A hydropower station rectification and river connectivity repair structure
By designing fish passages and ecological flow decentralization facilities on the left and right banks in the hydropower station, the river connectivity problem caused by the blocking of rivers in the hydropower station was solved, the fish migration channels were restored, the fish collection effect and power generation efficiency were improved, and the water resources were realized Efficient use.
Patent Information
- Application Number
- CN202210869542.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-22
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-07-22
AI Technical Summary
The existing hydropower stations have hindered the free movement of aquatic animals due to river blocking buildings, resulting in damage to river connectivity and adverse impacts on the ecosystem. It is necessary to ensure the ecological flow of the river section under the dam and fish passing through the dam on the basis of maintaining or enhancing the functions of the hydropower station. migration.
A hydropower station rectification and river connectivity restoration structure was designed, including the left bank crossing fish channel, the right bank crossing fish channel and the ecological flow decentralization facility. By combining the structural arrangement of the built hydropower station, the slope, the power generation tail canal, and the flood discharge dam section are used. and backfill platforms to realize the recovery of fish migration channels and ecological flow.
Effectively solve the problem of river section barrier, restore river connectivity, improve the fish lure effect and fish collection range of fish migration channels, ensure the guarantee rate of fish collection under different working conditions, and realize water resources through overflow measures. efficient utilization and improvement of power generation efficiency.
Smart Images

Figure CN115434290B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a hydropower station rectification and river connectivity repair structure, belonging to the field of hydropower station ecological rectification. Background Art
[0002] Hydropower is a clean and renewable energy source, and has played an important role in solving electricity consumption, optimizing energy structure, and promoting local economic and social development. However, river-blocking structures used for water diversion or water storage will hinder the free movement of aquatic animals, and aquatic animal populations are highly dependent on the connectivity characteristics of river habitats that support their growth, overwintering, spawning, refuge and other biological behaviors. Some of the hydropower stations that have been built in the past no longer meet the environmental protection requirements of the current era and have had an adverse impact on the river ecosystem, not only blocking the passage of rare and unique aquatic organisms to different habitats, but even causing serious dehydration in the river section below the dam. Nowadays, these hydropower stations that do not meet the requirements of ecological protection are required to be rectified, and the failure to release ecological flows as required or the failure of river connectivity to meet the requirements of aquatic biological protection are the main reasons for the rectification of these hydropower stations.
[0003] How to combine the overall layout of the hydropower station and formulate rectification measures according to local conditions is the main difficulty faced by the rectification of the hydropower station. The rectification of the hydropower station is carried out on the basis of the overall safety and stability of the dam body. It is necessary not only to consider the original functions of flood control, water supply, power generation, etc., but also to take repair measures for the problems of river disconnection caused by dehydration of river sections and obstruction of aquatic biological migration. How to ensure the ecological flow of the river section below the dam while maintaining or improving the original functions of the hydropower station and ensuring the migration of fish across the dam is the main problem faced by the rectification of the hydropower station and the improvement of its ecological functions. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides a hydropower station rectification and river connectivity restoration structure, which ensures the ecological flow of the river section below the dam and the migration of fish across the dam on the basis of improving the original function of the hydropower station, solves the problem of river section blockage caused by the construction of the hydropower station, and achieves the purpose of river connectivity restoration on the basis of ensuring project safety and making full use of water resources.
[0005] The present invention is achieved through the following technical solutions.
[0006] The invention provides a hydropower station renovation and river connectivity restoration structure, comprising a hydropower station, a left bank fish passage, a right bank fish passage and an ecological flow decentralization facility, wherein the hydropower station is an existing hydropower station, the left bank fish passage, the right bank fish passage and the ecological flow decentralization facility are supplementary ecological facilities arranged in combination with the existing hydropower station, the hydropower station comprises a left bank power plant dam section, a flood discharge sluice dam section, a right bank retaining dam section and a right bank backfill platform which are laterally connected in sequence, and the left bank power plant dam section is connected along the left bank mountain The structure is constructed in a body, with a generator set in the dam section of the left bank power plant, a power generation tailwater channel in the downstream section of the generator set, a left bank slope between the power generation tailwater channel and the left bank mountain, an inlet fish gathering channel arranged in the power generation tailwater channel, a left bank channel section arranged on the left bank slope, and the left bank channel section connected to the right bank retaining dam section; the left bank fish passage channel and ecological flow decentralization facility combination section, the right bank fish passage channel backfill platform section, the right bank fish passage channel and ecological flow decentralization facility combination section and the ecological unit are arranged on the right bank backfill platform.
[0007] The left bank fish passage crosses the river from the left bank to the right bank with the help of the existing hydropower station structure. The left bank fish passage consists of the left bank fish passage main inlet, the left bank fish passage secondary inlet, the inlet fish collecting channel, the left bank channel section, the cross-power plant section, the cross-plant spillway section flood retaining wall section, the cross-flood discharge gate section, the right bank channel section, the left bank fish passage and the ecological flow decentralization facility combination section and the left bank fish passage outlet; the left bank fish passage inlet is arranged on the left river bank downstream of the left bank power plant section, and the outlet is arranged upstream of the right bank flood retaining dam section. The lower part of the left bank channel section of the left bank fish passage is connected in sequence to the left bank fish passage secondary inlet, the inlet fish collecting channel and the left bank fish passage main inlet, and the upper part of the left bank channel section of the left bank fish passage is connected to the right bank fish passage outlet of the right bank flood retaining dam section through the cross-power plant section, the cross-plant spillway section flood retaining wall section, the cross-flood discharge gate section, the right bank channel section, the left bank fish passage and the ecological flow decentralization facility combination section.
[0008] The right bank fish passage is arranged on the right bank backfill platform, and the right bank fish passage is composed of a fish guide horizontal weir, a right bank fish passage inlet, a fish guide vertical weir, a right bank fish passage backfill platform section, a right bank fish passage and ecological flow decentralization facility combination section, and a right bank fish passage outlet; the left side of the right bank fish passage inlet is the fish guide horizontal weir, and the right side of the right bank fish passage inlet is the fish guide vertical weir; the right bank fish passage inlet is connected to the right bank fish passage backfill platform section, the right bank fish passage and ecological flow decentralization facility combination section, and the right bank fish passage outlet upstream.
[0009] The ecological flow decentralization facility is arranged on the backfill platform on the right bank of the hydropower station. The ecological flow decentralization facility consists of an inlet channel, a water storage tank, a power generation water diversion pipeline, an ecological unit, a power plant and an energy stilling pool; the ecological unit is installed in the power plant, there is an energy stilling pool downstream of the ecological unit, and there is a fish guide weir at the downstream outlet of the energy stilling pool. The inlet channel is arranged on the right bank water retaining dam section, the left side of the inlet channel is the left bank fish passage outlet, and the right side of the inlet channel is the right bank fish passage outlet.
[0010] The section of the left bank fish passage that crosses the power plant is arranged on the corbel of the left bank power plant dam section; the flood retaining wall section that crosses the power plant spillway section is arranged on the flood retaining wall of the power plant spillway section; the section that crosses the flood spillway gate is arranged on the pier of the flood spillway gate section; the right bank channel section is arranged on the right bank backfill platform; the left bank fish passage and the combined section of the left bank fish passage and the ecological flow decentralization facility are arranged on the water storage tank.
[0011] The inlet fish collecting channel is composed of a guide wall, a drainage trough, a fish blocking net, a side wall and a bottom plate. The bottom plate is laid at the bottom, the side wall separates the inlet fish collecting channel and the left bank channel section, the guide wall and the drainage trough are staggered to form an inclined extension surface and are vertically placed in the power generation tailwater channel; a fish blocking net is provided at the position of the drainage trough to connect two adjacent guide walls.
[0012] The front stage of the ecological unit is connected to a water storage tank through a power generation water diversion pipeline, and the water storage tank is connected to an inlet channel. The inlet channel is located on the water surface of the right bank dam section and is provided with a right bank fish passage outlet and a left bank fish passage outlet.
[0013] The right bank water retaining dam section is provided with a left bank fish channel outlet, an inlet channel and a right bank fish channel outlet. The bottom plate elevations of the left bank fish channel outlet, the inlet channel and the right bank fish channel outlet are lower than the reservoir operating low water level. Regulating gates are provided on the left bank fish channel outlet, the inlet channel and the right bank fish channel outlet. The left bank fish channel outlet draws water from the reservoir area into the combined section of the left bank fish channel and the ecological flow decentralization facility, the right bank fish channel outlet draws water from the reservoir area into the combined section of the right bank fish channel and the ecological flow decentralization facility, and the inlet channel draws water from the reservoir area into the water storage tank.
[0014] The combined section of the left bank fish passage and the ecological flow decentralization facility and the combined section of the right bank fish passage and the ecological flow decentralization facility are arranged above the water storage tank; part of the water flowing from the left bank fish passage outlet entering the combined section of the left bank fish passage and the ecological flow decentralization facility flows to the right bank channel section and flows out from the left bank fish passage secondary inlet, and part of it overflows from the overflow side wall on the left bank fish passage and the ecological flow decentralization facility combined section to the overflow pool; part of the water flowing from the right bank fish passage outlet entering the combined section of the right bank fish passage and the ecological flow decentralization facility flows to the right bank fish passage backfill platform section and flows out from the right bank fish passage outlet, and part of it overflows from the overflow side wall on the right bank fish passage and the ecological flow decentralization facility combined section to the overflow pool.
[0015] The beneficial effects of the present invention are as follows: adding fish passages and ecological flow decentralization facilities on the basis of an existing hydropower station can effectively solve the problem of ecological rectification of the existing hydropower station; combining with the existing layout of the hydropower station, utilizing the slope, the bull leg of the power generation tailwater dam section, the pier of the flood discharge dam section and the backfill platform on the right bank to arrange the left bank fish passage, the right bank fish passage and the ecological flow decentralization facilities, while reducing the transformation of the hub, restoring the river connectivity; the inlet layout of the left bank fish passage and the right bank fish passage takes into account the fish attraction of the power generation tailwater, while combining the arrangement of physical obstacles and flow velocity obstacles, to achieve precise fish gathering, which greatly improves the effect of attracting fish at the inlet; the inlet fish gathering channel of the left bank fish passage utilizes the diversion wall and the diversion trough to introduce the power generation tailwater along the way into the inlet channel and flow it to the inlet, so as to increase the flow cross-section and the flow rate at the same time, which greatly improves the fish attraction range and fish attraction effect of the main inlet of the left bank fish passage; the fish guiding weir of the right bank fish passage is combined with The tailwater arrangement of the ecological unit power generation not only serves as an energy dissipation pool, but also serves as a physical barrier for fish to swim upstream, guiding the upstream fish to enter the entrance of the right bank fish passage; the fish guide weir of the right bank fish passage is arranged in combination with the needs of shore slope protection. While playing the role of ecological slope protection, it eliminates the impact of eddy currents on the inlet side of the right bank fish passage on the upstream of fish, and guides the upstream fish to enter the entrance along the fish guide weir; compared with the single-sided fish passage, the combined operation of the left bank fish passage and the right bank fish passage increases the fish gathering range, improves the fish gathering effect, and ensures the fish gathering guarantee rate under different working conditions; the fish passage is arranged in combination with the ecological flow decentralization facilities. Through overflow measures, the water depth and flow of the fish passage are maintained unchanged when the reservoir water level fluctuates, and the overflow water is used for ecological unit power generation, realizing efficient utilization of water resources, increasing power generation benefits, and improving the operation stability, fish gathering effect and fish passing effect of the fish passage. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 is a plan layout diagram of at least one embodiment of the present invention;
[0017] Figure 2 In one embodiment Figure 1 The overall internal layout plan;
[0018] Figure 3 yes Figure 2 The layout plan of the middle left bank channel section;
[0019] Figure 4 yes Figure 2 Cross-sectional view of the middle AA section;
[0020] Figure 5 yes Figure 2 Longitudinal section of the flood retaining wall section of the middle span plant spillway section;
[0021] Figure 6 yes Figure 2 Cross-section of the middle BB section;
[0022] Figure 7 yes Figure 2 Cross-sectional view of the mid-CC section;
[0023] Figure 8 yes Figure 1 Longitudinal section of the backfill platform on the middle right bank;
[0024] Fig. 9 yes Figure 2 The layout plan of the combined section of the ecological flow decentralization facility;
[0025] Fig.10 yes Figure 2 Cross-sectional view of the middle DD section;
[0026] Fig.11 yes Figure 2 Cross-sectional view of the middle EE section;
[0027] Fig.12 yes Figure 2 Cross-sectional view of the middle FF section;
[0028] Fig.13 yes Figure 2 Schematic diagram of the fish's upstream direction and the fish's downstream path;
[0029] Fig.14 In another embodiment Figure 1 The overall interior layout plan.
[0030] In the figure: 11-left bank power plant dam section, 12-sluice gate dam section, 13-right bank retaining dam section, 14-left bank mountain, 15-plant spillway section flood retaining wall, 16-right bank flood retaining wall, 17-right bank backfill platform, 18-right bank mountain, 111-generator set, 112-left bank slope, 113-power tailwater channel, 114-entry road, 115-corbel, 121-six-hole spillway gate, 122-stilling pool, 123-gate pier, 21-left bank fish passage main inlet, 22-left bank fish passage secondary inlet, 23-inlet fish collection channel, 24-left bank channel section, 25-across power plant section, 26-across plant spillway section flood retaining wall section, 27-across spillway gate section, 28-right bank channel section, 29-left bank fish passage and ecological flow decentralization facility combined section, 210-left bank fish passage outlet, 231-diversion wall, 232-diversion trough, 233-fish intercepting net, 234-side wall, 235-bottom plate, 291-overflow side wall, 292-fish guide plate, 293-fish intercepting net, 31-fish guide horizontal weir, 32-right bank fish passage inlet, 33-fish guide vertical weir, 34-right bank fish passage backfill platform section, 35-right bank fish passage and ecological flow decentralization facility combined section, 36-right bank fish passage outlet, 351-overflow side wall, 352-fish guide plate, 353-fish intercepting net, 41- Inlet channel, 42-water storage tank, 43-power generation water pipeline, 44-ecological unit, 45-power plant, 46-energy dissipation pool, 421-side wall of water storage tank. DETAILED DESCRIPTION
[0031] The technical solution of the present invention is further described below, but the scope of protection claimed is not limited to the description.
[0032] Example 1
[0033] like Figures 1 to 14 The structure of the hydropower station renovation and river connectivity restoration shown in the figure includes a left bank power plant dam section 11, a flood discharge gate dam section 12, and a right bank retaining dam section 13 which are connected in sequence laterally. The left bank power plant dam section 11 is constructed along the left bank mountain 14. There is a generator set 111 inside, and a power generation tailwater channel 113 is arranged at the downstream section of the generator set 111. There is a left bank slope 112 between the power generation tailwater channel 113 and the left bank mountain 14. An inlet fish collecting channel 23 is arranged in the power generation tailwater channel 113, and a left bank channel section 24 is arranged in the left bank slope 112. The left bank channel section 24 is connected to the right bank water retaining dam section 13; a right bank fish passage and ecological flow decentralization facility combination section 35 is arranged in the right bank water retaining dam section 13, and the right bank fish passage backfill platform section 34 is arranged downstream of the right bank fish passage and ecological flow decentralization facility combination section 35 and opens through the right bank fish passage inlet 32. At the downstream position of the right bank water retaining dam section 13, an ecological unit 44 is arranged on the side of the right bank fish passage backfill platform section 34.
[0034] Example 2
[0035] Based on Example 1, the upper part of the left bank channel section 24 is connected to the right bank fish channel outlet 36 of the right bank retaining dam section 13 through the cross-power plant section 25, the cross-plant spillway section flood retaining wall section 26, the cross-flood spillway section 27, the right bank channel section 28, and the left bank fish passage and ecological flow decentralization facility combined section 29.
[0036] Example 3
[0037] Based on Example 1, the ecological unit 44 is installed in the power plant 45, there is an energy dissipation pool 46 downstream of the ecological unit 44, there is a fish guide weir 31 at the downstream outlet of the energy dissipation pool 46, and the right bank fish passage inlet 32 is opened at the downstream end of the right bank fish passage backfill platform section 34 near the fish guide weir 31.
[0038] Example 4
[0039] Based on Example 1, the left bank channel section 24 is arranged in a "Z" shape, and a left bank fish passage auxiliary inlet 22 is provided at the lower part of the left bank channel section 24 to communicate with the inlet fish collecting channel 23; the left bank channel section 24 is divided into a plurality of pool chambers by internal partitions.
[0040] Example 5
[0041] Based on Example 1, the inlet fish collecting channel 23 is composed of a guide wall 231, a drainage trough 232, a fish blocking net 233, a side wall 234 and a bottom plate 235. The bottom plate 235 is laid on the bottom, the side wall 234 separates the inlet fish collecting channel 23 and the left bank channel section 24, and the guide wall 231 and the drainage trough 232 are staggered to form an inclined extension surface and are vertically placed in the power generation tailwater 113; a fish blocking net 233 is provided at the position of the drainage trough 232 to connect two adjacent guide walls 231.
[0042] Example 6
[0043] Based on Example 2, the section 25 spanning the power plant is arranged on the corbel 115 of the left bank power plant dam section 11; the flood retaining wall section 26 spanning the plant spillway section is arranged on the flood retaining wall 15 of the plant spillway section; the section 27 spanning the flood discharge gate is arranged on the pier 123 of the flood discharge gate section 12; the right bank channel section 28 is arranged on the right bank backfill platform 17; the left bank fish passage and ecological flow decentralization facility combined section 29 is arranged on the water storage tank 42.
[0044] Example 7
[0045] Based on Example 1, the front stage of the ecological unit 44 is connected to the water storage tank 42 through the power generation water diversion pipeline 43, and the water storage tank 42 is connected to the water inlet channel 41. The water inlet channel 41 is located on the water surface of the right bank dam section 13 and is provided with a right bank fish passage outlet 36.
[0046] Example 8
[0047] Based on Example 1, the right bank fish channel backfill platform section 34 is arranged in a "Z" shape, the lower part of the right bank fish channel backfill platform section 34 is connected to the right bank fish channel inlet 32, the upper part of the right bank fish channel backfill platform section 34 is connected to the right bank fish channel and ecological flow decentralization facility combination section 35, and the right bank fish channel backfill platform section 34 is divided into multiple pool chambers by the partitions arranged inside.
[0048] Example 9
[0049] Based on Example 1, a left bank fish passage outlet 210, an inlet channel 41 and a right bank fish passage outlet 36 are arranged on the right bank water retaining dam section 13. The bottom plate elevations of the left bank fish passage outlet 210, the inlet channel 41 and the right bank fish passage outlet 36 are lower than the reservoir operating low water level. Regulating gates are provided on the left bank fish passage outlet 210, the inlet channel 41 and the right bank fish passage outlet 36. The left bank fish passage outlet 210 draws reservoir water into the left bank fish passage and ecological flow decentralization facility combination section 29, the right bank fish passage outlet 36 draws reservoir water into the right bank fish passage and ecological flow decentralization facility combination section 35, and the inlet channel 41 draws reservoir water into the storage tank 42.
[0050] Example 10
[0051] Based on the above embodiments, Figures 1 to 13 As shown, the hydropower station is a built hydropower station, mainly composed of the left bank power plant dam section 11, the flood discharge gate dam section 12, the right bank water retaining dam section 13, the left bank mountain 14, the plant spillway section flood retaining wall 15, the right bank flood retaining wall 16, the right bank backfill platform 17 and the right bank mountain 18. The left bank power plant dam section 11 includes a generator set 111, a left bank slope 112, a power generation tailwater channel 113, an access road 114 and a bracket 115 located above the power generation tailwater outlet. The power generation tailwater channel 113 is 36.0m wide. The flood discharge gate dam section includes a six-hole flood discharge gate 121, a stilling pool 122 and a gate pier 123. The low operating water level of the hydropower station reservoir is 2382.0m, the high operating water level is 2387.0m, and the dam crest elevation of the hydropower station is 2390.0m. The engineering task of the hydropower station is to generate electricity. The reservoir has weekly regulation performance. The generator set 111 of the hydropower station does not generate electricity during the process of reservoir water storage, power station unit maintenance and long storage and short generation (long water storage time, short power generation time), and the minimum water diversion and power generation flow of the generator set is greater than the minimum ecological flow required to be discharged. When the hydropower station does not generate electricity, it will cause water reduction in the river section below the dam. The hydropower station was required to rectify because it blocked fish migration and caused water reduction and dehydration in the river section below the dam.
[0052] The invention is essentially to add fish passage and ecological flow decentralization facilities on the basis of the existing hydropower station.
[0053] like Figure 2As shown, the fish passage includes a left bank fish passage and a right bank fish passage, and the left bank fish passage 2 is composed of a left bank fish passage main inlet 21, a left bank fish passage secondary inlet 22, an inlet fish collecting channel 23, a left bank channel section 24, a cross-power plant section 25, a cross-plant spillway section flood retaining wall section 26, a cross-flood spillway section 27, a right bank channel section 28, a left bank fish passage and ecological flow decentralization facility combination section 29, and a left bank fish passage outlet 210;
[0054] like Figure 2 As shown, the main inlet 21 of the left bank fish passage is close to the maximum flow velocity of the power generation tailwater channel 113 and is arranged near the downstream of the boss with an elevation of 2362.0m. The boss is the highest elevation of the power generation tailwater channel. The fish passage section at the boss is reduced, resulting in the maximum flow velocity at the boss. When the two units of the generator set 111 are fully powered, the downstream of the boss is the limit position for fish to swim upstream; the secondary inlet 22 of the left bank fish passage is arranged near the outlet of the generator set 111; the straight-line distance l between the main inlet 21 of the left bank fish passage and the secondary inlet 22 of the left bank fish passage is equal to 100.0m;
[0055] The elevation of the main entrance 21 of the left bank fish passage is 2362.1m, and the elevation of the secondary entrance 22 of the left bank fish passage is 2363.1m;
[0056] like Figure 3 As shown, the downstream end of the inlet fish collecting channel 23 is connected to the main inlet 21 of the left bank fish passage, and the upstream end is connected to the secondary inlet 22 of the left bank fish passage; the inlet fish collecting channel 23 is composed of eight guide walls 231, seven drainage grooves 232, a number of fish blocking nets 233, side walls 234 and a bottom plate 235; the drainage flow rate of the i-th drainage groove is Q i , then the fish attracting flow introduced into the imported fish collecting channel 23 is The angle between the guide wall 232 and the main stream of the power generation tailwater channel 113 is 2 degrees; Fig.13 As shown, the diversion trough 232 is a diversion channel located between adjacent guide walls 231 for guiding the power generation tailwater into the inlet fish collection channel 23; the diversion trough 232 is provided with a fish blocking net 233 to prevent the fish entering the inlet fish collection channel from entering the power generation tailwater channel 113 through the diversion trough 232; the side wall 234 is the side wall of the left bank channel section 24; the slope i of the bottom plate 235 is 1%;
[0057] The flow width a of the auxiliary inlet 22 of the left bank fish passage is equal to 0.3, and the flow width of the main inlet 23 of the left bank fish passage is 6.0m. The flow width of the main inlet 23 of the left bank fish passage is one sixth of the flow width of the power generation tailwater channel, which greatly increases the range of fish trapping in the inlet;
[0058] The left bank channel section 24 is arranged on the left bank slope 112, and is arranged in a "Z" shape. The lower part of the left bank channel section 24 is connected to the auxiliary inlet 22, and the upper part of the left bank channel section 24 is connected to the cross-power plant channel section 25. The left bank channel section 24 is divided into pools by the partitions arranged inside. The lower part of the left bank channel has an elevation of 2363.1m, the upper part of the left bank channel has an elevation of 2375.77m, and the left bank channel section climbs 12.67m;
[0059] like Figure 5 and Figure 6 As shown, the cross-power plant section 25 is arranged on the bracket 115 of the left-bank power plant dam section 11;
[0060] like Figure 5 As shown, the flood retaining wall channel section 26 of the plant spillway dam section is arranged on the flood retaining wall 15 of the plant spillway dam section;
[0061] like Figure 7 and Figure 8 As shown, the cross-sluice gate dam channel section 27 is arranged on the gate pier 123 of the spillway gate dam section 12;
[0062] like Figure 8 As shown, the right bank channel section 28 is arranged on the right bank backfill platform 17;
[0063] like Fig. 9 As shown, the left bank fish passage and the ecological flow decentralization facility combined section 29 are arranged on the water storage tank 42 of the ecological flow decentralization facility 4; the overflow side wall 291 of the left bank fish passage and the ecological flow decentralization facility combined section 29 has a wall length of d1, and d1 is equal to 50.0m; the bottom plate elevation of the left bank fish passage and the ecological flow decentralization facility combined section 29 is 2380.5m; Fig.11 and Fig.12 As shown, a fish blocking net 293 is provided on the overflow side wall 291 to prevent fish from entering the water storage tank 42; the overflow side wall height at the upstream end of the left bank fish passage and the ecological flow decentralization facility combination section 29 is h1, h1 is equal to 6.5m, and the overflow side wall height at the downstream end is h2, h2 is equal to 2.0m; Fig. 9 As shown, the left bank fish passage and the ecological flow decentralization facility combination section 29 are arranged with a fish guide plate 292, the fish guide plate is in a "fishbone shape", and the fish guide plate is used to create a mainstream to guide fish upstream and downstream;
[0064] like Fig. 9As shown, the left bank fish passage outlet 210 is arranged on the right bank retaining dam section 13, the bottom plate elevation of the left bank fish passage outlet 210 is lower than the operating low water level of the hydropower station reservoir area, and a regulating gate is arranged on the left bank fish passage outlet 210. The left bank fish passage outlet 210 draws reservoir water into the left bank fish passage and ecological flow decentralization facility combination section 29, and the water diversion flow rate of the left bank fish passage outlet 210 is Q1, and part of the water flowing into the left bank fish passage outlet overflows into the water storage tank 42, and part flows into the downstream section of the left bank fish passage.
[0065] like Figure 2 As shown, the right bank fish passage 3 is composed of a fish guide horizontal weir 31, a right bank fish passage inlet 32, a fish guide longitudinal weir 33, a right bank fish passage backfill platform section 34, a right bank fish passage and ecological flow decentralization facility combination section 35, and a right bank fish passage outlet 36;
[0066] The fish guide weir 31 is arranged obliquely toward the right bank fish passage entrance 32. The fish guide weir 31 is located at the end of the energy dissipation pool 46. The fish guide weir 31 can guide the fish in the river channel into the right bank fish passage entrance 32.
[0067] The fish guide weir 33 is arranged on the bank downstream of the right bank fish passage inlet 32. The fish guide weir 33 is formed by stacking stones. The fish guide weir 33 is used to eliminate the vortex near the right bank fish passage inlet 32 and guide the right bank fish school to enter the right bank fish passage inlet 32.
[0068] like Figure 2 As shown, the right bank fish passage backfill platform section 34 is arranged on the right bank backfill platform 17, and the right bank fish passage backfill platform section 34 is arranged in a "Z" shape. The lower part of the right bank fish passage backfill platform section 34 is connected to the right bank fish passage inlet 32, and the upper part of the right bank fish passage backfill platform section 34 is connected to the right bank fish passage and ecological flow decentralization facility combination section 35. The right bank fish passage backfill platform section 34 is divided into pools by partitions arranged inside.
[0069] The right bank fish passage and the ecological flow decentralization facility combined section 35 are arranged on the water storage tank 42 of the ecological flow decentralization facility 4; the overflow side wall 351 of the right bank fish passage and the ecological flow decentralization facility combined section 35 is d2 long, d2 is equal to 50.0m; the bottom plate elevation of the right bank fish passage and the ecological flow decentralization facility combined section 35 is 2380.5m; Fig.11 and Fig.12As shown, a fish blocking net 353 is arranged on the overflow side wall 351 to prevent fish from entering the water storage tank 42; the overflow side wall height at the upstream end of the right bank fish passage and the ecological flow decentralization facility combination section 35 is h3, h3 is equal to 6.5m, and the overflow side wall height at the downstream end is h4, h4 is equal to 2.0m; the right bank fish passage and the ecological flow decentralization facility combination section 35 is arranged with a fish guide plate 352 for creating a mainstream to guide fish upstream and downstream;
[0070] like Fig. 9 As shown, the right bank fish passage outlet 36 is arranged on the right bank retaining dam section 13, the bottom plate elevation of the right bank fish passage outlet 36 is lower than the operating low water level of the hydropower station reservoir area, and a regulating gate is arranged on the right bank fish passage outlet 36. The right bank fish passage outlet 36 draws water from the reservoir area into the right bank fish passage and ecological flow decentralization facility combination section 35, and the water diversion flow rate of the right bank fish passage outlet 36 is Q2, and part of the water flowing into the right bank fish passage outlet overflows into the water storage tank 42, and part flows into the downstream section of the right bank fish passage.
[0071] like Figure 2 As shown, the ecological flow decentralization facility 4 is composed of an inlet channel 41, a water storage tank 42, a power generation water pipeline 43, an ecological unit 44, a power plant 45 and a stilling pool 46;
[0072] like Fig. 9 As shown, the inlet channel 41 is arranged on the right bank retaining dam section 13, and the water from the reservoir area is led into the ecological flow decentralization facility 4. The bottom plate elevation of the inlet channel 41 is 2381.5m. The inlet channel 41 is provided with a regulating gate, and the water diversion flow of the inlet channel 41 is Q3;
[0073] The upstream end of the water storage tank 42 is connected to the left bank fish passage outlet 210, the right bank fish passage outlet 36 and the water inlet 41, and the downstream end of the water storage tank is connected to the power generation water diversion pipeline 43; the water storage tank has a water retaining side wall 421, and the highest elevation of the water storage tank side wall 421 is 2390.0m, which is equal to the dam top elevation; the lowest elevation of the water storage tank side wall 421 is 2382.5m, which is equal to the elevation of the side wall combined with the fish passage; part of the water volume of the left bank fish passage and the ecological flow decentralization facility combined section 29 and the right bank fish passage and the ecological flow decentralization facility combined section 35 can enter the water storage tank 42 through the overflow side wall 291 and the overflow side wall 351, The total length of the overflow side wall is 200.0m; the overflow flow of the left bank fish passage and ecological flow decentralization facility combined section 29 is Q4, and the overflow flow of the right bank fish passage and ecological flow decentralization facility combined section 35 is Q5; the water in the water storage tank 42 comes from the inlet channel 41, the right bank fish passage and ecological flow decentralization facility combined section 35 and the left bank fish passage and ecological flow decentralization facility combined section 29. The water flow entering the water storage tank is (Q3+Q4+Q5), that is, the power generation flow of the ecological unit 44 is (Q3+Q4+Q5).
[0074] The flow and water depth of the right bank channel section 28, the flood gate section 27, the flood retaining wall section 26, the power plant section 25 and the left bank channel section 24 entering the left bank fish passage 2 are equal, and the flow is (Q1-Q4).
[0075] The flow rate and water depth of the right bank fish passage backfill platform section 34 and the right bank fish passage inlet 32 entering the right bank fish passage 3 are equal, and the flow rate is (Q2-Q5).
[0076] When the reservoir water level of the hydropower station is at the high operating level and the reservoir water level is 2387.0m, the water depth of the left bank fish passage and the ecological flow decentralization facility combined section 29 is reduced from 6.5m to 1.5m, and the water depth of the right bank fish passage and the ecological flow decentralization facility combined section 35 is also reduced from 6.5m to 1.5m; the water depths of the right bank channel section 28, the cross-spilling gate section 27, the cross-plant spillway section flood retaining wall section 26, the cross-power plant section 25 and the left bank channel section 24 of the left bank fish passage are maintained at 1.5m; the water depth of the right bank fish passage backfill platform section 34 of the right bank fish passage is maintained at 1.5m;
[0077] When the water level of the hydropower station reservoir is at the low operating level and the reservoir water level is 2382.0m, the water volume of the left bank fish passage and ecological flow decentralization facility combined section 29 and the right bank fish passage and ecological flow decentralization facility combined section 35 will not overflow into the water storage tank 42; the water depths of the right bank channel section 28, the cross-flood gate section 27, the cross-plant spillway section flood retaining wall section 26, the cross-power plant section 25 and the left bank channel section 24 of the left bank fish passage are maintained at 1.5m; the water depth of the right bank fish passage backfill platform section 34 of the right bank fish passage is maintained at 1.5m.
[0078] When the original generator set 111 of the hydropower station is generating electricity, the right bank fish passage outlet 36 and the water inlet channel 41 can be closed. At this time, the left bank fish passage serves as an upstream and downstream channel for fish. The tail water of the original unit is used as the downstream ecological flow, while inducing the fish under the dam to enter the left bank fish passage inlet.
[0079] When the two original units of the hydropower station are not generating electricity, the left bank fish passage outlet 210 can be closed. At this time, the right bank fish passage serves as an upstream and downstream channel for fish. The tail water of the ecological unit power generation serves as the downstream ecological flow while inducing the fish under the dam to enter the right bank fish passage inlet.
[0080] When the original two units of the hydropower station and the newly added ecological unit are generating electricity at the same time, the left bank fish passage and the right bank fish passage serve as upstream and downstream channels for fish at the same time, and the tail water of the original two units and the tail water of the newly added ecological unit serve as downstream ecological flow and fish-attracting water flow at the same time.
[0081] Embodiment 11
[0082] Based on the above embodiments, Fig.14 As shown, there is another conventional arrangement of the combination of the left bank fish passage and the ecological flow decentralization facility, and the combination of the right bank fish passage and the ecological flow decentralization facility. In this arrangement, the left bank fish passage and the ecological flow decentralization facility combination section 29 and the right bank fish passage and the ecological flow decentralization facility combination section 35 are combined into one. In this arrangement, the left bank fish passage and the right bank fish passage share the overflow side wall and one fish passage outlet.
Claims
1. A hydropower station rectification and river connectivity restoration structure, comprising a hydropower station, a left bank fish passage, a right bank fish passage and an ecological flow decentralization facility, wherein the hydropower station is an existing hydropower station, and the left bank fish passage, the right bank fish passage and the ecological flow decentralization facility are supplementary ecological facilities arranged in combination with the existing hydropower station, characterized in that: The hydropower station comprises a left bank power plant dam section (11), a flood discharge dam section (12), a right bank water retaining dam section (13), and a right bank backfill platform (17) which are connected in sequence laterally. The left bank power plant dam section (11) is constructed along the left bank mountain (14). A generator set (111) is arranged in the left bank power plant dam section (11). A power generation tailwater channel (113) is arranged downstream of the generator set (111). A left bank slope (111) is arranged between the power generation tailwater channel (113) and the left bank mountain (14). 2), an inlet fish collecting channel (23) is arranged in the tailwater channel (113), a left bank channel section (24) is arranged on the left bank slope (112), and the left bank channel section (24) is connected to the right bank retaining dam section (13); the right bank backfill platform (17) is provided with a left bank fish passage and ecological flow decentralization facility combination section (29), a right bank fish passage backfill platform section (34), a right bank fish passage and ecological flow decentralization facility combination section (35) and an ecological unit (44); The inlet fish collecting channel (23) is composed of a guide wall (231), a drainage trough (232), a fish blocking net (233), a side wall (234) and a bottom plate (235); the bottom plate (235) is laid on the bottom; the side wall (234) separates the inlet fish collecting channel (23) and the left bank channel section (24); the guide wall (231) and the drainage trough (232) are staggered to form an inclined extension surface and are vertically placed in the power generation tailwater channel (113); a fish blocking net (233) is provided at the position of the drainage trough (232) to connect two adjacent guide walls (231); The left bank fish passage and ecological flow decentralization facility combined section (29) and the right bank fish passage and ecological flow decentralization facility combined section (35) are arranged above the water storage tank (42); part of the water flow entering the left bank fish passage and ecological flow decentralization facility combined section (29) from the left bank fish passage outlet (210) flows to the right bank channel section (28) and flows out from the left bank fish passage auxiliary inlet (22), and part of the water flow overflows from the overflow side wall (291) on the left bank fish passage and ecological flow decentralization facility combined section (29) to the overflow tank; Part of the water flow entering the right bank fish passage and the ecological flow decentralization facility combination section (35) from the right bank fish passage outlet (36) flows to the right bank fish passage backfill platform section (34) and flows out from the right bank fish passage outlet (36), and part of the water flow overflows from the overflow side wall (351) on the right bank fish passage and the ecological flow decentralization facility combination section (35) to the overflow pool.
2. The hydropower station rectification and river connectivity repair structure according to claim 1, characterized in that: The left bank fish passage crosses the river from the left bank to the right bank with the help of the existing hydropower station structure. The left bank fish passage consists of a left bank fish passage main inlet (21), a left bank fish passage secondary inlet (22), an inlet fish collecting channel (23), a left bank channel section (24), a power plant section (25), a flood retaining wall section (26) across the plant spillway section, a flood spillway section (27), a right bank channel section (28), a left bank fish passage and ecological flow transfer facility combination section (29) and a left bank fish passage outlet (210); the left bank fish passage inlet is arranged on the left downstream of the left bank power plant dam section (11). The outlet is arranged on the side bank of the river, and is arranged upstream of the right bank water retaining dam section (13). The lower part of the left bank channel section (24) of the left bank fish passage is connected to the left bank fish passage secondary inlet (22), the inlet fish collecting channel (23) and the left bank fish passage main inlet (21) in sequence. The upper part of the left bank channel section (24) of the left bank fish passage is connected to the right bank fish passage outlet (36) of the right bank water retaining dam section (13) through the cross-power plant section (25), the cross-plant spillway section flood retaining wall section (26), the cross-flood spillway section (27), the right bank channel section (28), and the left bank fish passage and ecological flow decentralization facility combination section (29).
3. The hydropower station rectification and river connectivity repair structure according to claim 1, characterized in that: The right bank fish passage is arranged on the right bank backfill platform (17), and the right bank fish passage is composed of a fish guide transverse weir (31), a right bank fish passage inlet (32), a fish guide longitudinal weir (33), a right bank fish passage backfill platform section (34), a right bank fish passage and ecological flow decentralization facility combination section (35), and a right bank fish passage outlet (36); the left side of the right bank fish passage inlet (32) is the fish guide transverse weir (31), and the right side of the right bank fish passage inlet (32) is the fish guide longitudinal weir (33); the right bank fish passage inlet (32) is connected to the right bank fish passage backfill platform section (34), the right bank fish passage and ecological flow decentralization facility combination section (35), and the right bank fish passage outlet (36) upstream.
4. The hydropower station rectification and river connectivity repair structure according to claim 1, characterized in that: The ecological flow decentralization facility is arranged on the backfill platform (17) on the right bank of the hydropower station, and is composed of an inlet channel (41), a water storage tank (42), a power generation water diversion pipeline (43), an ecological unit (44), a power plant (45) and an energy dissipation pool (46); the ecological unit (44) is installed in the power plant (45), an energy dissipation pool (46) is provided downstream of the ecological unit (44), a fish guide weir (31) is provided at the downstream outlet of the energy dissipation pool (46), the inlet channel (41) is arranged on the right bank water retaining dam section (13), the left side of the inlet channel (41) is a left bank fish passage outlet (210), and the right side of the inlet channel (41) is a right bank fish passage outlet (36).
5. The hydropower station rectification and river connectivity repair structure according to claim 2, characterized in that: The cross-power plant section (25) of the left bank fish passage is arranged on the bracket (115) of the left bank power plant dam section (11); the cross-plant spillway section flood retaining wall section (26) is arranged on the plant spillway section flood retaining wall (15); the cross-flood spillway section (27) is arranged on the gate pier (123) of the flood spillway dam section (12); the right bank channel section (28) is arranged on the right bank backfill platform (17); the left bank fish passage and the left bank fish passage and ecological flow decentralization facility combined section (29) are arranged on the water storage tank (42).
6. The hydropower station rectification and river connectivity repair structure according to claim 1, characterized in that: The front stage of the ecological unit (44) is connected to a water storage tank (42) through a power generation water diversion pipeline (43), and the water storage tank (42) is connected to an inlet channel (41). The inlet channel (41) is located on the water surface of the right bank water retaining dam section (13) and is provided with a right bank fish passage outlet (36) and a left bank fish passage outlet (210).
7. The hydropower station rectification and river connectivity repair structure according to claim 1, characterized in that: The right bank water retaining dam section (13) is provided with a left bank fish passage outlet (210), an inlet channel (41) and a right bank fish passage outlet (36); the bottom plate elevations of the left bank fish passage outlet (210), the inlet channel (41) and the right bank fish passage outlet (36) are lower than the reservoir area operating low water level; the left bank fish passage outlet (210), the inlet channel (41) and the right bank fish passage outlet (36) are provided with regulating gates; the left bank fish passage outlet (210) leads the water in the reservoir area into the left bank fish passage and ecological flow decentralization facility combination section (29); the right bank fish passage outlet (36) leads the water in the reservoir area into the right bank fish passage and ecological flow decentralization facility combination section (35); and the inlet channel (41) leads the water in the reservoir area into the water storage tank (42).