A dynamic prediction method for deformation of concrete gravity dam
Through the dynamic model and Kalman filter algorithm, a deformation prediction method for concrete gravity dams is constructed, which solves the problem that static prediction is difficult to reflect the internal changes of the dam body, improves the prediction accuracy and interpretability, and achieves accurate prediction of the dynamic changes of the dam body. .
Patent Information
- Application Number
- CN202310607929.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-26
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-05-26
AI Technical Summary
The existing concrete gravity dam deformation prediction technology is mainly static prediction, which is difficult to reflect the dynamic evolution of concrete dam deformation with internal factors, and the model cannot accurately reflect the internal changes and random disturbances of the dam body.
Using a dynamic model, a time-varying additivity linear model and a Kalman filter algorithm are used to construct a dynamic prediction method for the deformation of concrete gravity dams, taking into account the influence of external and internal factors, and using historical monitoring data for parameter estimation and prediction.
It achieves accurate estimation of the internal evolution rules of the concrete gravity dam, improves the accuracy and interpretability of deformation prediction, reduces the static model setting deviation, and can dynamically reflect the change rules of the dam body.
Smart Images

Figure CN116738601B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of concrete gravity dam deformation prediction, and in particular to a dynamic prediction method for concrete gravity dam deformation. Background Art
[0002] The deformation of concrete gravity dams is an important indicator of the safety status of concrete gravity dams; deformation monitoring is the focus of concrete dam safety monitoring. A large amount of monitoring data is often accumulated during the operation of the dam. Monitoring data analysis is of great value for realizing early warning and forecasting of the safety status of concrete dams. Predicting the deformation of concrete gravity dams is one of the important ways to fully utilize the value of deformation monitoring data.
[0003] Most of the existing concrete gravity dam deformation prediction technologies are static predictions, which assume that the influence of environmental factors such as water level and temperature on the gravity dam deformation is fixed; there are many models based on this assumption, among which the most common is the static statistical model, which usually uses the least squares method for parameter estimation. However, since the regression coefficient in the least squares method is a fixed value, it is difficult for the model to reflect the dynamic evolution of the concrete dam deformation with its internal factors. Summary of the invention
[0004] The purpose of the present invention is to overcome the above-mentioned shortcomings and provide a dynamic prediction method for deformation of a concrete gravity dam to solve the problems raised in the background technology.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a dynamic prediction method for deformation of a concrete gravity dam, which comprises the following steps:
[0006] S1. Construct a dynamic deformation model of concrete gravity dam;
[0007] S2. Estimation of the dynamic model of deformation of concrete gravity dam;
[0008] S3. Dynamic prediction of deformation of concrete gravity dam.
[0009] Furthermore, the step S1 is specifically as follows:
[0010] First, the dynamic deformation model of concrete gravity dam is expressed as:
[0011] Y(t)=f t [X(t)]+ε(t) (1)
[0012] Among them, Y(t) represents the deformation of the concrete gravity dam at time t, X(t) represents the external factors affecting the deformation of the concrete gravity dam at time t, and f t(·) represents the influence relationship of external factors on the deformation of concrete gravity dam under the condition of internal factors at time t, and ε(t) represents the error in obtaining the deformation of concrete gravity dam at time t;
[0013] Based on the idea of linear approximation, the influence relationship f in formula (1) t (·) Using the time-varying additive linear model L t (·) is approximated, so that formula (1) is converted into:
[0014]
[0015] Then, the time-varying additive linear model L t (·) is approximately the additive linear model L(·) with time-varying coefficients, so equation (2) is transformed into:
[0016]
[0017] At the same time, the additive linear model L(·) is used to analyze the influence relationship f t The approximate error of (·) is taken into account in the residual ε(t), and we can get:
[0018] Y(t)=L[B(t),X(t)]+μ(t) (4)
[0019] Where Y(t) represents the deformation of the concrete gravity dam at time t, X(t) represents the external influencing factors affecting the deformation of the concrete gravity dam at time t, L(·) represents the additive linear approximate influence relationship between external and internal factors on the deformation of the concrete gravity dam, B(t) represents the coefficient of the linear approximate influence of the external factor X(t) on the deformation of the concrete gravity dam under the condition of the internal factor at time t, and μ(t) represents the prediction error of the deformation of the concrete gravity dam at time t;
[0020] Let X(t) be expressed as:
[0021] X(t)=[x0(t),x1(t),x2(t),…,x k (t)] (5)
[0022] Where x0(t)=1, x i (t), i = 1, 2, ..., k is the i-th influencing factor of the concrete gravity dam, and k is the number of influencing factors considered;
[0023] Let B(t) be expressed as:
[0024] B(t)=[β0(t),β1(t),β2(t),…,β k (t)] (6)
[0025] Among them, β i(t), i=0,1,2,…,k is the influencing factor x i (t) The corresponding influence coefficient;
[0026] Therefore, formula (4) can be specifically expressed as:
[0027]
[0028] Formula (7) is the dynamic model of the deformation of the concrete gravity dam. It can be seen that the deformation Y(t) of the concrete gravity dam is the external factor x i (t), internal factors β i The result of the interaction between (t) and the residual μ(t) is that equation (7) can be further expressed as:
[0029]
[0030]
[0031] Where Δt is the sampling interval of the concrete gravity dam deformation; H(t) represents the upstream water depth at time t; T(t) represents the ambient temperature at time t;
[0032] According to formula (8), the external influencing factor matrix X(t) of the concrete gravity dam deformation Y(t) can be specifically expressed as:
[0033]
[0034] According to formula (9), U(t) is defined as the internal influencing factor matrix of the concrete gravity dam deformation Y(t), which can be expressed as:
[0035]
[0036] Furthermore, the step S2 specifically includes the following steps:
[0037] 2.1, X(t) and U(t) are orthogonalized;
[0038] According to the historical monitoring data, let X be the matrix composed of X(t), then the orthogonal processing of X(t) is:
[0039]
[0040] And let Z=(z1,z2,…,z 11 ), x i is the i-th column vector of the external influencing factor matrix X(t), z i corresponds to x i The orthogonalized vector of ;
[0041] According to the historical monitoring data, let U be the matrix composed of U(t), then the orthogonal processing of U(t) is:
[0042]
[0043] And V=(v1,v2,…,v 12 ),u i is the i-th column vector of the internal influencing factor matrix U(t), v i corresponds to u i The orthogonalized vector of ;
[0044] 2.2. μ(t) and ξ i (t) Selection of initial variance value;
[0045] For the historical deformation monitoring data series of concrete gravity dam, the following model is established:
[0046]
[0047] Among them, Z i (t) is the i-th column vector of the orthogonal matrix Z corresponding to the external influencing factor matrix X(t); γ i is the corresponding regression coefficient;
[0048] The BG segmentation method is used to segment the historical deformation monitoring data series of concrete gravity dams, and the least squares method is used to estimate the formula (14) for each monitoring data series to obtain the standard deviation estimate σ′ of μ′(t);
[0049] The initial value of the variance of μ(t) is selected as:
[0050] var(μ(t))=σ′ 2 (15)
[0051] Using the Bootstrap method, a normal distribution error with a standard deviation of σ′ is added to the original deformation monitoring data sequence of the concrete gravity dam, and equation (14) is estimated 1000 times to obtain γ i , i = 0, 1, 2, ..., 10, and according to each segment γ i We average the estimated standard deviations of i ′;
[0052] Will i The initial value of the variance of (t) is selected as:
[0053]
[0054] 2.3, Estimation of deformation dynamic model;
[0055] definition:
[0056]
[0057] Among them, Z i (t) is the i-th column vector of the orthogonal matrix Z corresponding to the external influencing factor matrix X(t); β i ′(t) is the corresponding regression coefficient associated with time t;
[0058] definition:
[0059]
[0060] Among them, V i (t) is the i-th column vector of the orthogonal matrix V corresponding to the internal influencing factor matrix U(t); α i ' ,j is the corresponding regression coefficient;
[0061] Equation (17) is used as the observation equation of Kalman filtering, and Equation (18) is used as the state equation of Kalman filtering. The standard Kalman filtering algorithm is used to estimate Equations (17) and (18).
[0062] Furthermore, the step S3 specifically includes the following steps:
[0063] 3.1. The historical monitoring data of concrete gravity dam deformation are modeled using formula (14), and the ordinary least squares method is used for parameter estimation;
[0064] 3.2、Get and the residual sequence An estimated value of
[0065] 3.3. Residual sequence Perform mutation, gradual change, and white noise tests;
[0066] 3.4. When the residual sequence When there is no mutation or gradual change in and it obeys the white noise distribution, execute step 3.5; otherwise, execute step 3.6;
[0067] 3.5. Specify the time t to be predicted pre ; According to the corresponding upstream reservoir water depth H(t pre ) and the dam site temperature T(t pre ), based on formula (10), we get X(t pre ); Using formula (12), X(t pre ) is converted to the corresponding Z(t pre ); μ′(t pre ) is set to 0, and Z(tpre ) into formula (14), we get the predicted value Y(t pre );
[0068] 3.6. According to formula (15), determine the initial value of the variance of μ(t);
[0069] 3.7. According to formula (16), determine the initial value of the variance of ξ(t);
[0070] 3.8. Use the standard Kalman filter algorithm to estimate equations (17) and (18);
[0071] 3.9. Specify the time t to be predicted pre ; According to the corresponding upstream reservoir water depth H(t pre ) and the dam site temperature T(t pre ), based on formula (11), we get U(t pre ); Using formula (13), U(t pre ) is converted to the corresponding V(t pre );
[0072] 3.10、 ξ(t pre ) is set to 0, and according to formula (18), the predicted value β is obtained i ′(t pre ),i=0,1,2,…,10;
[0073] 3.11. Based on formula (10), we get X(t pre ); Using formula (12), X(t pre ) is converted to the corresponding Z(t pre );
[0074] 3.12. μ(t pre ) is set to 0, according to formula (17) and the predicted value β i ′(t pre ),i=0,1,2,…,10, and get the predicted value Y(t pre ).
[0075] Beneficial effects of the present invention:
[0076] 1. The present invention regards the concrete gravity dam as a dynamic system driven by the external environment and constantly evolving internally, uses a state space model to characterize the dynamic evolution process of the concrete gravity dam, and based on historical concrete gravity dam deformation monitoring data, uses a Kalman filter algorithm to achieve accurate estimation of the internal evolution law of the concrete gravity dam; based on the prediction results of the internal evolution indicators of the concrete gravity dam, the dynamic prediction of the deformation of the concrete gravity dam is achieved.
[0077] 2. Compared with the traditional static prediction model, the dynamic model of this patent has stronger universality in model setting, and can significantly reduce the adverse effects caused by the static model setting deviation, and obtain the optimal estimate through continuous "prediction-correction" operations.
[0078] 3. The dynamic model of the present invention takes into account the internal changes and random disturbances of the system, as well as their relationship with the measured data, and overcomes the defects of the static regression model; combined with the time-varying characteristics of the dynamic model coefficients of this patent, it helps to explore and reveal the dynamic evolution law of the deformation of the concrete gravity dam with internal and external influencing factors, and thus helps to improve the prediction accuracy of the deformation of the concrete gravity dam, and improve the interpretability of the deformation change law of the concrete gravity dam. BRIEF DESCRIPTION OF THE DRAWINGS
[0079] Figure 1 It is a flow chart of a dynamic prediction method for deformation of concrete gravity dam;
[0080] Figure 2 It is a water level variation diagram of an embodiment;
[0081] Figure 3 It is a vertical displacement variation diagram of the embodiment;
[0082] Figure 4 This is the fitting and prediction result diagram of the traditional HST model;
[0083] Figure 5 This is a diagram of the fitting and prediction results of the model proposed in the present invention. DETAILED DESCRIPTION
[0084] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0085] like Figure 1 As shown, a dynamic prediction method for deformation of a concrete gravity dam comprises the following steps:
[0086] S1. Construct a dynamic deformation model of concrete gravity dam;
[0087] S2. Estimation of the dynamic model of deformation of concrete gravity dam;
[0088] S3. Dynamic prediction of deformation of concrete gravity dam.
[0089] Furthermore, the step S1 is specifically as follows:
[0090] First, the dynamic deformation model of concrete gravity dam is expressed as:
[0091] Y(t)=f t [X(t)]+ε(t) (1)
[0092] Among them, Y(t) represents the deformation of the concrete gravity dam at time t, X(t) represents the external factors affecting the deformation of the concrete gravity dam at time t, and f t (·) represents the influence relationship of external factors on the deformation of concrete gravity dam under the condition of internal factors at time t, and ε(t) represents the error in obtaining the deformation of concrete gravity dam at time t;
[0093] Based on the idea of linear approximation, the influence relationship f in formula (1) t (·) Using the time-varying additive linear model L t (·) is approximated, so that formula (1) is converted into:
[0094]
[0095] Then, the time-varying additive linear model L t (·) is approximately the additive linear model L(·) with time-varying coefficients, so equation (2) is transformed into:
[0096]
[0097] At the same time, the additive linear model L(·) is used to analyze the influence relationship f t The approximate error of (·) is taken into account in the residual ε(t), and we can get:
[0098] Y(t)=L[B(t),X(t)]+μ(t) (4)
[0099] Where Y(t) represents the deformation of the concrete gravity dam at time t, X(t) represents the external influencing factors affecting the deformation of the concrete gravity dam at time t, L(·) represents the additive linear approximate influence relationship between external and internal factors on the deformation of the concrete gravity dam, B(t) represents the coefficient of the linear approximate influence of the external factor X(t) on the deformation of the concrete gravity dam under the condition of the internal factor at time t, and μ(t) represents the prediction error of the deformation of the concrete gravity dam at time t;
[0100] Let X(t) be expressed as:
[0101] X(t)=[x0(t),x1(t),x2(t),…,x k (t)] (5)
[0102] Where x0(t)=1, x i (t), i = 1, 2, ..., k is the i-th influencing factor of the concrete gravity dam, and k is the number of influencing factors considered;
[0103] Let B(t) be expressed as:
[0104] B(t)=[β0(t),β1(t),β2(t),…,βk (t)] (6)
[0105] Among them, β i (t), i=0,1,2,…,k is the influencing factor x i (t) The corresponding influence coefficient;
[0106] Therefore, formula (4) can be specifically expressed as:
[0107]
[0108] Formula (7) is the dynamic model of the deformation of the concrete gravity dam. It can be seen that the deformation Y(t) of the concrete gravity dam is the external factor x i (t), internal factors β i The result of the interaction between (t) and the residual μ(t) is that equation (7) can be further expressed as:
[0109]
[0110]
[0111] Where Δt is the sampling interval of the concrete gravity dam deformation; H(t) represents the upstream water depth at time t; and T(t) represents the ambient temperature at time t.
[0112] According to formula (8), the external influencing factor matrix X(t) of the concrete gravity dam deformation Y(t) can be specifically expressed as:
[0113]
[0114] According to formula (9), U(t) is defined as the internal influencing factor matrix of the concrete gravity dam deformation Y(t), which can be expressed as:
[0115]
[0116] Furthermore, the step S2 specifically includes the following steps:
[0117] 2.1, X(t) and U(t) are orthogonalized;
[0118] According to the historical monitoring data, let X be the matrix composed of X(t), then the orthogonal processing of X(t) is:
[0119]
[0120] And let Z=(z1,z2,…,z 11 ), x i is the i-th column vector of the external influencing factor matrix X(t), z i corresponds to x iThe orthogonalized vector of .
[0121] According to the historical monitoring data, let U be the matrix composed of U(t), then the orthogonal processing of U(t) is:
[0122]
[0123] And V=(v1,v2,…,v 12 ),u i is the i-th column vector of the internal influencing factor matrix U(t), v i corresponds to u i The orthogonalized vector of .
[0124] 2.2. μ(t) and ξ i (t) Selection of initial variance value;
[0125] For the historical deformation monitoring data series of concrete gravity dam, the following model is established:
[0126]
[0127] Among them, Z i (t) is the i-th column vector of the orthogonal matrix Z corresponding to the external influencing factor matrix X(t); γ i is the corresponding regression coefficient.
[0128] The BG segmentation method is used to segment the historical deformation monitoring data series of concrete gravity dams. For each segment of the monitoring data series, the least squares method is used to estimate equation (14) to obtain the standard deviation estimate σ′ of μ′(t).
[0129] The initial value of the variance of μ(t) is selected as:
[0130] var(μ(t))=σ′ 2 (15)
[0131] Using the Bootstrap method, a normal distribution error with a standard deviation of σ′ is added to the original deformation monitoring data sequence of the concrete gravity dam, and equation (14) is estimated 1000 times to obtain γ i , i = 0, 1, 2, ..., 10, and according to each segment γ i We average the estimated standard deviations of i ′;
[0132] Will i The initial value of the variance of (t) is selected as:
[0133]
[0134] 2.3, Estimation of deformation dynamic model;
[0135] definition:
[0136]
[0137] Among them, Z i (t) is the i-th column vector of the orthogonal matrix Z corresponding to the external influencing factor matrix X(t); β i ′(t) is the corresponding regression coefficient associated with time t.
[0138] definition:
[0139]
[0140] Among them, V i (t) is the i-th column vector of the orthogonal matrix V corresponding to the internal influencing factor matrix U(t); α i ' ,j is the corresponding regression coefficient.
[0141] Equation (17) is used as the observation equation of Kalman filtering, and Equation (18) is used as the state equation of Kalman filtering. The standard Kalman filtering algorithm is used to estimate Equations (17) and (18).
[0142] Furthermore, the step S3 specifically includes the following steps:
[0143] 3.1. The historical monitoring data of concrete gravity dam deformation are modeled using formula (14), and the ordinary least squares method is used for parameter estimation;
[0144] 3.2. Acquisition and the residual sequence An estimated value of
[0145] 3.3. Residual sequence Perform mutation, gradual change, and white noise tests;
[0146] 3.4. When the residual sequence When there is no mutation or gradual change in and it obeys the white noise distribution, execute step 3.5; otherwise, execute step 3.6;
[0147] 3.5. Specify the time t to be predicted pre ; According to the corresponding upstream reservoir water depth H(t pre ) and the dam site temperature T(t pre ), based on formula (10), we get X(t pre ); Using formula (12), X(t pre ) is converted to the corresponding Z(t pre ); μ′(t pre) is set to 0, and Z(t pre ) into formula (14), we get the predicted value Y(t pre );
[0148] 3.6. According to formula (15), determine the initial value of the variance of μ(t);
[0149] 3.7. According to formula (16), determine the initial value of the variance of ξ(t);
[0150] 3.8. Use the standard Kalman filter algorithm to estimate equations (17) and (18);
[0151] 3.9. Specify the time t to be predicted pre ; According to the corresponding upstream reservoir water depth H(t pre ) and the dam site temperature T(t pre ), based on formula (11), we get U(t pre ); Using formula (13), U(t pre ) is converted to the corresponding V(t pre );
[0152] 3.10、 ξ(t pre ) is set to 0, and according to formula (18), the predicted value β is obtained i ′(t pre ),i=0,1,2,…,10;
[0153] 3.11. Based on formula (10), we get X(t pre ); Using formula (12), X(t pre ) is converted to the corresponding Z(t pre );
[0154] 3.12. μ(t pre ) is set to 0, according to formula (17) and the predicted value β i ′(t pre ),i=0,1,2,…,10, and get the predicted value Y(t pre ).
[0155] Specific engineering examples and comparative data:
[0156] This example uses the vertical displacement of a real project as an example to verify the feasibility of the dynamic prediction method, and compares the method of the present invention with the traditional prediction method to illustrate the applicability of the method of the present invention to the prediction of non-stationary monitoring data.
[0157] For this project example, the water level and vertical displacement change as shown in the figure below: Figure 2 and Figure 3 shown.
[0158] In this example, the data is divided into a training set and a prediction set, and 12 samples are selected for prediction (i.e., prediction for the next year). First, the traditional HST model is used to fit and predict the vertical displacement. The results are as follows: Figure 4 Then the dynamic model proposed by the present invention is used for fitting and prediction, and the results are shown in Figure 5 The correlation coefficients of the two models on the training set and the prediction set are shown in Table 1, and the prediction results on the prediction set are shown in Table 2.
[0159] Table 1 Correlation coefficients of different models on the training set and prediction set
[0160]
[0161] Table 2 Prediction results of different models on the prediction set
[0162]
[0163] It can be found from the above charts that the dynamic model proposed in the present invention has better fitting and prediction performance for non-stationary monitoring data than the traditional HST model.
[0164] The above-mentioned embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The embodiments and features in the embodiments of the present application can be arbitrarily combined with each other without conflict. The protection scope of the present invention shall be the technical solutions recorded in the claims, including the equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A dynamic prediction method for deformation of a concrete gravity dam, characterized in that: It includes the following steps: S1. Construct a dynamic deformation model of concrete gravity dam; The step S1 is specifically as follows: First, the dynamic deformation model of concrete gravity dam is expressed as: Y(t)=f t [X(t)]+ε(t) (1) Among them, Y(t) represents the deformation of the concrete gravity dam at time t, X(t) represents the external factors affecting the deformation of the concrete gravity dam at time t, and f t (·) represents the influence relationship of external factors on the deformation of concrete gravity dam under the condition of internal factors at time t, and ε(t) represents the error in obtaining the deformation of concrete gravity dam at time t; Based on the idea of linear approximation, the influence relationship f in formula (1) t (·) Using the time-varying additive linear model L t (·) is approximated, so that formula (1) is converted into: Then, the time-varying additive linear model L t (·) is approximately the additive linear model L(·) with time-varying coefficients, so equation (2) is transformed into: At the same time, the additive linear model L(·) is used to analyze the influence relationship f t The approximate error of (·) is taken into account in the residual ε(t), and we can get: Y(t)=L[B(t),X(t)]+μ(t) (4) Where Y(t) represents the deformation of the concrete gravity dam at time t, X(t) represents the external influencing factors affecting the deformation of the concrete gravity dam at time t, L(·) represents the additive linear approximate influence relationship between external and internal factors on the deformation of the concrete gravity dam, B(t) represents the coefficient of the linear approximate influence of the external factor X(t) on the deformation of the concrete gravity dam under the condition of the internal factor at time t, and μ(t) represents the prediction error of the deformation of the concrete gravity dam at time t; Let X(t) be expressed as: X(t)=[x0(t),x1(t),x2(t),…,x k (t)] (5) Where x0(t)=1, x i (t), i = 1, 2, ..., k is the i-th influencing factor of the concrete gravity dam, and k is the number of influencing factors considered; Let B(t) be expressed as: B(t)=[β0(t),β1(t),β2(t),…,β k (t)] (6) Among them, β i (t), i=0,1,2,…,k is the influencing factor x i (t) The corresponding influence coefficient; Therefore, formula (4) can be specifically expressed as: Formula (7) is the dynamic model of the deformation of the concrete gravity dam. It can be seen that the deformation Y(t) of the concrete gravity dam is the product of the external factor xi(t), the internal factor β i The result of the interaction between (t) and the residual μ(t) is that equation (7) can be further expressed as: Where Δt is the sampling interval of the concrete gravity dam deformation; H(t) represents the upstream water depth at time t; T(t) represents the ambient temperature at time t; According to formula (8), the external influencing factor matrix X(t) of the concrete gravity dam deformation Y(t) can be specifically expressed as: According to formula (9), U(t) is defined as the internal influencing factor matrix of the concrete gravity dam deformation Y(t), which can be expressed as: S2. Estimation of the dynamic model of deformation of concrete gravity dam; S3. Dynamic prediction of deformation of concrete gravity dam.
2. The method for dynamic prediction of deformation of a concrete gravity dam according to claim 1, characterized in that: The step S2 specifically includes the following steps: 2.1, X(t) and U(t) are orthogonalized; According to the historical monitoring data, let X be the matrix composed of X(t), then the orthogonal processing of X(t) is: And let Z=(z1,z2,…,z 11 ), x i is the i-th column vector of the external influencing factor matrix X(t), z i corresponds to x i The orthogonalized vector of ; According to the historical monitoring data, let U be the matrix composed of U(t), then the orthogonal processing of U(t) is: And V=(v1,v2,…,v 12 ),u i is the i-th column vector of the internal influencing factor matrix U(t), v i corresponds to u i The orthogonalized vector of ; 2.
2. μ(t) and ξ i (t) Selection of initial variance value; For the historical deformation monitoring data series of concrete gravity dam, the following model is established: Among them, Z i (t) is the i-th column vector of the orthogonal matrix Z corresponding to the external influencing factor matrix X(t); γ i is the corresponding regression coefficient; The BG segmentation method is used to segment the historical deformation monitoring data series of concrete gravity dams, and the least squares method is used to estimate the formula (14) for each monitoring data series to obtain the standard deviation estimate σ′ of μ′(t); The initial value of the variance of μ(t) is selected as: var(μ(t))=σ′ 2 (15) Using the Bootstrap method, a normal distribution error with a standard deviation of σ′ is added to the original deformation monitoring data sequence of the concrete gravity dam, and equation (14) is estimated 1000 times to obtain γ i , i = 0, 1, 2, ..., 10, and according to each segment γ i We average the estimated standard deviations of i ′; Will i The initial value of the variance of (t) is selected as: 2.3, Estimation of deformation dynamic model; definition: Among them, Z i (t) is the i-th column vector of the orthogonal matrix Z corresponding to the external influencing factor matrix X(t); β i ′(t) is the corresponding regression coefficient associated with time t; definition: Among them, V i (t) is the i-th column vector of the orthogonal matrix V corresponding to the internal influencing factor matrix U(t); α i ' ,j is the corresponding regression coefficient; Equation (17) is used as the observation equation of Kalman filtering, and Equation (18) is used as the state equation of Kalman filtering. The standard Kalman filtering algorithm is used to estimate Equations (17) and (18).
3. The method for dynamic prediction of deformation of a concrete gravity dam according to claim 2, characterized in that: The step S3 specifically includes the following steps: 3.
1. The historical monitoring data of concrete gravity dam deformation are modeled using formula (14), and the ordinary least squares method is used for parameter estimation; 3.2、Get and the residual sequence An estimated value of 3.
3. Residual sequence Perform mutation, gradual change, and white noise tests; 3.
4. When the residual sequence When there is no mutation or gradual change in and it obeys the white noise distribution, execute step 3.5; otherwise, execute step 3.6; 3.
5. Specify the time t to be predicted pre ; According to the corresponding upstream reservoir water depth H(t pre ) and the dam site temperature T(t pre ), based on formula (10), we get X(t pre ); Using formula (12), X(t pre ) is converted to the corresponding Z(t pre ); μ′(t pre ) is set to 0, and Z(t pre ) into formula (14), we get the predicted value Y(t pre ); 3.
6. According to formula (15), determine the initial value of the variance of μ(t); 3.
7. According to formula (16), determine the initial value of the variance of ξ(t); 3.
8. Use the standard Kalman filter algorithm to estimate equations (17) and (18); 3.
9. Specify the time t to be predicted pre ; According to the corresponding upstream reservoir water depth H(t pre ) and the dam site temperature T(t pre ), based on formula (11), we get U(t pre ); Using formula (13), U(t pre ) is converted to the corresponding V(t pre ); 3.10、 ξ(t pre ) is set to 0, and according to formula (18), the predicted value β is obtained i ′(t pre ),i=0,1,2,…,10; 3.
11. Based on formula (10), we get X(t pre ); Using formula (12), X(t pre ) is converted to the corresponding Z(t pre ); 3.
12. μ(t pre ) is set to 0, according to formula (17) and the predicted value β i ′(t pre ),i=0,1,2,…,10, and get the predicted value Y(t pre ).