Accommodating chamber and wafer electroplating system including the same
By designing separate storage units and filtering units in the storage chamber, the electroplating solution is filtered by using the liquid level difference and atmospheric pressure, the problems of low flow rate and insufficient supply of the electroplating solution are solved, and a more stable electroplating process is achieved and cost reduction is reduced.
Patent Information
- Application Number
- CN202011314597.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-20
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2040-11-20
AI Technical Summary
In the prior art, the flow rate of the electroplating solution is low after being filtered by bubbles, resulting in insufficient supply of the electroplating solution and rising or overflowing of the liquid surface, which increases the cost of the wafer plating system.
Design a containment chamber, by partitioning it into the first and second containment units, the electroplating solution is filtered through the filter unit by utilizing the liquid level difference and atmospheric pressure, avoiding the increase in the pressure of the filter on the circulation pipeline in the traditional method, ensuring that the electroplating solution is balanced supply.
The flow rate of the electroplating solution and the results of the electroplating process are improved, and the overflow or insufficient electroplating solution is avoided, thereby reducing system costs.
Smart Images

Figure CN112210813B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of semiconductor processing, and in particular to a containing cavity and a wafer electroplating system comprising the same. Background Art
[0002] One of the key indicators in the process results of wafer electroplating is the uniformity of the wafer surface. The more uniform the wafer surface is, the better the wafer electroplating process is. This indicator is related to the bubbles in the plating solution when the wafer is undergoing the electroplating process. The more bubbles in the plating solution, the worse the surface uniformity of the wafer, which leads to a worse wafer electroplating process. Therefore, when the technicians transport the plating solution in the plating solution holding chamber to the plating chamber for electroplating operations, they will first remove the bubbles in the plating solution to improve the wafer electroplating process results.
[0003] At present, a common method for removing bubbles from the electroplating solution is to install a bubble filter device in the circulation pipeline that transports the electroplating solution in the electroplating solution receiving chamber to the electroplating chamber. All the electroplating solution in the electroplating chamber needs to be filtered by the bubble filter device before it can flow into the electroplating chamber, so as to achieve the effect of no bubbles in the electroplating solution in the electroplating chamber. However, the cost of the bubble filter device is generally high, which will increase the overall cost of the wafer electroplating system. Moreover, the bubble filter device is arranged in the circulation pipeline, which will cause the pressure in the circulation pipeline to be too high, reduce the flow rate of the electroplating solution during bubble filtration, and cause the liquid inlet speed of the electroplating solution receiving chamber to be higher than the speed at which the electroplating solution flows into the electroplating chamber, that is, the electroplating solution outflow speed of the electroplating chamber is higher than the electroplating solution inflow speed of the electroplating chamber, which will cause the supply of the electroplating solution in the electroplating chamber to fail to meet the electroplating demand, affecting the electroplating effect, and on the other hand, it will also cause the liquid level of the electroplating solution receiving chamber to continue to rise, and even overflow. Summary of the invention
[0004] The technical problem to be solved by the present invention is to overcome the defect of low flow rate of electroplating solution after bubble filtration in the prior art, and to provide a containing chamber and a wafer electroplating system including the same.
[0005] The present invention solves the above technical problems through the following technical solutions:
[0006] A containing chamber, having a liquid inlet and a liquid outlet, wherein the interior of the containing chamber is divided into a first containing unit and a second containing unit, wherein the first containing unit and the second containing unit are respectively connected to the outside, wherein the liquid inlet is arranged in the first containing unit, and the liquid outlet is arranged in the second containing unit;
[0007] The accommodating chamber includes a first channel and a filtering unit. The electroplating liquid in the first accommodating unit and the electroplating liquid in the second accommodating unit are connected through the first channel. The filtering unit is arranged corresponding to the first channel. The filtering unit can filter bubbles in the electroplating liquid flowing through the first channel.
[0008] In this solution, the first accommodating unit is used to accommodate the electroplating liquid with bubbles input from the liquid inlet, and the second accommodating unit is used to accommodate the electroplating liquid without bubbles input from the first accommodating unit and filtered by the filtering unit, so that the electroplating liquid flowing from the liquid outlet into the electroplating chamber has no bubbles, thereby improving the electroplating process results. Since the first accommodating unit and the second accommodating unit are both connected to the outside world, the pressures of the electroplating liquids in the first accommodating unit and the second accommodating unit are basically the same and equal to the atmospheric pressure when they are not flowing. During the circulation of the electroplating liquid, the first accommodating unit is continuously replenished with electroplating liquid, and the second accommodating unit is continuously drawn out of the electroplating liquid, resulting in the liquid level in the first accommodating unit being higher than the liquid level in the second accommodating unit. Therefore, the pressure of the electroplating liquid in the first accommodating unit is greater than the pressure of the electroplating liquid in the second accommodating unit. Under the action of the pressure difference between the two, the electroplating liquid in the first accommodating unit will be filtered through the first channel and the filtering unit to enter the second accommodating unit. Compared with the traditional method of directly setting the filter on the circulation pipeline, the electroplating liquid passes through the filtering unit under the action of atmospheric pressure through the liquid level difference, and the passing speed is significantly faster than the solution using the pipeline pressure. Furthermore, because the plating liquid in the second accommodating unit connected to the liquid outlet has already been bubble-filtered, there is no need to set up an additional filtering structure between the accommodating chamber and the plating chamber, thereby not causing excessive pressure in the pipeline for transporting the plating liquid or a reduction in flow rate. Therefore, it is possible to ensure that the volume of the plating liquid in the accommodating chamber and the volume of the plating liquid in the plating chamber are always balanced, and there will be no overflow of the plating liquid in the accommodating chamber or insufficient plating liquid in the plating chamber.
[0009] Preferably, the accommodating chamber further comprises a first baffle, which is arranged inside the chamber of the accommodating chamber along the height direction of the accommodating chamber to separate the first accommodating unit and the second accommodating unit, and the first channel is arranged on the first baffle.
[0010] In the present solution, a method for forming a first accommodating unit and a second accommodating unit is provided, and the first baffle has a simple structure. The above arrangement facilitates the first accommodating unit and the second accommodating unit to be connected to the outside.
[0011] Preferably, the filter unit covers one of the ports of the first channel located in the first accommodating unit or the second accommodating unit.
[0012] In this solution, since the first baffle is a plate-like structure with a relatively small thickness, the above arrangement facilitates the disassembly and assembly between the first baffle and the filter unit, thereby improving the assembly and maintenance efficiency.
[0013] Preferably, the first baffle is detachably connected to the chamber, and the first baffle can be moved out relative to the chamber along the height direction of the accommodating cavity.
[0014] In this solution, the above arrangement can avoid interference with other structures of the accommodating chamber during the disassembly and assembly of the first baffle as much as possible. Moreover, since the first channel is arranged on the first baffle, and the filter unit is generally directly connected to the first channel, the above arrangement can also remove the filter unit while removing the first baffle, which is convenient for cleaning and replacement of the filter unit, and prevents the flux of the filter unit from decreasing due to long-term use, thereby preventing the flow rate of the electroplating solution from decreasing.
[0015] Preferably, the first channel is arranged below the liquid level of the electroplating solution in the first containing unit.
[0016] In this solution, the above arrangement can improve the utilization rate of the first channel. When the size of the first channel is the same, the flow area of the plating liquid is larger, and more plating liquid flows into the second containing unit in the same time.
[0017] Preferably, the material of the filter unit is a polytetrachloroethylene hydrophilic membrane.
[0018] In this solution, the polytetrachloroethylene hydrophilic membrane has a small pore size and a large membrane flux, which can reduce the impact on the flow rate of the electroplating solution while ensuring a good filtering effect.
[0019] Preferably, the accommodating cavity further comprises an infusion tube, the infusion tube is arranged along the height direction of the accommodating cavity, the outlet of the infusion tube forms the liquid inlet, and the outlet of the infusion tube is arranged upward or downward.
[0020] In this solution, a liquid infusion structure of a containing chamber is provided, and a liquid infusion tube is used to transport the electroplating liquid in the electroplating chamber to the containing chamber.
[0021] Preferably, the outlet of the liquid delivery tube is flush with or submerged in the liquid level of the electroplating solution in the first accommodating unit.
[0022] In this solution, the above arrangement ensures that the electroplating liquid flowing out of the outlet of the liquid delivery tube will not collide with the liquid surface of the electroplating liquid in the first containing unit to form bubbles.
[0023] Preferably, the outlet of the liquid delivery tube is located above the liquid level of the electroplating solution in the first containing unit.
[0024] In this solution, the above arrangement prevents the bubbles in the electroplating solution in the infusion tube from directly entering the electroplating solution in the first containing unit.
[0025] Preferably, the distance between the outlet of the liquid infusion tube and the liquid level of the electroplating solution in the first containing unit is 0-5 mm.
[0026] In this solution, the above arrangement can reduce the generation of bubbles or speed up the removal of bubbles regardless of whether the outlet of the liquid infusion tube is above or below the liquid level of the electroplating solution in the first containing unit.
[0027] Preferably, the outlet end of the liquid delivery tube is a U-shaped tube, and the bend of the U-shaped tube is located below the liquid level of the electroplating solution in the first containing unit.
[0028] In this solution, the infusion tube of the above-mentioned shape can play the role of overflow reflux. When the driving force applied to the electroplating liquid in the infusion tube is less than or equal to the atmospheric pressure, the electroplating liquid in the infusion tube cannot flow out of the infusion tube.
[0029] Preferably, the accommodating chamber further includes a second channel, and the electroplating liquid in the first accommodating unit and the electroplating liquid in the second accommodating unit can also be communicated through the second channel, and the second channel is located below the first channel.
[0030] In this solution, the second channel is used to increase the flow rate of the plating solution flowing from the first accommodating unit to the second accommodating unit per unit time, so as to improve the ability of the first accommodating unit to discharge liquid to the second accommodating unit when the flow rate of the plating solution input from the liquid inlet to the first accommodating unit is too large, and to avoid the situation where the liquid level in the first accommodating unit is too high and overflows. This structural setting can improve the stability of the electroplating process. In addition, since bubbles are relatively concentrated at the high point of the plating solution, the second channel is set below the first channel, which can relatively reduce the bubble content of the plating solution entering the second accommodating unit from the second channel.
[0031] Preferably, the accommodating chamber also includes a second baffle, which is arranged in the second accommodating unit and around the liquid outlet, the lower end of the second baffle is fixed on the bottom surface of the second accommodating unit, and the upper end surface of the second baffle is located above the liquid outlet, and the second baffle can control the plating liquid in the second accommodating unit to flow into the liquid outlet from above the second baffle.
[0032] In this solution, since the electroplating liquid in the first accommodating unit can also flow into the second accommodating unit through the second channel without a filtering structure, bubbles may still exist in the electroplating liquid flowing into the second accommodating unit from the second channel. Also, because the second channel and the liquid outlet are both arranged near the bottom of the chamber of the accommodating chamber, under the suction of the pump, the electroplating liquid flowing into the second accommodating unit from the second channel can be easily directly sucked into the liquid outlet, resulting in no time to remove the bubbles in the electroplating liquid, thereby reducing the electroplating process results. The above-mentioned arrangement can change the flow direction of the electroplating liquid, so that the electroplating liquid flowing into the second accommodating unit from the second channel needs to bypass the second baffle before flowing to the liquid outlet, so that the bubbles in the electroplating liquid have time to float above the liquid surface, thereby achieving the effect of removing bubbles and improving the electroplating process results.
[0033] Preferably, the height of the second baffle is adjustable, and the upper end surface of the second baffle is located below the liquid level of the electroplating solution in the second containing unit.
[0034] In this solution, the height of the second baffle can be adjusted according to the height change of the electroplating liquid level in the accommodating chamber to further reduce or even completely remove the bubbles in the electroplating liquid. The above arrangement can ensure that the second baffle will not block the electroplating liquid from flowing to the liquid outlet when no additional hole is opened at the upper end, thereby simplifying the structure of the second baffle.
[0035] Preferably, the wafer electroplating system includes the accommodating chamber as described above.
[0036] In the present solution, an application field of a containing chamber is provided, in which the plating liquid circulates continuously during the electroplating process, and the containing chamber is used to store the plating liquid overflowing from the electroplating chamber. As the plating liquid in the electroplating chamber is continuously lost, the plating liquid in the containing chamber will be pumped into the electroplating chamber again to replenish the plating liquid required by the plating chamber during the electroplating process in real time.
[0037] The positive and progressive effect of the present invention is that the first accommodating unit in the present invention is used to accommodate the electroplating solution with bubbles input from the liquid inlet, and the second accommodating unit is used to accommodate the electroplating solution without bubbles input from the first accommodating unit and filtered by the filtering unit, so that the electroplating solution flowing from the liquid outlet into the electroplating chamber has no bubbles, thereby improving the electroplating process results. Since the first accommodating unit and the second accommodating unit are both connected to the outside world, the pressure of the electroplating solution in the first accommodating unit and the second accommodating unit when not flowing is basically the same and equal to the atmospheric pressure. During the circulation of the plating solution, the first accommodating unit is continuously replenished with plating solution, and the second accommodating unit is continuously drawn out of plating solution, resulting in the liquid level in the first accommodating unit being higher than the liquid level in the second accommodating unit. Therefore, the pressure of the plating solution in the first accommodating unit is greater than the pressure of the plating solution in the second accommodating unit. Under the action of the pressure difference between the two, the plating solution in the first accommodating unit will be filtered through the first channel and the filter unit to enter the second accommodating unit. Compared with the traditional method of directly setting the filter on the circulation pipeline, the plating solution passes through the filter unit under the action of atmospheric pressure through the liquid level difference, and the passing speed is significantly faster than the solution using the pipeline pressure. In addition, because the plating solution in the second accommodating unit connected to the liquid outlet is already the plating solution filtered by bubbles, there is no need to set up a filtering structure between the accommodating chamber and the plating chamber, so that the pressure in the pipeline for conveying the plating solution will not be too high or the flow rate will not be reduced. Therefore, it can be ensured that the volume of the plating solution in the accommodating chamber and the volume of the plating solution in the plating chamber are always balanced, and there will be no overflow of the plating solution in the accommodating chamber or insufficient plating solution in the plating chamber. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a schematic diagram of the three-dimensional structure of the accommodating cavity according to an embodiment of the present invention.
[0039] Figure 2 The figure is a schematic top view of the structure of the accommodation cavity according to an embodiment of the present invention.
[0040] Figure 3 for Figure 2 Schematic diagram of the cross-sectional structure along AA.
[0041] Figure 4 for Figure 2 Schematic diagram of the cross-sectional structure along BB.
[0042] Figure 5 for Figure 2 Schematic diagram of the cross-sectional structure of the middle edge CC.
[0043] Figure 6 It is a schematic diagram of the three-dimensional structure of a receiving chamber according to an embodiment of the present invention.
[0044] Figure 7The figure is a schematic diagram of the three-dimensional structure of the first baffle according to an embodiment of the present invention.
[0045] Figure 8 The figure is a schematic diagram of the three-dimensional structure of the second baffle according to an embodiment of the present invention.
[0046] Fig. 9 The figure is a schematic diagram of the three-dimensional structure of an infusion tube according to an embodiment of the present invention.
[0047] Description of reference numerals:
[0048] Cavity 1
[0049] Chamber 11
[0050] The first accommodation unit 111
[0051] The second accommodation unit 112
[0052] First card slot 113
[0053] Second card slot 114
[0054] Infusion tube 2
[0055] First baffle 3
[0056] Opening 31
[0057] First channel 4
[0058] Filter unit 5
[0059] Liquid outlet 6
[0060] Liquid inlet 7
[0061] Second channel 8
[0062] Second baffle 9 DETAILED DESCRIPTION
[0063] The present invention is further described below by way of examples, but the present invention is not limited to the scope of the examples.
[0064] The present embodiment provides a wafer electroplating system for electroplating wafers. The wafer electroplating system includes a receiving chamber, a plating chamber, a delivery pipe, a driving pump and a plating solution. The delivery pipe is connected between the receiving chamber and the plating chamber. The driving pump is used to drive the plating solution to circulate between the receiving chamber, the plating chamber and the delivery pipe. The wafer is electroplated in the plating chamber. The receiving chamber is used to store the plating solution overflowing from the plating chamber. As the plating solution in the plating chamber is continuously lost, the plating solution in the receiving chamber will be pumped into the plating chamber again under the action of the driving pump to replenish the plating solution required by the plating chamber during the electroplating process in real time.
[0065] like Figure 1-5 As shown, the accommodating chamber includes a cavity 1, a liquid infusion tube 2, a first baffle 3, a first channel 4 and a filtering unit 5.
[0066] like Figure 6 As shown, the cavity 1 of the receiving chamber is a hollow structure, and the hollow part of the cavity 1 forms a chamber 11, and the chamber 11 is used to contain the electroplating liquid. The side wall of the cavity 1 is opened to form a liquid outlet 6, and the liquid outlet 6 is used to transport the electroplating liquid in the chamber 11 of the receiving chamber to the electroplating chamber. The infusion tube 2 is arranged along the height direction of the receiving chamber, and the infusion tube 2 extends from the top of the receiving chamber to the inside of the chamber 11. The outlet of the infusion tube 2 forms the liquid inlet 7 of the receiving chamber, and the liquid inlet 7 is used to transport the electroplating liquid in the electroplating chamber to the chamber 11 of the receiving chamber.
[0067] The first baffle 3 is arranged inside the chamber 11 of the accommodating chamber along the height direction of the accommodating chamber, and divides the chamber 11 into a first accommodating unit 111 and a second accommodating unit 112. The infusion tube 2 is arranged in the first accommodating unit 111, and the outlet of the infusion tube 2, i.e., the liquid inlet 7, is also located in the first accommodating unit 111. The liquid outlet 6 is arranged in the second accommodating unit 112. The upper parts of the first accommodating unit 111 and the second accommodating unit 112 are both connected to the outside atmosphere. The upper end surface of the first baffle 3 should always be located above the liquid level of the electroplating solution in the first accommodating unit 111 and the second accommodating unit 112 to prevent the electroplating solution in the first accommodating unit 111 and the electroplating solution in the second accommodating unit 112 from being connected through the upper end of the first baffle 3.
[0068] like Figure 7 As shown, the through hole at the lower end of the first baffle 3 forms a first channel 4, and the electroplating liquid in the first accommodating unit 111 and the electroplating liquid in the second accommodating unit 112 are connected through the first channel 4. The filtering unit 5 is arranged corresponding to the first channel 4, and the filtering unit 5 is used to filter the bubbles in the electroplating liquid flowing through the first channel 4. The first accommodating unit 111 is used to accommodate the electroplating liquid with bubbles input from the liquid inlet 7, and the second accommodating unit 112 is used to accommodate the electroplating liquid without bubbles input from the first accommodating unit 111 and filtered by the filtering unit 5, so that the electroplating liquid flowing from the liquid outlet 6 into the electroplating chamber has no bubbles, thereby improving the electroplating process results.
[0069] Since the first accommodating unit 111 and the second accommodating unit 112 are both connected to the outside, the pressure of the plating liquid in the first accommodating unit 111 and the second accommodating unit 112 is substantially the same and equal to the atmospheric pressure when the plating liquid is not flowing. During the circulation of the plating liquid, the first accommodating unit 111 is continuously replenished with plating liquid, and the second accommodating unit 112 is continuously drawn out of the plating liquid, resulting in the liquid level in the first accommodating unit 111 being higher than the liquid level in the second accommodating unit 112. Therefore, the pressure of the plating liquid in the first accommodating unit 111 is greater than the pressure of the plating liquid in the second accommodating unit 112. Under the action of the pressure difference between the two, the plating liquid in the first accommodating unit 111 will be filtered through the first channel 4 and the filter unit 5 to enter the second accommodating unit 112. Compared with the conventional method of directly setting the filter on the delivery pipeline, the plating liquid passes through the filter unit 5 under the action of the atmospheric pressure through the liquid level difference, and the passing speed is significantly faster than the solution using the pipeline pressure. Furthermore, because the plating liquid in the second accommodating unit 112 connected to the liquid outlet 6 has already been bubble-filtered, there is no need to set up an additional filtering structure between the accommodating chamber and the plating chamber, thereby not causing excessive pressure inside the delivery pipeline for conveying the plating liquid, or reducing the flow rate. Therefore, it is possible to ensure that the volume of the plating liquid in the accommodating chamber and the volume of the plating liquid in the plating chamber are always balanced, and there will be no overflow of the plating liquid in the accommodating chamber or insufficient plating liquid in the plating chamber.
[0070] Preferably, the first channel 4 is arranged below the liquid level of the electroplating liquid in the first accommodating unit 111. Compared with the case where the first channel 4 is partially exposed above the liquid level of the electroplating liquid in the first accommodating unit 111, the utilization rate of the first channel 4 can be improved. When the size of the first channel 4 is the same, the flow area of the electroplating liquid is larger, and more electroplating liquid flows into the second accommodating unit 112 in the same time.
[0071] like Figure 2 As shown, the filter unit 5 in this embodiment covers the first baffle 3 and completely covers the port of the first channel 4 located at the first accommodating unit 111, so as to ensure that the electroplating liquid flowing into the second accommodating unit 112 through the first channel 4 is completely filtered by the filter unit 5. Moreover, since the first baffle 3 is a plate-like structure with a small thickness, covering the filter unit 5 at the port of the first channel 4 is more conducive to the disassembly and assembly between the first baffle 3 and the filter unit 5 than setting the filter unit 5 inside the first channel 4, thereby improving the assembly and maintenance efficiency. In other alternative embodiments, the filter unit 5 may also cover the port of the first channel 4 located at the second accommodating unit 112, or the filter unit 5 may be directly set inside the first channel 4.
[0072] Preferably, the first baffle plate 3 is detachably connected to the chamber 11, and a first slot 113 extending in the height direction of the accommodating chamber is provided on the inner side wall of the chamber body 1. The first baffle plate 3 is engaged with the first slot 113, and the first baffle plate 3 can be moved out relative to the chamber 11 in the height direction of the accommodating chamber, thereby avoiding interference between the first baffle plate 3 and other structures of the accommodating chamber during the disassembly and assembly process. In addition, since the filter unit 5 is directly covered by the first baffle plate 3, the filter unit 5 can be removed at the same time as the first baffle plate 3 is removed, which is convenient for cleaning and replacing the filter unit 5, and prevents the flux of the filter unit 5 from decreasing due to long-term use, thereby preventing the flow rate of the electroplating solution from decreasing.
[0073] The material of the filter unit 5 in this embodiment is a polytetrachloroethylene (PTFE) hydrophilic membrane. The PTFE hydrophilic membrane has a small pore size and a large membrane flux, which can reduce the impact on the flow rate of the electroplating solution while ensuring a good filtering effect. In other alternative embodiments, the filter unit 5 can also use other filtering materials and structures. The filter unit 5 in this embodiment is mainly used to filter bubbles in the electroplating solution.
[0074] Preferably, the outlet of the infusion tube 2 is level with the liquid surface of the electroplating liquid in the first accommodating unit 111, and the electroplating liquid flowing out from the outlet of the infusion tube 2, i.e., the liquid inlet 7, will neither collide with the electroplating liquid in the first accommodating unit 111 to form bubbles, but the original bubbles in the electroplating liquid in the infusion tube 2 can also directly float on the liquid surface of the electroplating liquid in the first accommodating unit 111 and be quickly eliminated, so that the bubbles in the electroplating liquid in the first accommodating unit 111 are greatly reduced.
[0075] In other alternative embodiments, the outlet of the liquid infusion tube 2 may also be located above or below the liquid level of the electroplating solution in the first accommodating unit 111. When the outlet of the liquid infusion tube 2 is located above the liquid level of the electroplating solution in the first accommodating unit 111, although the electroplating solution flowing out of the outlet of the liquid infusion tube 2 collides with the liquid level of the electroplating solution in the first accommodating unit 111 to form bubbles, the bubbles originally in the electroplating solution in the liquid infusion tube 2 will not directly flow into the electroplating solution in the first accommodating unit 111. When the outlet of the liquid infusion tube 2 is located below the liquid level of the electroplating solution in the first accommodating unit 111, although the bubbles originally in the electroplating solution in the liquid infusion tube 2 will directly flow into the electroplating solution in the first accommodating unit 111, the electroplating solution flowing out of the outlet of the liquid infusion tube 2 will not collide with the liquid level of the electroplating solution in the first accommodating unit 111 to form bubbles.
[0076] Preferably, the distance between the outlet of the liquid infusion tube 2 and the liquid surface of the electroplating solution in the first accommodating unit 111 is controlled within the range of 0-5 mm. When the distance between the two is small, when the outlet of the liquid infusion tube 2 is located above the liquid surface of the electroplating solution in the first accommodating unit 111, the collision force between the electroplating solution flowing out of the outlet of the liquid infusion tube 2 and the liquid surface of the electroplating solution in the first accommodating unit 111 is small, and fewer bubbles are generated. When the outlet of the liquid infusion tube 2 is located below the liquid surface of the electroplating solution in the first accommodating unit 111, the bubbles in the electroplating solution that has flowed into the first accommodating unit 111 can quickly float on the liquid surface of the electroplating solution in the first accommodating unit 111 and be quickly eliminated.
[0077] like Fig. 9 As shown, the infusion tube 2 in this embodiment is a U-shaped tube, and the bend of the U-shaped tube is located below the liquid level of the electroplating solution in the first accommodating unit 111, that is, the outlet of the infusion tube 2 is arranged upward. The U-shaped tube can play the role of overflow reflux. When the driving force of the electroplating solution in the infusion tube 2 is less than or equal to the atmospheric pressure, the electroplating solution in the infusion tube 2 cannot flow out of the infusion tube 2. In other alternative embodiments, the infusion tube 2 can also be a straight tube or a pipe of other structures, and the outlet of the infusion tube 2 can also be arranged downward or inclined relative to the liquid level of the electroplating solution in the first accommodating unit 111.
[0078] like Figure 3 and 7 As shown, the accommodating chamber further includes a second channel 8, which is located below the first channel 4 and is formed by the downward opening 31 at the bottom of the first baffle 3 and the bottom surface of the accommodating chamber 11. The electroplating liquid in the first accommodating unit 111 and the electroplating liquid in the second accommodating unit 112 can also be communicated through the second channel 8. The second channel 8 is used to increase the flow rate of the electroplating liquid flowing from the first accommodating unit 111 to the second accommodating unit 112 per unit time, so as to improve the ability of the first accommodating unit 111 to discharge liquid to the second accommodating unit 112 when the flow rate of the electroplating liquid input from the liquid inlet 7 to the first accommodating unit 111 is too large, so as to avoid the situation where the liquid level in the first accommodating unit 111 is too high and overflow occurs. This structural arrangement can improve the stability of the electroplating process.
[0079] Since the second channel 8 is not provided with a filter unit 5 or other filter structure, bubbles may still exist in the plating solution flowing into the second containing unit 112 from the second channel 8. In this embodiment, the second channel 8 is arranged close to the bottom of the chamber 11 because the bubbles are relatively concentrated at the high point of the plating solution and will float upward to the liquid surface and disappear. Therefore, there are fewer bubbles in the plating solution near the bottom of the chamber 11, and thus there are fewer bubbles in the plating solution flowing into the second containing unit 112.
[0080] Because the second channel 8 and the liquid outlet 6 are both arranged near the bottom of the chamber 11 of the accommodating chamber, under the suction of the driving pump, the plating solution flowing from the second channel 8 into the second accommodating unit 112 is easily directly sucked into the liquid outlet 6, resulting in no time to remove the bubbles in the plating solution, thereby reducing the electroplating process results. Therefore, in this embodiment, a second baffle 9 is arranged between the second channel 8 and the liquid outlet 6 to prevent the plating solution flowing from the second channel 8 into the second accommodating unit 112 from being directly sucked into the liquid outlet 6.
[0081] Specifically, Figure 2 , Figure 5 , Figure 8 As shown, the second baffle 9 is arranged in the second accommodating unit 112 and surrounds the liquid outlet 6 on three sides. The lower end of the second baffle 9 is fixed on the bottom surface of the second accommodating unit 112, and the upper end surface of the second baffle 9 is located above the liquid outlet 6. The second baffle 9 is used to change the flow direction of the electroplating solution, so that the electroplating solution flowing into the second accommodating unit 112 from the second channel 8 needs to bypass the second baffle 9 in the process of flowing to the liquid outlet 6, and the electroplating solution in the second accommodating unit 112 is controlled to flow into the liquid outlet 6 from above the second baffle 9, so that the bubbles in the electroplating solution have time to float above the liquid surface of the electroplating solution in the second accommodating unit 112, thereby achieving the effect of removing bubbles and improving the electroplating process results.
[0082] Preferably, the first baffle 3 is arranged away from the liquid outlet 6 to lengthen the flow path of the plating solution, so that the bubbles in the plating solution have time to float to the liquid surface of the plating solution in the second containing unit 112 to be eliminated, thereby further reducing the bubbles in the plating solution flowing into the liquid outlet 6.
[0083] The second baffle 9 is detachably connected to the chamber 11, and a second slot 114 extending in the height direction of the accommodating chamber is provided on the inner side wall of the cavity 1, and the second baffle 9 is engaged with the second slot 114, and the height of the second baffle 9 is adjustable, and the upper end surface of the second baffle 9 is located below the liquid level of the electroplating solution in the second accommodating unit 112. The technician can adjust the height of the second baffle 9 according to the height change of the electroplating liquid level in the accommodating chamber to further reduce or even completely remove the bubbles in the electroplating solution. In this embodiment, the upper end surface of the second baffle 9 is arranged below the liquid level of the electroplating solution in the second accommodating unit 112, which can ensure that the second baffle 9 will not block the electroplating solution from flowing to the liquid outlet 6 without opening another hole at the upper end, thereby simplifying the structure of the second baffle 9.
[0084] In the description of the present invention, it is necessary to understand that the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships are orientations or positional relationships based on normal use of the components, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or component referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention, unless otherwise specified herein.
[0085] Although the specific embodiments of the present invention are described above, it should be understood by those skilled in the art that this is only for illustration and the protection scope of the present invention is defined by the appended claims. Those skilled in the art may make various changes or modifications to these embodiments without departing from the principles and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.
Claims
1. A containing chamber having a liquid inlet and a liquid outlet, characterized in that: The interior of the accommodating chamber is divided into a first accommodating unit and a second accommodating unit, the first accommodating unit and the second accommodating unit are respectively communicated with the outside, the liquid inlet is arranged in the first accommodating unit, and the liquid outlet is arranged in the second accommodating unit; The accommodating chamber comprises a first channel and a filtering unit, the electroplating solution in the first accommodating unit and the electroplating solution in the second accommodating unit are connected through the first channel, the filtering unit is arranged corresponding to the first channel, and the filtering unit can filter bubbles in the electroplating solution flowing through the first channel; The accommodating chamber further comprises a first baffle, which is arranged inside the chamber of the accommodating chamber along the height direction of the accommodating chamber to separate and form the first accommodating unit and the second accommodating unit, and the first channel is arranged on the first baffle; The accommodating chamber also includes a second channel, and the electroplating liquid in the first accommodating unit and the electroplating liquid in the second accommodating unit can also be connected through the second channel, and the second channel is located below the first channel; the downward opening at the bottom of the first baffle and the bottom surface of the chamber form the second channel, and the second channel is not provided with a filtering structure.
2. The accommodating chamber according to claim 1, characterized in that: The filter unit covers one of the ports of the first channel located at the first accommodating unit or the second accommodating unit.
3. The accommodating chamber according to claim 1, characterized in that: The first baffle is detachably connected to the chamber, and the first baffle can be moved out relative to the chamber along the height direction of the accommodating cavity.
4. The accommodating chamber according to claim 1, characterized in that: The first channel is disposed below a liquid level of the electroplating solution in the first containing unit.
5. The accommodating chamber according to claim 1, characterized in that: The material of the filter unit is a polytetrachloroethylene hydrophilic membrane.
6. The accommodating chamber according to claim 1, characterized in that: The accommodating cavity further comprises an infusion tube, which is arranged along the height direction of the accommodating cavity, and the outlet of the infusion tube forms the liquid inlet, and the outlet of the infusion tube is arranged upward or downward.
7. The accommodating chamber according to claim 6, characterized in that: The outlet of the liquid delivery tube is flush with or submerged in the liquid level of the electroplating solution in the first accommodating unit.
8. The accommodating chamber according to claim 6, characterized in that: The outlet of the liquid delivery tube is located above the liquid level of the electroplating solution in the first containing unit.
9. The accommodating chamber according to claim 7 or 8, characterized in that: The distance between the outlet of the liquid delivery tube and the liquid level of the electroplating solution in the first containing unit is 0-5 mm.
10. The accommodating chamber according to claim 6, characterized in that: The outlet end of the liquid delivery tube is a U-shaped tube, and the bend of the U-shaped tube is located below the liquid level of the electroplating solution in the first containing unit.
11. The accommodating chamber according to claim 1, characterized in that: The accommodating chamber also includes a second baffle, which is arranged in the second accommodating unit and around the liquid outlet, the lower end of the second baffle is fixed on the bottom surface of the second accommodating unit, and the upper end surface of the second baffle is located above the liquid outlet. The second baffle can control the plating liquid in the second accommodating unit to flow into the liquid outlet from above the second baffle.
12. The accommodating chamber according to claim 11, characterized in that: The height of the second baffle is adjustable, and the upper end surface of the second baffle is located below the liquid level of the electroplating solution in the second containing unit.
13. A wafer electroplating system, characterized in that: The wafer electroplating system comprises a containing chamber as described in any one of claims 1-12.
Citation Information
Patent Citations
FPC electroplating automatic liquid adding device
CN203807588U
Accommodating cavity and wafer electroplating system comprising same
CN213596440U
Storage tank for process liquids with a reduced amount of bubbles
US20050067288A1