A method for constructing an anti-sinking manhole cover
Through the steps of synchronous elevation of the well chamber, well ring reinforcement and asphalt paving steel mold fine adjustment, the existing anti-settlement manhole cover construction methods and poor compaction degree are solved, and the synchronous molding of the anti-settlement manhole cover and the pavement is achieved, which has improved the Construction efficiency and road quality.
Patent Information
- Application Number
- CN202110137142.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-01
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2041-02-01
AI Technical Summary
The existing anti-settlement manhole cover construction methods are complicated and uneconomical, making it difficult to ensure the compaction and flatness of asphalt, which affects the aesthetics of the road and driving safety.
The steps of synchronous elevation of the well chamber, well ring reinforcement and installation and joint filling, permeable sealing construction, fine-tuning of the elevation of the paving steel mold, asphalt paving and roller rolling are adopted to ensure that the anti-settlement manhole cover is formed synchronously with the road surface and pass through fine stones The use of concrete and modified asphalt ensures the compaction of the lower flange area and the surrounding area of the manhole cover.
The anti-settlement manhole cover and pavement are synchronized, ensuring the unevenness and flatness of settlement, reducing the later maintenance rate, saving construction costs, and improving the aesthetics of the road and driving comfort.
Smart Images

Figure CN112796346B_ABST
Abstract
Citation Information
Patent Citations
Well lid mounting die
CN210797661U
Inspection well cover device with well base installed in asphalt concrete
CN211816443U