A road bridge culvert inner side panel surface structure and its construction technology
By adopting a combined structure of vertical steel beams and upper steel beams in the inner panel of the road and bridge culverts, combined with the fastening bolts and nut mechanisms, the problem of insufficient support strength in the existing technology is solved, and higher support strength and construction quality are achieved.
Patent Information
- Application Number
- CN202210229111.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-10
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-03-10
AI Technical Summary
The support strength of the inner panels of existing road and bridge culverts is insufficient, especially for formwork with larger surface areas and thicker thickness. The support strength of the support steel beams needs to be improved, resulting in poor construction quality of the assembly formwork.
A support steel beam structure including vertical steel beams and upper steel beams is adopted. The tightening bolts and nut mechanisms of the lower support connection and upper support connection are formed to form a more stable support structure, and the tightening of the upper fastening bolts and the base is carried out. The lock nut and upper connection structure realize fine-tuned connection of the supporting steel beams and enhance support strength.
The adjustability of support strength and support connection positions is improved, and the construction quality of assembly formwork is significantly improved.
Smart Images

Figure CN114481875B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building construction, and in particular to an inner panel surface structure of a road bridge culvert and a construction process thereof. Background Art
[0002] The inner panel surface of the road bridge culvert is a supporting and protective component of the formwork, which provides stable arrangement of the formwork on the inner upper side of the road bridge culvert. The existing inner panel of the road bridge culvert only relies on the support and connection structure formed by the bottom of its supporting steel beam and the bottom surface of the road bridge culvert to support the formwork on the supporting steel beam. This structure is applicable to formwork with a small area, but for formwork with a large area and thick thickness, the supporting strength of the supporting steel beam needs to be improved, and the construction quality of the assembled formwork also needs to be improved. Summary of the invention
[0003] The purpose of the present invention is to provide an inner panel surface structure of a road bridge culvert and a construction process thereof, which solves the problems mentioned in the background, has better supporting strength, and strengthens the support connection position which can be fine-tuned to adapt to matching supporting steel beams, so that the construction quality of the assembled template is better.
[0004] In order to achieve the above purpose, the technical solution adopted by the present invention is: a road bridge culvert inner side panel surface structure, including an insulation board arranged on the bottom surface of the road bridge culvert, a support steel beam is arranged above the insulation board, the support steel beam includes a vertical steel beam erected on the bottom surface of the road bridge culvert and an upper steel beam located above the vertical steel beam, a lower support connection part and an upper support connection part are arranged between the support steel beam and the bottom surface of the road bridge culvert, the lower support connection part includes a lower fastening bolt arranged between the bottom of the vertical steel beam and the bottom surface of the road bridge culvert, and a lower fastening nut is arranged on the lower fastening bolt; the upper support connection part includes a base fixedly erected on the bottom surface of the road bridge culvert, a screw hole is arranged on the top of the base along its height direction, an upper fastening bolt is arranged in the screw hole, the upper end of the upper fastening bolt extends to the upper steel beam, and an upper connecting structure is arranged between the upper end of the upper fastening bolt and the upper steel beam;
[0005] A locking nut is arranged between the upper fastening bolt and the base, and the lower end surface of the locking nut abuts against the upper end surface of the screw hole of the base;
[0006] The upper connection structure includes an upper fastening nut threadedly connected to the upper end of the upper fastening bolt, the outer periphery of the upper fastening nut is provided with threads, the upper part of the upper fastening nut is threadedly connected to the supporting plate, and the horizontal beam edge of the upper steel beam is arranged between the cap edge of the upper fastening nut and the supporting plate;
[0007] A template is arranged on the upper steel beam;
[0008] The construction process steps of the panel structure include:
[0009] 1) Lay the insulation board on the bottom surface of the road bridge culvert where the base is cast;
[0010] 2) Arrange the supporting steel beam and tighten the lower supporting connection part: drill a hole on the bottom surface of the road bridge culvert, place the vertical steel beam on the hole, and fix the lower fastening bolt through the lower side of the vertical steel beam to the hole. The middle section of the upper fastening bolt is screwed with a locking nut, and the upper end of the upper fastening bolt is screwed with an upper fastening nut. The lower fastening bolt is located above the lower side of the vertical steel beam and tightened with the lower fastening nut.
[0011] 3) Arrange the upper support connection:
[0012] 3.1) The lower part of the upper fastening bolt is screwed into the top screw hole of the base, the brim of the upper fastening nut at the upper end of the upper fastening bolt is located at the lower side of the horizontal beam of the upper steel beam, and the upper end of the fastening nut is located at the upper side of the horizontal beam of the upper steel beam;
[0013] 3.2) Screw the locking nut until the lower end surface of the locking nut abuts against the upper end surface of the screw hole of the base;
[0014] 3.3) Screw the support plate onto the fastening nut until the lower end surface of the support plate abuts against the upper beam surface of the horizontal beam of the upper steel beam;
[0015] 4) Arrange the template.
[0016] Furthermore, the insulation board is a 40-60mm thick non-combustible rubber-plastic insulation board.
[0017] Furthermore, the step 4) comprises the following steps:
[0018] a) Calculation of standard value of formwork load;
[0019] b) Calculation of the strength and stiffness of the formwork panel, including: b1) verification of the panel's bending strength; b2) verification of the panel's shear strength; b3) verification of the panel's deflection;
[0020] c) Calculation of vertical rib strength, including: c1) verification of vertical rib bending strength; c2) verification of shear strength; c3) verification of deflection.
[0021] The technical effect of the present invention is that it has better support strength, and the strengthened support connection position can be fine-tuned to adapt to the matching support steel beam, so that the construction quality of the assembly template is better. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural diagram of the present invention;
[0023] Figure 2 yes Figure 1 A partial enlarged view of . DETAILED DESCRIPTION
[0024] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0025] A structure for the inner panel surface of a road bridge culvert comprises an insulation board 1 arranged on the bottom surface of the road bridge culvert, a support steel beam 2 is arranged above the insulation board 1, the support steel beam 2 comprises a vertical steel beam 21 erected on the bottom surface of the road bridge culvert and an upper steel beam 22 located above the vertical steel beam 21, and is characterized in that: a lower support connection part 3 and an upper support connection part 4 are arranged between the support steel beam 2 and the bottom surface of the road bridge culvert, the lower support connection part 3 comprises a lower fastening bolt 31 arranged between the bottom of the vertical steel beam 21 and the bottom surface of the road bridge culvert, and a lower fastening nut 32 is arranged on the lower fastening bolt 31; the upper support connection part 4 comprises a base 43 fixedly arranged on the bottom surface of the road bridge culvert, a screw hole is arranged at the top of the base 43 along its height direction, an upper fastening bolt 41 is arranged in the screw hole, the upper end of the upper fastening bolt 41 extends to the upper steel beam 22, and an upper connecting structure is arranged between the upper end of the upper fastening bolt 41 and the upper steel beam 22.
[0026] The lower support connection part 3 forms the lower support and stabilization structure; the upper support connection part 4 forms the upper reinforced support and stabilization structure, and the upper reinforced support and stabilization structure is formed based on the base 43 of the non-support steel beam 2, that is, its support force is borne by the upper support connection part 4 based on the base 43 alone, which does not affect the overall structural performance of the support steel beam 2. On the basis of the upper fastening bolt 41, which is an upper and lower adjustable connection base member, an upper connection structure is arranged on the upper fastening bolt 41, and the upper connection structure is matched with the support steel beam 2, so that the inner panel surface structure of the entire road bridge culvert has better support strength, and the reinforced support connection position can be fine-tuned to adapt to the matching support steel beam, so that the construction quality of the assembly template is better.
[0027] Furthermore, a locking nut 45 is disposed between the upper fastening bolt 41 and the base 43 , and the lower end surface of the locking nut 45 abuts against the upper end surface of the screw hole of the base 43 .
[0028] The upper and lower adjusted positions of the fastening bolts 41 and the base 43 are fixed by the locking nut 45 to further ensure the support and stability of the entire structure.
[0029] Furthermore, the upper connecting structure includes an upper fastening nut 44 threadedly connected to the upper end of the upper fastening bolt 41, a thread is arranged on the outer periphery of the upper fastening nut 44, the upper part of the upper fastening nut 44 is threadedly connected to a support plate 46, and the horizontal beam edge of the upper steel beam 22 is arranged between the brim of the upper fastening nut 44 and the support plate 46.
[0030] This is a specific and more preferred embodiment of the upper connection structure of the present invention. When arranged, the upper steel beam 22 of the support steel beam 2 is located below the brim of the upper fastening nut 44, that is, before mounting the support steel beam 2, all components of the upper support connection part 4 except the support plate 46 are arranged in place. After the lower support connection part 3 is connected, the upper support connection part 4 is adjusted to the matching position, and then the support plate 46 is assembled to complete the assembly of the inner panel surface structure of the road bridge culvert. That is, the horizontal beam edge of the upper steel beam 22 is set between the upper fastening nut 44 and the support plate 46, and the support plate 46 is threadedly connected to the upper fastening nut 44. The locking nut 45 is the support regulating nut.
[0031] Furthermore, a template 5 is provided on the upper steel beam 22 .
[0032] The construction process of the panel structure comprises the following steps:
[0033] 1) Lay the insulation board 1 on the bottom surface of the road bridge culvert of the casting base 43;
[0034] 2) Arrange the supporting steel beam 2 and tighten the lower supporting connection part 3: drill a hole on the bottom surface of the road bridge culvert, and place the vertical steel beam 21 on the drilled hole. The lower fastening bolt 31 passes through the lower side of the vertical steel beam 21 and is fixed in the drilled hole. The middle section of the upper fastening bolt 41 is screwed with a locking nut 45, and the upper end of the upper fastening bolt 41 is screwed with an upper fastening nut 44. The lower fastening bolt 31 is located above the lower side of the vertical steel beam 21 and the lower fastening nut 32 is tightened.
[0035] 3) Arrange the upper support connection part 4:
[0036] 3.1) The lower part of the upper fastening bolt 41 is screwed into the top screw hole of the base 43, the brim of the upper fastening nut 44 at the upper end of the upper fastening bolt 41 is located at the lower side of the horizontal beam of the upper steel beam 22, and the upper end of the fastening nut 44 is located at the upper side of the horizontal beam of the upper steel beam 22;
[0037] 3.2) The locking nut 45 is screwed until the lower end surface of the locking nut 45 abuts against the upper end surface of the screw hole of the base 43;
[0038] 3.3) The support plate 46 is screwed onto the fastening nut 44 until the lower end surface of the support plate 46 abuts against the upper beam surface of the horizontal beam of the upper steel beam 22;
[0039] 4) Arrange template 5.
[0040] Furthermore, the insulation board 1 is a non-combustible rubber-plastic insulation board with a thickness of 40-60 mm.
[0041] This is the specific temperature control structure of the inner panel surface structure of the road bridge culvert.
[0042] A specific embodiment:
[0043] In fact, the formwork consists of two parts. The first part is the vertical ribs that directly support the formwork to support the lateral pressure of the concrete on the formwork; the second part is the hoop protection piece that supports the vertical ribs to support the pressure on the vertical ribs; this embodiment only involves the first part of the formwork 5.
[0044] a) Calculation of standard value of template load
[0045] The maximum lateral pressure of newly poured concrete on the formwork is calculated according to the following formula, and the smaller value is taken:
[0046] F=0.22γtβ 1 β 2 V 1 / 2
[0047] F=γH
[0048] Where γ is the gravity density of concrete, which is 24.000 kN / m 3 ;
[0049] t--initial setting time of newly poured concrete, take 2.000h;
[0050] T--the temperature of concrete entering the mold, which is 20.000℃;
[0051] V--concrete pouring speed, take 2.500m / h;
[0052] H--template calculation height, take 3.000m;
[0053] β 1 --Admixture influence correction coefficient, take 1.200;
[0054] β 2 --Correction coefficient for concrete slump is taken as 1.000.
[0055] The calculated values are 20.036 kN / m 2 , 72.000 kN / m 2 , take the smaller value 20.036 kN / m 2 The load was calculated as in this example.
[0056] The standard value of the lateral pressure of fresh concrete, q, is used in the calculation. 1 =20.036kN / m2 ;
[0057] Standard value of load generated when pouring concrete q 2 =2 kN / m 2 .
[0058] b) Calculation of (strength and stiffness) of formwork panels
[0059] The panels in the formwork structure are bending members and are calculated as simply supported beams or continuous beams. The panels in the width direction of the section are taken as the verification object to perform strength and stiffness calculations. The strength verification is for the lateral pressure of the newly poured concrete and the load generated when pouring concrete; the deflection verification is for the lateral pressure of the newly poured concrete.
[0060] The vertical rib spacing in the cross-section width direction is l=280 mm, and the panel in the cross-section width direction is calculated as a two-span continuous beam under uniformly distributed load.
[0061] b1) Verification of panel bending strength
[0062] For the panel in one direction of the cross-section width, the maximum mid-span bending moment is calculated by the following formula as a two-span continuous beam under uniformly distributed load:
[0063] M=0.1ql 2
[0064] Where, M is the maximum bending moment calculated for the panel (N·mm);
[0065] l--Calculation span (vertical rib spacing): l = 280.0mm;
[0066] q--lateral pressure line load acting on the formwork, including:
[0067] Design value of lateral pressure of fresh concrete q 1 :1.2×20.04×0.45×
[0068] 0.90 = 9.737 kN / m;
[0069] Design value of lateral pressure of poured concrete q 2 :1.4×2.00×0.45×
[0070] 0.90 = 1.134 kN / m;
[0071] Where 0.90 is the temporary structure reduction factor.
[0072] q=q 1 +q 2 =9.737+1.134=10.871 kN / m;
[0073] Maximum bending moment of panel: M = 0.1 × 10.871 × 280 × 280 = 8.52 × 10 4 N.mm;
[0074] The maximum stress of the panel is calculated as follows:
[0075] σ=M / W <f
[0076] Among them, σ--stress borne by the panel (N / mm 2 );
[0077] M-- Maximum calculated bending moment of the panel (N·mm);
[0078] W--section resistance moment of panel:
[0079] W=bh 2 / 6
[0080] b: panel section width, h: panel section thickness;
[0081] W=450×15.0×15.0 / 6=1.69×10 4 mm 3 ;
[0082] f--Design value of bending strength of panel (N / mm 2 ); f = 13.000 N / mm 2 ;
[0083] The maximum stress calculation value of the panel: σ=M / W=8.52×10 4 / 1.69×10 4 =5.051N / mm 2 ;
[0084] The maximum calculated stress value of the panel is σ=5.051N / mm 2 Less than the design value of the panel's bending strength
[0085] [σ]=13N / mm 2 .
[0086] b2) Shear resistance calculation of panels
[0087] The maximum shear force is calculated based on a two-span continuous beam under uniformly distributed load, using the following formula:
[0088] V=0.625ql
[0089] Where, V--maximum shear force calculated for the panel (N);
[0090] l--Calculation span (vertical rib spacing): l = 280.0mm;
[0091] q--lateral pressure line load acting on the formwork, including:
[0092] Design value of lateral pressure of fresh concrete q 1 :1.2×20.04×0.45×0.90=9.737kN / m;
[0093] Design value of lateral pressure of poured concrete q 2 :1.4×2.00×0.45×0.90=1.134kN / m;
[0094] Where 0.90 is the temporary structure reduction factor.
[0095] q=q 1 +q 2 =9.737+1.134=10.871 kN / m;
[0096] Maximum shear force of the panel: V = 0.625 × 10.871 × 280.0 = 1902.512N;
[0097] The shear strength of the section must satisfy the following formula:
[0098] τ=3V / (2bh n )≤f v
[0099] Among them, τ--the shear stress on the panel (N / mm 2 );
[0100] V--Panel calculated maximum shear force (N): V = 1902.512N;
[0101] b--section width of the component (mm): b = 450mm;
[0102] h n --Panel thickness (mm): h n =15.0mm;
[0103] f v --- Design value of panel shear strength (N / mm 2 ):f v =13.000 N / mm 2 ;
[0104] Calculation value of shear stress on panel section: τ = 3 × 1902.512 / (2 × 450 ×
[0105] 15.0)=0.423N / mm 2 ;
[0106] Design value of shear strength of panel section: [f v]=1.500N / mm 2 ;
[0107] Shear stress of panel section τ=0.423N / mm 2 Less than the design value of the shear strength of the panel section [f v ]=1.5N / mm 2 .
[0108] b3) Panel deflection verification
[0109] The maximum deflection is calculated based on a two-span continuous beam under uniformly distributed load. The deflection calculation formula is as follows:
[0110] ν=0.521ql 4 / (100EI)
[0111] Among them, q--lateral pressure line load acting on the formwork (kN / m): q=20.04×0.45=9.02kN / m;
[0112] ν--maximum deflection of panel (mm);
[0113] l--Calculation span (vertical rib spacing): l = 280.0mm;
[0114] E--Panel elastic modulus (N / mm 2 ): E = 6000.00 N / mm 2 ;
[0115] I--Moment of inertia of panel section (mm 4 );
[0116] I=bh 3 / 12
[0117] I=450×15.0×15.0×15.0 / 12=1.27×10 5 mm 4 ;
[0118] Maximum allowable deflection of panel: [ν] = 280 / 250 = 1.12 mm;
[0119] The calculated maximum deflection value of the panel: ν = 0.521 × 9.02 × 280.0 4 / (100×6000.0×1.27×10 5 )=0.380 mm;
[0120] The calculated maximum deflection value of the panel ν = 0.38 mm is less than the design value of the maximum allowable deflection of the panel [ν] = 1.12 mm.
[0121] c) Calculation of vertical ribs (strength)
[0122] The vertical ribs in the formwork structure are bending members and are calculated as continuous beams.
[0123] In this embodiment, the vertical strips are made of wood with a width of 40 mm and a height of 90 mm. The section inertia moment I and section resistance moment W are respectively:
[0124] W=40×90×90 / 6×1=54cm 3 ;
[0125] I=40×90×90×90 / 12×1=243cm 4 ;
[0126] c1) Verification of vertical rib bending strength
[0127] Maximum bending moment calculation formula:
[0128] M=0.1ql 2
[0129] Where, M is the maximum bending moment calculated for the vertical rib (N·mm);
[0130] l--Calculation span (spacing): l = 450.0mm;
[0131] q--Line load acting on vertical ribs, including:
[0132] Design value of lateral pressure of fresh concrete q 1 :1.2×20.036×0.280×0.900=6.059kN / m;
[0133] Design value of lateral pressure of poured concrete q 2 :1.4×2.000×0.280×
[0134] 0.900 = 0.706 kN / m;
[0135] q=6.059+0.706=6.764 kN / m;
[0136] Maximum bending moment of vertical rib: M = 0.1 × 6.764 × 450.0 × 450.0 = 1.37 × 10 5 N·mm;
[0137] σ=M / W <f
[0138] Among them, σ--stress borne by the vertical ribs (N / mm 2 );
[0139] M--Maximum bending moment calculated for vertical ribs (N·mm);
[0140] W--section resistance moment of vertical ribs (mm3 ), W = 5.40 × 10 4 ;
[0141] f--Design value of bending strength of vertical ribs (N / mm 2 ); f = 13.000 N / mm 2 ;
[0142] The maximum stress calculation value of the vertical rib is: σ=M / W=1.37×10 5 / 5.40×10 4 =2.537N / mm 2 ;
[0143] The maximum calculated stress value of the vertical ribs is σ=2.537N / mm 2 Less than the design value of the bending strength of the vertical rib
[0144] [σ]=13N / mm 2 .
[0145] c2) Shear resistance calculation
[0146] The maximum shear force is calculated based on a three-span continuous beam under uniformly distributed load, using the following formula:
[0147] V=0.6ql
[0148] Where, V--maximum shear force calculated for vertical ribs (N);
[0149] l--Calculation span (spacing): l = 450.0mm;
[0150] q--lateral pressure line load acting on the formwork, including:
[0151] Design value of lateral pressure of fresh concrete q 1 :1.2×20.036×0.280×0.900=6.059kN / m;
[0152] Design value of lateral pressure of poured concrete q 2 :1.4×2.000×0.280×
[0153] 0.900 = 0.706 kN / m;
[0154] q=6.059+0.706=6.764 kN / m;
[0155] Maximum shear force of vertical ribs: V = 0.6 × 6.764 × 450.0 = 1826.411 N;
[0156] The cross-sectional shear strength satisfies the following formula:
[0157] τ=3V / (2bh n)≤f v
[0158] Where, τ is the maximum shear stress of the vertical cross section (N / mm 2 );
[0159] V--Maximum shear force calculated for vertical ribs (N): V = 0.6ql = 0.6 × 6.764 ×
[0160] 450 = 1826.411 N;
[0161] b--Cross-sectional width of vertical ribs (mm): b = 40.0 mm;
[0162] h n --Cross-sectional height of vertical ribs (mm): h n =90.0mm;
[0163] f v -- Design value of shear strength of vertical ribs (N / mm 2 ):f v =1.500 N / mm 2 ;
[0164] Calculated value of maximum shear stress of vertical rib section: τ = 3 × 1826.411 / (2 × 40.0 × 90.0 × 1) = 0.761 N / mm 2 ;
[0165] Design value of shear strength of vertical rib section: [f v ]=1.500N / mm 2 ;
[0166] The maximum calculated shear stress of the vertical rib section is τ=0.761N / mm 2 Less than the design value of shear strength of the vertical rib section [f v ]=1.5N / mm 2 .
[0167] c3) Deflection verification
[0168] The maximum deflection is calculated based on a three-span continuous beam using the following formula:
[0169] ν max =0.677ql 4 / (100EI)≤[ν]=l / 250
[0170] Where, q is the linear load acting on the vertical rib (kN / m): q = 20.04 × 0.28 = 6.76 kN / m;
[0171] ν max -- Maximum deflection of vertical ribs (mm);
[0172] l--Calculation span (spacing): l = 450.0mm;
[0173] E--Elastic modulus of vertical ribs (N / mm 2 ), E = 9000.00 N / mm2;
[0174] I--Moment of inertia of vertical cross section (mm 4 ), I = 2.43 × 10 6 ;
[0175] Maximum allowable deflection of vertical ribs: [ν] = 450 / 250 = 1.8 mm;
[0176] The calculated value of the maximum deflection of the vertical rib: ν = 0.677 × 6.76 × 450.0 4 / (100×9000.0×2.43×10 6 )=0.086 mm;
[0177] The calculated value of the maximum deflection of the vertical ribs is ν = 0.086 mm, which is less than the maximum allowable deflection of the vertical ribs.
[0178] [ν]=1.8mm.
[0179] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A road bridge culvert inner side panel surface structure, comprising an insulation board (1) arranged on the bottom surface of the road bridge culvert, a support steel beam (2) arranged above the insulation board (1), the support steel beam (2) comprising a vertical steel beam (21) vertically arranged on the bottom surface of the road bridge culvert and an upper steel beam (22) located above the vertical steel beam (21), characterized in that: A lower support connection part (3) and an upper support connection part (4) are arranged between the supporting steel beam (2) and the bottom surface of the road bridge culvert. The lower support connection part (3) includes a lower fastening bolt (31) arranged between the bottom of the vertical steel beam (21) and the bottom surface of the road bridge culvert, and a lower fastening nut (32) is arranged on the lower fastening bolt (31); the upper support connection part (4) includes a base (43) fixedly arranged on the bottom surface of the road bridge culvert, a screw hole is arranged at the top of the base (43) along its height direction, and an upper fastening bolt (41) is arranged in the screw hole, the upper end of the upper fastening bolt (41) extends to the upper steel beam (22), and an upper connection structure is arranged between the upper end of the upper fastening bolt (41) and the upper steel beam (22); A locking nut (45) is provided between the upper fastening bolt (41) and the base (43), and the lower end surface of the locking nut (45) abuts against the upper end surface of the screw hole of the base (43); The upper connection structure comprises an upper fastening nut (44) threadedly connected to the upper end of the upper fastening bolt (41), the outer periphery of the upper fastening nut (44) is provided with threads, the upper part of the upper fastening nut (44) is threadedly connected to a support plate (46), and the horizontal beam edge of the upper steel beam (22) is arranged between the cap edge of the upper fastening nut (44) and the support plate (46); A template (5) is arranged on the upper steel beam (22); The construction process steps of the panel structure include: 1) Laying the insulation board (1) on the bottom surface of the road bridge culvert of the casting base (43); 2) Arrange the supporting steel beam (2) and tighten the lower supporting connection part (3): drill a hole on the bottom surface of the road bridge culvert, and place the vertical steel beam (21) on the drilled hole. The lower fastening bolt (31) passes through the lower side of the vertical steel beam (21) and is fixed in the drilled hole. The middle section of the upper fastening bolt (41) is screwed with a locking nut (45), and the upper end of the upper fastening bolt (41) is screwed with an upper fastening nut (44). The lower fastening bolt (31) is located above the lower side of the vertical steel beam (21) and the lower fastening nut (32) is tightened. 3) Arrange the upper support connection part (4): 3.1) The lower part of the upper fastening bolt (41) is screwed into the top screw hole of the base (43), the cap edge of the upper fastening nut (44) at the upper end of the upper fastening bolt (41) is located at the lower side of the horizontal beam of the upper steel beam (22), and the upper end of the fastening nut (44) is located at the upper side of the horizontal beam of the upper steel beam (22); 3.2) The locking nut (45) is screwed until the lower end surface of the locking nut (45) abuts against the upper end surface of the screw hole of the base (43); 3.3) The support plate (46) is screwed onto the fastening nut (44) until the lower end surface of the support plate (46) abuts against the upper beam surface of the horizontal beam of the upper steel beam (22); 4) Arrange the template (5).
2. The inner side panel surface structure of a road bridge culvert according to claim 1, characterized in that: The insulation board (1) is a non-combustible rubber-plastic insulation board with a thickness of 40-60 mm.
3. The inner side panel surface structure of a road bridge culvert according to claim 1, characterized in that: The step 4) comprises the following steps: a) Calculation of standard value of formwork load; b) Calculation of the strength and stiffness of the formwork panel, including: b1) verification of the panel's bending strength; b2) verification of the panel's shear strength; b3) verification of the panel's deflection; c) Calculation of vertical rib strength, including: c1) verification of vertical rib bending strength; c2) verification of shear strength; c3) verification of deflection.