Comprehensive evaluation method for operation of multi-unit multi-mode thermal power plant based on fuzzy analysis
Through the fuzzy analysis method and digital twin model, the complexity problem of comprehensive evaluation of deep peak shaving of heating units is solved, and the optimal combination of heating mode is achieved, ensuring the economical and environmentally friendly operation of the heating system.
Patent Information
- Application Number
- CN202111254152.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-27
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2041-10-27
AI Technical Summary
The prior art is difficult to accurately and comprehensively evaluate the depth peak shaving of the heating unit under the combination of multiple heating modes, and it is impossible to effectively achieve efficient, rapid, scientific and reasonable optimal solutions for the economic and environmental protection of the system.
Using a comprehensive evaluation method for multi-unit multi-mode heating power plant operation based on fuzzy analysis, the multi-heating mode combination scheme is set up, digital twin models, economic and environmental evaluation models are established, and the fuzzy hierarchical analysis method and fuzzy decision-making algorithm are used to determine Combination schemes are preferred and performance verification is performed.
It realizes high-precision simulation and simulation of the operation of the heating unit, ensures economical and environmentally friendly operation under multi-dimensional constraints, provides the best combination of heating modes, and meets the actual needs of the power system.
Smart Images

Figure CN113987934B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of smart heating, and specifically relates to a comprehensive evaluation method for the operation of a multi-unit and multi-mode heating power plant based on fuzzy analysis. Background Art
[0002] With the continuous advancement of the country's clean heating policy in northern China, large-scale cogeneration systems represented by coal-fired heating units and gas-fired combined cycle heating units have become the main heat source for large and medium-sized cities in northern my country, accelerating the replacement of decentralized regional boiler room heating. Heating units have accounted for about 1 / 4 of the total installed capacity of thermal power units in my country. From the perspective of the country's clean heating policy, ultra-low emission cogeneration is the preferred technology for "clean heating". From the perspective of energy structure, coal-fired cogeneration is also a typical way to use coal cleanly and efficiently. Cogeneration uses high-quality thermal energy to generate electricity first and then provide heat, so as to achieve cascade utilization of energy, improve the overall utilization efficiency of energy, and reduce overall energy consumption. It is a form of energy utilization with high comprehensive efficiency. Cogeneration can effectively reduce the energy consumption of power generation and is an important energy-saving and emission reduction technology for thermal power units. At the same time, in order to reduce environmental pollution in large cities, some cities have adopted measures such as replacing coal with electricity and gas in heating in recent years, and use electric boilers and gas boilers for heating.
[0003] At present, in order to cooperate with urban heating and meet the needs of flexible peak-shaving, some power generation companies have successively carried out technical transformation of steam turbine intermediate-pressure cylinder extraction heating, low-pressure cylinder bare shaft heating, high back-pressure heating, low-pressure cylinder cutting heating, hot water storage tanks and electric boiler heating, and have formed a situation of coordinated operation of multiple heating modes and deep peak-shaving of units; how to set the evaluation index system of the plan is the goal orientation for its planning, design and peak-shaving optimization. By setting a reasonable and scientific evaluation index system, the energy system's inherent endowments in efficient and coordinated utilization of multiple energy technologies, cascade utilization of heterogeneous energy, and high economic and environmental protection brought about by high substitutability can be maximized, thereby meeting the expectations of decision makers for the energy system.
[0004] However, when deep peak-shaving of heating units is carried out for a combination of multiple heating modes, there are many peak-shaving conditions, and the optimization indicators and constraints are complex, making it difficult to conduct a comprehensive evaluation in a quantitative manner, and it is impossible to accurately obtain the plant-level intelligent quantitative operation and scheduling decisions of the peak-shaving thermal power plant. The solution optimization problem is how to model the system with high precision and optimize multiple evaluation indicators under the existing evaluation index system, and measure the economy and environmental protection of the system at the engineering level, and with these as the goal, find an optimal heating multi-mode combination solution that meets practical applications efficiently, quickly, scientifically and reasonably.
[0005] Based on the above technical problems, it is necessary to design a new comprehensive evaluation method for the operation of multi-unit and multi-mode thermal power plants based on fuzzy analysis. Summary of the invention
[0006] The purpose of the present invention is to provide a comprehensive evaluation method for the operation of a multi-unit multi-mode thermal power plant based on fuzzy analysis.
[0007] In order to solve the above technical problems, the present invention provides a comprehensive evaluation method for the operation of a multi-unit multi-mode thermal power plant based on fuzzy analysis, the comprehensive evaluation method comprising:
[0008] Step S1, setting a multi-heating mode combination scheme when the heating unit participates in deep peak load coordination operation;
[0009] Step S2: constructing a digital twin model of multi-mode deep peak regulation of the unit by using mechanism modeling and data identification methods;
[0010] Step S3: According to the dimensional indicators of the heating units participating in deep peak load regulation, a multi-mode deep peak load regulation evaluation model of the heating units is established, which includes at least economic evaluation indicators, environmental evaluation indicators and multi-dimensional constraints, so as to evaluate the units with different heating mode combination schemes;
[0011] Step S4, using fuzzy analytic hierarchy process to establish an evaluation hierarchy structure, construct a judgment matrix between evaluation indicators, determine the weight vector of each evaluation indicator for unit peak load regulation, and establish a fuzzy decision matrix between each multi-heating mode combination scheme and each evaluation indicator;
[0012] Step S5, using a fuzzy decision algorithm to perform fuzzy calculation on the weight vector and the fuzzy decision matrix to obtain a comprehensive evaluation value of each multi-heating mode combination scheme, and determining the multi-heating mode combination scheme with the highest evaluation value as the preferred combination scheme;
[0013] Step S6: Verify the unit performance of the preferred combination scheme through the digital twin model, use the verified scheme as the optimal combination scheme for multiple heating modes, and implement plant-level intelligent quantitative operation and scheduling decisions for the peak-shaving thermal power plant based on the optimal combination scheme.
[0014] Furthermore, in step S1, a multi-heating mode combination scheme is set when the heating unit participates in deep peak load collaborative operation, specifically including:
[0015] Based on the unit transformation cost, complexity, thermal economy, needs of different regions of the power plant and coal types, a multi-mode heating combination scheme is selected according to the technical adaptability of different heating modes. The heating modes include high back pressure heating mode, steam extraction heating mode, cylinder cutting heating mode, high and low pressure bypass heating mode, hot water storage tank heating mode and electric boiler heating mode. The multi-mode heating combination scheme includes a combination of two of the above-mentioned heating modes or a combination of more heating modes.
[0016] Furthermore, in step S2, a digital twin model of multi-mode deep peak regulation of the unit is constructed by using mechanism modeling and data identification methods, specifically including:
[0017] Based on the basic principles of engineering thermodynamics, fluid mechanics, and heat transfer, a mechanism simulation model consistent with the system structure of the heating unit is constructed using modeling and simulation technology, and by inputting structural parameters, attribute information, and setting boundary conditions, theoretical calculations of the operating performance of the unit and the thermal system of the entire plant under different load conditions are achieved; the mechanism simulation model includes at least a turbine module, a boiler module, a feedwater heat exchanger module, a condenser module, a steam-water flow module, a water pump module, a pipeline, and a confluence and intersection module, and each module needs to satisfy its own mass conservation equation, energy conservation equation, and constraint conditions;
[0018] The real-time operation data of the heating unit is connected to the mechanism simulation model, and the simulation results of the mechanism simulation model are adaptively identified and corrected using the reverse identification method;
[0019] Among them, the reverse identification method includes: after performing missing value processing, outlier processing and data smoothing preprocessing operations on the operating data of multiple working conditions of the heating unit, the operating data containing measurement errors in the real-time operating data are preliminarily corrected to data that meets the basic mechanism rules through historical operating data; the input variables in the data that meet the basic mechanism rules are input into the predicted values of the variables to be corrected in the mechanism simulation model calculation variables; the error membership function is constructed, and the data that meets the basic mechanism rules of the variables to be corrected are error detected and identified to obtain error-containing data; the errors are detected and identified through the predicted values, and the causes of the errors are judged by the expert system, and the operating data of the variables to be corrected with larger errors are corrected.
[0020] Furthermore, the economic evaluation index and environmental evaluation index in step S3 are primary evaluation indexes; the economic target also includes the coal procurement cost Ccost_i and the carbon emission transaction cost C cq , power supply income C1, heat supply income C2 and peak load income C3 secondary evaluation indicators; the total income C of the thermal power plant is expressed as:
[0021] C=C1+C2+C3-C cost ;
[0022] The coal purchase cost Ccost_i is based on the design parameters and actual operation data of the power plant, and takes into account that the number of turbine valves opened increases with the gradual increase of the unit's power generation. When the front-stage valve is fully opened and the rear-stage valve is just opened, the steam flow is hindered, which increases the coal consumption and produces a valve point effect, causing nonlinearity and discontinuity in coal consumption. By adding a sine function, the power supply coal consumption characteristics of each unit are fitted and expressed as:
[0023] Ccost_i (P i )=a i P i 2 +b i P i +c i +|d i sin{e i (P i min -P i )}|, i=1,2,…,N is the number of each unit; P i is the allocated load of the i-th unit, MW; is the lower limit of the load output of the i-th unit, MW; a i 、b i 、c i d i and e i are the coal consumption characteristic coefficients of the units respectively; Ccost_i is the coal consumption cost of the i-th unit for power generation, yuan / h;
[0024] The carbon emission trading cost C cq Carbon emissions E o and carbon quota E q Decision, expressed as: C cq =c(E o -E q ), c is the carbon trading price; the carbon emission E o Carbon emissions from thermal power units E o1 and carbon emissions from combined heat and power units E o2 It consists of two parts. μ i represents the carbon emission intensity per unit output of the i-th thermal power unit; γ i represents the carbon emission intensity per unit output of the i-th thermal power unit; the carbon quota E q Carbon quota E of thermal power units q1 and CHP unit carbon quota E q2 It consists of two parts. P i is the power generation capacity of the i-th thermal power unit; λ is the carbon emission allocation coefficient per unit of electricity; P ZS,i =P CHP,i +b v,i H CHP,i , P ZS,i represents the power generation power of cogeneration unit i under pure condensing conditions; P CHP,i and H CHP,i Respectively represent the net power generation and thermal power of thermal power unit i; b v,iIt is the value of the reduction in electrical output corresponding to the increase in unit thermal output when the air intake of the extraction condensing thermal power unit remains unchanged;
[0025] According to the coal purchase cost Ccost_i and carbon emission transaction cost C cq Calculate the total cost of the whole plant operation C cost , expressed as:
[0026] The power supply income C1 is composed of the power supply income of the pure condensing unit and the thermal power unit, which is expressed as: The heating income C2 is composed of the combined heating income of the thermal power unit and the electric heat storage, which is expressed as: p g is the on-grid electricity price; p heat is the unit heating charge; T is the system operation time; the same type of thermal power units are regarded as a whole, M is the number of pure condensing units, and N is the number of thermal power units; the peak-shaving income C3 is composed of the pure condensing units participating in the deep peak-shaving income C 3ck and CHP units participate in deep peak load regulation income C 3rl Composition, expressed as:
[0027]
[0028] p t1 、p t2 The first and second tier peak-shaving prices;
[0029] is the peak load of pure condensing unit k in the second gear;
[0030] The peak-shaving power of thermal power unit l in the first and second gears;
[0031] The environmental performance evaluation index is expressed as follows through the relationship between pollutant emissions and unit load: i (P i )=α i P i 2 +β i P i +γ i , α i , β i , γ i , respectively, unit smoke and NO x Characteristic coefficient of emission mass concentration; g i represents the pollutant emission of the i-th unit; the total pollution emission G is expressed as:
[0032] Furthermore, in step S3, the multi-mode deep peak load evaluation model of the heating unit is established, including:
[0033] Based on the maximum total revenue C of the thermal power plant in the economic evaluation index and the minimum total pollution emission G in the environmental evaluation index, and based on the multi-dimensional constraint conditions, a multi-mode deep peak load evaluation model for the heating unit is established;
[0034] The multi-dimensional constraints include at least: power balance constraints, thermal balance constraints, unit operation constraints, electric boiler operation constraints, heat storage device operation constraints, and deep peak load power constraints;
[0035] The power balance constraint:
[0036] P load (t) = P CHP (t)-P EB (t)-P CY (t);
[0037] Where: P load (t) is the power load demand of the system during the period t; P CHP (t) is the electric power output value of the thermal power unit at time t; P EB (t) is the electric power consumed by the electric boiler at time t; P CY (t) is the power load of the plant during period t;
[0038] The thermal energy balance constraint:
[0039] H load (t) = H CHP (t)+H EB (t)+H TS (t)-H TS (t-Δt);
[0040] Where: H load (t) is the heat load demand of the system during the period t; H CHP (t) is the heat generated by the thermal power unit during period t; H EB (t) is the heat generated by the electric boiler at time t; H TS (t) is the heat storage capacity of the heat storage device in time period t; Δt is the unit time length;
[0041] The operation constraints of the thermal power unit itself are:
[0042]
[0043]
[0044] -P CHP,down Δt≤PCHP (t)-P CHP (t-Δt)≤P CHP,up Δt;
[0045] Where: and They are the upper and lower limits of the electrical output of the cogeneration unit respectively; and are the upper and lower limits of the thermal output of the cogeneration unit; P CHP,down and P CHP,up are the downward ramp-up rate and upward ramp-up rate of the CHP unit, respectively;
[0046] The operating constraints of the electric boiler are:
[0047] 0≤P EB (t)≤P EB,max ;
[0048] -P EB,down Δt≤P EB (t)-P EB (t-Δt)≤P EB,up Δt;
[0049] Where: P EB,max The maximum power of the electric boiler installed; P EB,down and P EB,up They are the downward climbing rate and upward climbing rate of the electric boiler respectively.
[0050] The operation constraints of the thermal storage device are:
[0051] 0≤H TS (t)≤H TS,max ;
[0052]
[0053]
[0054] Where: H TS,max The maximum capacity installed for thermal storage; and are the minimum and maximum values of the heat storage power of the heat storage device respectively; and are the minimum and maximum values of the heat release power of the heat storage device respectively; u c (t) and u d (t) are the storage and release factors of the energy storage device, which are 0-1 variables, where 0 means that the energy storage device is not storing or releasing energy, and 1 means that the energy storage device is storing or releasing energy. Since the energy storage device cannot store and release energy at the same time in the same scheduling period, the storage and release factor satisfies 0≤u c (t)+ud (t)≤1;
[0055] The deep peak load power constraint is:
[0056]
[0057] Where P feasible It is the minimum load that a thermal power plant can achieve on the basis of meeting the heat demand, that is, the deep peak load regulation capability based on the feasible operation domain of each unit; is the grid load instruction during period t; P ability It is the maximum load capacity of the thermal power plant, that is, the peak capacity.
[0058] Further, the evaluation hierarchy in step S4 includes a scheme layer, a criterion layer and a target layer, wherein the scheme layer includes a combination scheme of multiple heating modes, the criterion layer includes various evaluation indicators, and the target layer includes the peak load evaluation result of the unit;
[0059] The step S4 constructs a judgment matrix between the evaluation indicators, including:
[0060] By comparing the influence of each factor in the criterion layer on the target layer, the pairwise comparison matrix is determined, which is the judgment matrix; let a ij represents the comparison result of the ith factor of the criterion layer relative to the jth factor, then If the number of evaluation indicators in the criterion layer is q, the judgment matrix is:
[0061]
[0062] Determining the weight vector of each evaluation index for the peak load regulation of the unit in step S4 includes:
[0063] The judgment matrix A is solved to obtain the corresponding characteristic roots and eigenvectors, and a consistency test is performed. If the test is passed, the normalized eigenvector corresponding to the maximum eigenvalue of the judgment matrix is the weight vector of each evaluation index of the criterion layer for the peak load evaluation target of the unit, which is recorded as w; if the test is not passed, the parameters of the judgment matrix are readjusted until the test is passed;
[0064] In step S4, a fuzzy decision matrix is established between each multi-heating mode combination scheme and each evaluation index, including:
[0065] Using the membership function of fuzzy mathematics, the peak load degree ranking of each multi-heating mode combination scheme at the scheme level for each single evaluation index is processed by fuzzy normalization, and a fuzzy decision matrix B from the scheme level to the criterion level is established. The fuzzy normalization processing method is expressed as:
[0066]
[0067]
[0068]
[0069] Among them, q is the number of evaluation indicators; b ol is the fuzzy membership of the heating multi-mode combination scheme l to the evaluation target o; r ol It is the ranking number of the peak load regulation degree of the evaluation index o for the heating multi-mode combination scheme l.
[0070] Furthermore, in step S5, a fuzzy decision algorithm is used to perform fuzzy calculation on the weight vector and the fuzzy decision matrix to obtain a comprehensive evaluation value of each multi-heating mode combination scheme, and the multi-heating mode combination scheme with the highest evaluation value is determined as the preferred combination scheme, including:
[0071] Step S51, performing fuzzy number normalization on the economic evaluation index and the environmental evaluation index in the fuzzy decision matrix to obtain a normalized decision matrix;
[0072] Step S52: Based on the normalized decision matrix and the weight vector, an intuitive trapezoidal fuzzy weighted average operator formula is used to obtain the average attribute value of each evaluation index corresponding to each multi-heating mode combination scheme;
[0073] Step S53: Based on the average attribute value, calculate the comprehensive evaluation value of each multi-heating mode combination scheme according to the score function, sort the calculated comprehensive evaluation values, and determine the multi-heating mode combination scheme with the highest evaluation value as the preferred combination scheme.
[0074] Furthermore, the comprehensive evaluation method also includes: after establishing the fuzzy decision matrix, using an intelligent algorithm to solve and calculate the multi-mode deep peak-shaving evaluation model of the heating unit to obtain a preferred combination scheme for the multi-mode deep peak-shaving of the heating unit.
[0075] Furthermore, the intelligent algorithm adopts an artificial bee colony algorithm;
[0076] The intelligent algorithm is used to solve and calculate the multi-mode deep peak-shaving evaluation model of the heating unit to obtain the optimal combination scheme of the multi-mode deep peak-shaving of the heating unit, including:
[0077] Initialize algorithm parameters, including the size of the bee colony, the size of the honey collecting and following bee populations, the population individual vector, the exploitation limit of the same nectar source, and the maximum number of iterations;
[0078] Scout bees use chaotic search to generate the initial solution of the optimal nectar source. Leading bees use a search strategy that introduces an exponential distribution proportional factor to search near the currently retained optimal nectar source. Follower bees use an adaptive proportional selection strategy to select from the searched nectar sources and become leading bees.
[0079] Determine whether the selected nectar source location can be further improved within the pre-set exploitation limit. If not, the leading bee at that location abandons the nectar source, becomes a scout bee, and searches for a new nectar source again.
[0080] Determine the iteration termination condition. If the location of the optimal nectar source is acceptable or the maximum number of iterations is reached, stop the calculation and output the optimal nectar source location, which is the optimal combination solution; otherwise, search for a new nectar source again.
[0081] Furthermore, in step S6, the unit performance of the preferred combination scheme is verified by the digital twin model, and the verified scheme is used as the optimal combination scheme of multiple heating modes. The plant-level intelligent quantitative operation and scheduling decision of the peak-shaving thermal power plant is implemented according to the optimal combination scheme, including:
[0082] The preferred combination scheme is simulated by the digital twin model to calculate the unit steam consumption rate, heat consumption rate, power generation coal consumption rate, power supply coal consumption rate, plant power consumption rate, unit efficiency, unit heating capacity, maximum power generation capacity, maximum heating capacity and minimum heating capacity parameter indicators under the preferred combination scheme. If the parameter indicators meet the expected values, the preferred scheme is used as the optimal combination scheme for multiple heating modes, and the plant-level intelligent quantitative operation and scheduling decision of the peak-shaving thermal power plant is implemented based on the optimal combination scheme.
[0083] The beneficial effects of the present invention are:
[0084] (1) The present invention adopts a technical method combining "structural mechanism modeling + data identification and correction", based on the basic principles of engineering thermodynamics, fluid mechanics, heat transfer, etc., and uses digital twin modeling technology to construct a mechanism simulation model that maps the actual structure of the thermal system of the demonstration power plant unit. At the same time, the reverse identification method is used to adaptively identify and correct the simulation results of the mechanism simulation model to minimize the deviation between the theoretical value and the measured value; and by inputting structural parameters and attribute information and setting boundary conditions, the operating performance of the unit and the thermal system of the entire plant under different load conditions can be theoretically calculated, and high-precision simulation and simulation of the operating performance of the thermal power unit can be achieved, which provides core technical support for further quantitative analysis of operating safety, energy consumption and environmental emission indicators, as well as research and establishment of multi-mode collaborative operation solutions under different load demand conditions;
[0085] (2) The present invention establishes a peak load evaluation model by setting the primary evaluation index of economy and environmental protection, as well as various secondary indicators and corresponding constraints included in the primary evaluation index, which can meet the goals of maximizing peak load benefits and minimizing pollutant emissions under multi-dimensional constraints, thereby ensuring the economic and environmentally friendly operation of the heating unit;
[0086] (3) The present invention adopts fuzzy hierarchical analysis method to establish an evaluation hierarchy structure, construct a judgment matrix between each evaluation index, determine the weight vector of each evaluation index for the unit peak load regulation, and establish a fuzzy decision matrix between each multi-heating mode combination scheme and each evaluation index, and adopts a fuzzy decision algorithm to perform fuzzy calculation on the weight vector and the fuzzy decision matrix to obtain a comprehensive evaluation value of each multi-heating mode combination scheme, and determine the multi-heating mode combination scheme with the highest evaluation value as the preferred combination scheme. It can set reasonable weights for each evaluation index according to the peak load regulation characteristics, consider the mutual influence between the evaluation indicators, and select the best multi-heating mode combination scheme, so that the final scheme can be more objective, scientific and reasonable;
[0087] (4) The present invention verifies the performance of the unit for the preferred combination scheme through the digital twin model, and uses the verified scheme as the optimal combination scheme for multiple heating modes. The selected preferred combination scheme can be tested through the established digital twin model to calculate whether the unit's coal consumption rate, heat consumption rate, peak-shaving capacity and other indicators under the scheme meet expectations, thereby ensuring that in actual applications, scientific guidance can be provided for the economic, environmentally friendly and safe operation of heating units in the power system, meeting the actual needs of the power grid and heat network, and bringing good economic benefits.
[0088] Other features and advantages will be described in the following description, and partly become apparent from the description, or understood by practicing the invention. The purpose and other advantages of the invention are realized and obtained by the structures particularly pointed out in the description and the drawings.
[0089] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0090] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0091] Figure 1It is a schematic diagram of the principle of the comprehensive evaluation method for operation of a multi-unit multi-mode thermal power plant based on fuzzy analysis of the present invention;
[0092] Figure 2 It is a flow chart of a comprehensive evaluation method of a multi-unit multi-mode thermal power plant operation comprehensive evaluation method based on fuzzy analysis of the present invention;
[0093] Figure 3 This is a schematic diagram of a combination of multiple heating modes of the present invention;
[0094] Figure 4 It is a schematic diagram of a single unit simulation model of the present invention;
[0095] Figure 5 It is a hierarchical structure for comprehensive evaluation of operation of a multi-unit multi-mode thermal power plant according to the present invention. DETAILED DESCRIPTION
[0096] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0097] Example 1
[0098] Figure 1 It is a schematic diagram of the principle of the comprehensive evaluation method for the operation of a multi-unit multi-mode thermal power plant based on fuzzy analysis involved in the present invention.
[0099] Figure 2 It is a flow chart of the comprehensive evaluation method for the operation of a multi-unit multi-mode thermal power plant based on fuzzy analysis involved in the present invention.
[0100] like Figure 1 , Figure 2 As shown, this embodiment 1 provides a comprehensive evaluation method for the operation of a multi-unit multi-mode thermal power plant based on fuzzy analysis, and the comprehensive evaluation method includes:
[0101] Step S1, setting a multi-heating mode combination scheme when the heating unit participates in deep peak load coordination operation;
[0102] Step S2: constructing a digital twin model of multi-mode deep peak regulation of the unit by using mechanism modeling and data identification methods;
[0103] Step S3: According to the dimensional indicators of the heating units participating in deep peak load regulation, a multi-mode deep peak load regulation evaluation model of the heating units is established, which includes at least economic evaluation indicators, environmental evaluation indicators and multi-dimensional constraints, so as to evaluate the units with different heating mode combination schemes;
[0104] Step S4, using fuzzy analytic hierarchy process to establish an evaluation hierarchy structure, construct a judgment matrix between evaluation indicators, determine the weight vector of each evaluation indicator for unit peak load regulation, and establish a fuzzy decision matrix between each multi-heating mode combination scheme and each evaluation indicator;
[0105] Step S5, using a fuzzy decision algorithm to perform fuzzy calculation on the weight vector and the fuzzy decision matrix to obtain a comprehensive evaluation value of each multi-heating mode combination scheme, and determining the multi-heating mode combination scheme with the highest evaluation value as the preferred combination scheme;
[0106] Step S6: Use the digital twin model to verify the unit performance of the preferred combination scheme, use the verified scheme as the optimal combination scheme for multiple heating modes, and implement plant-level intelligent quantitative operation and scheduling decisions for the peak-shaving thermal power plant based on the optimal combination scheme.
[0107] Figure 3 It is a schematic diagram of the combination of multiple heating modes involved in the present invention.
[0108] like Figure 3 As shown, in this embodiment, the multi-heating mode combination scheme when the heating unit participates in the deep peak load collaborative operation is set in step S1, specifically including:
[0109] Based on the unit transformation cost, complexity, thermal economy, needs of different regions of the power plant and coal types, a multi-mode heating combination scheme is selected according to the technical adaptability of different heating modes such as high back pressure, steam extraction, cylinder cutting, high and low pressure bypass, hot water storage tank and electric boiler. The multi-mode heating combination scheme includes a combination of two modes or more modes.
[0110] In actual applications, the most mature technologies are hot water tank heat storage heating and electric boiler heating technology. These two technologies have good thermal economy, but the transformation cost is relatively high and the floor space is large; the second is steam turbine bypass technology, which has low transformation cost but poor thermal economy; high and low pressure bypass combined heating uses high-pressure and low-pressure bypass valves to extract more high-quality steam for heating, and cylinder cutting improves the heating capacity by using the back pressure heating method that directly uses the exhaust steam of the medium-pressure cylinder for heating. Both heating modes have their own advantages and disadvantages. High and low pressure bypass combined heating uses high-grade steam for low-grade heating, and the overall thermal economy is low; cylinder cutting technology realizes the cascade utilization of heat and has high energy efficiency, but there are high safety hazards.
[0111] Due to the cost and complexity of unit transformation, as well as the instability of unit operation caused by too many mode combinations, the commonly used combination is a combination of two heating modes. Typical combinations include: high back pressure + extraction, high back pressure + cylinder cutting, high and low bypass + extraction, high and low bypass + cylinder cutting, extraction + hot water storage tank, cylinder cutting + hot water storage tank, extraction + electric boiler, cylinder cutting + electric boiler, high back pressure + electric boiler, high and low bypass + electric boiler, etc. There are many combinations of different modes. According to the needs of different regions and coal types of power plants, it is necessary to select corresponding multi-mode combinations according to the adaptability of specific technologies. In terms of technical adaptability, different methods should be selected according to the characteristics of different units. The technical adaptability and peak-shaving capability of thermal storage electric boilers are stronger than other transformation technologies, but the static investment is high and the thermal efficiency of the system is also low; back pressure heating (including light axis and cylinder cutting technology) has low static investment and high overall system efficiency, but the safety of the low-pressure cylinder must be considered, and further modifications must be made on the basis of the back pressure heating transformation; and the high and low pressure bypass heating method must also meet the blade strength and unit lateral thrust to meet the safe operation standards. The actual selection of transformation technology should be comprehensively considered based on economic and technical adaptability.
[0112] Figure 4 It is a schematic diagram of a single unit simulation model involved in the present invention.
[0113] like Figure 4 As shown, in this embodiment, in step S2, a mechanism modeling and data identification method is used to construct a digital twin model of multi-mode deep peak regulation of the unit, specifically including:
[0114] Based on the basic principles of engineering thermodynamics, fluid mechanics, and heat transfer, a structural mechanism model consistent with the system structure of the heating unit is constructed using modeling and simulation technology. By inputting structural parameters, attribute information, and setting boundary conditions, theoretical calculations of the operating performance of the unit and the thermal system of the entire plant under different load conditions are achieved. The structural mechanism model includes at least a turbine module, a boiler module, a feedwater heat exchanger module, a condenser module, a steam-water flow module, a water pump module, a pipeline, and a confluence and intersection module. Each module needs to satisfy its own mass conservation equation, energy conservation equation, and constraint conditions.
[0115] The real-time operation data of the heating unit is connected to the simulation model, and the simulation results of the model are adaptively identified and corrected using the reverse identification method;
[0116] Among them, the reverse identification method includes: after performing missing value processing, outlier processing and data smoothing preprocessing operations on the operating data of the heating unit under multiple working conditions, the operating data containing measurement errors in the real-time operating data are preliminarily corrected to data that meets the basic mechanism rules through historical operating data; the input variables in the data that meet the basic mechanism rules are input into the predicted values of the variables to be corrected in the mechanism simulation model calculation variables; the error membership function is constructed, and the data that meets the basic mechanism rules of the variables to be corrected are error detected and identified to obtain error-containing data; the errors are detected and identified through the predicted values, and the causes of the errors are judged by the expert system, and the operating data of the variables to be corrected with large errors are corrected.
[0117] In actual applications, data twin model generation is to integrate the logical model, the logical model, the simulation model and the data-driven model to finally establish a digital twin model of the physical entity of the thermal power plant in the virtual space. The overview of each model is as follows: (1) The physical model reflects the various physical entities in the physical system of the thermal power plant. According to the geometric shape and mechanical structure of the physical entity, the geometric properties and functional properties of the physical model are defined; the physical entities mainly include boilers, steam turbines, pumps / fans, valves, heat exchangers, condensers and cooling towers. According to the different physical devices of the thermal power plant, the physical model construction idea of "whole-module-whole" is adopted to establish a separate physical model for each device, and finally connect each module into a whole. (2) The logical model establishes a controllable closed-loop logical model based on the supply and demand relationship, distribution and transportation between the various physical entities of the thermal power plant, and maps the physical model to the logical model. (3) The simulation model is based on the collected operation data, status data and physical property data of the thermal power plant. The parameters of the simulation model can be adjusted according to the error between the predicted value and the actual value output by the simulation model. (4) The data-driven model is based on the normal operating data of the thermal power plant. Data fusion and deep learning algorithms can be used to extract features from the input data during normal operation of each physical entity of the thermal power plant according to its working principle. The features are used as the input of the data-driven model. The predicted value of the model output can be used for parameter tuning.
[0118] In the reverse identification process of the characteristic parameters of the digital twin model, multiple sets of measured data of the power plant under various steady-state conditions are selected; the theoretical value of the characteristic coefficient of each device is calculated; then the particle swarm algorithm is used to identify and calculate the characteristic coefficient correction of each device in combination with multiple sets of measured data, and the corrected parameters are obtained. The optimal characteristic parameters are identified by comparing the different characteristic coefficient corrections in the simulation model with the corresponding measured data under multiple conditions. The corrected model can better describe the actual physical system and improve the calculation accuracy of the multi-condition calculation simulation of the power plant.
[0119] In this embodiment, the economic evaluation index and the environmental evaluation index in step S3 are primary evaluation indexes; the economic target also includes the coal procurement cost Ccost_i and the carbon emission transaction cost C cq , power supply income C1, heat supply income C2 and peak load income C3 secondary evaluation indicators; the total income C of the thermal power plant is expressed as:
[0120] C=C1+C2+C3-C cost ;
[0121] The coal purchase cost Ccost_i is based on the design parameters and actual operation data of the power plant, and considering that the number of turbine valves opened increases with the gradual increase of the unit's power generation power. When the front-stage valve is fully opened and the rear-stage valve is just opened, the steam flow is hindered, which increases the coal consumption and produces a valve point effect, causing nonlinearity and discontinuity in coal consumption. By adding a sine function, the power supply coal consumption characteristics of each unit are fitted and expressed as:
[0122] C cost_i (P i )=a i P i 2 +b i P i +c i +|d i sin{e i (P i min -P i )}|, i=1,2,…,N is the number of each unit; P i is the allocated load of the i-th unit, MW; is the lower limit of the load output of the i-th unit, MW; a i 、b i 、c i d i and e i are the coal consumption characteristic coefficients of the units respectively; Ccost_i is the coal consumption cost of the i-th unit for power generation, yuan / h;
[0123] Carbon emissions trading costs C cq Carbon emissions E o and carbon quota E q Decision, expressed as: C cq =c(E o -E q ), c is the carbon trading price; carbon emissions E o Carbon emissions from thermal power units E o1 and carbon emissions from combined heat and power units E o2 It consists of two parts. μ irepresents the carbon emission intensity per unit output of the i-th thermal power unit; γ i represents the carbon emission intensity per unit output of the i-th thermal power unit; carbon quota E q Carbon quota E of thermal power units q1 and CHP unit carbon quota E q2 It consists of two parts. P i is the power generation capacity of the i-th thermal power unit; λ is the carbon emission allocation coefficient per unit of electricity; P ZS,i =P CHP,i +b v,i H CHP,i , P ZS,i represents the power generation power of cogeneration unit i under pure condensing conditions; P CHP,i and H CHP,i Respectively represent the net power generation and thermal power of thermal power unit i; b v,i It is the value of the reduction in electrical output corresponding to the increase in unit thermal output when the air intake of the extraction condensing thermal power unit remains unchanged;
[0124] According to the coal purchasing cost Ccost_i and carbon emission trading cost C cq Calculate the total cost of the whole plant operation C cost , expressed as:
[0125] The power supply income C1 is composed of the power supply income of pure condensing units and thermal power units, which can be expressed as: The heating income C2 is composed of the combined heating income of the thermal power unit and the electric heat storage, which can be expressed as: p g is the on-grid electricity price; p heat is the unit heating charge; T is the system operation time; the same type of thermal power units are regarded as a whole, M is the number of pure condensing units, and N is the number of thermal power units; the peak load income C3 is the pure condensing unit participating in the deep peak load income C 3ck and CHP units participate in deep peak load regulation income C 3rl Composition, expressed as:
[0126]
[0127] p t1 、p t2 The first and second tier peak-shaving prices;
[0128] is the peak load of pure condensing unit k in the second gear;
[0129] The peak-shaving power of thermal power unit l in the first and second gears;
[0130] The environmental performance evaluation index is expressed as the relationship between pollutant emissions and unit load: g i (P i )=α i P i 2 +β i P i +γ i , α i , β i , γ i , respectively, unit smoke and NO x Characteristic coefficient of emission mass concentration; g i represents the pollutant emission of the i-th unit; the total pollution emission G is expressed as:
[0131] It should be noted that for steam turbine thermal power units with multiple valves, a "valve point effect" usually occurs when the turbine intake valve is suddenly opened. The reason for this phenomenon is that the number of turbine valves opened will increase with the gradual increase of the unit's power generation. When the front-stage steam valve is fully opened and the rear-stage steam valve is just opened, the steam flow is hindered, resulting in increased coal consumption, and the coal consumption characteristic curve bulges upward, resulting in a valve point effect. At this time, the use of a smooth quadratic function cannot explain the actual input-output characteristics of the unit. If the nonlinearity and discontinuity caused by the valve point effect are considered, a corresponding sine function should be added to the formula.
[0132] The deep peak-shaving transaction is implemented on a daily basis and monthly basis. The paid peak-shaving fee obtained by the thermal power plant is related to the peak-shaving power volume and peak-shaving electricity price of each level. The peak-shaving ladder compensation electricity price table is as follows:
[0133]
[0134] The two-level quotation and output of thermal power units, when the two-level load rates of pure condensing units are α=40%, β1=48%; the two-level load rates of cogeneration units are α=40%, β2=50%. The output of thermal power units in the load rate [α, β] interval is the first-level peak-shaving power, and the output below the load rate α is the second-level peak-shaving power.
[0135] In this embodiment, the multi-mode deep peak-shaving evaluation model of the heating unit is established in step S3, including: maximizing the total revenue C of the thermal power plant in the economic evaluation index and minimizing the total pollution emission G in the environmental evaluation index, and establishing the multi-mode deep peak-shaving evaluation model of the heating unit based on multi-dimensional constraints;
[0136] The multi-dimensional constraints include at least: power balance constraints, thermal balance constraints, unit operation constraints, electric boiler operation constraints, heat storage device operation constraints, and deep peak load power constraints;
[0137] Power balance constraints:
[0138] P load (t) = P CHP (t)-P EB (t)-P CY (t);
[0139] Where: P load (t) is the power load demand of the system during the period t; P CHP (t) is the electric power output value of the thermal power unit at time t; P EB (t) is the electric power consumed by the electric boiler at time t; P CY (t) is the power load of the plant during period t;
[0140] Thermal energy balance constraints:
[0141] H load (t) = H CHP (t)+H EB (t)+H TS (t)-H TS (t-Δt);
[0142] Where: H load (t) is the heat load demand of the system during the period t; H CHP (t) is the heat generated by the thermal power unit during period t; H EB (t) is the heat generated by the electric boiler at time t; H TS (t) is the heat storage capacity of the heat storage device in time period t; Δt is the unit time length;
[0143] Operation constraints of the thermal power unit itself:
[0144]
[0145]
[0146] -P CHP,down Δt≤P CHP (t)-P CHP (t-Δt)≤P CHP,up Δt;
[0147] Where: and They are the upper and lower limits of the electrical output of the cogeneration unit respectively; and are the upper and lower limits of the thermal output of the cogeneration unit; PCHP,down and P CHP,up are the downward ramp-up rate and upward ramp-up rate of the CHP unit, respectively;
[0148] Operating constraints of electric boilers:
[0149] 0≤P EB (t)≤P EB,max ;
[0150] -P EB,down Δt≤P EB (t)-P EB (t-Δt)≤P EB,up Δt;
[0151] Where: P EB,max The maximum power of the electric boiler installed; P EB,down and P EB,up They are the downward climbing rate and upward climbing rate of the electric boiler respectively.
[0152] Operational constraints of thermal storage devices:
[0153] 0≤H TS (t)≤H TS,max ;
[0154]
[0155]
[0156] Where: H TS,max The maximum capacity installed for thermal storage; and are the minimum and maximum values of the heat storage power of the heat storage device respectively; and are the minimum and maximum values of the heat release power of the heat storage device respectively; u c (t) and u d (t) are the storage and release factors of the energy storage device, which are 0-1 variables, where 0 means that the energy storage device is not storing or releasing energy, and 1 means that the energy storage device is storing or releasing energy. Since the energy storage device cannot store and release energy at the same time in the same scheduling period, the storage and release factor satisfies 0≤u c (t)+u d (t)≤1;
[0157] Deep peak load power constraints:
[0158]
[0159] Where P feasible It is the minimum load that a thermal power plant can achieve on the basis of meeting the heat demand, that is, the deep peak load regulation capability based on the feasible operation domain of each unit; is the grid load instruction during period t; P ability It is the maximum load capacity of the thermal power plant, that is, the peak capacity.
[0160] Figure 5 It is the hierarchical structure of the comprehensive evaluation of the operation of the multi-unit multi-mode thermal power plant involved in the present invention.
[0161] like Figure 5 As shown, in this embodiment, the evaluation hierarchy structure in step S4 includes: a scheme layer, a criterion layer and a target layer, the scheme layer includes a combination scheme of multiple heating modes, the criterion layer includes various evaluation indicators, and the target layer includes the peak load evaluation results of the unit;
[0162] Constructing the judgment matrix between the evaluation indicators includes: determining the pairwise comparison matrix by comparing the influence of each factor of the criterion layer on the target layer, which is the judgment matrix; assuming a ij represents the comparison result of the ith factor of the criterion layer relative to the jth factor, then If the number of evaluation indicators in the criterion layer is q, the judgment matrix is:
[0163]
[0164] In step S4, the weight vector of each evaluation index for the peak load regulation of the unit is determined, including:
[0165] The judgment matrix A is solved to obtain the corresponding characteristic roots and eigenvectors, and a consistency test is performed. If the test is passed, the normalized eigenvector corresponding to the maximum eigenvalue of the judgment matrix is the weight vector of each evaluation index of the criterion layer for the peak load evaluation target of the unit, denoted as w; if the test is not passed, the parameters of the judgment matrix are readjusted until the test is passed;
[0166] In step S4, a fuzzy decision matrix is established between each multi-heating mode combination scheme and each evaluation index, including:
[0167] Using the membership function of fuzzy mathematics, the peak load degree ranking of each multi-heating mode combination scheme for each single evaluation index in the scheme layer is processed by fuzzy normalization, and the fuzzy decision matrix B from the scheme layer to the criterion layer is established. The fuzzy normalization processing method is expressed as:
[0168]
[0169]
[0170]
[0171] Among them, q is the number of evaluation indicators; b ol is the fuzzy membership of the heating multi-mode combination scheme l to the evaluation target o; rol It is the ranking number of the peak load regulation degree of the evaluation index o for the heating multi-mode combination scheme l.
[0172] In this embodiment, in step S5, a fuzzy decision algorithm is used to perform fuzzy calculation on the weight vector and the fuzzy decision matrix to obtain a comprehensive evaluation value of each multi-heating mode combination scheme, and the multi-heating mode combination scheme with the highest evaluation value is determined as the preferred combination scheme, including:
[0173] Step S51, performing fuzzy number normalization on the economic evaluation index and the environmental evaluation index in the fuzzy decision matrix to obtain a normalized decision matrix;
[0174] Step S52: Based on the normalized decision matrix and the weight vector, an intuitive trapezoidal fuzzy weighted average operator formula is used to obtain the average attribute value of each evaluation index corresponding to each multi-heating mode combination scheme;
[0175] Step S53: Based on the average attribute value, the comprehensive evaluation value of each multi-heating mode combination scheme is calculated according to the score function, and the calculated comprehensive evaluation values are sorted, and the multi-heating mode combination scheme with the highest evaluation value is determined as the preferred combination scheme.
[0176] In this embodiment, the comprehensive evaluation method also includes: after establishing the fuzzy decision matrix, using an intelligent algorithm to solve and calculate the multi-mode deep peak-shaving evaluation model of the heating unit to obtain the optimal combination scheme of the multi-mode deep peak-shaving of the heating unit.
[0177] In this embodiment, the intelligent algorithm adopts an artificial bee colony algorithm;
[0178] An intelligent algorithm is used to solve and calculate the multi-mode deep peak-shaving evaluation model of the heating unit to obtain the optimal combination scheme of the multi-mode deep peak-shaving of the heating unit, including:
[0179] Initialize algorithm parameters, including the size of the bee colony, the size of the honey collecting and following bee populations, the population individual vector, the exploitation limit of the same nectar source, and the maximum number of iterations;
[0180] Scout bees use chaotic search to generate the initial solution of the optimal nectar source. Leading bees use a search strategy that introduces an exponential distribution proportional factor to search near the currently retained optimal nectar source. Follower bees use an adaptive proportional selection strategy to select from the searched nectar sources and become leading bees.
[0181] Determine whether the selected nectar source location can be further improved within the pre-set exploitation limit. If not, the leading bee at that location abandons the nectar source, becomes a scout bee, and searches for a new nectar source again.
[0182] Determine the iteration termination condition. If the location of the optimal nectar source is acceptable or the maximum number of iterations is reached, stop the calculation and output the optimal nectar source location, which is the optimal combination solution; otherwise, search for a new nectar source again.
[0183] In practical applications, intelligent algorithms can also be used to solve the evaluation model to obtain the optimal combination scheme. The optimal combination scheme obtained by using the intelligent algorithm and the fuzzy decision algorithm can be verified separately, and the best combination scheme can be obtained after comprehensive evaluation.
[0184] In this embodiment, in step S6, the unit performance of the preferred combination scheme is verified through the digital twin model, and the verified scheme is used as the optimal combination scheme for multiple heating modes. The plant-level intelligent quantitative operation and scheduling decision of the peak-shaving thermal power plant is realized based on the optimal combination scheme, including: simulating the preferred combination scheme through the digital twin model, calculating the unit steam consumption rate, heat consumption rate, power generation coal consumption rate, power supply coal consumption rate, plant power consumption rate, unit efficiency, unit heating capacity, and maximum power generation capacity, maximum heating capacity and minimum heating capacity parameter indicators under the preferred combination scheme. If the parameter indicators meet the expected values, the preferred scheme is used as the optimal combination scheme for multiple heating modes, and the plant-level intelligent quantitative operation and scheduling decision of the peak-shaving thermal power plant is realized based on the optimal combination scheme.
[0185] In practical applications, coal consumption characteristics are an important indicator for measuring the energy efficiency of power plants. Based on a fixed heat load, the change in coal consumption under the condition of variable main steam flow in the heating mode combination scheme is studied to see whether the power supply coal consumption under the optimal combination scheme is within the preset indicator range; and to verify that the peak and deep regulation capabilities of the units meet the standards during peak and trough periods of electricity consumption, including maximum power generation capacity, maximum heating capacity and minimum heating capacity parameter indicators, to improve energy utilization efficiency; through the optimal combination of multiple heating modes, the target fitness function can be calculated based on the determination of the heating load. The total power load requirements are distributed to each unit according to the instructions issued by the power grid, so as to optimize the overall energy efficiency goals of the whole plant.
[0186] The present invention adopts a technical method that combines "structural mechanism modeling + data identification and correction". Based on the basic principles of engineering thermodynamics, fluid mechanics, heat transfer, etc., the digital twin modeling technology is used to construct a structural mechanism model that is mapped to the actual structure of the thermal system of the demonstration power plant unit. At the same time, the reverse identification method is used to adaptively identify and correct the simulation results of the model to minimize the deviation between the theoretical value and the measured value; and by inputting structural parameters and attribute information and setting boundary conditions, the operating performance of the unit and the thermal system of the entire plant under different load conditions can be theoretically calculated, and high-precision simulation and emulation of the operating performance of the thermal power unit can be achieved, which provides core technical support for further quantitative analysis of operating safety, energy consumption and environmental emission indicators, as well as research and establishment of multi-mode collaborative operation solutions under different load demand conditions.
[0187] The present invention establishes a peak-shaving evaluation model by setting primary evaluation indicators of economy and environmental protection, as well as various secondary indicators and corresponding constraints included under the primary evaluation indicators. This model can meet the goals of maximizing peak-shaving benefits and minimizing pollutant emissions under multi-dimensional constraints, thereby ensuring the economical and environmentally friendly operation of the heating unit.
[0188] The present invention adopts fuzzy hierarchical analysis method to establish an evaluation hierarchy structure, constructs a judgment matrix between each evaluation index, determines the weight vector of each evaluation index for the unit peak regulation, and establishes a fuzzy decision matrix between each multi-heating mode combination scheme and each evaluation index, and adopts a fuzzy decision algorithm to perform fuzzy calculation on the weight vector and the fuzzy decision matrix, so as to obtain a comprehensive evaluation value of each multi-heating mode combination scheme, and determine the multi-heating mode combination scheme with the highest evaluation value as the preferred combination scheme. It can set reasonable weights for each evaluation index according to the peak regulation characteristics, consider the mutual influence between the evaluation indicators, and select the best multi-heating mode combination scheme, so that the final scheme can be more objective, scientific and reasonable.
[0189] The present invention verifies the performance of the unit for the preferred combination scheme through the digital twin model, and takes the verified scheme as the optimal combination scheme for multiple heating modes. The selected preferred combination scheme can be tested through the established digital twin model to calculate whether the coal consumption rate, heat consumption rate, peak-shaving capacity and other indicators of the unit under the scheme meet expectations, thereby ensuring that in actual applications, scientific guidance can be provided for the economic, environmentally friendly and safe operation of the heating units in the power system, meeting the actual needs of the power grid and heat network, and bringing good economic benefits.
[0190] In several embodiments provided in the present application, it should be understood that the disclosed system and method can also be implemented in other ways. The system embodiments described above are merely schematic. For example, the flowcharts and block diagrams in the accompanying drawings show the possible architecture, functions and operations of the systems, methods and computer program products according to multiple embodiments of the present invention. In this regard, each box in the flowchart or block diagram can represent a module, a program segment or a part of the code, and a part of the module, program segment or code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flowchart, and the combination of boxes in the block diagram and / or flowchart can be implemented with a dedicated hardware-based system that performs a specified function or action, or can be implemented with a combination of dedicated hardware and computer instructions.
[0191] In addition, the functional modules in the various embodiments of the present invention may be integrated together to form an independent part, or each module may exist independently, or two or more modules may be integrated to form an independent part.
[0192] If the function is implemented in the form of a software function module and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods of each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.
[0193] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.
Claims
1. A comprehensive evaluation method for the operation of a multi-unit multi-mode heating power plant based on fuzzy analysis, characterized in that: The comprehensive evaluation method includes: Step S1, setting a multi-heating mode combination scheme when the heating unit participates in deep peak load coordination operation; Step S2, constructing a digital twin model of multi-mode deep peak regulation of the unit by using mechanism modeling and data identification methods; Step S3: According to the dimensional indicators of the heating units participating in deep peak load regulation, a multi-mode deep peak load regulation evaluation model of the heating units is established, which includes at least economic evaluation indicators, environmental evaluation indicators and multi-dimensional constraints, so as to evaluate the units with different heating mode combination schemes; Step S4, using fuzzy analytic hierarchy process to establish an evaluation hierarchy structure, construct a judgment matrix between evaluation indicators, determine the weight vector of each evaluation indicator for unit peak load regulation, and establish a fuzzy decision matrix between each multi-heating mode combination scheme and each evaluation indicator; Step S5, using a fuzzy decision algorithm to perform fuzzy calculation on the weight vector and the fuzzy decision matrix to obtain a comprehensive evaluation value of each multi-heating mode combination scheme, and determining the multi-heating mode combination scheme with the highest evaluation value as the preferred combination scheme; Step S6: Verify the unit performance of the preferred combination scheme through the digital twin model, use the verified scheme as the optimal combination scheme for multiple heating modes, and implement plant-level intelligent quantitative operation and scheduling decisions for the peak-shaving thermal power plant based on the optimal combination scheme.
2. The comprehensive evaluation method according to claim 1, characterized in that: In step S1, a multi-heating mode combination scheme is set when the heating unit participates in deep peak load coordination operation, specifically including: Based on the unit transformation cost, complexity, thermal economy, needs of different regions of the power plant and coal types, a multi-mode heating combination scheme is selected according to the technical adaptability of different heating modes. The heating modes include high back pressure heating mode, steam extraction heating mode, cylinder cutting heating mode, high and low pressure bypass heating mode, hot water storage tank heating mode and electric boiler heating mode. The multi-mode heating combination scheme includes a combination of two of the above-mentioned heating modes or a combination of more heating modes.
3. The comprehensive evaluation method according to claim 1, characterized in that: In step S2, a digital twin model of multi-mode deep peak regulation of the unit is constructed by using mechanism modeling and data identification methods, which specifically includes: Based on the basic principles of engineering thermodynamics, fluid mechanics, and heat transfer, a mechanism simulation model consistent with the system structure of the heating unit is constructed using modeling and simulation technology, and by inputting structural parameters, attribute information, and setting boundary conditions, theoretical calculations of the operating performance of the unit and the thermal system of the entire plant under different load conditions are achieved; the mechanism simulation model includes at least a turbine module, a boiler module, a feedwater heat exchanger module, a condenser module, a steam-water flow module, a water pump module, a pipeline, and a confluence and intersection module, and each module needs to satisfy its own mass conservation equation, energy conservation equation, and constraint conditions; The real-time operation data of the heating unit is connected to the mechanism simulation model, and the simulation results of the mechanism simulation model are adaptively identified and corrected using the reverse identification method; Among them, the reverse identification method includes: after performing missing value processing, outlier processing and data smoothing preprocessing operations on the operating data of multiple working conditions of the heating unit, the operating data containing measurement errors in the real-time operating data are preliminarily corrected to data that meets the basic mechanism rules through historical operating data; the input variables in the data that meet the basic mechanism rules are input into the predicted values of the variables to be corrected in the mechanism simulation model calculation variables; the error membership function is constructed, and the data that meets the basic mechanism rules of the variables to be corrected are error detected and identified to obtain error-containing data; the errors are detected and identified through the predicted values, and the causes of the errors are judged by the expert system, and the operating data of the variables to be corrected with larger errors are corrected.
4. The comprehensive evaluation method according to claim 1, characterized in that: The economic evaluation index and environmental evaluation index in step S3 are primary evaluation indexes; the economic target also includes the coal procurement cost Ccost_i and the carbon emission transaction cost C cq , power supply income C1, heat supply income C2 and peak load income C3 secondary evaluation indicators; the total income C of the thermal power plant is expressed as: C = C1 + C2 + C3 - C cost ; The coal purchase cost Ccost_i is based on the design parameters and actual operation data of the power plant, and takes into account that the number of turbine valves opened increases with the gradual increase of the unit's power generation. When the front-stage valve is fully opened and the rear-stage valve is just opened, the steam flow is hindered, which increases the coal consumption and produces a valve point effect, causing nonlinearity and discontinuity in coal consumption. By adding a sine function, the power supply coal consumption characteristics of each unit are fitted and expressed as: i=1,2,…,N is the number of each unit; P i is the allocated load of the i-th unit, MW; is the lower limit of the load output of the i-th unit, MW; a i 、b i 、c i d i and e i are the coal consumption characteristic coefficients of the units respectively; Ccost_i is the coal consumption cost of the i-th unit for power generation, yuan / h; The carbon emission trading cost C cq Carbon emissions E o and carbon quota E q Decision, expressed as: C cq =c(E o -E q ), c is the carbon trading price; the carbon emission E o Carbon emissions from thermal power units E o1 and carbon emissions from combined heat and power units E o2 It consists of two parts. μ i represents the carbon emission intensity per unit output of the i-th thermal power unit; γ i represents the carbon emission intensity per unit output of the i-th thermal power unit; the carbon quota E q Carbon quota E of thermal power units q1 and CHP unit carbon quota E q2 It consists of two parts. P i is the power generation capacity of the i-th thermal power unit; λ is the carbon emission allocation coefficient per unit of electricity; P ZS,i =P CHP,i +b v,i H CHP,i , P ZS,i represents the power generation power of cogeneration unit i under pure condensing conditions; P CHP,i and H CHP,i Respectively represent the net power generation and thermal power of thermal power unit i; b v,i It is the value of the reduction in electrical output corresponding to the increase in unit thermal output when the air intake of the extraction condensing thermal power unit remains unchanged; According to the coal purchase cost Ccost_i and carbon emission transaction cost C cq Calculate the total cost of the whole plant operation C cost , expressed as: The power supply income C1 is composed of the power supply income of the pure condensing unit and the thermal power unit, which is expressed as: The heating income C2 is composed of the combined heating income of the thermal power unit and the electric heat storage, which is expressed as: p g is the on-grid electricity price; eat charging for heating supply to the unit; T is the system operation time; the same type of thermal power units are regarded as a whole, M is the number of pure condensing units, and N is the number of thermal power units; the peak load income C3 is composed of the pure condensing units participating in the deep peak load income C 3ck and CHP units participate in deep peak load regulation income C 3rl Composition, expressed as: p t1 、p t2 The first and second tier peak-shaving prices; is the peak load of pure condensing unit k in the second gear; The peak-shaving power of thermal power unit l in the first and second gears; The environmental performance evaluation index is expressed as follows through the relationship between pollutant emissions and unit load: α i , β i , γ i , respectively, unit smoke and NO x Characteristic coefficient of emission mass concentration; g i represents the pollutant emission of the i-th unit; the total pollution emission G is expressed as:
5. The comprehensive evaluation method according to claim 4, characterized in that: The establishment of a multi-mode deep peak load regulation evaluation model for the heating unit in step S3 includes: Based on the maximum total revenue C of the thermal power plant in the economic evaluation index and the minimum total pollution emission G in the environmental evaluation index, and based on the multi-dimensional constraint conditions, a multi-mode deep peak load evaluation model for the heating unit is established; The multi-dimensional constraints include at least: power balance constraints, thermal balance constraints, unit operation constraints, electric boiler operation constraints, heat storage device operation constraints, and deep peak load power constraints; The power balance constraint: P load (t)=P CHP (t)-P EB (t)-P CY (t); Where: P load (t) is the power load demand of the system during the period t; P CHP (t) is the electric power output value of the thermal power unit at time t; P EB (t) is the electric power consumed by the electric boiler at time t; P CY (t) is the power load of the plant during period t; The thermal energy balance constraint: H load (t)=H CHP (t)+H EB (t)+H TS (t)-H TS (t-Δt); Where: H load (t) is the heat load demand of the system during the period t; H CHP (t) is the heat generated by the thermal power unit during period t; H EB (t) is the heat generated by the electric boiler at time t; H TS (t) is the heat storage capacity of the heat storage device in time period t; Δt is the unit time length; The operation constraints of the thermal power unit itself are: -P CHP,down Δt≤P CHP (t)-P CHP (t-Δt)≤P CHP,up Δt; Where: and They are the upper and lower limits of the electrical output of the cogeneration unit respectively; and are the upper and lower limits of the thermal output of the cogeneration unit; P CHP,down and P CHP,up are the downward ramp-up rate and upward ramp-up rate of the CHP unit, respectively; The operating constraints of the electric boiler are: 0≤P EB (t)≤P EB,max ; -P EB,down Δt≤P EB (t)-P EB (t-Δt)≤P EB,up Δt; Where: P EB,max The maximum power of the electric boiler installed; P EB,down and P EB,up They are the downward climbing rate and upward climbing rate of the electric boiler respectively; The operation constraints of the thermal storage device are: 0≤H TS (t)≤H TS,max ; Where: H TS,max The maximum capacity installed for thermal storage; and are the minimum and maximum values of the heat storage power of the heat storage device respectively; and are the minimum and maximum values of the heat release power of the heat storage device respectively; u c (t) and u d (t) are the storage and release factors of the energy storage device, which are 0-1 variables, where 0 means that the energy storage device does not store or release energy, and 1 means that the energy storage device stores or releases energy; since the energy storage device cannot store and release energy at the same time in the same scheduling period, the storage and release factor satisfies 0≤u c (t)+u d (t)≤1; The deep peak load power constraint is: Where P feasible It is the minimum load that a thermal power plant can achieve on the basis of meeting the heating demand, that is, the deep peak-shaving capability based on the feasible operation domain of each unit; is the grid load instruction during period t; P ability It is the maximum load capacity of the thermal power plant, that is, the peak capacity.
6. The comprehensive evaluation method according to claim 1, characterized in that: The evaluation hierarchy in step S4 includes a scheme layer, a criterion layer and a target layer, wherein the scheme layer includes a combination scheme of multiple heating modes, the criterion layer includes various evaluation indicators, and the target layer includes the peak load evaluation results of the units; The step S4 constructs a judgment matrix between the evaluation indicators, including: By comparing the influence of each factor in the criterion layer on the target layer, the pairwise comparison matrix is determined, which is the judgment matrix; let a ij represents the comparison result of the ith factor of the criterion layer relative to the jth factor, then If the number of evaluation indicators in the criterion layer is q, the judgment matrix is: Determining the weight vector of each evaluation index for the peak load regulation of the unit in step S4 includes: The judgment matrix A is solved to obtain the corresponding characteristic roots and eigenvectors, and a consistency test is performed. If the test is passed, the normalized eigenvector corresponding to the maximum eigenvalue of the judgment matrix is the weight vector of each evaluation index of the criterion layer for the peak load evaluation target of the unit, which is recorded as w; if the test is not passed, the parameters of the judgment matrix are readjusted until the test is passed; In step S4, a fuzzy decision matrix is established between each multi-heating mode combination scheme and each evaluation index, including: Using the membership function of fuzzy mathematics, the peak load degree ranking of each multi-heating mode combination scheme at the scheme level for each single evaluation index is processed by fuzzy normalization, and a fuzzy decision matrix B from the scheme level to the criterion level is established. The fuzzy normalization processing method is expressed as: Among them, q is the number of evaluation indicators; b ol is the fuzzy membership of the heating multi-mode combination scheme l to the evaluation target o; r ol It is the ranking number of the peak load regulation degree of the evaluation index o for the heating multi-mode combination scheme l.
7. The comprehensive evaluation method according to claim 1, characterized in that: In step S5, a fuzzy decision algorithm is used to perform fuzzy calculation on the weight vector and the fuzzy decision matrix to obtain a comprehensive evaluation value of each multi-heating mode combination scheme, and the multi-heating mode combination scheme with the highest evaluation value is determined as the preferred combination scheme, including: Step S51, performing fuzzy number normalization on the economic evaluation index and the environmental evaluation index in the fuzzy decision matrix to obtain a normalized decision matrix; Step S52: Based on the normalized decision matrix and the weight vector, an intuitive trapezoidal fuzzy weighted average operator formula is used to obtain the average attribute value of each evaluation index corresponding to each multi-heating mode combination scheme; Step S53: Based on the average attribute value, calculate the comprehensive evaluation value of each multi-heating mode combination scheme according to the score function, sort the calculated comprehensive evaluation values, and determine the multi-heating mode combination scheme with the highest evaluation value as the preferred combination scheme.
8. The comprehensive evaluation method according to claim 1, characterized in that: Also includes: After establishing the fuzzy decision matrix, an intelligent algorithm is used to solve and calculate the multi-mode deep peak-shaving evaluation model of the heating unit to obtain an optimal combination scheme for the multi-mode deep peak-shaving of the heating unit.
9. The comprehensive evaluation method according to claim 8, characterized in that: The intelligent algorithm adopts an artificial bee colony algorithm; The intelligent algorithm is used to solve and calculate the multi-mode deep peak-shaving evaluation model of the heating unit to obtain the optimal combination scheme of the multi-mode deep peak-shaving of the heating unit, including: Initialize algorithm parameters, including the size of the bee colony, the size of the honey collecting and following bee populations, the population individual vector, the exploitation limit of the same nectar source, and the maximum number of iterations; Scout bees use chaotic search to generate the initial solution of the optimal nectar source. Leading bees use a search strategy that introduces an exponential distribution proportional factor to search near the currently retained optimal nectar source. Follower bees use an adaptive proportional selection strategy to select from the searched nectar sources and become leading bees. Determine whether the selected nectar source location can be further improved within the pre-set exploitation limit. If not, the leading bee at that location abandons the nectar source, becomes a scout bee, and searches for a new nectar source again. Determine the iteration termination condition. If the location of the optimal nectar source is acceptable or the maximum number of iterations is reached, stop the calculation and output the optimal nectar source location, which is the optimal combination solution; otherwise, search for a new nectar source again.
10. The comprehensive evaluation method according to claim 9, characterized in that: In step S6, the preferred combination scheme is verified for unit performance through the digital twin model, and the verified scheme is used as the optimal combination scheme for multiple heating modes. The plant-level intelligent quantitative operation and scheduling decision of the peak-shaving thermal power plant is implemented according to the optimal combination scheme, including: The preferred combination scheme is simulated by the digital twin model to calculate the unit steam consumption rate, heat consumption rate, power generation coal consumption rate, power supply coal consumption rate, plant power consumption rate, unit efficiency, unit heating capacity, maximum power generation capacity, maximum heating capacity and minimum heating capacity parameter indicators under the preferred combination scheme. If the parameter indicators meet the expected values, the preferred scheme is used as the optimal combination scheme for multiple heating modes, and the plant-level intelligent quantitative operation and scheduling decision of the peak-shaving thermal power plant is implemented based on the optimal combination scheme.
Citation Information
Patent Citations
Intelligent manufacturing-oriented machine tool equipment optimization method
CN111340306A
Optimization scheduling decision method employing simulation technique for air compressor assembly
WO2020140564A1