110, and a base 140 is arranged near the end of each leg 121. The tower crane foundation 100 of the embodiment of the present invention comprises four corner blocks 110 arranged at four corners of the shaft 60, cross steel beams 120 diagonally connected to the four corner blocks 110, and a base 130 arranged on each leg 121 of the cross steel beam 120. The base 130 is four rectangular shapes such as squares or rectangles, and may also be regular polygonal shapes such as regular hexagons or circular shapes. The number of connecting rods 130 in the embodiment of the present invention is four, and the connecting rods 130 can improve the connection reliability and stability of the cross steel beams 120 and prevent the angle of the cross steel beams 120 from changing.

[0022] Please refer to Figure 2, the tower crane foundation 100 of the inner climbing tower crane provided by the embodiment of the present invention, the corner block 110 includes a first wing plate 111 and a second wing plate 112 parallel to the walls on both sides of the corner of the shaft 60, a web plate 113 connected between the first wing plate 111 and the second wing plate 112, a stiffening plate 114 is connected between the web plate 113 and the first wing plate 111 and / or the second wing plate 112, the corner block 110 also includes an upper plate 115, a lower plate 116 and an expansion bolt 117, the upper plate 115 is connected to the upper end of the web plate 113 and the stiffening plate 114, the lower plate 116 is connected to the lower end of the web plate 113 and the stiffening plate 114, and the expansion bolt 117 is arranged on the first wing plate 111 and the second wing plate 112. The expansion bolt 117 can be a chemical expansion bolt. The first wing plate 111 and the second wing plate 112 parallel to the walls on both sides of the corner of the well 60 can be consistent with the angle between the walls on both sides of the corner of the well 60. For example, when the walls on both sides of the corner of the well 60 are in a non-vertical relationship, the first wing plate 111 and the second wing plate 112 can adapt to the change in the angle between the walls on both sides of the corner of the well 60. Of course, the preferred solution is that the walls on both sides of the corner of the well 60 are vertical, and then the angle between the first wing plate 111 and the second wing plate 112 forms a right angle. In order to improve the stability of the corner block 110, the first wing plate 111 and the second wing plate 112 can be bolted or welded.

[0023] Please refer to Figure 2 and Figure 4 In order to solve the problem of reliable connection between the cross steel beam 120 and the corner block 110, the tower crane foundation 100 of the inner climbing tower crane provided by the embodiment of the present invention, the cross steel beam 120 also includes a head plate 122 perpendicular to the end of the leg 121, and a positioning bolt 118 is connected between the head plate 122 and the web 113. The positioning bolt 118 can be a high-strength bolt to improve the strength of the connection.

[0024] Please refer to Figure 1 In the tower crane foundation 100 of the inner climbing tower crane provided by the embodiment of the present invention, the hoistway 60 is square, and the cross steel beams 120 are cross-crossed, that is, the cross steel beams 120 are vertically crossed. The cross-crossed steel beams can improve the connection stability and reliability of the cross steel beams 120. The force carried by each leg 121 is balanced. The cross steel beams 120 can be non-vertically crossed according to the shape of the hoistway 60. For example, when the hoistway 60 is rectangular, the cross steel beams 120 are non-cross-crossed.

[0025] Please refer to Figure 1 and Figure 4In the tower crane foundation 100 of the inner climbing tower crane provided by the embodiment of the present invention, the cross steel beam 120 is a steel section. The steel section can be an I-beam, an H-beam, or a channel steel. Of course, it can also be an I-beam structure formed by butting two channel steels. The steel section can improve the bearing strength of the cross steel beam 120.

[0026] Please refer to Figure 1 In the tower crane foundation 100 of the inner climbing tower crane provided by the embodiment of the present invention, the lower end surface of the corner block 110 and the lower end surface of the cross steel beam 120 can be arranged on the foundation bottom plate in the shaft 60 to improve the stability and reliability of the load-bearing of the tower crane foundation. At this time, a ground-type tower crane foundation 100 is formed in the shaft 60, and when the inner climbing tower crane is installed through the ground-type tower crane foundation 100, the vertical load-bearing capacity of the inner climbing tower crane can be improved.

[0027] In the tower crane foundation 100 of the inner climbing tower crane provided by the embodiment of the present invention, the hoistway 60 includes but is not limited to an elevator hoistway 60 or a core tube hoistway 60. Any other completed hoistway may be used.

[0028] Please refer to Figure 1 , the tower crane foundation 100 of the internal climbing tower crane provided in the embodiment of the present invention, the base 140 includes but is not limited to a rectangular steel plate, and the steel plate is provided with bolt holes for connecting the internal climbing tower crane. The rectangular steel plate can be a square or a rectangle. Of course, the base 140 can also be a circular steel plate or a regular polygonal steel plate. The connection between the base 140 and the support leg 121 can be welding. It can also be a bolt connection method that is easy to disassemble and assemble. The bolt holes of the base 140 in the embodiment of the present invention include but are not limited to 6. In order to be reusable, the base 140 and the support leg 121 in the embodiment of the present invention are connected with high-strength bolts.

[0029] Please refer to Figure 5 , the installation method of the tower crane foundation 100 of the inner climbing tower crane provided by the embodiment of the present invention includes: an installation method in the initial installation stage of the tower crane foundation to form a ground-type tower crane foundation;

[0030] The installation method of the tower crane foundation in the initial installation stage includes:

[0031] Two adjacent legs 121 in the cross steel beam 120 are fixedly connected by a connecting rod 130;

[0032] The lower end surface of the corner block 110 and the lower end surface of the cross steel beam 120 are arranged on the base floor (not shown) in the hoistway 60;

[0033] Step 201, respectively fix the first wing plate 111 and the second wing plate 112 on the two side walls of the corner of the shaft 60 by the expansion bolts 117, so as to connect the corner block 110 with the corner of the shaft 60. The expansion bolts 117 in this step are post-embedded bolts such as chemical expansion bolts. The corner block 110 is hoisted to the position of the bottom plate in the shaft 60, and then the corner block 110 is placed at the corner of the shaft 60, and a hole is opened and cleaned on the wall corresponding to the position of the expansion bolt 117, and the chemical expansion bolt is planted after the hole is cleaned.

[0034] Step 202, the distance between the head plate 122 and the web plate 113 is adjusted by the positioning bolts 118 to position the cross steel beam 120 and the corner block 110, and then the upper plate 115 is welded to the upper end surface of the cross steel beam 120, and the lower plate 116 is welded to the lower end surface of the cross steel beam 120 to connect the cross steel beam 120 and the corner block 110. The positioning bolts 118 are used for preliminary positioning of the cross steel beam 120 and the corner block 110. In order to prevent loosening, the upper plate 115 and the lower plate 116 are respectively welded to the cross steel beam 120, thereby improving the stability of the load and the reliability of the connection when installing the inner climbing tower crane. For example, the cross steel beam 120 can be hoisted into the shaft 60.

[0035] Step 203 , connecting the base 140 to the upper end surface of the support leg 121 of the cross steel beam 120 .

[0036] The installation method of the tower crane foundation 100 of the inner climbing tower crane provided in the embodiment of the present invention further includes an installation method in the climbing stage of the tower crane foundation to form a suspended tower crane foundation; the installation method in the climbing stage of the tower crane foundation includes:

[0037] Two adjacent legs 121 in the cross steel beam 120 are fixedly connected by a connecting rod 130;

[0038] The lower end surface of the corner block 110 is suspended in the air without contacting the base floor in the hoistway 60;

[0039] Step 201, respectively fix the first wing plate 111 and the second wing plate 112 on the two side walls of the corner of the shaft 60 by the expansion bolts 117, so as to connect the corner block 110 with the corner of the shaft 60. The expansion bolts 117 in this step are post-embedded bolts such as chemical expansion bolts. The corner block 110 is hoisted to the position of the bottom plate in the shaft 60, and then the corner block 110 is placed at the corner of the shaft 60, and a hole is opened and cleaned on the wall corresponding to the position of the expansion bolt 117, and the chemical expansion bolt is planted after the hole is cleaned.

[0040] Step 202, the distance between the head plate 122 and the web plate 113 is adjusted by the positioning bolts 118 to position the cross steel beam 120 and the corner block 110, and then the upper plate 115 is welded to the upper end surface of the cross steel beam 120, and the lower plate 116 is welded to the lower end surface of the cross steel beam 120 to connect the cross steel beam 120 and the corner block 110. The positioning bolts 118 are used for preliminary positioning of the cross steel beam 120 and the corner block 110. In order to prevent loosening, the upper plate 115 and the lower plate 116 are respectively welded to the cross steel beam 120, thereby improving the stability of the load and the reliability of the connection when installing the inner climbing tower crane. For example, the cross steel beam 120 can be hoisted into the shaft 60.

[0041] Step 203 , connecting the base 140 to the upper end surface of the support leg 121 of the cross steel beam 120 .

[0042] The tower crane foundation 100 and installation method of the internal climbing tower crane provided in the embodiment of the present invention, when the previous construction party leaves the site to dismantle the tower crane and destroys the pre-buried tower crane foundation 100 at the bottom plate, in order to take over the construction of the construction project, a tower crane foundation 100 consisting of a corner block 110, a cross steel beam 120 and a base 140 is set in the completed well 60, and the internal climbing tower crane is installed through the tower crane foundation 100. So that the subsequent construction party can continue to hoist the construction project through the internal climbing tower crane. The tower crane foundation 100 of the embodiment of the present invention is set in the completed well 60, the cross steel beam 120 is used as the bearing body, and the cross steel beam 120 is fixedly connected by the corner block 110 set on the corner of the well 60, and the base 140 is used to expand the installation contact surface with the internal climbing tower crane, so that the connection between the internal climbing tower crane and the tower crane foundation 100 is more reliable and stable.

[0043] In the embodiment of the present invention, when the pre-buried tower crane foundation 100 at the bottom plate is damaged by the previous construction party, there is no need to repair the pre-buried tower crane foundation 100. Instead, the installation of the inner climbing tower crane is realized through the tower crane foundation 100 arranged in the shaft 60, which can improve the construction efficiency. There is no need to wait for the repair period of the pre-buried tower crane foundation 100, and the tower crane foundation 100 composed of the corner block 110, the cross steel beam 120 and the base 140 can be directly installed on site. When installing the tower crane foundation 100 of the embodiment of the present invention, the corner block 110 is installed first, then the cross steel beam 120 is installed, and finally the base 140 is installed. When dismantling, the base 140 is dismantled first, then the cross steel beam 120 is dismantled, and then the corner block 110 is dismantled. Therefore, it has the advantages of simple structure, convenient disassembly and assembly, and can be repeatedly recycled. During demolition, only the expansion bolts 117 of the corner block 110 cannot be removed and lost. Compared with the situation in the prior art where a large area of ​​steel components at the bottom plate cannot be removed, this reduces material waste and does not require on-site pouring of concrete, thereby preventing environmental pollution caused by pouring concrete and achieving a green and pollution-free effect.

[0044] The tower crane foundation 100 of the embodiment of the present invention can be quickly installed by using local materials in the construction project. The corner blocks 110, the cross steel beams 120, and the base 140 are convenient to hoist, economical and environmentally friendly. The installed tower crane foundation 100 has stable force transmission. The tower crane foundation 100 provided by the embodiment of the present invention can make full use of the completed basement structure. After installing the tower crane foundation 100, an internal climbing tower crane can be installed in advance to improve the safety of the internal climbing tower crane, quickly access the main structure construction of the construction project, speed up the progress of the project construction, and optimize the site layout of the construction project. The tower crane foundation 100 can effectively solve the unfavorable conditions such as the lagging progress of the main structure and the large number of bidding sections during the construction of super-high-rise buildings, and install the internal climbing tower crane in advance to quickly intervene in the construction of the main structure of the project.

[0045] The installation method of the tower crane foundation of the embodiment of the present invention forms a ground-type tower crane foundation and a suspended tower crane foundation by checking whether the lower end surfaces of the corner block 110 and the cross steel beam 120 are in contact with the foundation bottom plate in the shaft 60. The ground-type tower crane foundation formed by the embodiment of the present invention uses the corner block 110, the cross steel beam 120 and the base 140, and the ground-type tower crane foundation of the leg structure pre-buried in the foundation bottom plate, which is easy to disassemble and assemble, reduces material waste, and has the effect of being green and environmentally friendly.

[0046] The present invention is not limited to the above specific embodiments, and any deformation and modification made by those skilled in the art based on the above contents shall fall within the protection scope of the claims of the present invention.

Claims

1. A tower crane foundation of an internal climbing tower crane, characterized in that: The invention comprises a corner block arranged at the corner of the shaft wall and a cross steel beam connected to the corner block, wherein the cross steel beam comprises four diagonally equal legs, a connecting rod is connected between two adjacent legs, the end of each leg is connected to one of the corner blocks, and a base is arranged near the end of each leg; the corner block comprises a first wing plate and a second wing plate parallel to the walls on both sides of the shaft corner, a web plate connected between the first wing plate and the second wing plate, and a web plate connected between the web plate and the first wing plate and / or the second wing plate There is a stiffening plate, and the corner block also includes an upper plate, a lower plate and expansion bolts. The upper plate is connected to the upper ends of the web and the stiffening plate, and the lower plate is connected to the lower ends of the web and the stiffening plate. The expansion bolts are arranged on the first wing plate and the second wing plate; the cross steel beam also includes a head plate perpendicular to the end of the leg, and positioning bolts are connected between the head plate and the web; the base is a regular polygonal steel plate, a rectangular steel plate or a circular steel plate, and the base is provided with bolt holes for connecting the inner climbing tower crane.

2. The tower crane foundation of the inner climbing tower crane according to claim 1, characterized in that: The hoistway is square, and the cross steel beams are cross steel beams.

3. The tower crane foundation of the inner climbing tower crane according to claim 1, characterized in that: The lower end surface of the corner block and the lower end surface of the cross steel beam are arranged on the basic bottom plate in the hoistway.

4. The tower crane foundation of the inner climbing tower crane according to claim 1, characterized in that: The hoistway is an elevator hoistway or a core tube hoistway.

5. A method for installing a tower crane foundation of an inner climbing tower crane according to claim 1, characterized in that: The invention comprises an installation method in the initial installation stage of a tower crane foundation to form a ground-type tower crane foundation; the installation method in the initial installation stage of a tower crane foundation comprises: Two adjacent legs in the cross steel beam are fixedly connected by a connecting rod; The lower end surface of the corner block and the lower end surface of the cross steel beam are arranged on the foundation bottom plate in the hoistway; Fix the first wing plate and the second wing plate to the two side walls of the hoistway corner respectively by expansion bolts to connect the corner block to the hoistway corner; The distance between the head plate and the web plate is adjusted by positioning bolts to position the cross steel beam and the corner block, and then the upper plate is welded to the upper end surface of the cross steel beam, and the lower plate is welded to the lower end surface of the cross steel beam to connect the cross steel beam and the corner block; Connect the base to the upper end faces of the legs of the cross steel beams.

6. The method for installing the tower crane foundation of the inner climbing tower crane according to claim 5, characterized in that: It also includes an installation method for the tower crane foundation climbing stage to form a suspended tower crane foundation; the installation method for the tower crane foundation climbing stage includes: Two adjacent legs in the cross steel beam are fixedly connected by a connecting rod; The lower end surface of the corner block is suspended without contacting the base floor in the hoistway, and the first wing plate and the second wing plate are respectively fixed to the two side walls of the hoistway corner by expansion bolts to connect the corner block to the hoistway corner; The cross steel beam is suspended without contacting the base plate in the shaft, and the distance between the head plate and the web plate is adjusted by positioning bolts to position the cross steel beam and the corner block, and then the upper plate is welded to the upper end surface of the cross steel beam, and the lower plate is welded to the lower end surface of the cross steel beam to connect the cross steel beam and the corner block; Connect the base to the upper end faces of the legs of the cross steel beams.