A method for installing a water spray mechanism in a marking removal device for traffic engineering
By installing a water spray mechanism in the marking removal device for traffic engineering and using an inverted V-shaped waterproof cover and a suspended arm structure to spray water, the problems of limited vacuum range and overheating of the grinding mechanism are solved, and dust reduction and service life are extended. , simplifying the operation process.
Patent Information
- Application Number
- CN202210703807.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-21
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-06-21
AI Technical Summary
Existing marking line removal devices used in traffic engineering have limited dust suction range during marking line removal, causing dust to fly. Moreover, long-term use of the grinding mechanism will cause overheating and reduce the service life.
Design a method for installing a water spray mechanism, which includes connecting the water spray main pipe to the output end of the water supply pump through a hose, and inserting the water spray main pipe and waterproof cover into the walking vehicle body through the perforations through an inverted V-shaped waterproof cover and suspension arm structure. In the cavity, adjust the suspension support components and rotation limiting mechanism to achieve aligned spraying of the water spray branch pipe and the grinding roller to reduce dust and temperature.
Effectively reduce dust, reduce the temperature of the grinding mechanism, extend the service life, simplify the operating process and improve operating efficiency.
Smart Images

Figure CN115369728B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of traffic engineering, and in particular to a method for installing a water spray mechanism in a marking line removing device for traffic engineering. Background Art
[0002] In order to guide drivers on traffic roads, it is necessary to paint markings on the road. However, because a new road is built next to it or the road plan is changed, the original markings need to be removed and then new markings are painted. In order to facilitate the removal of markings, a marking removal device for traffic engineering is designed.
[0003] A Chinese patent discloses a marking removal device for traffic engineering with an application number of CN202121884411.3, which includes: a device housing, the marking removal device for traffic engineering also includes: a grinding mechanism for removing markings, the grinding mechanism is composed of a grinding disc assembly, a grinding roller assembly, a rotating drive element, and a transmission assembly for transmission connection between the grinding disc assembly, the grinding roller assembly and the rotating drive element; an automatic adjustment frame for making the grinding disc assembly and the grinding roller assembly seamlessly contact the ground, the automatic adjustment frame is connected to the device housing through an elastic telescopic member; and a dust suction assembly and a dust cover assembly for dust prevention, the dust suction assembly is installed in the device housing, and the dust cover assembly is sleeved on the outside of the grinding disc assembly and the grinding roller assembly. Although the probability of dust generation during the cleaning process can be reduced by the dust suction assembly, the following problems still exist:
[0004] Due to the limited dust collection range, it is inevitable that some dust will still fly everywhere, and the grinding mechanism will overheat if it grinds the floor for a long time, which will reduce the service life of the grinding mechanism. Summary of the invention
[0005] The present invention aims to provide a method for installing a water spray mechanism in a road marking removal device for traffic engineering, so as to solve the problem that dust cannot be reduced by installing a water spray mechanism in the prior art.
[0006] To achieve the above object, the present invention adopts the following technical solutions:
[0007] The invention discloses a method for installing a water spray mechanism in a marking removal device for traffic engineering, comprising the following steps:
[0008] S1. Connect a water spray pipe to the output end of a water supply pump in a marking removal device for traffic engineering through a hose;
[0009] S2. Pass the water spray branch pipe fixed to the water spray main pipe through the waterproof cover, which is an inverted V-shaped structure;
[0010] S3, sliding a second suspension arm into a guide rail installed on one side of the top of the waterproof cover, and the other side of the top of the waterproof cover upwards forms a first suspension arm;
[0011] S4, inserting the water spray main pipe, water spray branch pipe, waterproof cover, guide rail and water spray branch pipe into the installation cavity of the walking vehicle body in the marking removal device for traffic engineering through a perforation, and the perforation opened at the bottom of the walking vehicle body is connected to the installation cavity;
[0012] S5, adjusting a positioning mechanism so that the positioning mechanism positions the distance between the second suspension arm and the water spray pipe, and the second suspension arm moves on an extension column formed by extending from one end of the water spray pipe, so that the second suspension arm is hung on the second end of the suspension support assembly located in the installation cavity;
[0013] S6. Adjust the suspension support assembly, which is installed next to the perforation, so that the suspension support assembly suspends and supports the first suspension arm, the second suspension arm and the water spray main pipe.
[0014] Preferably, the positioning mechanism comprises: a blocking arm, which can slide on the inner wall of the installation cavity, and the blocking arm is used to be inserted between the second suspension arm and the water spray main pipe.
[0015] Preferably, a rotation limiting mechanism is installed in the installation cavity next to the suspension support assembly, and an elastic part is provided in the rotation limiting mechanism, which is used to keep the rotation limiting mechanism away from the second suspension arm. The second suspension arm cannot rotate relative to the extension column, and the rotation limiting mechanism is used to limit the rotation of the second suspension arm.
[0016] Preferably, after executing step S6, step S7 is performed, which is: closing the opening and closing door on the traveling vehicle body in the marking removal device for traffic engineering, one edge of the opening and closing door is hinged to the traveling vehicle body, and the other edge of the opening and closing door is detachably connected to the traveling vehicle body.
[0017] Preferably, when executing step S7, the opening and closing door presses the blocking arm so that the blocking arm remains between the second suspension arm and the water spray main pipe.
[0018] Preferably, when executing step S7, the rotation limiting mechanism is pushed to move to clamp the second suspension arm.
[0019] Preferably, after executing step S6 and before executing step S7, the water spray branch pipe connected to the water spray main pipe needs to be manually maintained.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] 1) By installing a water spray mechanism, dust is reduced, the grinding temperature of the grinding mechanism is reduced, and the service life is increased;
[0022] 2) The second suspension arm is designed to be able to slide under the guidance of the guide rail, so that there is no obstruction when the waterproof cover and the water spray pipe are inserted between the first end and the second end of the suspension support component. After the waterproof cover and the water spray pipe are inserted, the second suspension arm is moved so that the second suspension arm does not separate from the extension column and is hung on the support ring of the suspension support component (that is, the second end of the suspension support component). At the same time, the blocking arm is moved, and the blocking arm is inserted between the second suspension arm and the water spray pipe to keep the support ring in a single-arm support state, thereby avoiding the need to manually hold the waterproof cover and the water spray pipe, which causes troublesome operation. After supporting the waterproof cover and the water spray pipe with one arm, the screw is rotated, which reduces the difficulty of operation and improves the operating efficiency.
[0023] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a structural schematic diagram of a marking removal device for traffic engineering;
[0025] Figure 2 It is a schematic diagram of the structure of the water spray mechanism and the traveling vehicle body when the door is opened or closed;
[0026] Figure 3 This is a schematic diagram of the structure of the water spray mechanism and the traveling vehicle body after the opening and closing door is disassembled;
[0027] Figure 4 It is a structural schematic diagram of the water spray mechanism;
[0028] Figure 5 It is a schematic diagram of the structure of the opening and closing door.
[0029] Figure numerals: walking body 1, opening and closing door 11, extension arm 111, driving wheel 112, blocking arm 12, grinding roller 20, water spray main pipe 32, extension column 321, water spray branch pipe 33, suspension support assembly 34, waterproof cover 35, first water retaining inner wall 351, second water retaining inner wall 352, first suspension arm 353, second suspension arm 354, guide rail 355, first support seat 361, screw 362, second support seat 363, rotation limiting assembly 37, moving rod 371, spring 372, pushing surface 373. DETAILED DESCRIPTION
[0030] In order to make the technical means, creative features, objectives and functions of the present invention clearer and easier to understand, the present invention is further described below in conjunction with the accompanying drawings and specific embodiments:
[0031] like Figures 1 to 5As shown, the present invention discloses a marking line removal device for traffic engineering, comprising: a traveling vehicle body 1; a grinding mechanism, which extends from the bottom of the traveling vehicle body 1; and a water spraying mechanism, which comprises: a storage container (not shown in the figure), a water supply pump (not shown in the figure), a hose, a water spraying main pipe 32, a water spraying branch pipe 33, a suspension support assembly 34 and a water retaining assembly, a storage container for storing water is installed in the traveling vehicle body 1, the storage container is connected to the input end of the water supply pump, the output end of the water supply pump is connected to the hose, and the hose is connected to A water spray main pipe 32 is connected to a plurality of water spray branch pipes 33, the water spray branch pipes 33 face the grinding roller 20 of the grinding mechanism, a perforation is opened on the bottom wall of the traveling vehicle body 1, a suspension support assembly 34 is installed in the traveling vehicle body 1, the suspension support assembly 34 suspends and supports the water spray main pipe 32, and a water retaining assembly is installed at the connection between the water spray main pipe 32 and the water spray branch pipe 33; the water retaining assembly includes: a water retaining cover, the top of the water retaining cover is penetrated by the water spray main pipe 32, and the lower end of the water spray main pipe 32 emerges from the water retaining cover. Since the perforation is relatively large, it is convenient to adjust the inclination angle of the water spray branch pipe 33 according to the position of the grinding roller 20. In order to prevent the water from entering the walking body 1 through the perforation, a waterproof cover 35 is provided. The waterproof cover 35 can rotate with the water spray branch pipe 33 and the water spray main pipe 32. The waterproof cover 35 is always in a state of preventing water from entering. The bottom opening of the waterproof cover 35 is relatively large and can fully block the water from spraying toward the perforation, thereby improving the protection of the internal components of the walking body 1 and extending the service life.
[0032] The axis of the water spray main pipe 32 is parallel to the axis of the grinding roller 20 in the grinding mechanism, and all the water spray branches 33 are arranged in a row on the outer wall of the water spray main pipe 32, and each water spray branch 33 is installed in the radial direction of the water spray main pipe 32. It is convenient to rotate the water spray branch pipe 33 to a position where the sprayed water column is directly opposite to the grinding roller 20.
[0033] The inner wall of the water retaining cover is formed with a first water retaining inner wall 351 and a second water retaining inner wall 352, the first water retaining inner wall 351 and the second water retaining inner wall 352 are in an "eight"-shaped structure, the open end between the first water retaining inner wall 351 and the second water retaining inner wall 352 is for the water spray branch pipe 33 to pass through, the angle between the plane where the first water retaining inner wall 351 is located and the axis line of the water spray branch pipe 33 is an acute angle, and the angle between the plane where the second water retaining inner wall 352 is located and the axis line of the water spray branch pipe 33 is an acute angle. The first water retaining inner wall 351 and the second water retaining inner wall 352 are inclined, when water rebounds onto the first water retaining inner wall 351 and the second water retaining inner wall 352, the first water retaining inner wall 351 and the second water retaining inner wall 352 can rebound the water, and the first water retaining inner wall 351 and the second water retaining inner wall 352 also drain the water out.
[0034] The water retaining assembly also includes: a first suspension arm 353, a second suspension arm 354 and a guide rail 355. The first suspension arm 353 is fixed on one side of the top of the water retaining cover, and the guide rail 355 is fixed on the other side of the top of the water retaining cover. A movable second suspension arm 354 is installed in the guide rail 355. The second suspension arm 354 is hung on the second end of the suspension support assembly 34. The first suspension arm 353 and one end of the water spray pipe 32 are both hung on the first end of the suspension support assembly 34. An extension column 321 is extended from one end of the water spray pipe 32 and inserted into the second suspension arm 354. An installation cavity is opened in the walking body 1, and the installation cavity is connected to the through hole. A blocking arm 12 is installed on the bottom wall of the installation cavity. The blocking arm 12 is used to make the second suspension arm 354 hang on the second end of the suspension support assembly 34. During installation, the first suspension arm 353 can be suspended on the first extension column 321, and then the second suspension arm 354 can be slid onto the slide rail. The second suspension arm 354 hooks the slide rail, which also avoids the situation where the first suspension arm 353 and the second suspension arm 354 cannot be hooked on both ends of the water spray pipe 32 at the same time due to the second suspension arm 354 being unable to slide. This makes it convenient to suspend the water shield and the water spray pipe 32 on the suspension support assembly 34 at the same time, thereby facilitating the installation of the water shield and the water spray pipe 32.
[0035] The blocking arm 12 can move relative to the traveling body 1 in a direction away from or close to the perforation. An opening and closing door 11 is hinged on the traveling body 1. The opening and closing door 11 is used to open and close the installation cavity. After the opening and closing door 11 is closed, the blocking arm 12 is pressed to a position between the water spray pipe 32 and the second suspension arm 354. The blocking arm 12 is positioned at a relative position between the water spray pipe 32 and the second suspension arm 354, avoiding the need for other structures to position the blocking arm 12, which causes troublesome operation.
[0036] The second extension arm 111 is a rectangular parallelepiped structure. A limited rotation assembly 37 is installed at the second end of the second suspension arm 354 . The limited rotation assembly 37 is used to limit the rotation of the second suspension arm 354 .
[0037] The suspension support assembly 34 includes: a first support seat 361, a support shaft, a screw 362, a second support seat 363 and a support ring. The first support seat 361 and the second support seat 363 are installed on the bottom wall of the installation cavity. The first support seat 361 and the second support seat 363 are respectively arranged on both sides of the through hole. The first support seat 361 is threadedly connected with a screw 362, and the screw 362 is fixed to the support shaft. The support shaft is inserted into the first suspension arm 353 and the end of the water spray pipe 32 away from the extension column 321. The second support seat 363 is fixed with a support ring inserted into the second suspension arm 354.
[0038] The rotation limiting assembly 37 includes: a gear, a moving rod 371 and a spring 372. A toothed ring is installed on the second suspension arm 354, and the toothed ring can mesh with the gear. The gear is fixed to one end of the moving rod 371. The moving rod 371 passes through the support ring and the second support seat 363. The moving rod 371 forms a pushing surface 373. The angle between the pushing surface 373 and the moving direction of the moving rod 371 is an acute angle. The edge of the pushing surface 373 close to the opening and closing door 11 is the first edge, and the edge of the pushing surface 373 away from the closing door 11 is the second edge. The distance between the first edge and the through-hole is smaller than the distance between the second edge and the through-hole. The moving rod 371 is connected to the inner wall of the installation cavity through the spring 372. The spring 372 is used to keep the gear away from the toothed ring. An extension arm 111 is installed on the opening and closing door 11. A rotatable pushing wheel 112 is installed on the extension arm 111. The pushing wheel 112 is used to push the gear to a position meshing with the toothed ring when the opening and closing door 11 closes the installation cavity.
[0039] Based on the above structure, the present invention also discloses a method for installing a water spray mechanism in a marking removal device for traffic engineering, comprising the following steps:
[0040] S1. Connect a water spray main pipe 32 to the output end of a water supply pump in a marking removal device for traffic engineering through a hose; (connection with the water supply pump is achieved so that water can be supplied to the water spray branch pipe 33 and the water spray main pipe 32)
[0041] S2, passing the water spray branch pipe 33 fixed to the water spray main pipe 32 through the waterproof cover 35, which is an inverted V-shaped structure; (by providing the waterproof cover 35, water is blocked below the perforation)
[0042] S3, slide a second suspension arm 354 into the guide rail 355 installed on one side of the top of the waterproof cover 35, and the other side of the top of the waterproof cover 35 upwardly forms a first suspension arm 353; (the arrangement of the first suspension arm 353 and the second suspension arm 354 provides a suspension basis for the waterproof cover 35, and provides an installation basis for the installation of the water spray pipe 32 and the waterproof cover 35 together)
[0043] S4, insert the water spray main pipe 32, the water spray branch pipe 33, the waterproof cover 35, the guide rail 355 and the water spray branch pipe 33 into the installation cavity of the walking body 1 in the marking removal device for traffic engineering through a through hole, and the through hole opened at the bottom of the walking body 1 is connected to the installation cavity;
[0044] S5. Adjust a positioning mechanism so that the positioning mechanism positions the distance between the second suspension arm 354 and the water spray pipe 32, and the second suspension arm 354 moves on the extension column 321 formed by extending from one end of the water spray pipe 32, so that the second suspension arm 354 is hung on the second end of the suspension support assembly 34 located in the installation cavity;
[0045] S6. Adjust the suspension support assembly 34 , which is installed next to the perforation, so that the suspension support assembly 34 suspends and supports the first suspension arm 353 , the second suspension arm 354 and the water spray main pipe 32 .
[0046] Preferably, the positioning mechanism includes: a blocking arm 12 , which can slide on the inner wall of the installation cavity, and the blocking arm 12 is used to be inserted between the second suspension arm 354 and the water spray main pipe 32 .
[0047] A rotation limiting assembly 37 is installed in the installation cavity and is located next to the suspension support assembly 34. An elastic part is provided in the rotation limiting assembly 37, and the elastic part is used to keep the rotation limiting assembly 37 away from the second suspension arm 354. The second suspension arm 354 cannot rotate relative to the extension column 321. The rotation limiting assembly 37 is used to limit the rotation of the second suspension arm 354.
[0048] After executing step S6, proceed to step S7, which is: close the opening and closing door 11 on the traveling vehicle body 1 in the marking removal device for traffic engineering, one edge of the opening and closing door 11 is hinged to the traveling vehicle body 1, and the other edge of the opening and closing door 11 is detachably connected to the traveling vehicle body 1.
[0049] When executing step S7 , the opening and closing door 11 presses the blocking arm 12 so that the blocking arm 12 remains between the second suspension arm 354 and the water spray main pipe 32 .
[0050] When executing step S7 , the rotation limiting assembly 37 is pushed to move to clamp the second suspension arm 354 .
[0051] After executing step S6 and before executing step S7, it is necessary to manually maintain the water spray branch pipe 33 connected to the water spray main pipe 32. The water spray branch pipe 33 is kept aligned with the grinding roller 20.
[0052] In the present application, firstly, a plurality of water spray branch pipes 33 connected to the water spray main pipe 32 are provided, and all the water spray branch pipes 33 spray water toward the grinding roller 20, which not only reduces dust, but also reduces the temperature of the grinding roller 20, thereby extending the service life of the grinding roller 20; then, in order to facilitate the subsequent adjustment of the alignment of the water sprayed from the water spray branch pipe 33 with the grinding roller 20, a larger perforation opening is provided; then, in order to prevent the large perforation opening from causing water to easily enter the walking vehicle body 1, a waterproof cover 35 is provided; then, in order to facilitate the installation of the water spray main pipe 32 and the waterproof cover 35, a first suspension arm 35 is provided 3 and the second suspension arm 354, the suspension support assembly 34 supports the waterproof cover 35 and the water spray pipe 32 at the same time by supporting the first suspension arm 353 and the second suspension arm 354; furthermore, since the screw 362 of the suspension support assembly 34 needs to be rotated when installing the waterproof cover 35 and the water spray pipe 32, in order to avoid the difficulty of operation caused by the need to manually hold the waterproof cover 35 and the water spray pipe 32 and the need to rotate the screw 362, the second suspension arm 354 is designed to be able to slide under the guidance of the guide rail 355, so that when the waterproof cover 35 and the water spray pipe 32 are inserted into the first end and the second end of the suspension support assembly 34 ... When there is no obstruction between the second end and the second end, after the waterproof cover 35 and the water spray pipe 32 are inserted, the second suspension arm 354 is moved, so that the second suspension arm 354 does not separate from the extension column 321, and is hung on the support ring of the suspension support assembly 34 (that is, the second end of the suspension support assembly 34). At the same time, by moving the blocking arm 12, the blocking arm 12 is inserted between the second suspension arm 354 and the water spray pipe 32, and the support ring is kept in a single-arm support state, avoiding the need to manually hold the waterproof cover 35 and the water spray pipe 32, which causes trouble in operation. After the waterproof cover 35 and the water spray pipe 32 are supported by one arm, the screw 3 is rotated 62, reducing the difficulty of operation and improving the operation efficiency; then, in order to keep the water spray branch pipe 33 at the required inclination angle, a rotation limit component 37 is set; finally, in order to facilitate the adjustment of the rotation limit component 37, an extension arm 111 and a pushing wheel 112 are set on the opening and closing door 11, and the pushing wheel 112 slides on the pushing surface 373, thereby squeezing the pushing surface 373 on the moving rod 371, and finally pushing the gear to a position meshing with the gear ring. At the same time, the opening and closing door 11 also has the function of positioning the blocking arm 12, thereby preventing the blocking arm 12 from moving arbitrarily after installation, causing the second suspension arm 354 to be separated from the support ring.
[0053] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.
Claims
1. A method for installing a water spray mechanism in a marking removal device for traffic engineering, characterized in that: The steps include: S1. Connect a water spray pipe to the output end of a water supply pump in a marking removal device for traffic engineering through a hose; S2. Pass the water spray branch pipe fixed to the water spray main pipe through the waterproof cover, which is an inverted V-shaped structure; S3, sliding a second suspension arm into a guide rail installed on one side of the top of the waterproof cover, and the other side of the top of the waterproof cover upwards forms a first suspension arm; S4, inserting the water spray main pipe, water spray branch pipe, waterproof cover, guide rail and water spray branch pipe into the installation cavity of the walking vehicle body in the marking removal device for traffic engineering through a perforation, and the perforation opened at the bottom of the walking vehicle body is connected to the installation cavity; S5, adjusting a positioning mechanism so that the positioning mechanism positions the distance between the second suspension arm and the water spray pipe, and the second suspension arm moves on an extension column formed by extending from one end of the water spray pipe, so that the second suspension arm is hung on the second end of the suspension support assembly located in the installation cavity; S6. Adjust the suspension support assembly, which is installed next to the perforation, so that the suspension support assembly suspends and supports the first suspension arm, the second suspension arm and the water spray main pipe; The positioning mechanism comprises a blocking arm which can slide on the inner wall of the installation cavity and is used for being inserted between the second suspension arm and the water spray main pipe.
2. The method for installing a water spray mechanism in a marking removal device for traffic engineering according to claim 1, characterized in that: A rotation limiting mechanism is installed in the installation cavity next to the suspension support assembly. An elastic part is arranged in the rotation limiting mechanism. The elastic part is used to keep the rotation limiting mechanism away from the second suspension arm. The second suspension arm cannot rotate relative to the extension column. The rotation limiting mechanism is used to limit the rotation of the second suspension arm.
3. The method for installing a water spray mechanism in a marking removal device for traffic engineering according to claim 2, characterized in that: After executing step S6, proceed to step S7, which is: closing the opening and closing door on the traveling vehicle body in the marking removal device for traffic engineering, one edge of the opening and closing door is hinged to the traveling vehicle body, and the other edge of the opening and closing door is detachably connected to the traveling vehicle body.
4. The method for installing a water spray mechanism in a marking removal device for traffic engineering according to claim 3, characterized in that: When executing step S7, the opening and closing door presses the blocking arm so that the blocking arm remains between the second suspension arm and the water spray main pipe.
5. The method for installing a water spray mechanism in a marking removal device for traffic engineering according to claim 4, characterized in that: When executing step S7, the rotation limiting mechanism is pushed to move to clamp the second suspension arm.
6. The method for installing a water spray mechanism in a marking removal device for traffic engineering according to claim 5, characterized in that: After executing step S6 and before executing step S7, the water spray branch pipe connected to the water spray main pipe needs to be manually maintained.